Lockout/Tagout Program

Similar documents
Facilities Management

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

LOCKOUT/TAGOUT PLAN August 2015

THE UNIVERSITY OF NORTH CAROLINA

University of Arkansas Office of Environmental Health and Safety

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

Lockout/Tagout - Control of Hazardous Energy Program

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM

Hazardous Energy Control (Lockout-Tagout)

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

LOCKOUT/TAGOUT PROGRAM

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

Lockout/Tagout Program

Health, Safety, Security and Environment

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Lockout / Tagout Safety Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

Control of Hazardous Energy. Environmental Health and Safety

Lockout Tagout Policy

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

Control of Hazardous Energy Lockout / Tagout Program

LOCKOUT/TAGOUT PROGRAM

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

RiskTopics. Lockout/Tagout October 2017

Lockout/Tagout Safety Policy

Lockout Tagout Program

Gettysburg College. Energy Control Program

Lockout/Energy Control

LOCKOUT/TAGOUT PROGRAM

Lock Out - Tag Out Safety Program

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Lockout/Tagout - Energy Control Program

Lockout/Tagout Manual

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Lockout Tagout Program

H. Control of Hazardous Energy: Lockout/Tag Out

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

LOCKOUT / TAGOUT PROGRAM

UCHC Lockout/Tagout Policy (4/09)

University of Vermont Department of Physical Plant Burlington, Vermont

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Lockout / Tag out Program

Lockout / Tagout Program OSHA 29 CFR

Control of Hazardous Energy Program (LOTO)

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout/Tagout Training Overview. Safety Fest 2013

LOCKOUT-TAGOUT PROGRAM

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

Health and Fire Safety Review 2/15

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

MCW s Control of Hazardous Energy Program

Management Plan for Lockout Tagout (LOTO) ISD #535

Hazardous Energies Control and Lockout/Tagout Program

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lock Out/Tag Out Control of Hazardous Energy

Lockout Tagout Program

230-LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Program (Lockout/Tagout)

Safety Manual: Hazardous Energy. January, 2017

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

University of Tennessee Safety Program

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

Hazardous Energy Lockout Standard. Safety Resources

Environmental Health & Safety Programs

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

CONTROL OF HAZARDOUS ENERGY

Product Information Report Lockout/Tagout Hazardous Energy Control

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

2523-LDG-E. Leader s Guide

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

2008. AURORA PICTURES

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS)

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Environmental Health & Safety

LOCKOUT/TAGOUT POLICY

Hazardous Energy Program Lockout/Tagout

Elements of a Lockout/Tagout Program OSHA

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Transcription:

Lockout/Tagout Program Prepared by: Occupational Health and Safety Reviewed by: Joint Health and Safety Committees Approved by: Chief Human Resources Officer November 2014

TABLE OF CONTENTS 1.0 Purpose...3 2.0 Scope.....3 3.0 References....3 4.0 Definitions...3 5.0 Responsibilities..4 6.0 General Lockout Procedure.....5 6.1 Lockout/Tagout Guidelines 5 6.2 Lockout/Tagout Equipment...5 6.3 Lockout/Tagout Procedure 5 6.3.1 Prepare for Shutdown 5 6.3.2 Equipment Shutdown. 6 6.3.3 Isolation.6 6.3.4 Apply Lockout/Tagout Devices...6 6.3.5 De-organization: Stored energy Release or Restraint..6 6.3.6 Verification...6 6.3.7 Release from Lockout....6 7.0 Special Lockout/Tagout Procedures.... 7 7.1 Testing or Energized Equipment..7 7.2 Group Lockout....7 7.3 Contractors......7 7.4 Lockout/Tagout Device Removal..7 Appendix 1 Lockout Device Removal Report... 9

