YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS) AND VERTICAL CONSTRUCTION ARE MANAGED SEPARATELY PARTICIPATE IN REGIONAL TRANSPORTATION PLANNING WITH REGIONAL PLANNING ORGANIZATIONS INCLUDING THE NORTHERN ARIZONA COUNCIL OF GOVERNMENTS (NACOG), THE CENTRAL YAVAPAI METROPOLITIAN PLANNING ORGANIZATION (CYMPO) THE VERDE VALLEY TRANSPORTATION PLANNING ORGANIZATION (VVTPO),LOCAL CITIES AND TOWNS ANDADOT. FUNDED BY HURF, A PORTION OF ½ CENT SALES TAX, FEES (INCLUDING IMPACT FEES - $3400 PER DWELLING UNIT ) AND GRANTS
SR 89 / SR69 CONNECTOR PUBLIC ROADWAY LOCATED ON TRIBAL LAND PRIMARILY FUNDED BY YAVAPAI PRESCOTT TRIBE Y.C. CONTRIBUTION TO PROJECT IS $1.1 MILLION SR 69/89 CONNECTOR PRESCOTT RESORT TRIBAL LAND BOUNDARY
YAVAPAI COUNTY 2010 CENSUS POPULATION 211,000 REDISTRICTING FOR 5 SUPERVISOR BOARD District 1: Rowle Simmons District 2: Thomas Thurman District 3: Chip Davis District 4: Craig Brown District 5: Jack Smith
YAVAPAI COUNTY SOLID WASTE FACILITIES
PAULDEN SOLID WASTE TRANSFER STATION - $798K BID SCALES, MOBILE MINI FEE SHED AND USED BATTERY STORAGE ROLL-OFF DUMPSTERS AND COMPACTOR READY TO USE TARE AND WEIGH SCALES LOOKING TOWARDS DUMP-OFF AREA SAFETY RAIL IN-PLACE
CURRENT YAVAPAI COUNTY ROADWAY CONSTRUCTION PROJECTS
CURRENT PROJECTS WALKER ROAD 2 OVERLAY $1.4M BID MILLED EDGE PREPARED FOR OVERLAY AND THICKENED SAFETY EDGE PAVEMENT OVERLAY AND THICKENED SAFETY EDGE COMPLETE DELINEATION INSTALLED ALONG LENGTH OF IMPROVED ROADWAY EXISTING PCC EMBANKMENT CURB REPLACED WITH EXTRUDED AC CURB
VERDE VALLEY SCHOOL RD. - 1.3 MILE, 2-LANE RESIDENTIAL COLLECTOR; RECONSTRUCT AND MILL & FILL, DRAINAGE IMPROVEMENTS, ADD WIDENED SHOULDERS - $880K BID. PORTION OF EXISTING ROADWAY TO BE PULVERIZED AND ASYMETRICALLY WIDENED TO THE LEFT SIDE OF PHOTO TO CREATE 4- FOOT WIDE PAVED SHOULDERS FULL-DEPTH RECLAMATION OF EXISTING ROADWAY AND EMBANKMENT FOR ASYMETRICAL WIDENING COMPLETE AND FIRST LIFT OF AC PLACED LOOKING OPPOSITE DIRECTION OF PHOTO TO THE LEFT DRAINAGE IMPROVEMENTS - HEADWALLS OUTSIDE OF CLEAR ZONE PORTION OF ROADWAY TO RECEIVE 2 OVERLAY WILL ALSO BE WIDENED TO CREATE 3-FOOT WIDE PAVED SHOULDERS A FEW DRIVEWAYS NEEDED TO BE CUT-BACK TO ACCOMMODATE WIDENING
IRON SPRINGS ROAD (5 MILE RURAL 2-LANE HIGHWAY; FULLY RECONSTRUCT TO ADD WIDENED SHOULDERS 7.27M BID EXISTING ROADWAY WAS NARROW AND PORTIONS SUFFERED FROM CHRONIC EDGE DISTRESS FULL RECONSTRUCTION AND WIDENING UNDERWAY RETAINING WALLS REDUCE NEED FOR ADDITIONAL RIGHT-OF-WAY PORTION OF ROADWAY IS ALREADY PAVED
LOWER RED ROCK LOOP RD. (3.2 MILE, 2-LANE MINOR COLLECTOR AND ACCESS TO RED ROCK STATE PARK; MILL & FILL - $1.0M ESTIMATE) HUNDREDS OF BIG BLOCK CRACKS ON ROADWAY DON T FALL IN! ABOUT 3,000 FEET OF EXISTING GUARDRAIL ENTRANCE TO RED ROCK STATE PARK
PAGE SPRINGS RD. (6 MILE, 2-LANE RURAL/RESIDENTIAL HIGHWAY; 1.5 ARAC PAVEMENT OVERLAY $1.2 M EST.) IF IT WERE PRETTY WE WOULDN T BOTHER BRIDGE OVER OAK CREEK UGLY DRIVEWAY TO MATCH COBBLESTONE DRIVEWAY TO MATCH
MAREN AVENUE LOW-WATER CROSSING RESTORATION CROSSING BEFORE FLOOD PCC ROAD WITH 4-FOOT CUTOFF WALLS AFTER FLOOD OF JANUARY 2010
MAREN AVENUE LOW-WATER CROSSING RESTORATION SOIL CEMENT MATERIAL SOURCE SOIL CEMENT AGGREGATE MATERIAL SOURCE A PORTION OF HUGE PILE OF WASTE MATERIAL TO BE USED
CURRENT BUDGET COUNTY IS APPLYING MORE RESOURCES TO PAVEMENT PRESERVATION PROJECTS. MOST OF THESE WILL BE DESIGNED AND MANAGED IN-HOUSE. HURF BUDGET FOR PAVEMENT MAINTENANCE CURRENTLY AT $1.2M FOR CHIP SEALS, AND 1.7M FOR PAVING PROJECTS. REGIONAL ROAD PROJECT BUDGET (PRIMARILY ½ CENT SALES TAX) IS APPROX. $10M, DECREASING TO $7M NEXT FY.
WE MAINTAIN UNPAVED ROADWAYS AS WELL ABOUT 800 CENTERLINE MILES OF PAVED AND UNPAVED CROWN KING ROAD FLOOD DAMAGE JULY 2012
GLADIATOR FIRE IN MAY FOLLOWED BY HEAVY MONSOON RAINS IN JULY DAMAGED CROWN KING ROAD HEAVY RUNOFF WASHED OUT PORTIONS (14 PLACES) OF A ROADWAY THAT HAS BEEN IN PLACE FOR OVER 100 YEARS $250K IN REPAIRS SO FAR
SENATOR HIGHWAY NEW YEARS ROCKSLIDE SENATOR HIGHWAY HAS BEEN IN PLACE SINCE THE 1870 S BIG SLAB OF ROCK DECIDED TO CALVE OFF MOUNTAINSIDE FOR NEW YEARS
PHOTO OF COVERED BRIDGE ON SENATOR HIGHWAY CIRCA 1877
SEDONA AIRPORT SOUTHWEST APRON EXPANSION
SEDONA AIRPORT TAXILANE B7 CONSTRUCTION
SELIGMAN AIRPORT FAR PART 77 FENCE RELOCATION
Parting shot please remember to call before you dig!