Impact of the Esso Verdicts on Engineering Practice First Published in Engineers Australia, March 2001, reprinted with permission

Similar documents
Longford Royal Commission into the Explosion and Fire on 25 September 1998 at the Esso Gas Processing Plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

FINAL CERTIFICATION RETURN YEAR ENDED ON JUNE 2017 NSW Harness Race Field Information Use

Safety Engineering - Hazard Identification Techniques - M. Jahoda

Hazard Operability Analysis

Management of risk. Definition of terms. Managing risks. Risk

SEMS II: BSEE should focus on eliminating human error

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

SAFETY PLAN REVIEW. FirstElement Safety Plan Review Submission for the California Energy Commission General Funding Opportunity GFO

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Standard Pneumatic Test Procedure Requirements for Piping Systems

Pressure Gauge Failure Causes Release

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

1. The identity or, where an identity is uncertain, a description of the abuser.

Best Practice RBI Technology Process by SVT-PP SIMTECH

NATIONAL PLAYER TRANSFER REGULATIONS

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

NATIONAL PLAYER TRANSFER REGULATIONS

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

2014 AUSTRALIAN OLYMPIC WINTER TEAM Ski & Snowboard Australia NOMINATION CRITERIA FREESTYLE SKIING: MOGULS

National Youth Team Selection - Australian Sport Climbing Youth Team

Modification of the CNS Helium Injection Logic

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

BADGE COMPETENCIES. Introduction

Pulsed Eddy Current (PEC) Inspection through Insulation

EDUCATION DEPARTMENT ACCU-TEST

GIRL S RUGBY LEAGUE - COMPETITION RULES 2018

NKS PODRIS project. Importance of inspection reliability assumptions on piping failure probability estimates

REPEATED ACCIDENT CAUSES CAN WE LEARN?

Nitrogen System Contamination

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Disciplinary Procedures For Players in Scottish Women s Football Youth Regional Leagues. Season 2016

BROCHURE. Pressure relief A proven approach

Questions for GRNSW. - What measures have you as the regulator taken to ensure that greyhound racing has integrity?

Raw Material Spill. Lessons Learned. Volume 05 Issue USW

AN APPROACH TO THE PROBLEMS OF PROCESS HAZARDS IN PLANT DESIGN

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

2014 AUSTRALIAN OLYMPIC WINTER TEAM Ski & Snowboard Australia NOMINATION CRITERIA CROSS COUNTRY SKIING

PSM TRAINING COURSES. Courses can be conducted in multi-languages

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

User Information Sheet 015

Major Hazard Facilities. Hazard Identification

RUPTURE HAZARD OF PRESSURE VESSELS

NEW IGC CODE AND IGF CODE

WIKA INSTRUMENT CORPORATION

Conduct and Discipline

2018 AUSTRALIAN OLYMPIC WINTER TEAM. Ski & Snowboard Australia NOMINATION CRITERIA FREESTYLE SKIING: SKI HALFPIPE

Acoustic Pulse Reflectometry Brings an End to Tube Inspection Sampling By Dr. Noam Amir, Chief Technology Officer, AcousticEye

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

Disciplinary Procedures for Players in Scottish Women s Football Youth Leagues. Season 2018

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

IN THE COURT OF APPEALS OF INDIANA

Introduction to HAZOP Study. Dr. AA Process Control and Safety Group

Dieter Krenz, Linde, Germany, Manel Serra, Inprocess, Spain, and. Theron Strange, Simplot Phosphates, USA, discuss dynamic process simulation

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL

in Australian Workplaces

Australian/New Zealand Standard

Developing a HACCP plan

NORMAL OPERATING PROCEDURES Operating Parameter Information

LOCKOUT SYSTEM AND POLICIES

SAASL DISCIPLINARY RULES FOR PLAYERS AND CLUBS

Protective Atmospheres, Measurement Technologies and Troubleshooting Tools

Pressure Test Results in Injury

2016 AUSTRALIAN OLYMPIC TEAM WRESTLING AUSTRALIA INCORPORATED NOMINATION CRITERIA

Overview of Recovery and Rescue Validation, Verification and Extrapolation

COLLEGE OF ENGINEERING LABORATORY SAFETY MANAGEMENT SYSTEM (SMS) & HAZOP PROTOCOL January 2018

Presentation Details Document

Unattended Bleeder Valve Thaws, Causing Fire

The Relationship Between Automation Complexity and Operator Error

ON-FIELD REGULATIONS SECTION THREE: PROVISIONS APPLICABLE TO CATEGORY 5 GENERAL CHARGES. 2 Nothing in this Section Three shall preclude:

HEIGHT SAFETY IT S EVERYONE S BUSINESS

2018 AUSTRALIAN OLYMPIC WINTER TEAM. Ski & Snowboard Australia NOMINATION CRITERIA SNOWBOARD CROSS

2016 AUSTRALIAN OLYMPIC TEAM

COAL MINES TECHNICAL SERVICES, GAS DETECTION RELATED SERVICES FOR MINES RESCUE

STEWARDS SUMMARY OF JUDICIAL OUTCOMES, Update #5: FINAL issued Sunday 25 March 2018 at 1600hrs.

