TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

Similar documents
Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Nome Harbor Page 2 of 12

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Juneau Douglas Harbor

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Town of Duck, North Carolina

Town of Barnstable Mooring Program

Grays Harbor Federal Project

Follets Island Nearshore Beach Nourishment Project

Sediment Management Plan Rehoboth Bay

Ninilchik Harbor Page 2 of 11

Norwalk Harbor: The Jewel of Long Island Sound. A Presentation by the Norwalk Harbor Management Commission

City of Pittsfield HARBORMASTER RULES AND REGULATIONS on docks

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Water Resources Report RKLD Annual Meeting July 30, 2016

Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE.

Cat Island Chain Restoration

Grays Harbor O&M and Deepening Dredging

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

U.S. Army Corps of Engineers (USACE) P.O. Box 428 Smithville, MO

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT

Shoreline Studies Program, Department of Physical Sciences, VIMS

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

Information for File # SEW

For more information or permission to reprint slides, please contact Donna Milligan at 1

Estimated on-the-ground start and end dates: 1 June October 2018

Ketchikan Harbors Thomas Basin and Bar Point Harbor

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

Attachment A. Pertinent Correspondence

Use of Conservation Moorings as a Component of Eelgrass Restoration in two Massachusetts Harbors

North Shore of Long Island, Feasibility Study

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

Town of Duck, North Carolina

Appendix C3. Cost Engineering

X.B WETLANDS ROGUE RIVER ESTUARY

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

Cordova Harbor Page 2 of 9

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

Dredging Keeping Our Underwater Highways Open

Chapter I: Marine Resources

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

Beach Renourishment in Jacksonville

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

A Single-Point Mooring System for Direct Pumpout of Hopper Dredges

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

GOAL: Collect product flowing over Onalaska spillway to protect downstream resources C&C 250 Y Y. Looking upstream at spillway

United States Department of the Interior

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

Redondo Pier Alternate Site Activity

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

Abandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary

APPENDIX D REAL ESTATE PLAN

Building Coastal Resiliency at Plymouth Long Beach

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Shoalwater Bay Shorline Erosion Dredging

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Shellfish Division Annual Shellfish Resource Management Regulations

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access:

{ } Jack Holland Page 1 of DOC

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279

Southeast Volusia Coastal Projects Update

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

UMass Boston Waterfront at a glance

Canal Dock Boathouse, Inc. (CDBi) Paddle-Sports Request for Proposal Q & A Posted to CDBi website 9/16/2017

3.7 River Navigation Affected Environment

Impact of Dredging the Lower Narrow River on Circulation and Flushing

Summary of Water Access for Marinas and Public Boat Ramps

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)

Caloosahatchee River Citizen s Association

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

Fort Hancock Sailing Center

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!!

Created by Luke and David Walden

New Orleans Municipal Yacht Harbor

CITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT

Protecting our Beaches

CE 535, Spring 2002 Preliminary Design Example 1 / 6

Transcription:

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

WHAT IS IT? ALL NECESSARY PERMITS FOR DREDGING FOR PORTIONS OF BASS RIVER, SWAN POND RIVER, SESUIT HARBOR AND CHASE GARDEN CREEK ONE PACKAGE. WILL INCLUDE: NAVIGATION CHANNELS, DOCK & PEIR ACCESS, MOORING BASINS, DEWATERING SITES AND DISPOSAL SITE AND BEACH NOURISHMENT LOCATIONS VALID FOR 10 YEARS

WHY DO IT? VARIOUS AGENCY PERMITS FOR SWAN POND RIVER & SESUIT HARBOR ENTRANCE CHANNELS HAVE BEEN REQUESTED AS NEEDED. THEY HAVE DIFFERENT RESTRICTIONS AND EXPIRATION DATES.

Agency DenConsCom MADEP Wetlands Table 2 4. Permits for Swan Pond River Permit Order of Conditions Water Quality Cert. Expiration Date 4/21/2012 5/12/2012 10/20/2014 MADEP Waterways Chapter 91 Permit 1/19/2020 US Army Corps of Engineers Prog. General Permit 1/20/2015 Rev 1/20/2010 Activities Permitted Dredge 20,000 cy Beach nourishment at W. D Beach Dredge 20,000 cy; placement as beach nourishment at W. Dennis Dredge 20,000 cy; placement as nourishment at W. D Beach Dredge 20,000 cy; placement as nourishment at W. D Beach place 10,000 cy at W. D B from other source Time of Year Restrictions No dredging Jan. 15 to Jun. 15 No nourishment from Apr. 1 to Aug. 31 No dredging Jan. 15 to Jun. 15. No nourishment from Apr. 1 to Aug. 31 No dredging Jan. 15 to Jun. 15 in inner channel (Sta. 0+00 to 60+00); no nourishment from Apr. 1 to Aug. 31 No beach nourishment in Plover habitat from Apr. 1 to Sep. 1

COMBINING PERMITTING: EASIER TO MANAGE EXISTING AND PROPOSED DREDGE LOCATIONS MORE COST EFFICIENT 2 TO 3 TIMES LONGER PERMITTED TIME BETTER FISCAL PLANNING FOR ANNUAL DREDGING REGULAR BEACH NOURISHMENT PRESERVES VALUABLE ECONOMIC RESOURCES ALLOWS MUNICIPAL/PRIVATE PARTNERSHIPS WHICH COULD REDUCE MUNICIPAL COSTS AND HELP WATERFRONT PROPERTIES DEAL WITH EROSION

WHAT IS INCLUDED?

