LIMITED RISK ASSESSMENT FOR STUDIOS

Similar documents
Contractor handbook. Purpose

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #16 RECOMMENDED GUIDELINES FOR SAFETY WITH PYROTECHNIC SPECIAL EFFECTS

Working Alone Safety Program

Safe Work Method Statement

Suitability of Work Equipment

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

CONTRACTOR SAFETY RULES

The Optima Batteries ChumpCar World Series Presents Frozen Peaches & Ice Cream. Road Atlanta (Braselton, GA) February 2014

(Health, Safety, and Welfare)

Risk Assessment for Beacon Cricket Club

Contractor / Exhibitor Handbook

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Understanding health and safety in gas utilisation

TRANSPORTATION POLICY

Don t let a fall shatter your life!

Health and Safety Inspection Procedure

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

Permit-To-Work Guidance and Templates

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

B S Glass Ltd Safety procedures- outsourced Workplaces

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Powerplay Paintball Brighouse Risk Assessment

Prevention of Falls and Working at Heights

Minimum standard of competence for electro-technical officers (STCW Reg III/6) Electrical, electronic and control engineering at the operational level

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Chairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:

Safety Checklist for Events Held at Hillbrook

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

FIRE HYDRANT TESTING METHOD STATEMENT.

Work at height Policy

RISK ASSESSMENT Date Of Assessment:

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Safe Work Method Statement (SWMS)

Electrical, electronic and control engineering at the operational level

HS26 Working at Height Policy and Procedure

TEXAS A&M WATER SKI CLUB BOAT DRIVER S MANUAL

Safety at Work. Rules for Staying Alive

Specific Risk Assessment Partyrocksbounce

BASIC HEALTH AND SAFETY MEASURES TO BE TAKEN INTO CONSIDERATION FOR STAND CONSTRUCTION AT MOBILE WORLD CONGRESS rev01

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Method Statement Author

CONTRACTOR SAFETY INDUCTION HANDBOOK

Contractors' Code of Safe Practice

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Contractor/Visitor Safety Orientation UNBC

OSHA s new walking working surfaces standards

COACH HIRE RISK ASSESSMENT SOUTH STAFFS COACH HIRE

Recognition, Evaluation, and Control of Hazards

Safety Risk Assessment Driving Grey Fleet Vehicles

Working at Height Regulation 2005

TRANSPORTATION POLICY

8. Fall Protection Procedures WAC

Rules Committee Philip Hamilton, Doug Medley, Darell Sprague, Benny Boudreaux, Micha McCall

Harbour Town Gold Coast Site Induction

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

LADDERS FIXED AND PORTABLE

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Application 15.1 This Part applies to every workplace where a worker works in a confined space.

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Working safely in an engineering environment

OVERVIEW OF RESTAURANT SAFETY

WHS CONTRACTOR INFORMATION PACKAGE

Safe work method statements

Risk Assessment June Skirmish Paintball Games Exeter

Risk Assessment Form

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

Telco Antennas SWMS Working At Height Above 2m

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height

Work Activity (e.g. Road Work): Work Location:.

2.0 Management Systems and Documentation

FIRE FIGHTER II JPR: FFII-1A

Fall Prevention in Residential Construction FALL HAZARD AWARENESS, PREVENTION, SOLUTIONS, AND RESCUE.

Responsibilities / Accountability

Safe Work Method Statement

Risk assessment part 1 of 3

Events. Law Management of Health and Safety at Work Regulations 1999

Industry Code: Alberta Small Employer OHS Legislated Requirements

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

CHAPTER 10 FALL PROTECTION

Work Health and Safety Risk Management Procedures

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

Safety is a priority at Vault Pipelines.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Generic Health and Safety Risk Assessment

TEARFUND RISK ASSESSMENT

Workplace Safety Inspection Sheet

Permit-Required Confined Spaces...29CFR

General Safety and Health Provisions for Construction Self Inspection Checklist

BHC-P-07.2 Health Hazards in Construction

Health and Safety Policy

BICETSER RUFC HEALTH & SAFETY POLICY

Transcription:

