Columbia Lake Dam Removal Project

Similar documents
COLUMBIA LAKE DAM REMOVAL PROJECT

Columbia Lake Dam Removal Project

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Electrofishing Surveys Shed Light on Dynamic Millstone River Fishery. By Shawn Crouse, Principal Fisheries Biologist

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

The Life History and Management of Alewife (Alosa pseudoharengus)

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Study Update Fish Distribution and Species Composition

Merrimack River Watershed MERRIMACK RIVER WATERSHED

Rahway River Fish Passage Feasibility Evaluation. Weston Solutions, Inc. February 5, 2009

Restoring Migratory Fish to Rhode Island s Rivers and Streams. Outline

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement

Blueback Herring. Appendix A: Fish. Alosa aestivalis. New Hampshire Wildlife Action Plan Appendix A Fish-10

GRANT F-48-R. Investigations and Management of New Jersey s Freshwater Fisheries Resources FINAL REPORT JOB I-5

Feasibility and Planning Study

Environmental Review and Permitting for Wild Trout

Return. of the. Restored access leads to record runs up the Lamprey River. Michael Dionne

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Chagrin River TMDL Appendices. Appendix F

Eastern Brook Trout Joint Venture Completed Project Report Form

New Hampshire ASMFC River Herring Sustainable Fishing Plan New Hampshire Fish and Game Department March, Executive Summary

Agenda Item 7.1 For Information. Council CNL(10)24. Annual Report on Actions Taken Under Implementation Plans USA

NJ DIVISION OF FISH AND WILDLIFE Bureau of Freshwater Fisheries

Culvert Replacement and Stream Restoration in Wolfden Run, Garrett County, Maryland

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Executive Summary. New Hampshire ASMFC River Herring Sustainable Fishing Plan New Hampshire Fish and Game Department March, 2011.

Integrated Pest Management: Application in the Sea Lamprey Control Program

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan

Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey. Bill Holman, P.E. Stanley Consultants

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Searsville Dam Removal

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Mill Creek/Rose Valley Watershed General Information Presented by Dr. Mel Zimmerman Lycoming College CWI

Resources and Guidance for writing a River Herring Management Plan

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Southern Oregon Coastal Cutthroat Trout

APPENDIX A. Stream Electrofishing Survey Data (2015)

Brook Trout in Massachusetts: A Troubled History, A Hopeful Future

Warmwater Fisheries Assessments 2014

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Western native Trout Status report

Volume I: Ecological Attributes of the San Francisco Bay-Delta Watershed

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Manual of Fisheries Survey Methods II: with periodic updates. Chapter 22: Guidelines for Sampling Warmwater Rivers with Rotenone

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Black Sturgeon Regional Plan

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Chadbourne Dam Repair and Fish Barrier

Management of headwater streams in the White Mountain National Forest

Okanagan Sockeye Reintroduction

PROJECT TITLE. Leadmine Brook Fish Passage and Habitat Restoration Project. NFHAP funding requested: $50,000

APPENDIX A-6 SALUDA HYDROELECTRIC PROJECT STURGEON PROTECTION AND ADAPTIVE MANAGEMENT PROGRAM

RESTORING AND MONITORING MIGRATORY FISH POPULATIONS IN THE PIE WATERSHEDS

Finding the Way Home

Outstanding Iowa Waters, Trout Streams & Value to Northeast Iowa

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA

STEELHEAD SURVEYS IN OMAK CREEK

Muskegon River Management Plan

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Council CNL(15)42. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

IN THE MATTER OF. Ed Friedman, under the penalty of perjury, states as follows:

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017

Council. CNL(15)42rev. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

Family Clupeidae. River Herring of the James

SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2012

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

Delaware River Seine Survey: 2012 Sampling Summary

Nechako white sturgeon are an Endangered Species

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018

California Steelhead: Management, Monitoring and Recovery Efforts

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Refined Designated Uses for the Chesapeake Bay and Tidal Tributaries

JOB 1, PART 2. SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2011

Fish Community. Fish Habitat, Streams and Rivers

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Upper Columbia Redband Trout: Conservation for the Future

Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4)

Sub-watershed Summaries

Fisheries Survey of White Rapids Flowage, Marinette County Wisconsin during Waterbody Identification Code

Study Update Tailrace Slough Use by Anadromous Salmonids

NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

July 24, Kalispel Tribe of Indians Update on Efforts to Suppress Northern Pike and Policy Implications

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Alewife. Appendix A: Fish. Alosa pseudoharengus. New Hampshire Wildlife Action Plan Appendix A Fish-21

Claytor Lake View of the Claytor Lake dam from Claytor Lake State Park s boat ramp.

