Project Length (miles) Nominal Area* (SY) WK Construction American Asphalt Tri County Paving Northeast Asphalt The Kraemer Co. Merrill Gravel & Construction Bid No. Project Limits and Scope of Work Anticipated Start Date Nominal Width* Total Bid Price with Traffic Control Total Bid Price with Traffic Control Total Bid Price with Traffic Control Total Bid Price with Traffic Control Total Bid Price with Traffic Control CTH N CTH Z Bid I CTY D Full Depth Pulverizing 5/15/2017 22.5' 3.67 51,800 $ 22,792.00 No Bid $ 29,064.19 $ 18,648.00 $ 19,498.71 No Bid Bid II Eau Claire River CTH J Full CTH C Depth Pulverizing 7/17/2017 22.5 5.68 73,400 $ 51,229.00 No Bid $ 40,431.00 $ 31,562.00 $ 30,177.84 No Bid STH 52 Brookside Cold CTY HH In Place Recycling Start 25' 3 44,200 $ 84,422.00 $ 77,350.00 No Bid No Bid No Bid No Bid Bid III CTH Y CTH D 05/15/17 CTH DD Cold In Place Recycling **06/20/17** 25' 4.3 62,600 $ 119,566.00 $ 100,160.00 No Bid No Bid No Bid No Bid CTH J STH 29 completion CTH Q Cold In Place Recycling 27' 6.9 109,500 $ 209,145.00 $ 191,625.00 No Bid No Bid No Bid No Bid Bid IV Bid V CTH Z CTH C Pulverizing, Milling, & Cold In Place Recycling, M 2017 1 CTH Q CTH Y (south) Profiling with 12' mill 1/2" depth 5/8/2017 24' 5 70,400 23,232.00 TBD CTH DB I 39 Overpass 1.5" mill, max width 11' *Widths are based off periodic field measurements. Contractor is responsible for verifying all measurements. **Work can begin May 15, 2017 and is scheduled to be completed by June 20,2017 Total Bid Price with Traffic Control $ $ 23,936.00 No Bid $ 38,720.00 $ 27,667.20 $ 21,995.00 Sept. 2017 22' 25' 0.87 12,250 $ 11,993.00 $ 8,207.50 $ 7,913.00 $ 9,310.00 $ 16,243.50 $ 7,586.00 Not available until July 2017 Bid III Asphalt Stabilizing Agent for Cold in Place Recycling (Bid III) WK Construction American Asphalt Tri County Paving Northeast Asphalt The Kraemer Co. Merrill Gravel & Construction Project Limits Stabilizing Area* Asphalt Oil (tons) Product Cost per Ton Cost per Ton Cost per Ton Cost per Ton Cost per Ton Cost per Ton CTY HH1 STH 52 Brookside 44,200 175 PG 52 34 $ 362.00 $ 250.00 No Bid No Bid No Bid No Bid CTH DD1 CTH Y CTH D 62,600 250 PG 52 34 $ 362.00 $ 250.00 No Bid No Bid No Bid No Bid CTH Q1 CTH J STH 29 109,500 27' PG 52 34 $ 362.00 $ 250.00 No Bid No Bid No Bid No Bid *Widths are based off periodic field measurements. Contractor is responsible for verifying all measurements. Pulverizing Machine Award Milling Machine Asphalt Stabilizing Agent for CIR CIR Equipment Wirtgen WR2500 NA not provided Terex 950B (950 HP) CMI RS950 & 800 not provided Wirtgen W250 (8' & 12' Wirtgen W2200 (12.5) & RX900 & RX50 Wirtgen W2200 Wirtgen 3800 not provided units) (990 HP) WirtgenW250 (8') Roadtec Mills Foamed Asphalt PG 52 34 Wirtgen 3800 NA NA NA NA Roadtec RX900 w/bear Cat Injection system Dynapac 624 Roller NA NA NA NA United Machinery RAP Crusher Hamm 18 Roller NA NA NA NA CAT AP1055F Paver CR 551 Paver NA NA NA NA Compaction Equipment as specified
