Trial Anchors through Existing Gabions

Similar documents
1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD

Successful slope stabilization under severe conditions

TRAFFIC BOLLARDS. B2.a 114mm - Self-Righting. B2.b 114mm - Self-Righting Retractable. B2.c 114mm - Retractable. B2.d 114mm - Fixed

h o l l o w poles for foundat i o n s

Static and Dynamic Behaviour of the VersaBolt. Presented by Denis Champaigne VP Technical Services MMTI

h o l l o w poles for foundat i o n s

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

Homework 2 PROBLEM No. 1

Unit 1, Fullerton Road Rotherham S60 1DJ. Tele: Fax:

The Glockemann Pump Site & Installation Guide

Item 404 Driving Piling

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

Peter Jansson - MDOT Bridge Field Services Tia Klein - Fishbeck, Thompson, Carr & Huber Peter MacAskill Hubbell, Roth & Clark, Inc.

SHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE SYSTEM USING WELDED STIRRUPS

Construction Dewatering

Natural Gas. Safety Information. For Excavators and Contractors. Información en español en el interior. swgas.com/safety

Operating instructions. Skyline Beam Clamp

FLEXIBLE AND RELIABLE ANCHORING

WIRE ROPE PULLING MACHINE

Civil Application Solutions

Made in the USA. For Fall Protection Only. SafeLok Part Description

AIR VENT HEADS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2008

UNIT-I SOIL EXPLORATION

ASSEMBLY AND OPERATING MANUAL LTW MAXI TRENCH BOX

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Reinforced Soil Retaining Walls-Design and Construction

Installation and Operation Instruction Manual

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100 & VB 120

b

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

Series 58 SAFETY VALVES 312

Height Safety Lifting Load Control

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

Beavers are particularly adept at manipulating their

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 60

High Pressure Tube Unions

LOW ANGLE ROPE RESCUE OPERATIONAL

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Instructions for use Installation recommendations

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

b

PERSONAL FALL PROTECTION

DNVGL-CP-0187 Edition March 2016

MSA Latchways Ladder System

INSTALLATION AND USAGE HANDBOOK

MECHANICAL REDESIGN OF ION EXCHANGE RESIN VESSEL BOTTOMS AT HULETT REFINERY

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS. zinc-plated steel stainless steel hot-dip galvanised steel

3/4 SafeClaw Anchorage Connectors

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

Irrigation &Hydraulics Department lb / ft to kg/lit.

Geotechnical Engineering Laboratory CIVIL ENGINEERING VIRTUAL LABORATORY Experiment no 8 Standard Penetration Test

Engineering Design Challenge 3. Mars Colonization. Rules & Game Description

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Roughneck TM Mesh Slings

Report to COUNCIL for decision

QLDC Council 29 October Report for Agenda Item: 3

IC67 - Pre-Instructional Survey

Technical Diving Equipment

CSO/STORMWATER MANAGEMENT. HYDROVEX HHV-E Vortex Driven Regulator

Self Drilling Anchor System

Bellows actuator EB Key features

The Work At Height Safety Association

Watermain Replacement and Connection Procedure

1 Exam Prep. Tabs and Highlights

photo: deltaport berth 2 project

User Instructions 1790 Rail Anchor

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

COMPRESSED AIR TEXTILES ENERGY EFFICIENCY

POLYURETHANE PISTOL TARGETS

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

CLEAR COLLISION LEAD EVALUATE ACT RE-OPEN KEEPING TRAFFIC MOVING. CFOATechRescue ConfJuly2013v0.1

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

Gold Coast Barges-Vessel Information Sheet Vessel Name: 'ICEBREAKER'

Important: If you have questions on the use, care, or suitability of this equipment for your application contact Capital Safety.