LOCKOUT/TAGOUT PROGRAM 1.0 PURPOSE The purpose of this program is to ensure procedures are in place to prevent injuries from the unexpected energization, activation or release of hazardous energy during servicing or maintenance of machinery or equipment. This lockout/tagout program has been developed to establish procedures for de-energizing machines, equipment and processes to ensure work can be safely performed. 2.0 SCOPE This program applies to all College Departments, staff, students and contractors who perform servicing or maintenance on machines, equipment or processes that may contain hazardous energy that, if released unexpectedly, could cause harm. This program does not apply to minor servicing tasks that do not have the potential to cause injury to a person or damage to equipment through the release of energy from a hazardous energy source. For example: minor servicing, tool changes or adjustments that do not have potential to cause injury. This program will be reviewed once every three years in consultation with the Joint Health and Safety Committee (JHSC) and relevant areas. 3.0 REFERENCES Occupational Health and Safety Act Regulations for Industrial Establishments (Reg. 851) CSA Standard Z460 Control of Hazardous Energy Health and Safety Policy CS-1401-1979 Lockout Tagout A Practical Approach, ASSE 2001 4.0 DEFINITIONS Affected Employee: An employee who operates or uses a machine or equipment on which servicing or maintenance is being performed under lockout/ tagout or who works in an area where such work is being performed. Authorized Employee: An employee authorized to implement lockout/tagout procedures on machines or equipment to perform maintenance or servicing work. De-energized: Disconnected from all sources of energy and not containing residual or stored energy. Electrical Disconnect Switch: A pull-type switch or circuit breaker which physically opens to disconnect the circuit. Energy Isolating Device: A mechanical device that physically prevents the transmission or release of energy, to or from a machine or equipment. This device usually de-energizes the machine or equipment and allows a padlock to be placed on it. A lockout device is used where a padlock cannot be placed directly on the energy isolating device. Energy isolating devices include: manually operated disconnect switches, circuit breakers; line valve; block. Note: Push buttons, selection switches and other circuitcontrol type devices are not considered energy isolating devices. Energy Source: Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, gravitational or other energy. November 2014 Page 3 of 9

Hazardous Energy: Energy sources including electrical, mechanical, hydraulic, pneumatic, chemical, thermal, gravitational or other energy that, when released, can cause harm. Isolation: Ensuring all sources of hazardous energy for a piece of equipment or machinery are moved or controlled to prevent it from unexpected activation or energization. Lockout: The placement of a lock on an energy isolating device or lockout device to physically neutralize all energies in a piece of equipment or machinery to ensure the energy isolating device being controlled cannot be operated until the lockout device is removed. Lockout Device: A device that can be placed on an energy isolating device and that allows a positive means, such as a lock, to be placed on it to control the energy isolating device. Examples include plug, switch, circuit breaker and gate or valve covers. Maintenance Work: Refers to inspection, repair, adjustment, cleaning, maintenance etc., for which a machine must be stopped. (i.e. other than normal operation). This includes activities such as constructing, installing, setting up, adjusting, inspecting, modifying, lubricating, cleaning, unjamming, servicing or repairs. Professors/Instructors/Technologists/Technicians: Individuals who have responsibility for the learning environment or authority over a student. Supervisor: An individual who has charge over a workplace or authority over a worker as defined by the Occupational Health and Safety Act. Tagout: The act of placing a warning tag on a padlock used for lockout to communicate the equipment must not be reenergized or operated until the lock is removed. 5.0 RESPONSIBILITIES Supervisors are responsible for: Identifying machines, equipment or processes in their area(s) that possess hazardous energy and are required to be included in the lockout/tagout program. Providing equipment, materials and protective devices necessary to perform work safely. Ensuring written lockout/tagout procedures are prepared for machines, equipment and processes in their area. Ensuring authorized employees under their control understand and apply lockout/tagout procedures. Ensuring contractors performing servicing or maintenance work in their area comply with lockout/tagout procedures. Employees are responsible for: Assisting in the development of lockout/tagout procedures for machines, equipment or processed in their area. Following procedures developed for machines, equipment or processes in their area. Reporting any deficiencies or problems associated with lockout/tagout procedures. November 2014 Page 4 of 9