ALTERNATE 1 Furnish material to be place in County Trucks at Pit Bid No. Project Limits and Design HMA (tons) HMA Type CTY Z CTH Q CTH Y (south) Option 1 1"x 9.5mm CTY Z CTH Q CTH Y (south) Option 2 1"x 9.5mm Bid I CTY D CTH N CTH Z 2MT58 28S 11,900 Option 1 4"X25 12.5mm 4MT58 28S CTY D CTH N CTH Z 2MT58 28S 11,900 Option 2 4"X25 9.5mm 5MT58 28S CTH HH STH52 Brookside 2"x12.5mm Bid II CTH DD CTH Y CTH D 2"x12.5mm CTH N Pleasant County Line 1"x 9.5mm CTH Q CTH J STH 29 2"x12.5mm Bid III CTY C Little Eau Claire CTH J 2MT58 28S 18,400 Option 1 4"X25 12.5mm 4MT58 28S CTY C Little Eau Claire CTH J 2MT58 28S 18,400 Option 2 4"X25 9.5mm 5MT58 28S CTY C Youngs Ln CTH O Bid IV Option 1 1"x 9.5mm CTY C Youngs Ln CTH O Option 2 1"x 9.5mm Bid No. Project Limits and Design HMA (tons) HMA Type I A2 II A2 CTH HH CTH DD CTH N STH52 Brookside 2"x12.5mm CTH Y CTH D 2"x12.5mm Pleasant County Line 1"x 9.5mm Bid Price American Asphalt *Price Adjustment for warm mix Plant Location Bid Price Northeast Asphalt *Price Adjustment for warm mix Plant Location 4,400 5LT58 28S $ 40.50 $ (0.20) Resch $ 38.25 $ Antigo WR1 4,400 5MT58 28S $ 41.86 $ (0.20) Resch $ 39.90 $ Antigo WR1 $ 38.50 $ (0.20) Resch $ 35.85 $ Antigo WR1 $ 39.26 $ (0.20) Resch $ 36.70 $ Antigo WR1 4,900 4MT58 28S $ 39.82 $ (0.20) Resch $ 37.20 $ Antigo WR1 7,000 4MT58 28S $ 39.82 $ (0.20) Resch $ 37.20 $ Antigo WR1 3,500 5LT58 28S $ 40.50 $ (0.20) Resch $ 38.25 $ Antigo WR1 13,100 4MT58 28S $ 40.15 $ (0.20) Ziolkowski No Bid No Bid No Bid $ 37.99 $ (0.20) Ziolkowski No Bid No Bid No Bid $ 39.21 $ (0.20) Ziolkowski No Bid No Bid No Bid 7,400 5LT58 28S $ 47.56 $ (0.20) Plant 22 No Bid No Bid No Bid 7,400 5MT58 28S $ 48.14 $ (0.20) Plant 22 No Bid No Bid No Bid * Indicate + for a price increase, or for a reduction ALTERNATE 2 Furnish, Haul, Place, and Compact material Bid Price *Price Adjustment for warm mix Bid Price *Price Adjustment for warm mix 4,900 4MT58 28S $ 46.52 $ (0.20) $ 48.60 $ 7,000 4MT58 28S $ 49.10 $ (0.20) $ 51.20 $ 3,300 5LT58 28S $ 49.23 $ (0.20) $ 57.80 $ * Indicate + for a price increase, or for a reduction
