YAVAPAI COUNTY PUBLIC WORKS

Similar documents
Lake Waterford Community Association Meeting. November 15, 2016

Pavement Management Program

Secondary Road Program

MNDOT PAVEMENT DESIGN MANUAL

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

City of Davis Pavement Management Program

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Swamp Road Residents Study

New Mexico Transportation Funding Challenges

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

VISION TRANSPORTATION

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Roadside Safety Proven Countermeasures. Emmett McDevitt Transportation Safety Engineer Federal Highway Administration

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

ITEM 3 ATTACHMENT A RESOLUTION NO

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

SECTION 3 STREET DESIGN

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Legislative Update Williamsburg Residency

Existing conditions of each bridge and repair plan are presented in Table

Bluffdale/ UDOT South High-T Intersection Project Type Operations

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

APPENDIX D COST SUMMARY TABLES

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Culpeper District. Albemarle County Monthly Report October, 2011

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Executive Summary. September 3, 2014

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Kentucky s Surface Transportation System

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Gerald P. Oliveto, P.E. George Franz NJDOT

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

FDOT Treasure Coast Traffic Impact Report

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

Page 1 of 5 11/18/2013 9:17 AM

Action Plan and Summary for Roads to Gravel

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Roadway Design Manual

Driving Indiana s Economic Growth

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

APPENDIX L. Design Criteria

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

El Dorado County / Tahoe Roadwork Schedule

CITY OF SOUTH DAYTONA

Culpeper District. Albemarle County Monthly Report September, 2011

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

HIGHWAY 11 CORRIDOR STUDY

FDOT Treasure Coast Traffic Impact Report

Smoothing Out the Bumpy Road Ahead

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

PENNDOT HPMS DATA COLLECTION GUIDE

MONTGOMERY COUNTY PLANNING DEPARTMENT

Project Update May 2018

BPP / SUB

MASTER THOROUGHFARE PLAN

Executive Summary. Introduction

Project Status Update

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

Regional Transportation Priorities Survey Results. Introduction

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

CHAPTER 5 TRANSPORTATION GOAL

City Avenue Projects

S/TIP LIST OF PROJECTS

CTH M HIGHWAY PROJECT CTH Q to STH 113

The City of Port Moody 2013 Paved Road Network Condition Assessment

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

FDOT Treasure Coast Traffic Report

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008

Access requests to County streets and roadways are processed through one of the following methods:

Fort Defiance Industrial Area Traffic Circulation Study Task Assignment MPD

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

Readington Road (C.R. 637) Construction

Transportation Improvement Study

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS

2.0 Existing Conditions

Reconstruction of Leland Avenue. Stanford Avenue. Palo Alto Way

Third Street Bridge & Corridor Project

Lynchburg District Update

2014 Capital Improvement Program Current Year Projects for:

CASTLE CREEK CORRIDOR PLANNING PUBLIC OPEN HOUSE

section 4 Existing Conditions, Issues, and Options

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Transcription:

YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS) AND VERTICAL CONSTRUCTION ARE MANAGED SEPARATELY PARTICIPATE IN REGIONAL TRANSPORTATION PLANNING WITH REGIONAL PLANNING ORGANIZATIONS INCLUDING THE NORTHERN ARIZONA COUNCIL OF GOVERNMENTS (NACOG), THE CENTRAL YAVAPAI METROPOLITIAN PLANNING ORGANIZATION (CYMPO) THE VERDE VALLEY TRANSPORTATION PLANNING ORGANIZATION (VVTPO),LOCAL CITIES AND TOWNS ANDADOT. FUNDED BY HURF, A PORTION OF ½ CENT SALES TAX, FEES (INCLUDING IMPACT FEES - $3400 PER DWELLING UNIT ) AND GRANTS

SR 89 / SR69 CONNECTOR PUBLIC ROADWAY LOCATED ON TRIBAL LAND PRIMARILY FUNDED BY YAVAPAI PRESCOTT TRIBE Y.C. CONTRIBUTION TO PROJECT IS $1.1 MILLION SR 69/89 CONNECTOR PRESCOTT RESORT TRIBAL LAND BOUNDARY

YAVAPAI COUNTY 2010 CENSUS POPULATION 211,000 REDISTRICTING FOR 5 SUPERVISOR BOARD District 1: Rowle Simmons District 2: Thomas Thurman District 3: Chip Davis District 4: Craig Brown District 5: Jack Smith

YAVAPAI COUNTY SOLID WASTE FACILITIES

PAULDEN SOLID WASTE TRANSFER STATION - $798K BID SCALES, MOBILE MINI FEE SHED AND USED BATTERY STORAGE ROLL-OFF DUMPSTERS AND COMPACTOR READY TO USE TARE AND WEIGH SCALES LOOKING TOWARDS DUMP-OFF AREA SAFETY RAIL IN-PLACE

CURRENT YAVAPAI COUNTY ROADWAY CONSTRUCTION PROJECTS

CURRENT PROJECTS WALKER ROAD 2 OVERLAY $1.4M BID MILLED EDGE PREPARED FOR OVERLAY AND THICKENED SAFETY EDGE PAVEMENT OVERLAY AND THICKENED SAFETY EDGE COMPLETE DELINEATION INSTALLED ALONG LENGTH OF IMPROVED ROADWAY EXISTING PCC EMBANKMENT CURB REPLACED WITH EXTRUDED AC CURB