Professors/Instructors/Technologist are responsible for: Identifying hazardous tasks requiring lockout procedures to be followed in the learning environment. Ensuring students follow lockout procedures in the learning environment as required. Occupational Health and Safety Department is responsible for: Providing assistance and guidance to departments regarding lockout procedures. Coordinating appropriate training for employees. Reviewing and updating the lockout/tagout program. Contractors and Students are responsible for: Complying with the requirements of this program. Providing their own locks, tags and lockout devices. Removing their own locks, tags and lockout devices when the maintenance or servicing work has been completed. Communicating their lockout procedures to the designated Mohawk College representative. 6.0 GENERAL LOCKOUT PROCEDURES 6.1 Lockout/Tagout Guidelines 1) Only authorized employees are permitted to perform lockout/tagout procedures. 2) If an energy isolating device is capable of being locked out, then it must be locked and tagged. 3) If an energy isolating device is not capable of being locked out, then it must be tagged out. 4) Prior to commencing servicing or work, equipment and machinery shall be inspected to verify the equipment or machinery can be effectively isolated. 5) All potential sources of hazardous energy (e.g. gravity, electrical, mechanical, pneumatic, pressure etc ) must be considered when determining lockout/tagout procedures. 6) Each person performing servicing or work on a machine must apply their own lock. After the lock has been applied, the key must be retained by the person who applied the lock. 6.2 Lockout/Tagout Equipment Each department is responsible for selecting and maintaining their lockout/tagout equipment. Lockout/tagout equipment must meet the following requirements: Locks must be key operated and standardized for each department or trade. Locks must not be used for purposes other than lockout. Tags must be made of durable, non-conductive material and must include wording such as: DO NOT OPERATE, DO NOT START, DO NOT OPEN. Note: OUT OF SERVICE tags must not be used for lockout/tagout purposes. 6.3 Lockout/Tagout Procedure 6.3.1 Prepare for Shutdown The authorized employee will: 1) Identify machines, equipment and processes to be isolated. 2) Inform all affected employees when machinery or piece of equipment will be locked out. 3) Identify the types and magnitude of hazardous energy to be controlled and understand the hazards of that energy. 4) Identify the methods for controlling the hazardous energy. 5) Identify all isolation points and energy isolation devices to be locked out. Ensure remote computer and/or programmable computer logic controllers are considered. 6) Identify and obtain appropriate personal protective equipment. 7) Identify and obtain locks, tags, lockout devices and other equipment required to perform the work. November 2014 Page 5 of 9

6.3.2 Equipment Shutdown 1) Notify all affected employees of the lockout. 2) Shutdown the equipment following the normal stop or rundown procedures. (e.g. push ON/OFF or START/STOP buttons or switches). 6.3.3 Isolation 1) Locate all energy isolation devices required to control the hazardous energy. 2) Operate the energy isolation devices such that the machine or equipment is isolated from energy sources. This usually involves opening a disconnect switch, circuit breaker or closing valves. Notes: (1) Never open a disconnect switch without first shutting down the equipment as it could result in arcing or an explosion. Use the left hand rule when opening and closing disconnect switches. (Left hand rule: Stay to the right of the disconnect switch, face away and use your left hand to operate the switch. This positioning protects the face and body in the event of arcing or an explosion). Use your right hand and face away if the switch is on the left side of the box. (2) Removal of fuses does not constitute lockout since the fuse could be easily replaced. Removing a fuse and locking the box is acceptable though. 6.3.4 Apply Lock and Tag 1) Apply locks and tags to each energy isolation device to ensure it is held in OFF position. 2) Where a lockout device is required for an energy isolation device, install the lockout device and apply locks and tags to ensure it is held in the OFF position. 6.3.5 De-energization: Control or Release Stored Energy 1) After application of lockout devices, all stored or residual energy must be relieved, disconnected, blocked, bled, restrained or otherwise made safe. Note: Remember to check that all motion has stopped. Consider energy stored in capacitors, springs, pressure lines, block or support elevated equipment. 6.3.6 Verification 1) Ensure all affected employees are cleared of the machine or equipment. 2) Before beginning any work, verify the machine or equipment is isolated and cannot be activated or restarted by one or more of the following actions: Manually operating control buttons or switches to start or operate the machine or equipment. Return controls to their off or neutral position. Using test instruments to test circuits. Visually inspecting the position or movement of parts such as gears, rotating parts, shafts, flywheels to ensure movement has ceased; inspecting gauges or other indicators. 6.3.7 Release from Lockout 1) Ensure all non-essential equipment or parts have been removed from the machine and the machine is operationally intact and safe to be operated. 2) Ensure the machinery, equipment and surrounding area is clear of anyone who could be harmed by the start-up. 3) Ensure each person who applied a lockout device and tag removes these from each energy isolation device. 4) Energize the machine, but do not start it up. 5) Notify all affected employees the machine or equipment is ready to be started. 6) Re-start the machine or equipment. November 2014 Page 6 of 9

