Original Gondola Train Operator s Manual

Similar documents
Assembly Instructions. -Cantilever Boat Lifts

TURF BROOM ATTACHMENT ASSEMBLY KIT

VERSA BIKE RACK INSTRUCTIONS

Installation of 2 Tier In Line Greeting Card Rack

#59114 Rola 2-Bike Rack Carrier (Shown Assembled) (A) (C) (B)

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

A. TO PREPARE THE MACHINE FOR USE.

Installation Instructions for the AlphaDeck Staging System

Universal Anchoring Adapter For Mercedes

User Manual. User Manual

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Row Marker OEM /

Final Assembly Instructions Bikes with Quill Stems

Tru Trak Sulky Proline Mid Size Mower Attachment

FOLD AND ROLL PLAYBACK TABLE TENNIS TABLE

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Assembly, disassembly and user manual

Ladies Shopper Bike Assembly Manual 28C03

Parts & Installation Instructions SV & SV 2 8.5, 9.5 & 10.5 and SVLD 7.5 Snow Plow


Final Assembly Instructions Bikes with Threaded Headsets

BELT DRIVE INDOOR CYCLING BIKE SF-B1712

Assembly Guide ST200 FUNCTIONAL TRAINER

IMPORTANT: RECEIVING INSTRUCTIONS:

Telescoping Attic Stair Operating Instructions

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

Troyer s Gourd Rack 8 unit F R H O P

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

Boat Boat Loader Fitting Instructions

FOLD AND ROLL PLAYBACK TABLE TENNIS TABLE

Santa Fe Cycles Assembly Guide Introduction

ATOC Meteorological Tower (6 meter-4 level) Guide

OPERATION AND FUNCTIONING

CAUTION - PUT SAFETY FIRST

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

INCLINE SLIDE ROWER SF-RW5720 USER MANUAL

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

SAVE THESE INSTRUCTIONS. NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further instructions.

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

CHAINLESS ANCHORING SYSTEM USER MANUAL

SAFETY FIRST. Inspection Proper Set Up Proper Climbing & Use Proper Storage & Carrying Operating Instructions

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Installation. Striping Kit for 42in and 50in Mowers Model No Installation Instructions. Removing the Mower Deck.

MAGNETIC CYCLING TRAINER SF-B0419 USER MANUAL

Kirra Entertainment Unit Assembly Instructions

VALVES & MEASUREMENT

BELT DRIVE INDOOR CYCLING BIKE SF-B1712 USER MANUAL

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

I.H.S INSTALLATION INSTRUCTIONS

Detroit Speed, Inc. A-body Rear Coilover Conversion Kit A-body (Moser Rear Axle) P/N: , , , , ,

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

BackCountry ebikes 2019 MULE Assembly

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

To Purchase This Item, Visit BMI Gaming (800)

engineered products Foldable Topside Creeper Safety First VIDEO INSTRUCTIONS ARE AVAILABLE ON OUR WEBSITE AT:

80 SERIES MOBILE-KARRIERS. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE 80 SERIES

X-6FC STRINGING MACHINE OWNER'S MANUAL. Issue 1 - May Copyright 2004 GAMMA Sports - All Rights Reserved

OWNERS MANUAL. Foldable Topside Creeper Model ATD-8116F

U.S. Patent No. 7,922,246. Patents Pending

Anchors that can be used for a lifeline in a grain bin. or Ladder do not make good anchors!

Instructions. Follow All Instructions Before Assembling Or Using This Product

Tripod Setup Guide (M-TPx)

USER S MANUAL QUESTIONS? CAUTION. Model No. FMEX Serial No. Write the serial number in the space above for reference. Serial Number Decal

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

BICYCLE TO MOTORCYCLE BICYCLE RACK

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

WINCH MOUNT KIT OWNER S MANUAL

Cable Replacement Instructions for R-Series Roust-A-Bout 100/150/250

F1 Ace Sport 2-in-1 Baby walker

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

Trampoline Installation Instructions

RS Important Notes. Contact. Bicycle Maintenance Stand instructions manual. Warranty Period : 1 year (from the date of your purchase)

! CAUTION! ! WARNING! General Information

Introduction 4-5 Ten commandments of safety 6-12 Important Parts & Mechanism Loading and Firing Unloading 24 Cleaning Complete

Stand-Up Wheelchair User s Manual. the H E L I U M

Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013)

632 AccuPro Set-up & Operation

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

Yoke Block Instruction Manual

INSTALLATION INSTRUCTIONS. Parts List. Tools Required. Before You Begin. Installation. Customer Information BICYCLE ATTACHMENT JUL.

