Traffic Calming Policy

Similar documents
TRAFFIC CALMING POLICY NEWTOWN TOWNSHIP DELAWARE COUNTY, PA

City of Vestavia Hills Traffic Calming Policy for Residential Streets

VILLAGE OF NILES TRAFFIC CALMING POLICY

Improve the livability of our streets by

CITY OF COCONUT CREEK IMPLEMENTATION GUIDELINES FOR TRAFFIC CALMING

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Prepared By: Town of Waxhaw Traffic Calming Policy

Draft Traffic Calming Policy Paper

City of Tamarac, Florida Traffic Calming Policy

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Town of Clarkstown Traffic Calming Program. Table of Contents

Residential Traffic Calming Handbook

Community Transportation Plan

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

RESIDENTIAL TRAFFIC CALMING PROGRAM

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Neighborhood Traffic Calming Policy & Guidelines

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Borough of Danville, PA Traffic Calming Program Guidelines

Town of Orangetown Neighborhood Traffic Calming Program

TOWN OF PAYSON TRAFFIC CALMING MANUAL

RESIDENTIAL TRAFFIC CALMING POLICY JENKINTOWN BOROUGH MONTGOMERY COUNTY, PA

NEIGHBORHOOD TRAFFIC CALMING PROGRAM. Policy and Procedure. Roswell Department of Transportation (770)

City of Cape Coral Traffic Calming. City Council May 16,

STANDARD PROCEDURE FOR MANAGING SPEED ON RESIDENTIAL STREETS

City of Charlottesville Traffic Calming Handbook

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

POLICY: TRAFFIC CALMING

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

City of Memphis On-Street Parking Modification Guidelines

Example Traffic Calming Approval Processes

3.1 TRAFFIC CALMING PROCESS SUMMARY

City of Turlock Traffic Calming Program

County of Spartanburg South Carolina

3.1 TRAFFIC CALMING PROCESS SUMMARY

Living Streets Policy

Citizens Handbook for Requesting Traffic Calming Devices

A Residential Guide to Neighborhood Speed Enforcement

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

TRAFFIC CALMING POLICY & PROCEDURES

CORPORATE. Transportation Department Traffic Services Division Neighbourhood Traffic Management Policy. Revision Date January 24, 2006

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

SANTA CRUZ COUNTY BOARD OF SUPERVISORS INDEX SHEET

Traffic Calming Program Update

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Town of Southwest Ranches Neighborhood Traffic Calming Program

CITY OF ROCK HILL, SOUTH CAROLINA. Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets

REPORT District of Maple Ridge

Neighborhood Traffic Calming Program

NEIGHBORHOOD TRAFFIC CALMING POLICY

Traffic Calming Policy

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

City of Port St. Lucie Neighborhood Traffic Calming Policy City of Port St. Lucie Neighborhood Traffic Calming Policy Adopted June 26, 2017

TRAFFIC CALMING POLICY

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

Malvern Borough Local Traffic Calming

City of Rocky Mount Residential Traffic Management Policy

Neighborhood Traffic Management Program Adopted July 9, 2012

Street Paving and Sidewalk Policy

Town of Christiansburg. Traffic Calming Program

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

Downey Road. Transportation Improvement Study

City of Overland Park Collector Street Traffic Calming Program

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

TOWN OF HALTON HILLS TRAFFIC CALMING PROTOCOL. Page 1 of 25

NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM. Adopted by City Council February 2004 Revised by City Council August 2006

City of Margate, Florida. Neighborhood Traffic Management Manual

Access Management Regulations and Standards

CITY OF SASKATOON COUNCIL POLICY

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Speed Limit Policy Isle of Wight Council

Brief Outline of the Neighborhood Traffic Management Program (NTMP)

Corporate Report. Recommendation

Table of Contents Introduction...1. A. Background B. Introduction to Traffic Calming Devices Purpose Statement...

