WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Similar documents
CHIEF PEGUIS TRAIL EXTENSION WEST

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

DUNBOW ROAD FUNCTIONAL PLANNING

I-10 AT SCENIC LOOP RD. Open House

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Terwillegar Drive Expressway Draft Concept Plan

CITY OF SASKATOON COUNCIL POLICY

Design Criteria. Design Criteria

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

Project Update May 2018

Route 7 Corridor Study

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Welcome to the McKenzie Interchange Project Open House!

Harrah s Station Square Casino

List of Display Boards

Chapter 4 Traffic Analysis

Casablanca Boulevard & GO Station Access

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Iowa Highway 58 Corridor Improvement Study

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

TRANSPORTATION & MOBILITY

Truck Climbing Lane Traffic Justification Report

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Proposed Action, Purpose and Need Technical Memorandum

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Sixth Line Development - Transit Facilities Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

INDEX. Geometric Design Guide for Canadian Roads INDEX

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Intersection Traffic Control Feasibility Study

Appendix D: Concept Screening

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Preliminary Engineering Study

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Tonight is for you. Learn everything you can. Share all your ideas.

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Welcome to the Open House

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Traffic Control Inspection Checklist Segment:

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

APPENDIX E Evaluation of Improvement Alternatives

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

FDOT Treasure Coast Traffic Impact Report

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Welcome! San Jose Avenue Open House August 25, 2015

122 Avenue: 107 Street to Fort Road

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Hospital Link Project Project Update November 2017

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

FDOT Treasure Coast Traffic Impact Report

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

3.0 PROJECT DESCRIPTION

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Hospital Link Project Project Update September 2017

Highway 56 Traffic Study Rymal Road to Cemetery Road

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

PROJECT FACT SHEET May 25, 2018

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Intersection Control Evaluation Report Project: Alternative: Location: Evaluator:

IH 20 RANGER HILL PUBLIC MEETING

Evaluation of Alternatives and Options For the City of Windsor Sam Schwartz Engineering PLLC January 2005

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

APPENDIX D COST SUMMARY TABLES

Highway 1 Kamloops to Alberta Four-Laning Program

Access Routes from US 101 to the Richmond San Rafael Bridge

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Corridor Studies. LA 415 and LA 73

Route 29 Solutions Projects

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Detailed Description of Work

Parks Highway: MP Lucus Road to Big Lake Road

Transcription:

WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M.

PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm Road PTH 1 De Vries Avenue PTH 1 1 Knowles Avenue Avenue Headmaster Row Row Lagimodiere Boulevard

INTERSECTION VS INTERCHANGE 2 INTERSECTION Road junction where two (or more) roads meet at the same level. PTH 1 (Perimeter Highway) and PTH 6 Controlled by yields or stop signs or traffic lights or roundabouts. Example: Provincial Trunk Highway (PTH) 1 (Perimeter Highway) and PTH 6. INTERCHANGE Road junction where two roads meet at different levels. PTH 1 (Perimeter Highway) and PTH 59 South Uses different levels and ramps to allow traffic on at least one of the roads to flow freely. Many configurations exist; most common in Manitoba is the cloverleaf (four loop) or partial cloverleaf (three or less loop ramps). Example: PTH 1 (Perimeter Highway) and PTH 59 South.

PROJECT BACKGROUND 3 The original design for the and PTH 1 interchange was completed in the mid 1990 s. The current configuration, which includes two traffic signal controlled intersections, is the 1996 construction detour that was designed to be in place on an interim basis to allow future construction of the interchange. The existing layout is unusual, and operational and safety issues have arisen at the two intersections since their construction, and conditions continue to deteriorate. As traffic volumes have increased, the intersection layout has reached the end of its effective service life.

PROJECT BACKGROUND 4 The government has approved the full interchange project at and PTH 1 in the current five-year Highway Capital program. An update to the design is required to incorporate changes to Manitoba Infrastructure and Transportation (MIT) design standards and practices, as well as to accommodate development that has occurred in the area since the original design. The purpose of this project is to ensure the functional design of the interchange meets today s standards and future operating requirements. This project will also include the preliminary design of all associated structures.

SUPPLEMENTAL STUDIES 5 Geotechnical / Groundwater Geotechnical site investigations will be completed and foundation recommendations provided. Drainage Drainage requirements will be recommended and incorporated into the functional design. Road Safety Audit An independent road safety audit of the functional design will be conducted. Noise / Vibration Noise and vibration levels will be monitored; noise forecasts and mitigation strategies will be identified as required.

