1 2 3 Supply of flowmeters 3" line: Supply of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter for 3" line Erection of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter for 3" line Testing & Commissioning of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter for 3" line Set 103 Set 103 Set 103 Supply of flowmeters 1.5" line: Supply of Positive displacement type flowmeters, 4 Strainer with DPG, air eliminator, with Set 23 pulse transmitter and Non return valve for 1.5" ethanol line 5 Erection of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter and Non return valve for 1.5" ethanol line Set 23 6 7 Testing & commissioning of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter and Non return valve for 1.5" ethanol line Set Stop valve 3" for white oil:supply of Set Stop Valve 3"for white oil Set 23 5 8 Erection of Set Stop Valve 3"for white oil 5 9 10 Testing,Commissioning of Set Stop Valve 3"for white oil Set Stop valve 3" for black oil:supply of Set Stop Valve 3" for black oil 5 11 Erection of Set Stop Valve 3" for black oil PRICED BID -PACKAGE II Page 1 of 19 Vendor Seal and Signature
Testing,Commissioning of Set Stop Valve 12 3" for black oil 13 14 15 16 Set Stop valve 1.5" for ethanol:supply of Set Stop Valve 1.5" for Ethanol Erection of Set Stop Valve 1.5" for Ethanol Testing,Commissioningof Set StopValve 1.5" for Ethanol Supply of Multi Channel Batch Controllers for White Oil with blending firmware & Two additive injection System Each 23 Each 23 Each 23 Each 48 17 18 19 20 21 Erection of Multi channel Batch Controllers for White Oil with blending firmware & Two additive injection System Testing,Commissioning of Multi channel Batch Controllers for White Oil with blending firmware & Two additive injection System Supply of Multi channel Batch Controller for black oil Erection of Multi channel Batch Controller for black oil Testing,Commissioning of Multi channel Batch Controller for black oil Each 48 Each 48 Each 4 Each 4 Each 4 22 Supply of RTD at Each Loading Point Each 103 23 Erection of above item Each 103 24 Testing,Commissioning of above item Each 103 Supply of additive skid & other items 25 except block for MS Set 8 26 Erection of above item Set 8 27 Testing,Commissioning of above item Set 8 Supply of additive skid & other items 28 except block for HSD Set 8 29 Erection of above item Set 8 30 Testing,Commissioning of above item Set 8 PRICED BID -PACKAGE II Page 2 of 19 Vendor Seal and Signature
31 Supply of additive injection blocks Each 39 32 Erection of above item Each 39 33 Testing,Commissioning of above item Each 39 Supply of SS 304 pipeline for additive 34 System Meters 1600 35 Erection of above item Meters 1600 36 Testing,Commissioning of above item Meters 1600 37 Supply of 3" CS Plug Valve Each 40 38 Erection of 3" CS Plug Valve Each 40 39 Installation of 3" CS Plug Valve Each 40 40 Supply of 1.5" CS Plug Valve Each 11 41 Erection of 1.5" CS Plug Valve Each 11 42 Installation of 1.5 " CS Plug Valve Each 11 43 Supply of Loading arms Each 102 44 Erection of Loading arms Each 102 45 Testing,Commissioning of Loading arms Each 102 Supply of Earthing Relay and 2 Meters Long 16 sqmm cross-sectional area 46 braided copper Strip with heavy duty Each 52 clamps. Erection of Earthing Relay and 2 Meters Long 16 sqmm cross-sectional area 47 braided copper Strip with heavy duty Each 52 clamps. Testing,Commissioning of Earthing Relay and 2 Meters Long 16 sqmm crosssectional area braided copper Strip with 48 Each 52 heavy duty clamps. 49 Supply of mobile Proving tank (2 kl) Each 8 50 Erection of mobile Proving tank (2 kl) Each 8 51 Testing,CommissioningofmobileProving tank (2 kl) including W&M Stamping Each 8 52 53 Supply of IS/ Explosion proof Proximity card readers Erection of IS/ Explosion proof Proximity card readers Each 84 Each 84 PRICED BID -PACKAGE II Page 3 of 19 Vendor Seal and Signature