BIKE PLAN CONTENTS GATEWAY

Town of Apex Process for Consideration of Traffic Calming Devices on Public Residential Streets 10/26/15

Traffic Calming Policy

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland

Public Information Centre

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY COUNCIL AGENDA REPORT

BOARD OF COUNTY COMMISSIONERS CLAY COUNTY

NEIGHBOURHOOD TRAFFIC CALMING PROCESS AND GUIDELINES

CITY OF ORILLIA POLICY MANUAL

Approve the Belle Haven Traffic Calming Study Scope of Work

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Washington County NEIGBORHOOD STREETS PROGRAM

TRAFFIC CALMING POLICY MIDDLETOWN TOWNSHIP BUCKS COUNTY, PA. MIDDLETOWN TOWNSHIP 3 Municipal Way Langhorne, P A 19047

TRAFFIC STUDY GUIDELINES Clarksville Street Department

SCHOOL CROSSING PROTECTION CRITERIA

City of Rancho Cordova Neighborhood Traffic Management Program (NTMP) Manual

Neighborhood Traffic Calming Guidelines

Access Location, Spacing, Turn Lanes, and Medians

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Transcription:

Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood traffic issues are typically characterized by vehicles exceeding the speed limit, cut-through traffic, vehicle crashes, and near-miss incidents. Many of these issues cannot be resolved with regulatory traffic control measures (which are limited by statutory requirements such as compliance with the Minnesota Manual on Uniform Traffic Control Devices) or advisory traffic control measures that have been shown to be ineffective. The goal of this policy is to establish a consistent method for evaluating traffic calming requests in accordance with sound engineering principles to maximize public safety, enhance the quality of life in neighborhoods, and maintain reasonable mobility. Article II. Applicable Streets & Minimum Criteria. To be eligible for traffic calming, streets must satisfy the following minimum criteria: The street must be under the jurisdiction of the City. State and County highways are not eligible for traffic calming measures. The affected street has residential land use comprising at least 50% of the property directly fronting or adjacent to the roadway (generally measured as abutting length). Two of the following criteria must be met: o the median speed of vehicles on the street must exceed 30 mph, or the posted speed limit if different from 30 mph, o the 85 th percentile speed must exceed 35 mph, or 5 mph over the posted speed limit if different from 30 mph, or o three or more correctable crashes have occurred within any one-year period. Only unobtrusive traffic calming measures will be considered or implemented on arterial or major collector streets. Unobtrusive traffic calming consists of traffic calming measures that do not alter the pavement, number of lanes, or limit the existing capacity (such as a driver feedback sign that provides feedback on current speed). Trucks are allowed on all local streets unless posted weight restrictions prohibit truck travel. Traffic calming measures will not be implemented to limit or prohibit truck travel. Traffic Calming Policy Page 1

Traffic Calming Flowchart Project Terminated Step 1 - Request for Traffic Calming Eligibility Check: City Jurisdiction? Development Area Substantially Complete? Initial Data Collection & Criteria: (2 of 3 must be met) Median Speed 30mph? 85 th Percentile 35mph? 3 or more correctible crashes? Project Terminated Under 60% in Favor Step 2 - Neighborhood Engagement Project Champion Identified? Identify Project Area. Project Petition Form Circulated. Over 60% in Favor Reconsider Options Step 3 - Project Development Create Traffic Calming Working Group & identify options. Proposed solutions submitted to Traffic Technical Committee for approval. Approved Step 4 - Final Plan Development Temporary Device Installation & Testing (If needed) Testing Successful Assessment Petition Under 60% in Favor Project Terminated Step 5 - Project Funding & City Council Consideration Over 60% in Favor Project & Assessment Hearing Project Terminated by City Council Project Award by City Council Traffic Calming Policy Page 2

Article III. Traffic Calming Program The Traffic Calming Program provides a mechanism for neighborhood groups to collaborate with the City to manage traffic in their neighborhood to address documented traffic concerns including excessive vehicle speeds, high volumes of non-local traffic, vehicle crashes, and conflicts between motorized and non-motorized users. This Article describes the steps involved in the program. The Traffic Calming Program provides an opportunity for all neighborhood stakeholders to be involved so that the needs of the neighborhood as a whole can be appropriately considered and proposed improvements do not create issues on adjacent streets. Step 1 - Request for Traffic Calming Typically, traffic calming requests begin with a phone call, email, or visit to the Engineering Department with a complaint about perceived excessive speed, cut-through traffic, or a safety issue on a neighborhood street. The City has also established an on-line request form. All candidate requests are referred to the Traffic Engineer to determine if the traffic calming program is the appropriate tool for the conditions described in the complaint. The traffic calming process begins by verifying that the requirements of Article II are satisfied. Engineering staff will collect preliminary data to characterize current conditions. This data may include, but not be limited to, location, description of the problem, crash data, bicycle volumes, pedestrian activity, traffic speed, and traffic volume. Traffic calming projects are intended to respond to traffic issues related to speeding and/or excessive non-local traffic on one street or intersection within a neighborhood. Solutions may include modifications to the street to slow traffic or to divert through traffic from the subject street to a nearby collector or minor arterial street. Traffic calming projects will only be considered insofar as the improvements do not divert a significant volume of traffic from the study street to another local street. The definition of a significant volume of traffic will be established by the participating neighborhood group (in step 2) with the assistance of the Traffic Engineer. A traffic calming plan which is estimated to cause significant diversion to another neighborhood street may result in the termination of a traffic calming study. Upon completion of initial data collection and analysis, a determination will be made to either continue the traffic calming process, or terminate and close the request (if the criteria in Article II are not satisfied). The requestor will be notified of the Step 1 determination in writing. Step 2 - Neighborhood Engagement Once a determination has been made that the base criteria for traffic calming have been met, the Traffic Engineer will work with the affected neighborhood to designate a project champion. The project champion will serve as the neighborhood representative and assist in defining the affected area. In the identification of the affected area, a clear nexus should exist between the reported concern and the impacted properties. In addition, consideration should be given to those property owners that do not have an option of avoiding traffic calming measures that may Traffic Calming Policy Page 3