CSO/STORMWATER MANAGEMENT. HYDROVEX VHV / SVHV Vertical Vortex Flow Regulator

Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse

steel wire rope for lifting machines

FRONT BOLT ACTION ASSAULT SHOTGUN

TECHNICAL DATA. Notes: For use with Trim Charts on Pages 2-4

Edition 4 Summary Document Stage Rally Safety Requirements

80 SERIES MOBILE-KARRIERS. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE 80 SERIES

2.4M Viking Swing Basket Swing

Type Testing Procedure for Crankcase Explosion Relief Valves

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

TUBE SIGN POST PRODUCTS

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Football Equipment. 5 9/16" Gooseneck Goalposts

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

TRAVSMART permanent single-cable horizontal lifeline system

Contents Threadbar anchors

Model 10E Enviro-Line Environmental Pressurization System Installation & Operation Manual

Assembly, Installation and operating. instructions for. Söll-Xenon anchorage device

Transcription:

Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016. Trial Anchors through Existing Gabions Story: Theme: Design Refurbishment of Gabion Walls with Anchors a Trial A paper describing the procedure and challenges associated with installing anchors through gabion baskets. This document has been provided as an example of a tool that might be useful for other organisations undertaking complex disaster recovery or infrastructure rebuild programmes. For more information about this document, visit www.scirtlearninglegacy.org.nz

Trial Anchors through Existing Gabions SCIRT Yellow Team 20 May 2014 Introduction Anchoring through gabion baskets has been proposed as a method for the repair of two existing walls at SCIRT. This solution has the potential to provide a cost and time saving because baskets would not need to be removed and therefore significant volumes of excavation and backfill could be avoided. Over all this could provide a sustainable solution with a reduced construction time. It is anticipated that drilling through the baskets maybe difficult and therefore two test anchors were installed by Rock Control in March 2014 to assess the feasibility of this solution. The anchors were drilled on 6 th March using self-drilling anchors and sacrificial drill heads. Figure 1 Anchor drilling through an existing gabion basket Two anchors were installed. The first was 25mm diameter with a 70mm diameter anchor head. The other was 32mm diameter with a 90mm diameter drill head. These were grouted using the hollow core of the anchors. The smaller anchor was only partially grouted. This was thought to be due to a blockage in the anchor tube. Anchor testing was against a plate 1.0m wide and 0.6m high. This was not packed against the basket because packing it could cause additional deformation to the basket once the load is applied.

Figure 2 Anchor testing equipment The testing was conducted and deflection measured. As the load increased the gabion deformed further so as the plate used for measuring moved. This caused the anchor angle to change and at 70kN the gauge slipped off apparatus due to the deformation. The anchor was then unloaded and loaded to 125kN with no measurements taken. The load reduced when held because of ongoing deformation of the basket. The load was held at 125kN and deflection measured: Table 1 Deflection measured during anchor testing with a sustained load of 125kN Time Deflection (min) (mm) 0 6.39 5 6.51 10 6.54 Then the kit was unloaded. The anchor was then reloaded to 170 kn. This was considered to be the maximum load so as not to exceed 80% of bar capacity. The load was released and the basket relaxed and returned to shape.

Figure 3 Resulting anchor head showing basket damage Lessons learnt Drilling of the anchors was possible and while the basket mesh at the rear of the basket was awkward to penetrate, it could be done. During grouting there is no grout recovery and therefore there is less certainty regarding how complete the grout is. Therefore all anchors must be load tested. Galvanising and sacrificial steel are the only corrosion protection measures for self-drilling anchors. The testing regime needs consideration because measuring deflection may prove challenging. Therefore to load an anchor and only measuring deflection while holding the load may be appropriate if this will satisfy the designers testing requirements. It is suggested that loads for anchor tests are derived for individual or zones of anchors so as the load is not excessive. i.e. don t just find the largest load for the whole wall and test all anchors for this be more specific. The gabion baskets were damaged by the plate used in testing. Therefore using a textile layer or other protection under the plate may be advisable. Alternatively the basket my need to be patch repaired. Anchors should be installed in the middle of baskets to allow sufficient space for the plate to span. Conclusion The trial anchors through gabion baskets have been completed. Both the installation and testing of the anchors were successfully completed. Adopting the above lessons learnt into the design and specification for anchors through existing gabion baskets is recommended.