54 Testing,Commissioning of IS/ Explosion proof Proximity card readers Each 84 55 Supply of Proximity cards Each 800 56 Supply of Remote Interaction Terminal Each 104 57 Erection of Remote Interaction Terminal Each 104 58 59 60 61 62 63 64 65 66 67 Testing,Commissioning of Remote Interaction Terminal Supply of Radar gauges for CRVT and fixed cum floating roof tank Erection of Radar gauges for CRVT and fixed cum floating roof tank Testing,Commissioning of Radar gauges for CRVT and fixed cum floating roof tank Average Temp. Sensor for CRVT:Supply of Average temperature sensor with water bottom sensor for CRVT and floating cum fixed roof Erection of Average temperature sensor with water bottom sensor for CRVT and floating cum fixed roof Testing,Commissioning of Average temperature sensor with water bottom sensor for CRVT and floating cum fixed roof Supply of Pressure transmitters for density measurement including Isolation valves Erection of Pressure transmitters for density measurement including Isolation valves Testing,Commissioning of Pressure transmitters for density measurement including Isolation valves Each 104 68 Supply of Tank side Indicator 69 Erection of Tank side Indicator PRICED BID -PACKAGE II Page 4 of 19 Vendor Seal and Signature
Testing,Commissioning of Tank side 70 Indicator 71 Supply of radar gauges for FRVT Each 18 72 Erection of radar gauges for FRVT Each 18 Testing,Commissioning of radar gauges 73 for FRVT Each 18 74 75 Average Temp. Sensor for FRVT:Supply of Average temperature sensor with water bottom sensor for FRVT Erection of Average temperature sensor with water bottom sensor for FRVT Each 18 Each 18 Testing,Commissioning of Average 76 temperature sensor with water bottom sensor for FRVT Supply of Pressure transmitters for 77 density measurement including Isolation valves Erection of Pressure transmitters for 78 density measurement including Isolation valves Each 18 Each 18 Each 18 79 Testing,Commissioning of Pressure transmitters for density measurement including Isolation valves Each 18 80 Supply of Tank side Indicator Each 18 81 Erection of Tank side Indicator Each 18 Testing,Commissioning of Tank side 82 Indicator Each 18 Supply of Computer Interface Unit in Hot 83 standby mode mounted in the Each 16 Networking panel. Erection of Computer Interface Unit in 84 Hot standby mode mounted in the Networking panel. Each 16 85 Testing,Commissioning of Computer Interface Unit in Hot standby mode mounted in the Networking panel. Each 16 PRICED BID -PACKAGE II Page 5 of 19 Vendor Seal and Signature
Supply of radar gauges +/- 1mm for underground tanks, A/G horizontal A/G 86 tanks with local display along with Each 7 required still well pipe Erection of radar gauges +/- 1mm for underground tanks, A/G horizontal A/G 87 tanks with local display along with required still well pipe Each 7 88 89 90 91 92 93 94 95 96 97 Testing,Commissioning of radar gauges +/- 1mm for underground tanks, A/G horizontal A/G tanks with local display along with required still well pipe Supply of radar gauges +/- 3mm for underground tanks, A/G horizontal A/G tanks with local display along with required still well pipe Erection of radar gauges +/- 3mm for underground tanks, A/G horizontal A/G tanks with local display along with required still well pipe Testing,Commissioning of radar gauges +/- 3 mm for underground tanks, A/G horizontal A/G tanks with local display along with required still well pipe Supply of Single point RTD with water bottom sensor in U/G tanks & AGHT Erection of Single point RTD with water bottom sensor in U/G tanks & AGHT Testing,Commissioning of Single point RTD with water bottom sensor in U/G tanks & AGHT Supply of density probe in U/G tanks & AGHT Erection of density probe in U/G tanks & AGHT Testing,Commissioning of density probe in U/G tanks & AGHT Each 7 Each 46 Each 31 Each 31 Each 38 Each 38 Each 38 Each 53 Each 38 Each 38 PRICED BID -PACKAGE II Page 6 of 19 Vendor Seal and Signature