TtTEDDINGTON TEDDINGTON STUDIOS LIMITED RISK ASSESSMENT FOR STUDIOS Production Title:... Production Company:... Date/s in Studio:... EDITION (5) June 2003 Ray Gearing. Studio Manager

RISK ASSESSMENT FOR PRODUCTIONS UNDER THE MANAGEMENT OF HEALTH AND SAFETY REGULATIONS 1992 YOU ARE REQUIRED TO COMPLETE A RISK ASSESSMENT OF ALL PRODUCTIONS CARRIED OUT AT TEDDINGTON STUDIOS. THIS SHOULD INCLUDE A METHOD STATEMENT WHICH SHOULD DETAIL EXACTLY HOW THE PRODUCTION IS TO BE COMPLETED AND FROM THIS IT CAN BE DETERMINED WHAT ACTIVITIES, IF ANY, INVOLVE A LEVEL OF RISK. THE RISK ASSESSMENT THEN DETERMINES AT WHAT POINT ALL REASONABLY PRACTICABLE MEASURES ARE INTRODUCED TO REMOVE OR CONTROL THE HAZARDS IDENTIFIED. ATTACHED IS A FORM DESIGNED TO ASSIST YOU IN PRODUCING YOUR RISK ASSESSMENT, ALONG WITH A SET OF EXPLANATORY NOTES GIVING SOME GUIDE LINES TO WHAT HAZARDS YOU SHOULD BE LOOKING FOR. THESE FORMS ARE NOT DESIGNED TO BE COMPREHENSIVE BUT AS A PROMPT TO ASSIST YOU. THERE WILL BE TIMES WHEN THE PRODUCTION BEING WORKED ON WILL INVOLVE HAZARDS AND RISK AREAS NOT INCLUDED IN THESE FORMS. HOWEVER, IF YOU SHOULD REQUIRE FURTHER ASSISTANCE PLEASE CONTACT THE STUDIO MANAGER, MR RAY GEARING, ON 020-8614-2252 or #6115 (on site) DEFINITIONS: RISK: THE PROBABILITY OF, OR SEVERITY OF, INJURY OR DAMAGE RESULTING FROM A SET OF ACTIONS OR CIRCUMSTANCES. HAZARD: SOMETHING WHICH HAS THE POTENTIAL TO DO HARM OR DAMAGE. REASONABLY PRACTICABLE: IMPLIES A CALCULATION OF COST AGAINST RISK COMPETENT PERSON: SOMEONE WHO HAS SUFFICIENT THEORETICAL AND PRACTICAL KNOWLEDGE COUPLED WITH ACTUAL EXPERIENCE. EDITION (4) August 2002 Ray Gearing. Studio Manager 2