Transcription:

Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport. Restore 10 miles of migratory pathways for fish such as American Shad and improve abundance of other migratory fish such as American Eel (particularly juveniles that are impeded by the dam). Restore 1.4 miles of riparian /stream habitat impounded by the lake. Reduce thermal impacts on the 1.4 mile impounded section of the Paulins Kill. Eliminate the turbine impacts on aquatic biota, especially, anadromous and resident fish populations. Eliminate costs associated with maintaining 100-year old dam. Major Partners: The Nature Conservancy, American Rivers, USFWS, DEP Office of Natural Resource Restoration and DEP Fish and Wildlife. Project Timeline: (Updated June 14, 2018) At this time and until project completion in the Spring 2019, the portion of the Columbia Wildlife Management Area in the vicinity of the lake will be closed to the public. Lake Lowering - June 4 th (underway) Mussel Salvage and Relocation - (completed) Remnant Dam Removal - end of June/early July 2018 Initial Breach of the Columbia Dam - mid July 2018 Scour Protection to Bridges (Rt 80, Warrington, Bugler) - August to October 2018 Fish Passage Rt. 80 Bridge - October to December 2018 Columbia Dam Removal - January 2019 Planting/Stabilization - March to April 2019

Background: The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County. The dam impounds a 43-acre lake that stretches more than 1.5 miles upstream of the dam. The dam and the lake (sold by NJ Power & Light Co. in 1955) is owned and managed by the NJ DEP Division of Fish and Wildlife as part of the 1,098 acre Columbia Wildlife Management Area. Since the construction of the dam in 1909 by Warren County Power Co., the 18-foot high, 330- foot long dam has served as a barrier to fish passage, severing New Jersey s third largest tributary to the Delaware River from its watershed. This obstruction blocks American Shad access to their historic spawning grounds, and impedes the movement of American Eel. The proposed removal of the dam will restore fish passage to over 10 miles of river, restore natural flow regime, and reclaim 1.5 miles of stream habitat. The dam removal project is just one aspect of a larger initiative led by The Nature Conservancy with the goals of improving riparian and instream habitat throughout the Paulins Kill watershed. Paulins Kill Watershed The Paulins Kill is 41 miles long, its headwaters beginning in the Hyper Humus marshes (part of Paulins Kill Wildlife Management Area) around Newton and flowing west, entering the Delaware River in Knowlton Twp. There are four on-stream impoundments; Columbia Lake (Knowlton Twp.), Paulina Lake (Blairstown Twp.), Paulins Kill Lake (Stillwater/Hampton Twp.) and Hyper Humus (Hampton/Andover Twps.). Downstream of Paulins Kill Lake the Paulins Kill is classified as Trout Maintenance meaning it has suitable habitat and water temperatures to support trout year-round. The Paulins Kill is stocked annually with trout by Fish and Wildlife from just below the Hyper Humus ponds downstream to Columbia Lake. Upstream of Paulins Kill Lake is Non-trout meaning its habitat and temperatures are not conducive to trout and therefore supports a more general warmwater fish