Supply of float & Tape type Level 98 transmitters for Water tanks Each 14 Erection of float & Tape type Level 99 transmitters for Water tanks Each 14 100 101 102 103 Testing,Commissioning of float & Tape type Level transmitters for Water tanks P.T.in header of white oil:supply of Pressure Transmitters in the header of White Oil Erection of Pressure Transmitters in the header of White Oil Testing,Commissioning of Pressure Transmitters in the header of White Oil Each 14 Each 31 Each 31 Each 31 104 105 P.T in header of black oil:supply of Pressure Transmitters in the header of Each 4 black oil Erection of Pressure Transmitters in the header of black oil Each 4 106 107 108 109 110 111 112 113 114 Testing,Commissioning of Pressure Transmitters in the header of black oil Supply of Densitometer in HSD header in Erection of Densitometer in HSD header in Testing,Commissioning of Densitometer in HSD header in Supply of Orifice plate in HSD header in Erection of Orifice plate in HSD header in Testing,Commissioning of Orifice Plate in HSD header in Supply of Densitometer SKO header in Erection of Densitometer SKO header in Each 4 Each 8 Each 8 PRICED BID -PACKAGE II Page 7 of 19 Vendor Seal and Signature
115 116 117 118 119 120 121 Testing,Commissioning of Densitometer SKO header in Supply of Orifice plate in SKO header in Erection of Orifice plate in SKO header in Testing,Commissioning of Orifice Plate in SKO header in Supply ofdensitometer onms header in Erection of densitometer on MS header in Testing,Commissioning of densitometer on MS header in Each 8 Each 8 Each 8 Each 8 122 Supply of Orifice plate in MS header in 123 124 125 126 127 128 129 Erection of Orifice plate in MS header in Testing,Commissioning of Orifice Plate in MS header in Densitometer for other product:supply of densitometer for other product as HEXANE/ FO/ LDO/BIODIESEL/ ATF/NAPTHA Erection of densitometer for other product as HEXANE/ FO/ LDO/BIODIESEL/ ATF/NAPTHA Testing,Commissioning of densitometer for other product as HEXANE/ FO/ LDO/BIODIESEL/ ATF/NAPTHA Orifice plate for other product:supply of Orifice Plate for other product as HEXANE/ FO/ LDO/BIODIESEL/ ATF/NAPTHA Erection of Orifice Plate for other product as HEXANE/ FO/ LDO/BIODIESEL/ ATF/NAPTHA Each 3 Each 3 Each 3 Each 3 Each 3 PRICED BID -PACKAGE II Page 8 of 19 Vendor Seal and Signature
Testing,Commissioning of Orifice Plate 130 for other product as HEXANE/ FO/ Each 3 LDO/BIODIESEL/ ATF/NAPTHA Densitometer for ethanol:supply of 131 Densitometer for ETHANOL Each 7 132 Erection of Densitometer for ETHANOL Each 7 Testing,Commissioning of Densitometer 133 for ETHANOL Each 7 OrificePlatefor Ethanol:Supply oforifice 134 Plate for Ethanol Each 7 135 Erection of Orifice Plate for Ethanol Each 7 Testing,Commissioning of Orifice Plate 136 for Ethanol Each 7 Supply of 12" line Bulk Air Eliminator with 137 Gate Valve, NRV & two Thermal Relief Each 2 Valve Erection of 12" line Bulk Air Eliminator 138 with Gate Valve, NRV & two Thermal Each 2 Relief Valve Testing,Commissioning of 12" line Bulk 139 Air Eliminator with Gate Valve, NRV & Each 2 two Thermal Relief Valve Supply of 10" line Bulk Air Eliminator with 140 Gate Valve, NRV & two Thermal Relief Each 2 Valve Erection of 10" line Bulk Air Eliminator & 141 Thermal Relief Valve Each 2 Testing,Commissioning of 10" line Bulk 142 Air Eliminator with Gate Valve, NRV & Each 2 two Thermal Relief Valve Supply of 8" line Bulk Air Eliminator with 143 Gate Valve, NRV & two Thermal Relief Each 7 Valve Erection of 8" line Bulk Air Eliminator 144 with Gate Valve, NRV & two Thermal Each 7 Relief Valve Testing,Commissioning of 8" line Bulk Air 145 Eliminator with Gate Valve, NRV & two Thermal Relief Valve Each 7 PRICED BID -PACKAGE II Page 9 of 19 Vendor Seal and Signature
