SERVICE & MAINTENANCE MANUAL FOR:

Similar documents
68 MEGA OBSTACLE COURSE

Attaching the ball Attach the rope to the underside of the middle of the inflatable. The rope will then attach to the ball using a D-ring.

NO FLIPPING NO HEAD FIRST 4 TO 7 PASSENGERS AT A TIME

Inflatable Acoustical Shell

User Instructions 1789 Parapet Wall Anchor

Operating Instructions Part No

Risk Assessment For : Ace Tones Entertainments Ltd

E Cube Lift Model: ECU Installation Instructions

HAS2400 Hepa Air Scrubber

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

Management Plan for Electrical Safety ISD #535

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

USER MANUAL. MACMAG magnetic separator MHK MHF

Heavy-Duty Hot Knife

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

User Instruction Manual For Davit Rescue System

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Operating Instructions Part No

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Fiber Cable Puller with Tuf-Lugger lite

deluxe toilet safety support

MODEL NUMBER: P PORTABLE COMPRESSOR

Inflatable Product Owner s Manual

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor

Roto-Max Work Positioner. Operation. Maintenance

IMPORTANT SAFETY INSTRUCTIONS

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

SAFETY & OPERATING INSTRUCTIONS

INSTALLATION, OPERATION AND SERVICE MANUAL ABS AIR BAG LIFT

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN

Blue Whale Spa :- Site Preparation and Delivery

200 PSI COMPRESSORS - MODEL NUMBERS

100C Air Compressor Kit

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

SLIDE. Super Sweet. instruction manual SLIP SLIDE SPLASH INFLATE THE FUN WITH THINGS YOU NEED TO KNOW ABOUT THE SUPER SWEET SLIDE.

444C DUAL PERFORMANCE VALUE PACK

CP10K. 10,000 lb. Cable Puller Instruction Sheet. SAFETY ISSUES

WARNING: FOR OUTDOOR USE ONLY

Aquavar SOLO 2 Frequently Asked Questions

User Instruction Manual Fixed Beam Anchor

Arbor Terminator Press Operation Manual For IDT Connectors Order No Engineering No: AM

D E L U X E S E R I E S. Your Hot Tub Pre-Delivery Guide D E L U X E

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

MODEL NUMBER: P PORTABLE COMPRESSOR

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

Installation Instructions Air Compressor Part # 2780, 2781

1 DRIVE INDUSTRIAL IMPACT WRENCH

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

Portable Oil Lube Air Compressors

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

400C & 450C DUAL PERFORMANCE VALUE PACKS

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

Residential Swimming pools

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

User Instruction Manual Fixed Beam Anchor

User Instructions 1790 Rail Anchor

PORTABLE 5 GALLON AIR TANK ASSEMBLY & OPERATING INSTRUCTIONS

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

4-in-1 Professional Inflator Kit

SPECIAL EVENTS BOUNCE RENTAL CONTRACT

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

S Surge Arresters

OWNER S MANUAL AirTop Large and AirTop Small

Original Date of Issue: 04/09

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

CLARKES ERO FEEDER MANUAL

8675/8677/8678 OWNER S MANUAL

Your Hot Tub Pre-Delivery Guide

Tube-Line Accelerator Spinner Kit

CAUTION: YOU MUST READ THE FOLLOWING BEFORE OPERATING THE SNOWMAN.

airplaine kite Model assembly & Operating Instructions Important: If damage is caused due to a crash; your warranty is void.

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO


Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Paradise Pump Series Operator s Manual

INDUSTRIAL - SOLVENT PARTS CLEANER

Chair Topper. Autoadapt. Hoisting and stowing. User manual

Installation. Heat Trace Combination Drench Shower and Eyewash Unit (includes 120 V and 208/240 V versions) S19-304GA

INSTRUCTIONS FOR USE

DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WINCH2GO 4000 WINCH2GO 4000SR

OPERATION and MAINTENANCE Guide

DRAG HARROW SAFETY & OPERATING INSTRUCTIONS. Original Language. Serial No. Order No.