Introduction to Emergency Response & Contingency Planning

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

GPT NOTICE OF DETERMINATION.

Markus Hofer (Chair WHS committee) & Dianne Fisher (Safety Officer)

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

ATHLETICS AUSTRALIA SELECTION POLICY WORLD RACE WALKING TEAM CHAMPIONSHIPS 5-6 May 2018, Taicang, China

Preventive Maintenance

PROPOSALS FOR 2019 MODIFICATIONS TO THE ENDURANCE RULES

Supplementary Submission by Free TV Australia Limited

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Translation of the original Operating Instructions for HKS rubber compensators

2016 AUSTRALIAN OLYMPIC TEAM

BRITISH STANDARD BS : Flat-bottomed, vertical, cylindrical storage tanks for low temperature service

Lessons learned from LPG/LNG Accidents

Consolidated Guidance to Intelligence Officers and Service Personnel on the Detention and Interviewing of Detainees Overseas, and on the Passing and

2006 AUSTRALIAN WINTER OLYMPIC TEAM SKI & SNOWBOARD AUSTRALIA LIMITED NOMINATION CRITERIA ALPINE SKIING

CONSEQUENCE MODELLING OF THE HYDROCARBON FIRE AT LONGFORD, AUSTRALIA, 25 SEPTEMBER 1998

First Aid. Compliance &emergency aid training programmes. BritishSafety Council Professional Health and Safety Qualifications

Instrument Operating Manual

2012 AUSTRALIAN OLYMPIC TEAM GYMNASTICS AUSTRALIA NOMINATION CRITERIA MEN S GYMNASTICS

JUDICIARY OF ENGLAND AND WALES. District Judge Ashworth. In the Stratford Magistrates Court. The Queen -V- Ashley Gill-Webb

Transcription:

Impact of the Esso Verdicts on Engineering Practice First Published in Engineers Australia, March 2001, reprinted with permission When a jury in the Supreme Court of Victoria found Esso guilty of 11 criminal charges under the Occupational Health and Safety Act, it was essentially passing judgement on the company's management performance. It found that the company had failed, in several ways, to provide and maintain a safe workplace. Some of the charges have direct and strong bearing on engineering practice at not only the Longford gas plant, but also at all other complex, hazardous process plants in Australia. Behind the guilty findings for these charges lie judgements with respect to the community's expectations of performance by engineering practice in delivering workplace safety at complex process plants. The Rupture of GP905 The vessel that exploded at Longford was a shell and tube heat exchanger, GP905, located in Gas Plant 1. In normal operation, cold rich oil entered the vessel at 60 C and exited at 100 C, being heated by a counter flow of hot lean oil entering at 230 C and exiting at 120 C. It was a "hot service" vessel, and not expected to ever experience temperatures lower than ambient. Heat transfer between the two process streams was achieved in other heat exchangers as well as GP905, as depicted in Fig. 1. The cold rich oil entered the first of these exchangers at or below minus 30 C. The prosecution argued that GP905 exploded as a result of: 1. flow of hot lean oil ceased due to a pump shutdown, and remained so for at least three hours 2. flow of the cold stream (at first cold rich oil and then cold hydrocarbon condensate) continued 3. without the heating medium, GP905 dropped in temperature to below minus 30 C which was way below its minimum design safe operating temperature 4. the weld metal of GP905 became brittle at the low temperature and susceptible to fracture if unduly stressed 5. approximately 4 hours after the pumps shut down they were restarted and flow of hot lean oil was re-established into GP905 6. hot lean oil entered the cold exchanger, producing sudden thermal stresses and causing a weld to crack

7. the vessel had been kept at its normal operating pressure and, upon the weld cracking, violently ruptured Charge 1 - Failure to Conduct Any Adequate Hazard Analysis The OH&S Act requires employers to identify, as far as is practicable, workplace hazards. Absolute safety is seen as an unachievable ideal, and much hangs on that phrase "as far as is practicable". For any alleged breach, a court will consider the accepted methods, standards, codes of practice, safety management systems and so on utilised within the industry in question. For the jury to find the company guilty on this charge, it had to be satisfied on two "elements" of the charge, namely: (i) the hazard of cold embrittlement existed (ii) the company had a practicable means of identifying the hazard, that it did not employ The prosecution case for element (i) was fairly simple: If the flow of heating medium ceased and the flow of cold medium continued, then GP905 would reach temperatures lower than its minimum design temperature and become dangerously cold. This was the hazard. Their case for element (ii) was that a HAZOP study was the tool available to the company by which it could have identified the hazard. Moreover, a HAZOP study performed by a competent team could be expected, beyond reasonable doubt, to have identified the hazard. A HAZOP on Gas Plant 1 had never been done. Since a guilty verdict was found for this charge, it follows that the jury considered both these elements proven.