EXPLANATORY NOTES SERIAL HAZARD POSSIBLE HAZARDOUS AREAS 1. COMPETENCY OF TECHNICAL CREW IS THE CREW AWARE OF THE RISKS? HAVE THEY USED THE EQUIPMENT BEFORE? ARE THEY CAPABLE OF PERFORMING THE TASK REQUIRED? 2. FALLS OF MEN AND EQUIPMENT ARE STAFF WORKING AT HEIGHTS? IS EQUIPMENT POSITIONED AT HEIGHTS? WHAT PROCEDURES ARE TO BE IMPLEMENTED WHEN STAFF ARE WORKING IN THE GRID? ARE STEPLADDERS SAFE, ARE LADDERS SAFE? ARE ALL LADDERS SECURED OR FOOTED WHILST IN USE? 3. TEMPORARY STRUCTURES, SCAFFOLDING, SCENERY ETC HAS SCENERY BEEN ERECTED PROPERLY? IS IT SECURE? DOES IT HAVE TO BE MOVED DURING THE RECORDING / TRANSMISSION? IS THERE A CLEAR SAFE PATH TO DO SO? IS THERE SUFFICIENT MANPOWER TO DO SO SAFELY? IS IT MADE OF A FIRE RETARDANT CONSTRUCTION, IF NOT HAS IT BEEN TREATED TO PREVENT SPREAD OF FIRE? HAS THE SCAFFOLDING BEEN ERECTED BY A COMPETENT PERSON/S? HAS IT BEEN INSPECTED? IS THE INSPECTION CERTIFICATE AVAILABLE? HAS IT BEEN ALTERED? ARE THERE HANDRAILS, SAFETY HARNESSES & LADDERS CORRECTLY SECURED? 4. ELECTRICAL EQUIPMENT USED ON SET IS THE EQUIPMENT CORRECT FOR THE PURPOSE? IS IT INSTALLED CORRECTLY? HAS IT BEEN PACT TESTED? ARE THE INSTALLERS COMPETENT? 5. MANUAL HANDLING WHAT LIFTING, PULLING, PUSHING HAS TO BE DONE? HAS A MANUAL HANDLING ASSESSMENT BEEN COMPLETED? 6. TRIPPING HAZARDS ARE THE CAMERA, SOUND & ELECTRICAL CABLES COVERED? IF ACROSS FIRE LANES ARE THEY ROUTED SAFELY? ARE THEY IN GOOD CONDITION? WHAT OTHER HAZARDS MAY BE PRESENT? ARE PROP CAGES SECURED? ARE PROPS TIDY AND IN THE CORRECT PLACE? EDITION (4) August 2002 Ray Gearing. Studio Manager 3

7. VEHICLES IN THE STUDIO THE FUEL TANK MUST BE DRAINED AND VENTED. VEHICLES MUST NOT BE DRAINDED OR REFILLED ANYWHERE ON THE TEDDINGTON SITE. FUEL CANS (Even if empty) MUST NOT BE KEPT ANYWHERE ON THE VEHICLE. DOES THE VEHICLE REQUIRE VALID MOT, TAX, INSURANCE, IS THE DRIVER COMPETENT? 8. SPECIAL EFFECTS /PYROTECHNICS/L ASERS ARE THE SPECIAL EFFECTS REALLY NECESSARY? ARE THEY POSITIONED AND USED BY COMPETENT PERSONS? WHAT FIRE RISK IS RELATED TO PYROTECHNICS? ARE LASER OPERATORS LICENSED? DO THEY CONFORM TO BS 4803, OR PM 19? HAVE WARNING SIGNS BEEN POSTED? COULD THEY INDUCE EPILEPSY? 9. CHILDREN ON SITE ARE THEY CHAPERONED? IS THE CHAPERON AWARE OF THE WORKING HOURS? DO THEY HAVE SPECIAL NEEDS THAT REQUIRE CATERING FOR? HAS A CHILD ON SITE FORM BEEN COMPLETED? 10. STUNTS / NOVELTY CONSTRUCTION IS THE STUNT CO-ORDINATOR GIVEN FULL COMMAND OF THE STUNT? DOES THE CONSTRUCTION REQUIRE A SAFETY ZONE? HOW IS THIS ENFORCED? WHO ENFORCES IT? 11. WEAPONS FIREARMS CROSSBOWS WHAT IS THE DANGER AREA? IS THE USER COMPETENT? ARE EAR DEFENDERS ISSUED? ARE THEY BEING WORN? DO YOU NEED AN ARMOURER? 12. PRACTICAL FIRES/COOKERS (BUTANE / PROPANE GAS) WHERE IS THE GAS STORED? WHO WILL CONTROL IT? WHAT ARE THE ADDITIONAL FIRE RISKS? HAVE THEY BEEN ALLOWED FOR? 13. SMOKE GENERATORS ARE THEY OF THE CORRECT TYPE? WHAT EXTRACTION IS AVAILABLE FOR VENTING AFTER USE? ARE THE STUDIO SMOKE DETECTORS TO BE ON OR OFF? 14. CONTROLLED SUBSTANCES ARE INFLAMMABLE MATERIALS PRESENT IN THE AREA? WHAT FIRE PRECAUTIONS HAVE BEEN TAKEN? IS ASBESTOS PRESENT? EDITION (4) August 2002 Ray Gearing. Studio Manager 4