Supply of 6" line Bulk Air Eliminator with 146 Gate Valve, NRV & two Thermal Relief Each 18 Valve Erection of 6" line Bulk Air Eliminator 147 with Gate Valve, NRV & two Thermal Each 18 Relief Valve Testing,Commissioning of 6" line Bulk Air 148 Eliminator with Gate Valve, NRV & two Each 18 Thermal Relief Valve Supply of 4" line Bulk Air Eliminator with 149 Gate Valve, NRV & two Thermal Relief Each 3 Valve Erection of 4" line Bulk Air Eliminator 150 with Gate Valve, NRV & two Thermal Each 3 Relief Valve Testing,Commissioning of 4" line Bulk 151 Air Eliminator with Gate Valve, NRV & Each 3 two Thermal Relief Valve Supply of 3" line Bulk Air Eliminator & 152 Thermal Relief Valve Each 3 Erection of 3" line Bulk Air Eliminator 153 with Gate Valve, NRV & two Thermal Each 3 Relief Valve Testing,Commissioning of 3" line Bulk Air 154 Eliminator with Gate Valve, NRV & two Each 3 Thermal Relief Valve Supply of pressure gauges with pulsation 155 dampener Each 124 Erection of pressure gauges with 156 pulsation dampener Each 124 Testing,Commissioning of pressure 157 gauges with pulsation dampener Each 124 158 Supply of Electronic Display Unit Each 8 159 Erection of Electronic Display Unit Each 8 Testing,Commissioning of Electronic 160 Display Unit Each 8 Supply of barrier gate with motor and IR 161 sensor Each 12 Erection of barrier gate with motor and IR 162 sensor Each 12 Testing,Commissioning of barrier gate 163 with motor and IR sensor Each 12 PRICED BID -PACKAGE II Page 10 of 19 Vendor Seal and Signature
164 Supply of PLC System Set 8 165 Erection of PLC System Set 8 166 Testing,Commissioning of PLC System Set 8 UPS supply: Supply of parallel redundant 167 UPS System Set 8 Erection of parallel redundant UPS 168 System Set 8 Testing,Commissioning of parallel 169 redundant UPS System Set 8 Supply of Dedicated batteries for UPS 170 System Set 8 Erection of Dedicated batteries for UPS 171 System Set 8 Testing,Commissioning of Dedicated 172 batteries for UPS System Set 10 173 Supply of Emergency Push Button Each 32 174 Erection of Emergency Push Button Each 32 Testing,Commissioning of Emergency 175 Push Button Each 32 176 Supply of all type of cables required for automation of the terminal/depot viz. Power cables, control cables, signal cables, data communication cables, and special cables if any up to Main Junction box. Cabling from Main JB to individual instrument shall be part of respective instrument/ equipment 177 178 179 Laying of all type of cables required for automation of the terminal/depot viz. Power cables, control cables, signal cables, data communication cables, and special cables if any up to Main Junction box. Cabling from Main JB to individual instrument shall be part of respective instrument/ equipment Testing,Commissioning of all type of cables Construction of Cable Trench including all material PRICED BID -PACKAGE II Page 11 of 19 Vendor Seal and Signature
180 Supply of cable trays 181 Erection of above item 182 Supply of Flame proof junction boxes 183 Erection of Flame proof junction boxes Testing,Commissioning Flame proof 184 junction boxes 185 Supply of Manual Call Points Each 72 186 Erection of Manual Call Points Each 72 Testing,Commissioning of Manual Call 187 Points Each 72 188 Supply of Pressure Switch Each 24 189 Erection of Pressure Switch Each 24 Testing,Commissioning of Pressure 190 Switch Each 24 191 Supply of Weather proof Junction boxes 192 Erection of Weather proof Junction boxes 193 Testing,Commissioningof Weatherproof Junction boxes 194 Supply of fire water diesel engine panel Each 20 195 Erection of fire water diesel engine panel Each 20 Testing,Commissioning of fire water 196 diesel engine panel Each 20 197 Supply of LRC /TAS servers Each 16 198 Erection of LRC /TAS servers Each 16 Testing,Commissioning of LRC /TAS 199 servers Each 16 200 Supply of client PC Each 32 201 Erection of client PC Each 32 202 Testing,Commissioning of client PC Each 32 203 Supply of gateway servers Each 16 204 Erection of gateway servers Each 16 Testing,Commissioning of gateway 205 servers Each 16 PRICED BID -PACKAGE II Page 12 of 19 Vendor Seal and Signature