Bid Item Number & Material Basic Bid Hwy Est. Tons I CTH Z 3/4" 1,800 II CTH D 1 1/4" 800 3/4" 3,200 Alt. 1 Price Alt. 2 Price Distance Pit to Middle of Project Drive Time Avg Speed Trucking Cost Per Ton Total Price At Project Site III CTH HH 3/4" 1,300 IV CTH DD 3/4" 1,850 V CTH N 3/4" 1,450 VI CTH Q 3/4" 2,000 VII CTH C East 1 1/4" 500 3/4" 7,450 VIII CTH C West 3/4" 3,350 $ 5.50 $ 5.65 11.00 15.60 $2.01 7.66 Bid Item Number & Material Basic Bid Hwy Est. Tons I CTH Z 3/4" 1,800 II CTH D 1 1/4" 800 3/4" 3,200 Alt. 1 Price Alt. 2 Price Distance Pit to Middle of Project Drive Time Avg Speed Trucking Cost Per Ton Alt 3 Price Pit Location ADDING $.0.15/ton/mil e $ 7.3 Earth Inc. Total Price At Project Site Alt 3 Price III CTH HH 3/4" 1,300 IV CTH DD 3/4" 1,850 V CTH N 3/4" 1,450 VI CTH Q 3/4" 2,000 VII CTH C East 1 1/4" 500 $ 6.50 $ 6.90 0.50 4.80 $0.62 $ 7.52 8.95 3/4" 7,450 $ 6.78 $ 7.18 0.50 4.80 $0.62 7.80 VIII CTH C West 3/4" 3,350 $ 5.85 $ 6.15 16.50 22.80 $2.94 9.09 Distance Pit to Middle of Project Drive Time Avg Speed Pit Location $ Bid VIII Stroetz Quarry Galvin Rd T.26N R.3E Sec. 6.975 $ 1D 7.255 $ 8.625 American Asphalt Basic Bid Hwy Bid Item Number & Material Est. Tons Alt. 1 Price Alt. 2 Price Alt 3 Price Pit Location I CTH Z 3/4" 1,800 $ 5.21 9.60 16.80 $2.16 $ 8.02 6.95 II CTH D 1 1/4" 800 $ 5.21 10.40 18.00 $2.32 $ 8.18 7.07 3/4" 3,200 $ 5.21 10.40 18.00 $2.32 $ 8.18 7.07 III CTH HH 3/4" 1,300 $ 5.21 16.00 27.60 $3.55 $ 9.41 Meadow Lane 7.91 IV CTH DD 3/4" 1,850 $ 5.21 5.30 10.80 $1.39 $ 7.25 6.305 V CTH N 3/4" 1,450 $ 5.21 6.90 13.20 $1.70 $ 7.56 6.545 VI CTH Q 3/4" 2,000 $ 5.21 11.20 19.20 $2.47 $ 8.33 7.19 VII CTH C East 1 1/4" 500 $ 5.60 14.00 24.00 $3.09 $ 8.69 7.7 3/4" 7,450 $ 5.70 14.00 24.00 $3.09 $ 8.79 Cisler 7.8 VIII CTH C West 3/4" 3,350 $ 5.70 14.50 22.80 $2.94 $ 8.64 7.875 Meverden Materials Distance Pit to Middle of Project Drive Time Avg Speed Red Rock Granite Trucking Cost Per Ton Total Price At Project Site Basic Bid Hwy Bid Item Number & Material Est. Tons Alt. 1 Price Alt. 2 Price Alt 3 Price Pit Location I CTH Z 3/4" 1,800 $ 4.40 13.30 20.40 $2.63 $ 7.03 6.395 II CTH D 1 1/4" 800 $ 4.40 3.90 7.20 $0.93 $ 5.33 $ 7.40 4.985 Bids I, II 1 1/4", & III Hwy HH, 2 miles north of 3/4" 3,200 $ 4.40 3.90 7.20 $0.93 $ 5.33 4.985 Hwy 52 Trucking Cost Per Ton Total Price At Project Site 1406 ST Hwy 107, Mosinee, less than 1 mile north of 153 on east sided of Hwy 107 Bid VII Krukowski Stone, CTH C T.26N R.8E, Sec. 26