NAVIGATION CHANNELS

DOCK & PIER ACCESS

MOORING BASINS

DEWATERING SITES DISPOSAL AREAS

BEACH NOURISHMENT AREAS

CURRENTLY PERMITTED NAVIGATION CHANNELS BASS RIVER LOWER CHANNEL (TOWN OF YARMOUTH OBTAINED 10 YEAR COMPREHENSIVE PERMIT FOR BASS RIVER CHANNEL FROM MOUTH TO GRAND COVE AREA IN 2010). SESUIT HARBOR ENTRANCE CHANNEL

CURRENTLY PERMITTED HABITAT IMPROVEMENT AREA SWAN POND ENTRANCE CHANNEL

CURRENTLY PERMITTED BEACH NOURISHMENT AREAS WEST DENNIS BEACH COLD STORAGE BEACH

CURRENTLY PERMITTED DEWATERING & DISPOSAL SITES NONE

PROPOSED NAVIGATION CHANNEL DREDGING BASS RIVER GRAND COVE TO FOLLINS POND BASS RIVER SPUR CHANNELS: WEIR CREEK, UNCLE FREEMAN, FERRY ST, BASS RIVER PARK, HORSEFOOT COVE, GRAND COVE, WILBUR COVE, FOLLINS POND.

PROPOSED MOORING BASIN DREDGE LOCATIONS STAGE ISLAND WEIR CREEK UNCLE FREEMANS CAPT. HARDING AUNT JULIA ANNS LITTLE COVE GRAND COVE

PROPOSED MOORING BASINS (CONT.) WILBUR COVE HIGH BANK KELLEY S BAY FOLLINS POND SESUIT INNER BASIN SESUIT INNER MOORING

PROPOSED HABITAT IMPROVEMENT AREA CHASE GARDEN CREEK CHANNEL CHASE GARDEN CREEK SHOAL

PROPOSED DEWATERING SITES WEST DENNIS BEACH PARKING LOT BASS RIVER PARK PARKING LOT HORSEFOOT COVE LANDING COVE ROAD LANDING, SD AUNT JULIA S LANDING OLD FISHERMAN S LANDING FOLLINS POND LANDING

PROPOSED DEWATERING SITES (CONT.) CHAPIN BEACH PARKING LOT SESUIT HARBOR WEST SIDE PARKING LOT SESUIT HARBOR EAST SIDE PARKING LOT COLD STORAGE BEACH PARKING LOT

PROPOSED DISPOSAL AREA EAST OF COMPOST AREA AT THE TRANSFER STATION ARMY CORPS OF ENGINEERS (ACOE) OFF SHORE MASSACHUSETTS BAY DISPOSAL SITE, BOSTON

Project Type Side/Spur Channel Mooring Basin Outer/Entrance Channel Inner Channel Mooring Basin Capacity 10 YR COMPREHENSIVE MATRIX Category ID Name Bass River Entrance ü Old Field Channel 1 ü Bass River Lower Channel ü B Ri Ch l Mid Ri 1 ü

GIS MAPPING http://www.mapsonline.net/dennisma/dennisdredge.html

DREDGE VOLUMES & COSTS WOODS HOLE GROUP REPORTED THAT THE TOWN WAS, ON AVERAGE, DREDGING ABOUT 10,500 CY OF CLEAN SAND FOR BEACH NOURISHMENT. FUNDING: $100,000/YR. 10 YEAR PERMIT ESTIMATE: 153,000 CY OR 15,300 CY/YR. FUNDS NEEDED: $250,000/YR* BARNSTABLE COUNTY DREDGE RATES: FIRST 3,500 FT =$7/CY, 3,500 TO 12,000 FT = $11/CY OFF SITE DEWATERING & DISPOSAL $80 $100/CY * Conceptual estimate, requires survey to confirm

WHERE DO WE GO FROM HERE? POST MAP ON TOWN WEB PAGE FOR PUBLIC REVIEW AND COMMENT DISCUSS SUPPORT WITH TOWN OF YARMOUTH PRELIMINARY DISCUSSIONS WITH DEP FUND $250,000 FOR ENGINEERING TO OBTAIN FINAL PERMIT IN 2 TO 3 YEARS. FUNDING SCHEDULE: NOV2013 STM: $60K, MAY2014 ATM: $165K; MAY2015 ATM: $25K

DREDGE EQUIPMENT COST ESTIMATE

Minimum Dredge Equipment: Cost: Dredge (replacement 20 years) - $1,200,000 Booster pump - $300,000 14 Dia. Pipe (6,000 ft @ $40 per ft)- $240,000 Couplers for pipe or joint fusion- $25,000 Pipe floats $120,000 Push Barge w/ boom (150hp engine)- $50,000 Support boat (with 150hp engine) - $30,000

Boat trailers (2)barge & boat - $8,000 Loader (replacement 7 years)- $180,000 Crane (rental 5 days @ $1,500)- $7,500 Flat bed trailer for hauling pipe, used- $8,000 Truck for flatbed trailer used - $15,000 Miscellaneous Safety equipment $15,000 Misc. tools & equipment $25,000 Subtotal: $2,223,500 Annual Operating Budget: $650,000 Total start-up cost first year - $2,873,500

Other Information Estimate does not include backup parts and equipment. Pipe storage either on town beach or hauled overland to town property. North side/south side mobilization measured in weeks. Equipment operates in highly corrosive environment. Requires qualified (licensed) work force.