N. Frederick Street to N. Manchester Street

Similar documents
Arlington s Master Transportation Plan

Planned Improvements from Sector & Area Plans that have been added to the MTP

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Update of the Master Transportation Plan s (MTP) Bicycle Element

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of March 16, 2019

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N

Columbia Pike Implementation Team (CPIT) Meeting

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

ARLINGTON COUNTY, VIRGINIA

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

MTP BICYCLE ELEMENT UPDATE. November 2017

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Prince George s County plans, policies, and projects

What Is a Complete Street?

Virginia Hospital Center Expansion

Road Diets FDOT Process

TECHNICAL MEMORANDUM. Introduction

Broadway Complete Streets Project

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

COUNTY BOARD APPROVED MEASURES FOR RESIDENTIAL STREETS

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Transportation Planning Division

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

122 Avenue: 107 Street to Fort Road

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

NAUCK SHIRLINGTON ALEXANDRIA FIGURE 2.22: CIRCULATION MAP 2.24

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

BAC-PAC-LHA Joint Meeting July 11, PM

Working Group Meeting

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Multimodal Through Corridors and Placemaking Corridors

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Omaha s Complete Streets Policy

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

42nd Ave N Reconstruction

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Station Plan: Penn & 43rd Avenue

Federal Highway Administration Pedestrian Safety Guidance for Transit

COMPLETE STREETS PLANNER S PORTFOLIO

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

PUBLIC HEARING QUESTIONS AND COMMENTS

Arlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings. Thomas Jefferson Working Group Meeting #2 October 1, 2014

10.0 CURB EXTENSIONS GUIDELINE

Built Environment Childhood Obesity Forum September 15, 2010

Hennepin County Bicycle and Pedestrian Planning

NJDOT Complete Streets Checklist

Appendix 3 Roadway and Bike/Ped Design Standards

Planning Guidance in the 2012 AASHTO Bike Guide

RECOMMENDATION: Approve traffic calming projects as recommended by the Neighborhood Traffic Calming Committee (NTCC) on the following streets:

Complete Streets. Designing Streets for Everyone. Sarnia

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

June 29, Dear Mr. Walter:

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

5. RUNNINGWAY GUIDELINES

Solana Beach Comprehensive Active Transportation Strategy (CATS)

North Avenue Corridor Study

INDEX. Geometric Design Guide for Canadian Roads INDEX

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

5 CIRCULATION AND STREET DESIGN


El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Walking Along the Road. Module 2

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

LANCASTER CITY BICYCLE NETWORK

I-105 Corridor Sustainability Study (CSS)

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Welcome. If you have any questions or comments on the project, please contact:

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

IBI Group November 5, 2012

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Classification Criteria

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

The DC Pedestrian Master Plan

2.0 LANE WIDTHS GUIDELINE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Highway 93 South Corridor. Planning

Bicycle Facilities Planning

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

Proposed White Flint Separated Bike Lane Network September 2015

FHWA Bikeway Selection Guide

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

NEWMARKET UPHAM S CORNER

Item No. 14 Town of Atherton

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Transcription:

November 20, 2014

N. Frederick Street to N. Manchester Street

Goals and Summary, November 2007 Map, December 2007 Bicycle Element, July 2008 Pedestrian Element, July 2008 Demand and System Management, December 2008 Transit Element, June 2009 Parking and Curb Management Element, November 2009 Streets Element, February 2011 Updates Bicycle Map Bicycle Element

Vision Equity and access for all users Goals Provide high quality transportation service Move more people without more traffic Promote safety Establish equity Manage effectively and efficiently Advance environmental sustainability General Policies Integrate transportation and land use Support the design and operation of complete streets Manage travel demand and transportation systems

Wilson Boulevard Street Network Existing 4 Travel Lanes Limited Median Locations Speeding Moderate Transit Service No Bicycle Facilities Multiple Driveway Locations No On-street Parking Narrow Pedestrian Way ADT 13,000 to 15,000 MTP 2-4 Travel Lanes None/Medium Medians 25-30 Speed Limit Limited Transit Service Bike Lane/Shared Lane No Driveway Restrictions Medium On-street Parking 5-6 feet Sidewalks 4-5 feet Green Strip

Issues Narrow Sidewalks Utility Poles Sidewalk Obstructions ADA Issues Min. Crossing Areas Slope Erosion Continuous Driveways MTP Provide safe and convenient pedestrian access on all streets Construct Complete Street Meet ADA Guidelines Encourage sustainable modes

Complete the Bicycle Network MTP recommends sharrows or bicycle lanes on Wilson Boulevard between County line and N. Glebe Road Overcoming Barriers Narrow Right-of-way Vehicle centric corridors Improve Connectivity between Trails and Other Major Bikeway Corridors Off Street Trails W&OD Trail Bluemont Junction Trail Upton Hill Regional Park Bike Lanes Patrick Henry Drive George Mason Drive On-street Routes Jefferson Street Harrison Street

Existing Service Metro Bus Route 1A Vienna Station, Seven Corners Fairfax Hospital Metro Bus Route 1B Dunn Loring Station, Fairview Park, Seven Corners Metro Bus Route 1E Seven Corners, Dominion Hills Metro Bus Route 1Z Fairfax Hospital ART 75 Ballston, Virginia Sq. Station Improved Transit Network Consolidating Bus Stops Improved Access to Transit

Arterial Transportation Management Study (2004) 10 Concept Locations - Countywide Wilson Boulevard Fairfax County Line to N. George Mason Drive 15% Concept plans Two Projects Funded on Wilson Boulevard Wilson Boulevard George Mason Drive to N. Edison Street (2006) Wider Sidewalks Upgraded Bus Shelters Landscaping Enhanced Trail Connection 2 New Traffic Signals $1M Wilson Boulevard - N. Edison Street to Frederick Street (2008) Wider Sidewalks Moved Utility Polls Upgraded Bus Shelters Landscaping Fencing (at N. Florida Street) $500K

Arlington County Examples: Four Mile Run Drive Columbia Pike to George Mason Drive Williamsburg Boulevard Old Dominion Drive to Westmoreland Street Military Road Nelly Custis Drive to Old Glebe Road Lorcom Lane Edgewood Street to Military Road Patrick Henry Drive Wilson Boulevard to Washington Boulevard McKinley Road Wilson Boulevard to Washington Boulevard Kirkwood Road Lee Highway to Washington Boulevard Walter Reed Drive Four Mile Run Drive to S. Oakland Street

D.C. - Sherman Ave. NW 4 Lanes to 2 Lanes Turning Lanes Upgraded Sidewalks Improved Crossing Areas Parking Sharrows Median Landscaping

Improved Bicycle Access Bicycle Lane Buffers Existing Sidewalk Improved Access to Transit Reduction in Average Daily Traffic Reduction in Speeding Improved Left Turn Sightlines Fewer Mid-Block Conflicts Improved Emergency Access

Timeline Community Notification Process Early Spring 2015 Implementation of Restriping - Spring 2015 Public Perception Survey Fall/Winter 2015 After Action Report Spring 2016 http://projects.arlingtonva.us/projects/wilson-boulevard-improvements/