7.0 SPECIAL LOCKOUT/TAGOUT PROCEDURES 7.1 Testing on Energized Equipment When there is a need to temporarily remove a lockout device to perform testing or troubleshooting on a piece of equipment or machinery, the following procedure is to be used: 1) Clear the machine or equipment of parts, tools that could be affected by energizing the machine or equipment. 2) Clear people from the area. 3) Remove the lock(s) and tag(s) from the affected energy isolation device. 4) Perform the required testing/work. 5) De-energize and re-apply the lockout devices 6) Verify the machine or equipment has been re-isolated by operating controls etc 7) Resume work on the machine or equipment. 7.3 Group Lockout When maintenance or servicing work is being performed by more than one authorized employee, a primary authorized employee must be assigned responsibility for controlling all energy isolating devices for the machine, equipment or process. 1) Before beginning work, the primary authorized employee will apply a multi-lock hasp and lock to each energy isolating device and verify the machine, equipment or process has been isolated. 2) Other authorized workers review the adequacy of the isolation and apply their own locks to the multi-lock hasp. 3) Authorized employees perform work. 4) Upon completion of work, each authorized employee removes non-essential items from the work area and remove their own personal lock(s). 5) The primary authorized employee is the last one to remove their lock and the energy isolating device. This can only be done after the primary authorized employee has assessed the area and is satisfied it is safe to do so. 7.4 Contractors Whenever outside contractors perform maintenance or servicing work that requires lockout/tagout procedures, the designated Mohawk College representative and each contractor shall inform each other of their respective lockout/tagout procedures. The Mohawk College representative must communicate this to affected College employees and ensure these respective procedures are mutually understood. 7.5 Lockout/Tagout Device Removal Each authorized employee who applies a lock and tag is responsible for removing their own lock and tag. In situations where it is not possible for the employee to remove his/her own lock, the lock can be removed by an individual authorized to do so and by the following steps: 1. The authorized individual will assess the situation to determine whether it is safe to remove the lock, preferably with someone knowledgeable of the machine, equipment or process and reason for the lockout and/or the maintenance or service work being performed. 2. After it has been determined to be safe to remove the lock, the authorized individual will complete a Lockout Device Removal Report (Appendix 1) before removing the lock. 3. The authorized individual removes the lock and ensures the person whose lock was removed is notified of the removal before they return to work. November 2014 Page 7 of 9

Appendix 1 LOCKOUT DEVICE REMOVAL REPORT November 2014 Page 8 of 9

LOCKOUT DEVICE REMOVAL REPORT Department: Shift: Authorized employee: Machine, equipment, or process: Time and date lockout device and information tag was discovered to have been left on: Confirmed that the authorized employee has left the site and/or facility? Yes No Supervisor s Initials: Time and Date: Attempts made to contact the authorized employee? Yes No Authorized employee has been contacted and is returning to the workplace to remove the lockout device and tag. Yes No If Yes, wait for authorized employee to return and remove the lock and tag. File form for future reference. If No, Supervisory personnel may authorize removal of the lock and tag once: The status and condition of the machine, equipment, or process are assessed and verified to be in a state that will allow for the safe removal of the lockout device. Provisions are in place to prevent the authorized employee from resuming work at this facility without notification of the fact that his or her lock and tag has been removed. Supervisor s Initials: Time and Date: Supervisory personnel can now remove the lockout device and tag. Supervisor s Initials: Time and Date: Witness: November 2014 Page 9 of 9