PUBLIC CONSULTATION 6 Key stakeholders within the study area were identified and contacted: Government Departments and Agencies: City of Winnipeg, Rural Municipality (RM) of East St. Paul, RM of Springfield, emergency services, Canada Post, and local school divisions. Special Interest Stakeholders: River East Neighbourhood Network-Trail Committee, and Brokenhead Ojibway Nation (BON). Property Owners: Property owners and individuals directly affected by land acquisitions were consulted individually. General Public: Information is being provided to the general public through this Public Information Session.

TRAFFIC ANALYSIS 7 Traffic volumes were examined for current () and forecast conditions (30) for weekday peak traffic and summer recreational peak traffic flows. Movements through the proposed and PTH 1 interchange are forecast to experience little delay during peak periods. Some congestion is anticipated to occur at the intersections of Lagimodiere Boulevard at Headmaster Row and at at Provincial Road (PR) 2, primarily due to high through volumes on.

TRAFFIC VOLUMES and PR 2 8 390 730 640 80 770 80 730 2 50 PTH 1 WEEKDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and Wenzel Street 1590 Wenzel St. Sperring Avenue Birds Hill Road 30 30 350 11 PTH 1 390 740 0 530 7 30 330 70 0 530 70 0 640 950 10 80 50 Pritchard Farm Road 140 70 Headmaster Row Knowles Avenue 1550 0 50 70 670 380 570 1 1580 McGregor Farm Road 30 14 1590 30 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and

TRAFFIC VOLUMES and PR 2/Wenzel Street and Headmaster Row/Knowles Avenue 9 2 290 80 370 140 30 730 5 PTH 1 30 WEEKDAY PM PEAK HOUR FORECAST TRAFFIC VOLUMES PTH 1 and Interchange Birds Hill Road 540 00 PTH 1 50 575 540 640 1980 Sperring Avenue 965 115 40 95 70 950 40 PR 2 00 1350 70 90 30 550 1300 930 70 30 40 9 980 1630 40 80 930 640 1300 930 140 Wenzel Street 80 2230 0 16 80 700 Headmaster Row 9 80 140 70 Knowles Avenue 40 50 2230 30

4 840 830 1950 880 1950 840 PTH 1 TRAFFIC VOLUMES SUMMER FRIDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and PR 2 and Wenzel Street 40 Wenzel St. Sperring Avenue Birds Hill Road 30 30 4 1340 PTH 1 4 8 0 8 50 840 40 0 400 1670 0 0 8 1680 0 830 12 1440 0 30 1230 Pritchard Farm Road 170 1270 Headmaster Row Knowles Avenue 2430 0 50 70 770 70 500 7 340 2 25 40 McGregor Farm Road 2350 2490 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and

11 815 1515 7 1180 890 1180 1515 PTH 1 TRAFFIC VOLUMES SUMMER SUNDAY PM PEAK HOUR CURRENT TRAFFIC VOLUMES and PR 2 and Wenzel Street 13 Wenzel St. Sperring Avenue Birds Hill Road 7 1705 PTH 1 815 80 1650 0 0 7 90 1700 290 300 1490 0 0 7 0 1815 0 70 22 30 Pritchard Farm Road 1765 1445 70 Headmaster Row Knowles Avenue 0 1830 0 50 70 180 4 190 0 1780 McGregor Farm Road 40 1740 1880 and Headmaster Row/Knowles Avenue and Pritchard Farm Road/McGregor Farm Road PTH 1 and

& PTH 1 LEVEL OF SERVICE 11B Wenzel St. Wenzel St. Wenzel St. Wenzel St. PR 2 PTH 1 PR 2 PTH 1 Pritchard Farm Road Knowles Avenue PM SUMMER FRIDAY PM PR 2 Wenzel St. Pritchard Farm Road PTH 1 PTH 1 Knowles Avenue Wenzel St. PTH 1 Headmaster Row Knowles Avenue Headmaster Row A,B,C = Green D,E = Yellow F = Red A,B,C = Green D,E = Yellow F = Red PR 2 SUMMER SUNDAY PM 30 PM Wenzel St. Pritchard Farm Road PTH 1 PTH 1 Knowles Avenue Headmaster Row Wenzel St. PTH 1 Headmaster Row A,B,C = Green D,E = Yellow F = Red A,B,C = Green D,E = Yellow F = Red

PEDESTRIAN/CYCLIST AMENITIES 12 Northeast Pioneer Greenway is located southwest of the proposed and PTH 1 interchange. Ultimate plan is to extend the Greenway to Birds Hill Park. An overpass over PTH 1 would link North Kildonan with the RM of East St. Paul along the Gateway/Raleigh corridor. The proposed roadway plans include shoulders similar to those existing elsewhere on and PTH 1 within the study area.