15. WATER IS IT IN USE NEAR ELECTRICAL EQUIPMENT? ARE PEOPLE WORKING ON OR OVER WATER? ARE SUFFICIENT LIFE JACKETS AVAILABLE? IS A LIFEGUARD REQUIRED? 16. GLASS ON OR PART OF SET REAL GLASS IS PROHIBITED IN THE STUDIO, UNLESS PRIOR PERMISSION HAS BEEN GRANTED. (WHERE PERMISSION HAS BEEN GRANTED THE GLASS MUST BE COVERED AT ALL TIMES WHILST BEING MOVED). 17. CONFRONTATIONAL SUBJECT MATTER IF YOU KNOW YOUR PROGRAM HAS A CONTENT THAT COULD LEAD TO VIOLENCE, THE STUDIO MANAGER AND SECURITY MUST BE INFORMED BEFORE THE EVENT. 18. ANIMALS (TO INCLUDE ANY BIRD MAMMAL OR REPTILE) IS THE ANIMAL COVERED BY THE DANGEROUS ANIMALS ACT? IS THE HANDLER LICENSED? DOES THE ANIMAL HAVE A VETS CERTIFICATE? IS THE ANIMAL BEING USED IN THE CORRECT MANNER? WHAT SPECIAL PROVISIONS WILL THE ANIMAL REQUIRE? (Food, water, housing etc) IS THE HOUSING TO THE CORRECT STANDARDS? 19. WILL YOUR AUDIENCE REQUIRE EXTRA SUPERVISION SEE ITEM 17 ABOVE. COULD THEY BE INTOXICATED? DO YOU REQUIRE EXTRA SECURITY? 20. WHEELCHAIRS IN THE STUDIO WILL THERE BE A REQUIREMENT TO HAVE A WHEELCHAIR IN THE AUDIENCE OR PRODUCTION GALLERY? 21. ANY HEALTH CONDITIONS ARE YOU AWARE OF ANY CREW, PRODUCTION OR AUDIENCE MEMBER THAT HAS ANY KIND OF ILLNESS THAT MAY REQUIRE MEDICAL OR FIRST AID TREATMENT? PLEASE NOTE ANY ANIMALS (Including clients / Artiste s Pets) THAT ARE BROUGHT ONTO THE TEDDINGTON STUDIO SITE MUST BE ENTERED ONTO A RISK ASSESSMENT FORM EDITION (4) August 2002 Ray Gearing. Studio Manager 5

RISK AREAS TO BE ASSESSED WHEN COMPLETING THE TABLE BELOW, CONSIDER THE NATURE OF THE HAZARD (SEE ATTACHED EXPLANATORY NOTES) AND THE POSSIBLE SEVERITY OF THE OUTCOME TO EITHER PROPERTY OR PERSONS. HOW LIKELY IS IT THAT THE INCIDENT WILL OCCUR? HOW MANY PEOPLE ARE AT RISK AND WHO ARE THEY? HAVE ALL REASONABLY PRACTICAL MEASURES BEEN TAKEN TO PREVENT THE INCIDENT OCCURRING? ARE THE PRECAUTIONS PROPORTIONED TO THE LEVEL OF RISK? HAZARD ARE THE TECHNICAL CREW 1 COMPETENT FALLS OF MEN 2 AND EQUIPMENT 3 TEMPORARY STRUCTURES (SCAFFOLDING, SCENERY, ETC) 4 ANY ELECTRICAL EQUIPMENT (OTHER THAN SUPPLIED BY TSL) 5 MANUAL HANDLING (SEPARATE ASSESSMENT REQUIRED) Severity YES NO DATE of risk (H,M,L) Likelihood of injury or damage (H,M,L) Persons at risk (Who, & how many) WHAT PRECAUTIONS HAVE YOU TAKEN TO ELIMINATE THE RISK? 6 TRIPPING HAZARDS 7 8 9 10 11 VEHICLES IN THE STUDIO (TO INCLUDE ANY ENGINE USING PETROL/DIESEL) PLEASE READ ITEM 7 IN EXPLANATORY NOTES SEPARATE ASSESSMENT ON BACK PAGE SPECIALS EFFECTS / PYROTECHNICS / LASERS (SEPARATE ASSESSMENT REQUIRED) CHILDREN ON SITE / STUDIO (Has a CHILD ON SITE form been completed and signed?) STUNTS / NOVELTY CONSTRUCTIONS (SEPARATE ASSESSMENT REQUIRED) WEAPONS / FIREARMS / CROSSBOWS (SEPARATE ASSESSMENT REQUIRED) EDITION (4) August 2002 Ray Gearing. Studio Manager 6