III CTH HH 3/4" 1,300 $ 4.40 1.00 2.00 $0.26 $ 4.66 Hwy 52 4.55 IV CTH DD 3/4" 1,850 $ 4.40 4.50 6.00 $0.77 $ 5.17 5.075 V CTH N 3/4" 1,450 $ 4.40 2.50 5.00 $0.64 $ 5.04 4.775 VI CTH Q 3/4" 2,000 Bids II 3/4", IV, V Corner of Hwy D & 1 1/4" 500 VII CTH C East Birnamwood Rd 3/4" 7,450 VIII CTH C West 3/4" 3,350 Distance Pit to Middle of Project Drive Time Avg Speed Basic Bid Hwy Bid Item Number & Material Est. Tons Alt. 1 Price Alt. 2 Price Alt 3 Price Pit Location I CTH Z 3/4" 1,800 $ 4.25 21.40 30.00 $3.86 $ 8.11 7.46 II CTH D 1 1/4" 800 $ 4.05 23.00 33.60 $4.33 $ 8.38 7.5 3/4" 3,200 $ 4.25 23.00 33.60 $4.33 $ 8.58 7.7 III CTH HH 3/4" 1,300 $ 4.25 20.00 36.00 $4.64 $ 8.89 7.25 IV CTH DD 3/4" 1,850 $ 4.25 15.00 21.60 $2.78 $ 7.03 6.5 South Fork 2075 CTH Rd J Hatley V CTH N 3/4" 1,450 $ 4.25 19.50 27.60 $3.55 $ 7.80 7.175 VI CTH Q 3/4" 2,000 $ 4.25 7.40 12.00 $1.55 $ 5.80 5.36 VII CTH C East 1 1/4" 500 $ 4.05 6.70 8.40 $1.08 $ 5.13 5.055 3/4" 7,450 $ 4.25 6.70 8.40 $1.08 $ 5.33 5.255 VIII CTH C West 3/4" 3,350 $ 4.25 25.00 36.00 $4.64 $ 8.89 8 James Peterson Sons, Inc Distance Pit to Middle of Project Drive Time Avg Speed Trucking Cost Per Ton Total Price At Project Site Basic Bid Hwy Bid Item Number & Material Est. Tons Alt. 1 Price Alt. 2 Price Alt 3 Price Pit Location I CTH Z 3/4" 1,800 $ 5.18 9.50 18.00 $2.32 $ 7.50 6.605 II CTH D 1 1/4" 800 $ 5.18 8.50 12.00 $1.55 $ 6.73 $ 7.90 Bids I, II, III Resch Pit, Hwy 52 6.455 3/4" 3,200 $ 5.18 8.80 12.00 $1.55 $ 6.73 $ 12.56 6.5 III CTH HH 3/4" 1,300 $ 5.18 * $0.00 $ 11.67 #VALUE! IV CTH DD 3/4" 1,850 $ 5.18 5.80 8.40 $1.08 $ 6.26 $ 12.02 6.05 Bids IV & V Szews Pit, Birnamwood Rd V CTH N 3/4" 1,450 $ 5.18 4.80 7.20 $0.93 $ 6.11 5.9 VI CTH Q 3/4" 2,000 $ 6.30 16.00 22.80 $2.94 $ 9.24 8.7 VII CTH C East 1 1/4" 500 $ 6.04 11.80 15.60 $2.01 $ 8.05 7.81 Bids Vi & VII Central Wis Airport 3/4" 7,450 VIII CTH C West 3/4" 3,350 Distance Pit to Middle of Project Drive Time Avg Speed Mitch King & Sons Trucking Cost Per Ton Total Price At Project Site Michels Corporation Basic Bid Hwy Bid Item Number & Material Est. Tons Alt. 1 Price Alt. 2 Price Alt 3 Price Pit Location I CTH Z 3/4" 1,800 $ 5.95 $ 6.30 9.30 13.20 $1.70 $ 8.00 7.695 II CTH D 1 1/4" 800 $ 5.95 $ 6.30 18.00 25.20 $3.25 $ 9.55 9 3/4" 3,200 $ 5.95 $ 6.30 18.00 25.20 $3.25 $ 9.55 9 III CTH HH 3/4" 1,300 $ 5.95 $ 6.30 * #VALUE! IV CTH DD 3/4" 1,850 $ 5.95 $ 6.30 21.00 30.00 $3.86 $ 10.16 9.45 Rose Quarry, T9543 Quarry Rd, Wausau V CTH N 3/4" 1,450 $ 5.95 $ 6.30 18.50 25.20 $3.25 $ 9.55 9.075 VI CTH Q 3/4" 2,000 $ 5.95 $ 6.30 19.00 28.80 $3.71 $ 10.01 9.15 VII CTH C East 1 1/4" 500 $ 5.95 $ 6.30 * 3/4" 7,450 $ 5.95 $ 6.30 * VIII CTH C West 3/4" 3,350 $ 5.95 $ 6.30 * Trucking Cost Per Ton Total Price At Project Site
Award *NOT ALL BIDS WERE EVALUATED IF THE PRICE WAS HIGHER THAN A PIT THAT WAS OBVIOUSLY CLOSER TO THE PROJECT, THE DRIVE TIME MAY NOT HAVE BEEN CALCULATED.