206 207 208 TAS Software with license:supply of complete Terminal Automation Software with user license as defined in the specification for entire automation System(Terminal Automation Application Software, Operating System Software. RDBMS Software, Tank Farm Management System software, PLC Software and various instrumentation sub Systems etc complete) Installation of complete Terminal Automation Software with user license as defined in the specification for entire automation System (Terminal Automation Application Software, Operating System Software. RDBMS Software, Tank Farm Management System software, PLC Software and various instrumentation sub Systems etc complete) Testing & Commissioning of complete Terminal Automation Software with user license as defined in the specification for entire automation System (Terminal Automation Application Software, Operating System Software. RDBMS Software, Tank Farm Management System software, PLC Software and various instrumentation sub Systems etc complete) 209 Supply of Printer Each 16 210 Erection of Printer Each 16 211 Testing,Commissioning of Printer Each 16 Supply of 10/100 Fast Ethernet Stackable 212 manageable Switches Erection of 10 / 100 Fast Ethernet 213 Stackable manageable Switches PRICED BID -PACKAGE II Page 13 of 19 Vendor Seal and Signature
214 215 216 217 Testing,Commissioning 10 / 100 Fast Ethernet Stackable manageable Switches Supply of Enhanced UTP CAT 6 Structured Cabling with suitable end connection Erection of Enhanced UTP CAT 6 Structured Cabling with suitable end connection Testing,Commissioning of Enhanced UTP CAT 6 Structured Cabling with suitable end connection 218 LAN for interbldg. distance exceed 100 Meters:Supply of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for connection between Control Room & Admin Building, S&D/ Planning Room wherever interbuilding distance exceeds 100 Meters 219 Laying of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for connection between Control Room & Admin Building, S&D/ Planning Room wherever interbuilding distance exceeds 100 Meters PRICED BID -PACKAGE II Page 14 of 19 Vendor Seal and Signature
220 Testing,Commissioning of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for connection between Control Room& Admin Building, S&D/ Planning Room wherever interbuilding distance exceeds 100 Meters 221 222 LAN for TFMS to control room:supply of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for providing Tank Farm Signal to pipeline Control Room Laying of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for providing Tank Farm Signal to pipeline Control Room Lot 1 Lot 1 223 Testing,Commissioning of of LAN Networking with fiber optics cable, CAT 6 Ethernet Cabling, UTP to Fiber optic convertor, LIU, mounting rack, coupler, connector, RJ 45 connectors, switches GI pipe, etc complete for providing Tank Farm Signal to pipeline Control Room Lot 1 224 Supply of redundant Terminal server Each 16 225 Erection of above item Each 16 226 Testing,Commissioning of above item Each 16 227 Supply of computer consoles Each 48 PRICED BID -PACKAGE II Page 15 of 19 Vendor Seal and Signature
228 Erection of above item Each 48 229 Supply of FCU for MOVs Each 54 230 Erection of above item Each 54 231 Testing,Commissioning of above item Each 54 232 Supply of DG sets Each 8 233 Erection of above item Each 8 234 Testing,Commissioning of above item Each 8 235 Supply of AC Each 32 236 Erection of above item Each 32 237 Testing,Commissioning of above item Each 32 Supply of Control Station for the existing 238 MOVs Each 2 239 Erection of Control Station for MOV Each 2 Testing & commissioning of Control 240 Station for MOV Each 2 Providing limit switches, auxiliary contactors, cabling etc. for connecting 241 PLC I/Os to existing motor operated Lot 4 Barrier Gates. 