WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M.
PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm Road PTH 1 De Vries Avenue PTH 1 1 Knowles Avenue Avenue Headmaster Row Row Lagimodiere Boulevard
INTERSECTION VS INTERCHANGE 2 INTERSECTION Road junction where two (or more) roads meet at the same level. PTH 1 (Perimeter Highway) and PTH 6 Controlled by yields or stop signs or traffic lights or roundabouts. Example: Provincial Trunk Highway (PTH) 1 (Perimeter Highway) and PTH 6. INTERCHANGE Road junction where two roads meet at different levels. PTH 1 (Perimeter Highway) and PTH 59 South Uses different levels and ramps to allow traffic on at least one of the roads to flow freely. Many configurations exist; most common in Manitoba is the cloverleaf (four loop) or partial cloverleaf (three or less loop ramps). Example: PTH 1 (Perimeter Highway) and PTH 59 South.
PROJECT BACKGROUND 3 The original design for the and PTH 1 interchange was completed in the mid 1990 s. The current configuration, which includes two traffic signal controlled intersections, is the 1996 construction detour that was designed to be in place on an interim basis to allow future construction of the interchange. The existing layout is unusual, and operational and safety issues have arisen at the two intersections since their construction, and conditions continue to deteriorate. As traffic volumes have increased, the intersection layout has reached the end of its effective service life.
PROJECT BACKGROUND 4 The government has approved the full interchange project at and PTH 1 in the current five-year Highway Capital program. An update to the design is required to incorporate changes to Manitoba Infrastructure and Transportation (MIT) design standards and practices, as well as to accommodate development that has occurred in the area since the original design. The purpose of this project is to ensure the functional design of the interchange meets today s standards and future operating requirements. This project will also include the preliminary design of all associated structures.
SUPPLEMENTAL STUDIES 5 Geotechnical / Groundwater Geotechnical site investigations will be completed and foundation recommendations provided. Drainage Drainage requirements will be recommended and incorporated into the functional design. Road Safety Audit An independent road safety audit of the functional design will be conducted. Noise / Vibration Noise and vibration levels will be monitored; noise forecasts and mitigation strategies will be identified as required.
PUBLIC CONSULTATION 6 Key stakeholders within the study area were identified and contacted: Government Departments and Agencies: City of Winnipeg, Rural Municipality (RM) of East St. Paul, RM of Springfield, emergency services, Canada Post, and local school divisions. Special Interest Stakeholders: River East Neighbourhood Network-Trail Committee, and Brokenhead Ojibway Nation (BON). Property Owners: Property owners and individuals directly affected by land acquisitions were consulted individually. General Public: Information is being provided to the general public through this Public Information Session.
TRAFFIC ANALYSIS 7 Traffic volumes were examined for current () and forecast conditions (30) for weekday peak traffic and summer recreational peak traffic flows. Movements through the proposed and PTH 1 interchange are forecast to experience little delay during peak periods. Some congestion is anticipated to occur at the intersections of Lagimodiere Boulevard at Headmaster Row and at at Provincial Road (PR) 2, primarily due to high through volumes on.
TRAFFIC VOLUMES and PR 2 8 390 730 640 80 770 80 730 2 50 PTH 1 WEEKDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and Wenzel Street 1590 Wenzel St. Sperring Avenue Birds Hill Road 30 30 350 11 PTH 1 390 740 0 530 7 30 330 70 0 530 70 0 640 950 10 80 50 Pritchard Farm Road 140 70 Headmaster Row Knowles Avenue 1550 0 50 70 670 380 570 1 1580 McGregor Farm Road 30 14 1590 30 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and
TRAFFIC VOLUMES and PR 2/Wenzel Street and Headmaster Row/Knowles Avenue 9 2 290 80 370 140 30 730 5 PTH 1 30 WEEKDAY PM PEAK HOUR FORECAST TRAFFIC VOLUMES PTH 1 and Interchange Birds Hill Road 540 00 PTH 1 50 575 540 640 1980 Sperring Avenue 965 115 40 95 70 950 40 PR 2 00 1350 70 90 30 550 1300 930 70 30 40 9 980 1630 40 80 930 640 1300 930 140 Wenzel Street 80 2230 0 16 80 700 Headmaster Row 9 80 140 70 Knowles Avenue 40 50 2230 30
4 840 830 1950 880 1950 840 PTH 1 TRAFFIC VOLUMES SUMMER FRIDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and PR 2 and Wenzel Street 40 Wenzel St. Sperring Avenue Birds Hill Road 30 30 4 1340 PTH 1 4 8 0 8 50 840 40 0 400 1670 0 0 8 1680 0 830 12 1440 0 30 1230 Pritchard Farm Road 170 1270 Headmaster Row Knowles Avenue 2430 0 50 70 770 70 500 7 340 2 25 40 McGregor Farm Road 2350 2490 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and
11 815 1515 7 1180 890 1180 1515 PTH 1 TRAFFIC VOLUMES SUMMER SUNDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and PR 2 and Wenzel Street 13 Wenzel St. Sperring Avenue Birds Hill Road 7 1705 PTH 1 815 80 1650 0 0 7 90 1700 290 300 1490 0 0 7 0 1815 0 70 22 30 Pritchard Farm Road 1765 1445 70 Headmaster Row Knowles Avenue 0 1830 0 50 70 180 4 190 0 1780 McGregor Farm Road 40 1740 1880 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and
& PTH 1 LEVEL OF SERVICE 11B Wenzel St. Wenzel St. Wenzel St. Wenzel St. PR 2 PTH 1 PR 2 PTH 1 Pritchard Farm Road Knowles Avenue PM SUMMER FRIDAY PM PR 2 Wenzel St. Pritchard Farm Road PTH 1 PTH 1 Knowles Avenue Wenzel St. PTH 1 Headmaster Row Knowles Avenue Headmaster Row A,B,C = Green D,E = Yellow F = Red A,B,C = Green D,E = Yellow F = Red PR 2 SUMMER SUNDAY PM 30 PM Wenzel St. Pritchard Farm Road PTH 1 PTH 1 Knowles Avenue Headmaster Row Wenzel St. PTH 1 Headmaster Row A,B,C = Green D,E = Yellow F = Red A,B,C = Green D,E = Yellow F = Red
PEDESTRIAN/CYCLIST AMENITIES 12 Northeast Pioneer Greenway is located southwest of the proposed and PTH 1 interchange. Ultimate plan is to extend the Greenway to Birds Hill Park. An overpass over PTH 1 would link North Kildonan with the RM of East St. Paul along the Gateway/Raleigh corridor. The proposed roadway plans include shoulders similar to those existing elsewhere on and PTH 1 within the study area.