be installed. To preserve flexibility, this policy does not include a strict definition for the affected area. In conjunction with the project requestor and/or project champion, the City may facilitate an initial public meeting in the project area. The purpose of this meeting is to inform residents of the traffic calming request, to describe the traffic calming program, and to gather additional information about traffic issues within the neighborhood. At this time, a Traffic Calming Working Group may be formed. This group will work with City staff to establish membership and meeting procedures and will continue to work closely with staff throughout the project. A Neighborhood Traffic Calming Petition form will be sent to the project champion to be circulated in the study area to evaluate neighborhood interest and willingness to participate in traffic calming. This petition process is used only to determine if there is sufficient neighborhood support to expend staff resources on project development. The Traffic Engineer may modify the petition (or affected) area to address unique circumstances. Affirmative signatures representing a minimum of 60% of the property owners within the study area are required for a street to be considered for traffic calming. Each property owner is entitled to one signature. If the petition does not meet this threshold, or has not been completed and returned to the Traffic Engineer within four weeks, the request will be terminated and the requestor will be notified of the Step 2 determination in writing. Step 3 - Project Development Project development consists of the following: evaluation of issues, identification of project goals and objectives, development of alternative plans and solutions, and selection of a recommended plan or solution. Working with the Traffic Calming Working Group, the City will propose solutions based on property owner input and sound engineering principles. Improvements will focus on speed and/or volume reduction without negatively impacting capacity, safety, or function. Priority will be given to the lowest-cost, least-intrusive (non-physical) measures as a first consideration. Proposed improvements must balance traffic mitigation with needs for street maintenance and emergency services. In addition to considering traffic management and control devices, plans developed in the traffic calming program will also consider the positive effects of education and enforcement. Alternative solutions and associated impacts will be evaluated by the Traffic Calming Working Group. Comments and/or recommendations will be solicited from other affected departments (e.g. Police, Fire & Rescue, Public Works, Planning & Neighborhood Services, Transit, etc.) and shared with the Traffic Calming Working Group. The Traffic Engineer will submit the recommended solution to the City Traffic Technical Committee for consideration. The committee will review the plan with respect to positive and negative consequences for public safety and emergency services, public works operations & maintenance services, local neighborhood traffic operations, transit access, and pedestrian and bicycle safety. Traffic Calming Policy Page 4

If the Traffic Technical Committee expresses concern with the recommended plan, specific issues may be referred back to the Traffic Calming Working Group for revision, further study, or termination of the request. Once approved by the Traffic Technical Committee, the project is considered active for up to three years. If, after three years, a project has not continued to completion, the project champion and/or Traffic Calming Working Group will be notified it will no longer be eligible for consideration. This time limitation is intended to ensure that the project requests continue to remain a neighborhood priority and avoids expenditure of City resources on projects with little neighborhood interest. Step 4 - Final Plan Development Once a plan is approved by the Traffic Technical Committee, City staff will develop plans & specifications for the improvements including a detailed cost-estimate. Depending on the complexity of the project, the City may install a temporary device for up to 30 days to evaluate the effectiveness of the proposed improvements. For most projects, a temporary installation will not be required. If a temporary device is installed and is found to be unsafe or ineffective, development of plans & specifications will be terminated and the process will return to Step 3. Step 5 - Project Funding & City Council Consideration Project funding and approval is generally conducted in accordance with Minnesota Statutes, Chapter 429 (which governs the use of special assessments to construct local improvements) and the City s Special Assessment Policy with some minor modifications noted below. A petition complying with this policy will be prepared and provided to the project champion and/or Traffic Calming Working Group. The benefiting area (special assessment district) will typically be the same as the initial petition. However, if the scope of the project has changed significantly from the time of the original petition, the benefiting area will be revised accordingly. For projects that are expected to result in traffic diversion and a corresponding traffic volume increase on other local streets, property owners on these other affected streets will be included in the notification area prior to the public hearing. Estimated project costs and estimated special assessments will be included with the petition. Project costs will be allocated as follows: Cost Category Benefiting Parcels City Cost-Share Engineering Fees 0% 100% Administration Fees 100% 0% Construction 100% 0% Routine Maintenance 0% 100% Traffic Calming Policy Page 5