COLLISION ANALYSIS 13 Collision analysis involves a review of the collision history to establish collision rates and identify possible relationships between collisions and the geometric features and operational conditions of the road facility. Collision rate is a measure of the risk faced by the road user and is based on the number of collisions that occurred and the volume of traffic during a specified period. Collision rates for road links exceeding 1.5 incidents per MVKT (million vehicle-kilometres of travel) warrant further review. There are no locations within the study area that had a collision rate greater than 0.81 incidents per MVKT. Collision rates for intersections exceeding 1.5 incidents per MEV (million entering vehicles) warrant further review. All intersections within the study area had a collision rate at or below 0.25 incidents per MEV.

ACCESS MANAGEMENT 14 Proposed intersection modifications at /PR 2 Proposed closure of De Vries Ave. at PTH 1 Proposed closure of Sperring Ave. at PTH 1 PTH 1 Pritchard Farm Road Proposed closure of Pritchard and McGregor Farm Rd. Access to and median cross-over McGregor Farm Road Proposed realignment of Wenzel St. Proposed interchange upgrades to PTH 1 and Proposed closure of Wenzel St. at and median cross-over Wenzel Street Proposed closure of Knowles Ave. and BLVD LAGIMODIERE Proposed extension of Headmaster Row PTH 1

PROPOSED INTERCHANGE DESIGN 15

BRIDGES 16 Seven bridges are required. Six new locations: Three on PTH 1 over the east-bound to north-bound (EB-NB) Ramp to (No. 5, No. 6, and No. 7). Three on PTH 1 over (No. 2, No. 3, and No. 4). One Reconstruction: One on east-bound to northbound (EB-NB) Ramp over PTH 59N (No. 1).

TYPICAL DECK SECTION FOR MAIN BRIDGES 17 SECTION LOOKING WEST ON PTH 1

DRAINAGE DESIGN FEATURES 18 Ditch slopes shall be as steep as possible to adequately convey the flow and prevent unwanted ponding Culverts have been sized to control the flow of water downstream at a rate compatible with the ditch section No long-term retention ponds shall be incorporated into the design

DRAINAGE - KEY POINTS 19 Flows from areas outside of the proposed interchange are a significant portion of the total flow that is eventually discharged into the Red River The proposed interchange will improve the performance of the overall drainage basin by slowing down and reducing the peak flows into the Red River The proposed drainage system: Optimizes the use of culverts, ditches and local depression areas in order to reduce peak flows Adequately conveys up to a one-in-50 year 24-hour City of Winnipeg storm event Incorporates emergency spillways to prevent water levels from rising higher than the roadway surface The current outfall at the Red River, although adequate in size to discharge the design flow, should undergo a complete condition assessment.

OVERALL DRAINAGE PLAN

PROPERTY IMPACTS 21

PROPERTY IMPACTS 22

AND PR 2 INTERSECTION 23 Controlling the number of access points to and providing for acceleration and deceleration of vehicles entering and exiting the highway are two areas that significantly improve roadway safety. By closing access points along, traffic levels at the intersection of and PR 2 will increase. The intersection will be signalized as a result of the increased traffic volumes. Wenzel Street will be realigned to form the eastern leg of the intersection. The long-term plan for this location is an interchange.

AND PR 2 INTERSECTION UPGRADES AND PROPERTY IMPACTS 24 PR 2

LONG-TERM PLAN FOR AND PR 2 25

PROJECT TIMELINE 26 END OF 11 12-13 14-17 Functional Design Study Completion Detailed Design Land Acquisition Environmental Approvals Finalize Project Staging Construction

THANK YOU PLEASE FILL OUT AN EXIT SURVEY BEFORE LEAVING AND DROP OFF IN THE BOX PROVIDED.