VERDE VALLEY SCHOOL RD. - 1.3 MILE, 2-LANE RESIDENTIAL COLLECTOR; RECONSTRUCT AND MILL & FILL, DRAINAGE IMPROVEMENTS, ADD WIDENED SHOULDERS - $880K BID. PORTION OF EXISTING ROADWAY TO BE PULVERIZED AND ASYMETRICALLY WIDENED TO THE LEFT SIDE OF PHOTO TO CREATE 4- FOOT WIDE PAVED SHOULDERS FULL-DEPTH RECLAMATION OF EXISTING ROADWAY AND EMBANKMENT FOR ASYMETRICAL WIDENING COMPLETE AND FIRST LIFT OF AC PLACED LOOKING OPPOSITE DIRECTION OF PHOTO TO THE LEFT DRAINAGE IMPROVEMENTS - HEADWALLS OUTSIDE OF CLEAR ZONE PORTION OF ROADWAY TO RECEIVE 2 OVERLAY WILL ALSO BE WIDENED TO CREATE 3-FOOT WIDE PAVED SHOULDERS A FEW DRIVEWAYS NEEDED TO BE CUT-BACK TO ACCOMMODATE WIDENING

IRON SPRINGS ROAD (5 MILE RURAL 2-LANE HIGHWAY; FULLY RECONSTRUCT TO ADD WIDENED SHOULDERS 7.27M BID EXISTING ROADWAY WAS NARROW AND PORTIONS SUFFERED FROM CHRONIC EDGE DISTRESS FULL RECONSTRUCTION AND WIDENING UNDERWAY RETAINING WALLS REDUCE NEED FOR ADDITIONAL RIGHT-OF-WAY PORTION OF ROADWAY IS ALREADY PAVED

LOWER RED ROCK LOOP RD. (3.2 MILE, 2-LANE MINOR COLLECTOR AND ACCESS TO RED ROCK STATE PARK; MILL & FILL - $1.0M ESTIMATE) HUNDREDS OF BIG BLOCK CRACKS ON ROADWAY DON T FALL IN! ABOUT 3,000 FEET OF EXISTING GUARDRAIL ENTRANCE TO RED ROCK STATE PARK

PAGE SPRINGS RD. (6 MILE, 2-LANE RURAL/RESIDENTIAL HIGHWAY; 1.5 ARAC PAVEMENT OVERLAY $1.2 M EST.) IF IT WERE PRETTY WE WOULDN T BOTHER BRIDGE OVER OAK CREEK UGLY DRIVEWAY TO MATCH COBBLESTONE DRIVEWAY TO MATCH

MAREN AVENUE LOW-WATER CROSSING RESTORATION CROSSING BEFORE FLOOD PCC ROAD WITH 4-FOOT CUTOFF WALLS AFTER FLOOD OF JANUARY 2010

MAREN AVENUE LOW-WATER CROSSING RESTORATION SOIL CEMENT MATERIAL SOURCE SOIL CEMENT AGGREGATE MATERIAL SOURCE A PORTION OF HUGE PILE OF WASTE MATERIAL TO BE USED

CURRENT BUDGET COUNTY IS APPLYING MORE RESOURCES TO PAVEMENT PRESERVATION PROJECTS. MOST OF THESE WILL BE DESIGNED AND MANAGED IN-HOUSE. HURF BUDGET FOR PAVEMENT MAINTENANCE CURRENTLY AT $1.2M FOR CHIP SEALS, AND 1.7M FOR PAVING PROJECTS. REGIONAL ROAD PROJECT BUDGET (PRIMARILY ½ CENT SALES TAX) IS APPROX. $10M, DECREASING TO $7M NEXT FY.

WE MAINTAIN UNPAVED ROADWAYS AS WELL ABOUT 800 CENTERLINE MILES OF PAVED AND UNPAVED CROWN KING ROAD FLOOD DAMAGE JULY 2012

GLADIATOR FIRE IN MAY FOLLOWED BY HEAVY MONSOON RAINS IN JULY DAMAGED CROWN KING ROAD HEAVY RUNOFF WASHED OUT PORTIONS (14 PLACES) OF A ROADWAY THAT HAS BEEN IN PLACE FOR OVER 100 YEARS $250K IN REPAIRS SO FAR

SENATOR HIGHWAY NEW YEARS ROCKSLIDE SENATOR HIGHWAY HAS BEEN IN PLACE SINCE THE 1870 S BIG SLAB OF ROCK DECIDED TO CALVE OFF MOUNTAINSIDE FOR NEW YEARS

PHOTO OF COVERED BRIDGE ON SENATOR HIGHWAY CIRCA 1877

SEDONA AIRPORT SOUTHWEST APRON EXPANSION

SEDONA AIRPORT TAXILANE B7 CONSTRUCTION

SELIGMAN AIRPORT FAR PART 77 FENCE RELOCATION

Parting shot please remember to call before you dig!