It allows you to. is the Best Option. More information at

Final Assembly Instructions Bikes with Threaded Headsets

INDOOR CYCLING BIKE SF-B1110 USER MANUAL

TECHNICAL DATA ZTR Model 312

SETTING THE HANDLE HEIGHT ON THE ROLLATOR

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

Beach Dolly with cradle & keel pad Assembly Instructions

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

Portable Soccer Goal Safety Program

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Final Assembly Instructions Bikes with 16 Wheel Size

Transcription:

1-888-400-5227 Original Gondola Train Operator s Manual

Gondola Train BEFORE MOVE BEGINS (OPTIONAL) It is helpful to vice grip, clamp - one row on one side of shelves together (or bolt through holes on front of shelf) (OPTIONAL) On heavily weighted pegged peg boarded sections (heavy hardware, pulleys batteries etc...) Place a ¼ x 3 ½ bolt through a large washer, insert bolt through the middle of the weighted pegboard, place another large washer on the opposite side and lightly tighten a nut. This will help prevent the heavily weighted pegboard from coming out of its track. Remove/secure high or easily tip-able items. Push product back from edge of shelf. Remove base Kick-plates and Base feet end cap covers (Use Kick Plate remover hook) *If moving Lozier brand fixtures: Install Safety Cap and Pin. * Place cap on top of top upright, push Cap down firmly onto upright and place safety pin through the proper hole in cap that will insure the tightest/snug fit through the top hole in upright. This is important step to insure top rail remains in place during lifting and moving of fixture. If base shelf is missing or has to be removed to remove the kick plate. It is imperative to replace base shelf and place weight onto shelf. Sweep under gondolas and all open floor space.

MOVING DAY 1) Place Gondola Train Rollers in front of the first gondolas to be moved. Every other section of gondola. ** If moving Lozier brand fixtures: Install Safety Cap and Pin. * Place cap on top of top upright, push Cap down firmly onto upright and place safety pin through the proper hole in cap that will insure the tightest/snug fit through the top hole in upright. This is important step to insure top rail remains in place during lifting and moving of fixture. 2) Lift gondolas with the Gondola Handle. Always lift heavy side first and when lowering the gondola, lower the heavy side last. *** HEAVY SIDE UP FIRST - HEAVY SIDE DOWN LAST *** When lifting please use the cross pipe on the Gondola Handle. Place the cross pipe into the conduit hole in base foot bracket, and apply even downward pressure. If there is not a conduit hole available use the tip of the Gondola Handle, under the front of the base foot bracket. Lift only as high as needed to place Gondola Roller under shelf unit. Never lift higher than 2 inches. 3) When placing Gondola Roller under gondolas: Place forefingers on the underside of roller when installing roller. Place Gondola Roller under foot brackets and move to the front of the gondola feet. (Just behind front foot adjustable leveler Bolt) Turn Wheels in direction of initial push (use U Handle on Kick plate tool) **Replacing the kick plate after the Gondola Rollers have been positioned greatly increases stability of the gondola** 4) *On New Tile* Place a piece of carpet or cardboard under the Handle floor pivot point Also keep wheels clean to prevent marking of the new tile. WEIGHT / LOAD POLICIES 1) Recommend 200# pound person or less per Jack Handle. 2) If 2-200# workers are unable to lift a section of gondola. Remove weight from shelving

Always remove weight from top of gondola and work downward. * Remove ONLY front facings of product, thus allowing for easy restocking of shelves. Always leave weight on bottom shelf. **Replacing the kick plate after the Gondola Rollers have been positioned increases stability of the gondola** READY TO MOVE GONDOLAS 1) Length & weight of gondola will determine the quantity of people needed to move and control the fixture. 2) Roll gondola to holding area or to its final location as designated on your detailed floor plan. *Push low on fixture 3) We do not suggest leaving the Gondola Rollers under the gondolas for extended periods of time. 4) Remove base kick plates and lower gondolas into the position. ***Heavy side down last***. LEVELING THE GONDOLAS 1) Level main support uprights first. Place a string line from the top each of the end uprights Locate a person on each side of the gondola, with a Gondola Jack. Raise a section until center upright touches the string line. Work your way down the gondola leveling as needed.* It may be necessary to repeat this step. If the floor is very unlevel and during the first leveling, you were unable to completely level the gondola unit. It may be necessary to lower base foot levelers to help stabilize the gondola from wobbling. This becomes required if the center uprights levelers are extended. 2) Leveling gondolas side to side Locate a person on each side of the gondola unit, with a Gondola Jack Handle. Using a level find in which direction the gondola is leaning. Using the Gondola Jack Handle, raise the side of the gondola until level and lower the leveling leg until it touches the floor. Lift opposite side with very minimal pressure and lower leveling leg till it touches. Move on to next section. 3) Replace kick plates and base feet end cap covers. THE GONDOLAS ARE MOVED

SUGGESTION: HOW TO MOVE A DEPARTMENT AFTER SHELVING IS MOVED RELIEVE PRESSURE ON DEPT. & MERCHANDISING MANAGERS 1) Set up an empty 8 or 12 gondola on Gondola Rollers. 2) Move the empty gondola to an area that needs to be relocated. 3) Place the merchandise onto the empty, movable gondola in the exact Position as it was on the original gondola. ** counter balance the empty side of movable gondola with weight (cases of product, detergent etc...) 4) Roll this gondola to the new location. If there is product in the location, Place these items in the exact order on the backside of the movable gondola. (Remove the counter balance weight). Rotate the gondola and place the merchandise onto its new shelf location. 5) Replace counter balance weight and move to the area that the merchandise on the reverse side will be placed. 6) Continue this process until all merchandise is in its proper place Greatly reduces broken items, damaged packages Lost bin tags, and miss-positioned merchandise. THIS ALLOWS ANY LEVEL EMPLOYEE TO BE ABLE TO RESTOCK AND MERCHANDISE DURING THIS BUSY MOVE. EMPLOYEE MORALE WILL REMAIN HIGH