Generally, project costs (special assessments) will be allocated on an equivalent single family lot basis with costs and applicable fees assigned to all parcels in the benefiting area. However, an alternate allocation may be used based upon recommendation of the Traffic Calming Working Group. If a project proceeds, special assessments will be levied to all parcels in the benefiting area (i.e. a project cannot proceed with voluntary special assessments levied only to property owners signing the petition). The petition must be returned within four weeks. The petition will be processed as follows: If the number of property owners signing the petition represents less than 60% of the parcels in the benefiting area, the project will be terminated. If the number of property owners signing the petition represents greater than 60% of the parcels in the benefiting area, the City Council will conduct a Project Hearing concurrently with the Assessment Hearing on the proposed project. The City will prepare final plans and specifications and receive bids on the proposed improvements prior to the hearing. At the conclusion of the hearing, the City Council will consider a resolution to order the improvement. If the resolution does not receive five (5) affirmative votes, the project will be terminated. If a project is terminated in Step 5, a notice will be sent to the project champion and/or Traffic Calming Working Group and the project will not be reconsidered for a period of at least three (3) years unless the Traffic Engineer determines that significant changes in traffic volume, traffic speed, or accident history justify reconsideration. If the City Council orders the proposed traffic calming improvement, the project will proceed in accordance with Minnesota Statutes, Chapter 429 and other statutory and/or local requirements. Step 6 - Maintenance The City will oversee the construction and perform routine maintenance on any traffic calming device authorized and implemented within the traveled way as part of this program. Major rehabilitation and/or reconstruction of a traffic calming improvement will be funded through the same procedures as initial project construction (Step 5); however will not require the neighborhood petition process be repeated. Article IV. Removal of Traffic Calming Measures The modification or removal of a traffic calming measure will generally follow the same process outlined in Article III. However, the City Council may, without consideration of this policy, order the removal of a traffic calming device at any time. Traffic Calming Policy Page 6

Article V. Speed Limits. MN Statute 169.14 establishes statutory speed limits on most roadways in the State under ideal conditions. All other speed limits must be established by the Commissioner of the Minnesota Department of Transportation (MnDOT) based on an engineering and traffic investigation. The statutory speed limit in an urban district is 30 mph and the statutory speed limit in an alley is 10 mph. MN Statute 169.14 grants the local road authority (City Council) with power to establish a 25 mph limit on a residential street if signs are erected designating the beginning and end of the street to which the speed limit applies. The cost to erect such signage for all residential streets would be prohibitive, and therefore, the City will not exercise this authority unless there are circumstances that justify this speed limit that are clearly unique from all other residential streets within the City. The City Council may, upon recommendation of the City Engineer, consider formal requests to the MnDOT Commissioner to evaluate and establish non-statutory speed limits on minor arterial and collector streets when a speed limit other than (e.g. greater than) the statutory speed limit is appropriate. MN Statute 169.14 identifies specific requirements applicable to work zones, school zones, and other special cases. This policy does not supersede or modify those requirements. Article VI. Modification and Deviation from Policy The City reserves the right to modify this policy at any time if deemed to be in the best interest of the City based on safety, social, political and economic considerations. The City Engineer and/or Public Works Director, or his or her designee, may authorize a deviation from the implementation of this policy with respect to a particular location when deemed to be in the best interest of the City based on safety, social, political and economic considerations. Such deviation shall be documented including the reason for the deviation and other information supporting the deviation. Article VII. Resource Materials The City has relied on numerous resources to develop this policy. These resource materials include, but are not limited to, the following: The Institute of Transportation Engineers (ITE) library of traffic calming solutions at http://www.ite.org/traffic/ Developing a Traffic Calming Process, Fargo-Moorhead Metropolitan Council of Governments, 2008. Traffic Calming Manual, City of Moorhead, 2014. Traffic Calming Policy Page 7