assemblage. This section of the Paulins Kill also provides the critical habitat to support important mussel species. Paulins Kill River Fish and Wildlife's Bureau of Freshwater Fisheries has been monitoring sites within the Paulins Kill for two years to collect baseline data. Ten sampling locations, over 17 field days, were sampled in 2015 and 2016, involving a total of 499 man hours. These activities are funded by Hunters & Anglers and Federal Sport Fish Restoration Funds. Sampling techniques included; stream electrofishing, boat electrofishing, gill nets, trap nets, seines, cast nets and a dissolved oxygen / temperature probe. The Paulins Kill being a large, wide and deep river complicates typical sampling methods used for wadeable streams so several techniques were utilized. Below average water levels during the spring of 2015 aided sampling efforts, however 2016 water levels were closer to average making sampling more difficult. Overall, 2,313 individual fish representing 41 American Shad caught electrofishing different species were collected, inspected and below the Columbia Lake Dam released back into the Paulins Kill River. Anadromous fish species such as American Shad (33) and Blueback Herring (1) were documented below the Columbia Lake Dam, but not found in any locations above the Dam confirming the Dam as a barrier to fish passage for these anadromous species. 461 American Eels (365 smaller than 200mm) were found in 2 locations below the Columbia Lake Dam. This compares to only 87 American Eels (8 smaller than 200mm) found in 8 locations above the Dam. These data illustrate that the Columbia Lake Dam is restricting the passage of this catadromous (live in fresh water but spawn in marine waters) species as well. Biological Monitoring The Columbia Lake dam removal project includes comprehensive pre and post project monitoring. This includes: Water Chemistry (American Rivers/The Nature Conservancy) Freshwater Mussels (United States Geological Survey) Macroinvertebrates (The Nature Conservancy) American Eel and Lamprey (Academy of Natural Sciences) Freshwater Fisheries (NJDEP Division of Fish and Wildlife) Stream Temperature (The Nature Conservancy/NJDEP Division of Fish and Wildlife)

Angler Use (NJDEP Division of Fish and Wildlife/ Stockton State University)

Frequently Asked Questions How many private homes are located on the lake? There are no private homes on the lake. The lake and surrounding property is owned by the State of New Jersey and managed by the Division of Fish and Wildlife as part of the Columbia Wildlife Management Area. How do we know American Shad will migrate up the river once the dam is removed? The Paulins Kill is a known historic migratory pathway for American Shad. Local historic documents, from the late 1700's, reference the runs of shad as well as concern that the construction of mill dams at the time was limiting shad from migrating up the river. To this day, American Shad continue to migrate to the base of the dam. In 2016, a Blueback Herring, another migratory species, was documented at the base of the dam. Why remove the dam - why not just build a fish ladder? Dam removal or breaching (partial removal) are the preferred options when restoring fish passage. Fish ladders are used when removing the dam is not a feasible option. Fish ladders require considerable maintenance as they often become clogged with debris or sediment requiring clean out. As such, a fish ladder adds to maintenance costs, in addition to continuing dam maintenance costs. The effectiveness of a fish ladder to pass fish also varies considerably as ever changing hydrologic conditions affects water depth, velocities and turbulence through the ladder. Fish ladders also do not achieve the added benefits of dam removal such as restoring natural flow regime, sediment transport, and reducing thermal stressors, as well as eliminating dam maintenance costs. Is Columbia Lake Dam the only dam slated for potential removal in the Paulins Kill? No. Paulina Dam, located 9 miles upstream, directly on the Paulins Kill mainstem, is also being considered for removal. Paulina Dam, is owned by Blairstown Township. The township is interested in having the dam removed. Wasn't the dam used to generate hydropower? Warren County Power Co. constructed the Columbia Lake dam in 1909 to generate electricity. Hydropower was generated until 1955 when the dam and surrounding acres were sold to the state. Great Bear Hydropower Inc., a small hydropower company, restored hydropower operations in 1986, leasing the dam from Fish and Wildlife. Approximately 530 KW of electricity could be generated. The company's 40-year Federal Energy Regulatory Commission (FERC) license for generating power was set to expire in 2025 and would require renewal. Great Bear Hydropower Inc. sold its hydropower operations at Columbia in 2016 and surrendered its FERC license. All hydropower generating components have been removed from the dam and powerhouse. Do American Shad reach the dam now? Yes. Each spring, American Shad migrate up the Paulins Kill, from the Delaware River, to the base of the Columbia Lake Dam. What will happen to the fish in the Lake?

Prior to the removal of the dam, lake levels in Columbia Lake will be lowered to help congregate fish in the lake and the fish from the lake will then be collected via boat electrofishing and transferred to hatchery trucks and relocated to nearby off-stream impoundments whose fisheries would benefit. Any invasive species present such as Common Carp or any other of the ten potentially dangerous fish species that may be encountered cannot be relocated and will be humanely destroyed.