To: 2017 SUMMER ROAD SCHOOL (HIGHWAY CONFERENCE) JUNE 5, 6, 7, 2017 CHULA VISTA RESORT WISCONSIN COUNTY HIGHWAY ASSOCIATION PRE-REGISTRATION DEADLINE MAY 12, 2017 Highway Commissioners/Public Works Directors & Office Managers/Committee Members/ State Officials/Corporate Sponsors/Associate Members The WCHA Conference Coordinating Committee will be hosting the 2017 Summer Road in Wisconsin Dells, at the Chula Vista Resort. We do have room blocks available at the host hotel. Hotel room reservation deadline date is May 12, 2017. Please contact the reservation department at 855-830-4730 and the booking ID # is E84443 for reservations. The room block is listed under WCHA (Wisconsin County Highway Association). When you call for a room reservation, ask for the WCHA room block and conference rates. Tax-exempt status verification must be arranged in advance by mailing or faxing a copy of your tax-exempt certificate to (Fax # 608-253-5430); otherwise, you will be charged room tax. The room rates for the conference are $99.00 or $169.00 or $289.00 per night. Every member, spouse/guest, associate member, state official or vendor attending the conference must complete the attached Pre-Registration form. Sharing of name badges is not permitted. Pre-registration forms must be returned with payment by May 12, 2017. Cancellation and 100% refunds (by written request) will be received until May 12, 2017. After this date, cancellations will not be refunded. All attendees and spouse/guests will be required to be registered to participate in any function of the conference. Name badges will be issued and must be worn to attend any and all functions, including conference areas, social areas and events. Individuals not registered for the conference will not be admitted and/or asked to leave any event area. If you are not wearing your name badge, it will be assumed that you have not registered for the conference. Non Pre-registration/on-site registration will be $ 215.00* for county members & associate members, $325.00 for non-members, and $140.00* for spouse/guest. On-site registration requires the payment by check, cash or credit card. Those who have pre-registered may pick up their registration packets at the registration area, Monday, June 5, 2017 from 8:00 am 4:00 pm or Tuesday, June 6, 2017 after 7:00 am. Questions call: Gary L. Kennedy, WCHA Professional Development Director 1355 North 16 th Street Manitowoc, WI 54220 Cell Phone (920) 323-6500 E-mail: hwygary@ameritech.net All the Road School information is located on our website: www.wiscohwy.org
2017 WCHA SUMMER ROAD SCHOOL JUNE 5, 6 & 7 PRE-REGISTRATION DEADLINE - MAY 12, 2017 COUNTY/ORGANIZATION NAME TITLE SPOUSE/GUEST PHONE ADDRESS CITY EMAIL STATE fgfg ZIP+4 fgfgdgffgf REGISTRATION FEES REGISTRATION DEADLINE (COUNTY & ASSOC. MEMBERS, WisDOT) REGISTRATION DEADLINE (NON-MEMBER OF WCHA) REGISTRATION DEADLINE (MEMBER S SPOUSE/GUEST) GOLF FEE Pre 5/12 After 5/12 $175.00 $215.00 $275.00 $325.00 $100.00 $140.00 $75.00 $75.00 TOTAL FEES ENCLOSED Payment Type Visa MasterCard Discover Check-Make payable to WI COUNTY HIGHWAY ASSOCIATON Credit Card Number Exp. Date Security Code Name on Card Signature Phone Number Address City State * A 3.5% convenience fee will be assessed to each credit card transaction. Mail payment along with registration form to: Gary L. Kennedy, WCHA Professional Development Director 1355 North 16 th Street Manitowoc, Wisconsin 54220 Please register us for the following activities by circling YES or NO: Member Spouse/Guest Tuesday, June 6 6:30 8:00 am Breakfast @ Chula Vista Resort YES or NO YES or NO 9:00-11:00 am Crafts with Soozii Madden - Mosaic Birdhouse YES or NO 11:00 12:00 pm Luncheon - *Golfers do not register for this event see below YES or NO YES or NO 12:00 2:00 pm Boat Tour (loading by registration lobby) YES or NO YES or NO 11:00 5:00 pm 2:00 5:00 pm Annual Golf Outing Conference registration is required golf fees are an additional fee see separate golf flyer Special Tent Reception Sponsored by Cedar Corp. Conf. registration required/no fee/outside by vendors Live Auction at 3:30 pm Wednesday, June 7 YES or NO YES or NO YES or NO YES or NO 6:30 8:00 am Breakfast @ Chula Vista Resort YES or NO YES or NO Crafts with Soozii Madden Gardening/Farmers Market 8:30 11:30 a.m. Tote Bag YES or NO 12:00 1:00 p.m. Honors Lunch at Chula Vista Resort YES or NO YES or NO
Date: Tuesday, June 6, 2017 WCHA Golf 2017 Summer Tournament Invitation Time: Location: Cost: Format: Lunch: Shotgun start at 11:00 am (please arrive no later than 10:30 am) Chula Vista Golf Course $75.00 per golfer All golfers must have a conference registration. 4 person Scramble teams (maximum 36 teams or 144 golfers) Your golf fee includes lunch served at the golf course from 10:30 to 11:00 am Registration: Deadline is May 12, 2017 Vendors: Awards: Hole sponsorship is $300 (includes sign & a reserved tee box for your company) and charity collection is welcomed at the tee boxes. 5:00 pm 5:30 pm at the golf club house. Make checks payable to WCHA or pay by credit card Mail to: Gary Kennedy WCHA Professional Development Director 1355 North 16 th Street Manitowoc, WI 54220 Phone 920-323-6500 hwygary@ameritech.net