242 Erection of above item Lot 4 243 Testing,Commissioning of above item Lot 4 244 Modification in batch controller: Supplying of required hardware and software for necessary modifications in the existing batch controller in software and hardware firmware Lot 6 245 Erection of above item Lot 6 246 Testing,Commissioning of above item Lot 6 247 Nozzle for Radar gauge on CRVT:Supply of necessary nozzles and accessories on the existing man hole/ dip gauge opening for installation of Radar gauge on CRVT,fixed cum floating roof TANKS Lot 41 248 Erection of above item Lot 41 PRICED BID -PACKAGE II Page 16 of 19 Vendor Seal and Signature
249 Testing,Commissioning of above item Lot 41 250 Nozzle for Temp. Sensor on CRVT:Supply of necessary nozzles and accessories on the existing man hole/ Dip gauge opening for installation of Averaging temperature sensor cum water probe on CRVT, horizontal, fixed cum floating roof TANKS Lot 41 251 Erection of above item Lot 41 252 Testing,Commissioning of above item Lot 41 253 Nozzle for P.T on CRVT: Supply of nozzles and accessories on existing man holes for installation of Pressure transmitter on CRVT TANKS, horizontal A/G, fixed cum floating tanks Lot 41 254 Erection of above item Lot 41 255 Testing,Commissioning of above item Lot 41 Nozzle for radar gauge on FRVT:Supply of necessary nozzles and accessories on the 256 existing dip gauge opening for Lot 18 installation of Radar gauge on FRVT TANKS 257 Erection of above item Lot 18 258 Testing,Commissioning of above item Lot 18 259 Nozzle for temp.sensor on FRVT:Supply of necessary nozzles and accessories on the existing man hole/ Dip gauge opening for installation of Averaging temperature sensor cum water probe on FRVT TANKS Lot 18 260 Erection of above item Lot 18 261 Testing,Commissioning of above item Lot 18 PRICED BID -PACKAGE II Page 17 of 19 Vendor Seal and Signature
Nozzle for P.T on FRVT: Supply of nozzles and accessories on manhole for 262 Installation of Pressure transmitter on Lot 33 FRVT TANKS 263 Erection of above item Lot 18 264 Testing,Commissioning of above item Lot 18 265 Nozzle for TFMS in U/G tanks:supply of nozzles and accessories for installation of TFMS equipments in U/G tanks Lot 38 266 Erection of above item Lot 38 267 Testing,Commissioning of above item Lot 38 268 Supply of Steel Structure for alterations in TLF platform Metric Ton 32 269 Fabrication, Welding & Erection ofabove Metric Ton 32 item 270 Testing,Commissioning of above item Metric Ton 32 Modification of MCC Starter: Supply of items required for modification of MCC 271 Starter schemes for local Remote operation of pumps for sequencing and Auto operation. 272 Erection of above item 273 Testing,Commissioning of above item 274 Modification for fire engine panel: Supply of items required for modification of fire engine panel for local Remote operation of pumps and Auto operation. Lot 6 275 Erection of above item Lot 6 276 Testing,Commissioning of above item Lot 6 277 Integration of VFD into TAS:Supply of items required for Integration of VFD into TAS including required cables Lot 5 PRICED BID -PACKAGE II Page 18 of 19 Vendor Seal and Signature
278 Erection of item required for Integration of VFD into TAS including required cables Lot 5 Testing,Commissioning of items 279 required for Integration of VFD into TAS Lot 5 including required cables Integration of MOV's into TAS:Supply of 280 items required for integration of MOV Lot 2 with TAS 281 Erection of above item Lot 2 282 Testing,Commissioning of above item Lot 2 283 Training Lot 11 284 AMC for 5 years Lump sum 8 Grand total in words Grand Total Currency unit- Currency symbol- Note : Incase currency unit quoted in Un-priced bid is not matching with currency quoted in Priced bid, Currency unit quoted in unpriced bid shall be considered for evaluation and PO purpose. PRICED BID -PACKAGE II Page 19 of 19 Vendor Seal and Signature