HAZARD? 12 PRACTICAL FIRES / COOKERS (BUTANE / PROPANE ETC) YES NO DATE Severity of risk (H,M,L) Likelihood of injury or damage (H,M,L) Persons at risk (Who, & how many) WHAT PRECAUTIONS HAVE YOU TAKEN TO ELIMINATE THE RISK? 13 SMOKE GENERATORS 14 CONTROLLED / FLAMMABLE SUBSTANCES 15 WILL WATER BE USED ON THE SET? 16 WILL GLASS BE USED ON OR AS PART OF THE SET? 17 CONFRONTATIONAL SUBJECT MATTER? (Which will require Security) 18 ANIMALS ON SITE / STUDIO (TO INCLUDE ANY BIRD, MAMMAL OR REPTILE) 19 WILL YOUR AUDIENCES REQUIRE EXTRA SUPERVISION? 20 WILL THERE BE ANY WHEELCHAIRS IN THE STUDIO? 21 ANY HEALTH CONDITIONS? MEMBERS OF STAFF / ARTIST / AUDIENCE) NAME OF PERSON IN CHARGE OF DAY TO DAY CONTROL OF THE HEALTH & SAFETY ON YOUR PRODUCTION. CONTACT NO: POSITION (E.G. FLOOR MANAGER). I HAVE READ THE ABOVE AND I AM SATISFIED THAT THIS CONSTITUTES A PROPER AND ADEQUATE RISK ASSESSMENT OF THIS PRODUCTION. SIGNATURE OF PRODUCTION MANAGER DATE. EDITION (4) August 2002 Ray Gearing. Studio Manager 7

VEHICLES IN THE STUDIO TO BE COMPLETED IF ANY VEHICLE OR APPARATUS ENTERING THE STUDIO BLOCK USES A FUEL FOR PROPULSION ANY VEHICLE OR APPARATUS USED THE STUDIO MUST BE EMPTY OF FUEL VEHICLES CANNOT BE DRAINED OR REFILLED ANYWHERE ON THE TEDDINGTON SITE FUEL CANS (even if empty) MUST NOT BE STORED IN THE VEHICLE OR ON THE TEDDINGTON STUDIOS SITE UNDER NO CIRCUMSTANCES WILL VEHICLES BE DRIVEN IN OR OUT OFF THE STUDIO A MEANS OF STOPPING OIL, ETC DRIPPING ONTO THE STUDIO FLOOR MUST BE PROVIDED. (A charge will be made for any cleaning or repairs that have to be made to the studio floor) A SEPARATE RISK / METHOD STATEMENT MUST BE PROVIDED BY THE HIRE COMPANY OR OWNER STATING THAT THE FUEL WILL BE EMPTIED & REFILLED OFF SITE & THAT THE VEHICLE OR APPARATUS ENTERING THE STUDIO IS IN A SAFE CONDITION. MOTOR CYCLE CAR VAN OTHER PETROL PETROL PETROL PETROL DIESEL DIESEL DIESEL DIESEL OTHER (Please specify) OTHER (Please specify) OTHER (Please specify) OTHER (Please specify) TYPE OF VEHICLE & FUEL (Please tick or specify any other vehicle or fuel) I HAVE READ & COMPLETED THE ABOVE FORM AND WILL ENSURE THAT ALL OF THE ABOVE ITEMS WILL BE COMPLIED WITH FULLY. SIGNATURE OF PRODUCTION MANAGER. ` DATE.