HAZOP - HAZard and OPerability Study HAZOP is a methodology widely practised in process industries to identify likely hazards in complex, extensive process plants. A team systematically examines the plant design, considering the consequences of deviations from normal conditions at each item of equipment. The team always includes process engineers familiar with the plant. In pretrial hearings, the judge ruled that the prosecution could not merely assert that the hazard was identifiable, but it also had to specify the particular method the company should have used to identify the hazard. Hence, HAZOP became an integral component of charge 1. HAZOP in Australian Case Law The term "HAZOP" has been referenced three times in Australian case law, prior to the Esso trial - once in the Environment Court of NSW, and twice in the Industrial Relations Commission. Although in each instance HAZOP was a minor component of the overall case, the record shows that the law recognizes the HAZOP methodology as an established and defined engineering and management tool, although it is not a statutory requirement. With the Esso case, HAZOP has been examined in detail by a jury, and their verdict of guilty for charge 1 elevates the position of the methodology in Australian law. A jury has now made a judgement on the expected performance level of a HAZOP study, which in turn implies an expected performance level of the HAZOP team members. Impact on Engineering Practice The Law loves a precedent. Having now established that HAZOP can be expected to achieve a particular outcome, it becomes easier in future cases to pursue the allegation that an employer failed to identify a hazard in a complex plant. In its defence, Esso called an expert witness who maintained that the outcomes of a HAZOP are neither predictable nor guaranteed. He argued that much depends on the quality of the individual team members. This is plausible, but somewhat academic the jury has effectively taken the question out of the experts hands. The jury has said that the hazard of cold embrittlement was identifiable and should have been identified. That is essentially a statement of the community's expectations of the experts' performance. Ongoing Offence

Charge 1 was alleged to have been an ongoing offence from 1 Jan 1993 to 25 Sept 1998, the day of the explosion. There was no need for the vessel to have actually ruptured for this charge to be proven. It was not even necessary for the hazard to have been realised, that is, for the vessel to become brittle. The hazard - the potential of cold embrittlement - existed continuously during normal plant operation. So the offence was that the company failed to perform adequate hazard analysis on a continuous basis for the entire period of more than five years. The charge could have stood up in court at any time in that period and did not depend on the tragic incident of 25 Sept 1998. Potential Impact on Engineers Charge 1 essentially targeted the performance of company management. Engineers might like to consider the following scenario - that the HAZOP was done, but did not identify the hazard. In that situation, would individual team members be joined with the company in alleged breaches of the Act? HAZOP team members must now keep in mind that their performance may be subject to inspection and judgement by a court. This applies not just to future HAZOPs, but also to past HAZOPs whose results have current effect. Charge 9 - Failure to Monitor Plant Charge 9 was that the company failed to adequately monitor the health of the plant. The prosecution claimed that the tools to do so were the control room instruments and charts in the hands of experienced process engineers. The essentials of this charge were: (i) crucial chart recorders were not functioning (ii) there were no on-site engineers The non-functioning recorders were associated with the very parameters that were needed to diagnose the process upsets. These would have been invaluable to investigators after the event. For diagnosing the dangers from abnormally cold vessels, the most important parameter was the temperature of GP905, the chart recorder for which was not functioning. However this instrument did not register sub-zero temperatures, so its usefulness, even if working, was limited. Heavy icing was seen on GP905's pipework - conclusive evidence that its internals were at less than 0 C. This was enough data for "any competent engineer", in the prosecution's words, to recognise the danger and advise the operators to not shock the vessel. However, no such person was available on site to make this assessment. Engineers were based at head office in Melbourne, 200 km from Longford. They were accessible by phone, but the prosecution claimed that the data necessary to diagnose the process upsets was not available, as the relevant recorders were not functioning.

The likely impact on engineering practice of the guilty verdict for this charge is not as clear as for charge 1. If the jury's view was that process engineers should always be available on-site, then that is an expectation that cannot be met. There are simply far more process plants in Australia than process engineers. What is clear is that the jury considered that the danger should have been correctly assessed, and that the relevant discipline to ensure this happened is process engineering. The profession now has the responsibility to determine how to ensure the necessary expertise is available to plant operators as and when it is required. The Esso case has generated powerful judicial verdicts with respect to the community's expectations on companies in providing and maintaining safe workplaces. The engineering profession and individual engineers have crucial, unavoidable roles to play in delivering industrial safety. The Longford tragedy underscores the responsibilities and challenges that continually face the profession.