COLLISION ANALYSIS 13 Collision analysis involves a review of the collision history to establish collision rates and identify possible relationships between collisions and the geometric features and operational conditions of the road facility. Collision rate is a measure of the risk faced by the road user and is based on the number of collisions that occurred and the volume of traffic during a specified period. Collision rates for road links exceeding 1.5 incidents per MVKT (million vehicle-kilometres of travel) warrant further review. There are no locations within the study area that had a collision rate greater than 0.81 incidents per MVKT. Collision rates for intersections exceeding 1.5 incidents per MEV (million entering vehicles) warrant further review. All intersections within the study area had a collision rate at or below 0.25 incidents per MEV.
ACCESS MANAGEMENT 14 Proposed intersection modifications at /PR 2 Proposed closure of De Vries Ave. at PTH 1 Proposed closure of Sperring Ave. at PTH 1 PTH 1 Pritchard Farm Road Proposed closure of Pritchard and McGregor Farm Rd. Access to and median cross-over McGregor Farm Road Proposed realignment of Wenzel St. Proposed interchange upgrades to PTH 1 and Proposed closure of Wenzel St. at and median cross-over Wenzel Street Proposed closure of Knowles Ave. and BLVD LAGIMODIERE Proposed extension of Headmaster Row PTH 1
PROPOSED INTERCHANGE DESIGN 15
BRIDGES 16 Seven bridges are required. Six new locations: Three on PTH 1 over the east-bound to north-bound (EB-NB) Ramp to (No. 5, No. 6, and No. 7). Three on PTH 1 over (No. 2, No. 3, and No. 4). One Reconstruction: One on east-bound to northbound (EB-NB) Ramp over PTH 59N (No. 1).
TYPICAL DECK SECTION FOR MAIN BRIDGES 17 SECTION LOOKING WEST ON PTH 1
DRAINAGE DESIGN FEATURES 18 Ditch slopes shall be as steep as possible to adequately convey the flow and prevent unwanted ponding Culverts have been sized to control the flow of water downstream at a rate compatible with the ditch section No long-term retention ponds shall be incorporated into the design
DRAINAGE - KEY POINTS 19 Flows from areas outside of the proposed interchange are a significant portion of the total flow that is eventually discharged into the Red River The proposed interchange will improve the performance of the overall drainage basin by slowing down and reducing the peak flows into the Red River The proposed drainage system: Optimizes the use of culverts, ditches and local depression areas in order to reduce peak flows Adequately conveys up to a one-in-50 year 24-hour City of Winnipeg storm event Incorporates emergency spillways to prevent water levels from rising higher than the roadway surface The current outfall at the Red River, although adequate in size to discharge the design flow, should undergo a complete condition assessment.
OVERALL DRAINAGE PLAN
PROPERTY IMPACTS 21
PROPERTY IMPACTS 22
AND PR 2 INTERSECTION 23 Controlling the number of access points to and providing for acceleration and deceleration of vehicles entering and exiting the highway are two areas that significantly improve roadway safety. By closing access points along, traffic levels at the intersection of and PR 2 will increase. The intersection will be signalized as a result of the increased traffic volumes. Wenzel Street will be realigned to form the eastern leg of the intersection. The long-term plan for this location is an interchange.
AND PR 2 INTERSECTION UPGRADES AND PROPERTY IMPACTS 24 PR 2
LONG-TERM PLAN FOR AND PR 2 25
PROJECT TIMELINE 26 END OF 11 12-13 14-17 Functional Design Study Completion Detailed Design Land Acquisition Environmental Approvals Finalize Project Staging Construction
THANK YOU PLEASE FILL OUT AN EXIT SURVEY BEFORE LEAVING AND DROP OFF IN THE BOX PROVIDED.