VERTICAL AIR COMPRESSORS

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

Owner s Manual & Safety Instructions

DBI SALA Confined Space Rescue Davit System

ISB SERIES INTERNAL SHOT BLASTING MACHINES INSTRUCTION MANUAL MANUAL NUMBER

DUAL ACTION SANDER MODEL NO: CAT121 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS0211

Pontoon Slide Owner s Manual

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

2000 lb manual winch

Ground Fault Circuit Interrupter(GFCI) Policy

Transcription:

SERVICE & MAINTENANCE MANUAL FOR: Tube Arch by: 2880 Interstate Parkway Brunswick, OH 44212 PH: 330-273.3200 Fax: 330-273-3212 Scherba Industries, Inc. 2011

Tube Arch INTRODUCTION INTRODUCTION To the owner: This manual is your guide to safe, productive operation. Read it carefully. It will reduce/eliminate trial and error learning and minimize downtime caused by improper maintenance. For additional information, contact the INFLATABLE IMAGES CUSTOMER SERVICE DEPARTMENT AT 330-273-3200 x154. NOTE: Because we try to improve every INFLATABLE IMAGES product, specifications and product design are subject to change without notice. Intended uses: The equipment described herein is intended to be used by a commercial operator to provide a service to the buyer s customers. As a commercial operator, the buyer agrees to operate and maintain the equipment for its intended use in a professional and competent manner as per INFLATABLE IMAGES recommendations and instructions, ASTM standards on amusement inflatables and devices, applicable governmental standards, and good commercial practices using professional and competent mechanics and operators. If at any time, and for any reason, the equipment cannot be adequately and safely operated for its intended use, buyer agrees not to operate the equipment until repairs or corrections are made. Inflatable information plaque: The inflatable information plaque is mounted to the main structure at the front of the inflatable. The plaque lists inflatable specifications, operating dimensions, ground load, as well as model and serial number and date of manufacture. When ordering parts or requesting information from the INFLATABLE IMAGES CUSTOMER SERVICE DEPARTMENT, always specify the model and serial number of your inflatable. SPECIFICATIONS INFLATABLE Tube Arch MODEL NO. N/A SERIAL NO. N/A ELECTRICAL SERVICE 110V, 60Hz OPERATORS/ INSTALLERS - 1-2 people for ground installs DIMS 13-26 Tall BLOWER REQUIREMENTS MODEL WB-1 / Eco Eagle HP 1 HP VOLTS 115 AMPS 60 Once pressurized HERTZ 60 CFM 908 MAX RPM 3450 OR MODEL EGII HP 1 HP VOLTS 115 AMPS 11 Once pressurized HERTZ 60 CFM 4000 MAX RPM 1550 Page 2

Tube Arch SETUP/TEAR DOWN 1 SETUP AND TEAR DOWN General Information: This manual provides detailed instructions for setting up and tearing down the portable unit. The general sequence is given for carrying out each procedure, and should be followed. If the size of the set-up crew permits, some steps can be performed simultaneously. Extra caution must be used, however, to keep all workers clear of any potential hazard. WARNING: When setting up or tearing down the unit, never allow bystanders and/or other workers in the area. Always know the whereabouts of all workers during the entire set-up or tear-down procedure. CAUTION: Precautions for personnel safety must be observed at all times when setting up or tearing down the unit. Be aware of elevated areas, pinch points, suspended loads, moving equipment, etc. Keep a safe distance from these hazards to avoid serious personal injury. ELECTRICAL CONNECTION Before starting to set up the inflatable, electrical power must be connected as follows: 1. Check the Main circuit breaker located in the main control box. Make sure it is in the OFF position. 2. Ground per local code. IMPORTANT: Make sure the small ground wire of the power cable is connected to an adequate ground per local code. 3. Connect the main electrical power supply to the inflatable. Check the electrical specifications for the power requirements of the inflatable, noting the color coding of the power cable. GROUND Green wire NEUTRAL White wire PHASES Black, red, and blue wires 4. Make sure all switches on the controls are in the OFF position. Page 3

Tube Arch SETUP/TEAR DOWN 2 SETUP PROCEDURE 1. Select a suitable location which is flat and has adequate space for the fully inflated unit. Keep at least 10 feet of clearance on all sides. Use a ground sheet under the inflatable unit, particularly on a hard surface. 2. The distance between ground anchor points and the inflatable is equal to the height of the inflatable. Example: for a 25 inflatable you would have a distance of 25 between each anchor point. Please reference the drawing below. 25 tall inflatable anchor point tie-down strap 3. All anchor points around the bottom and 2/3 of the way up on the inflatable need to be staked down using 30 metal stakes adjustable or non-adjustable. The stakes should be hammered into the ground using a sledge hammer 27-28 deep leaving only 2-3 exposed for the attachment of straps. 4. Remove the rolled up and folded unit from its transport packaging. DO NOT drag the unit across the ground. ALWAYS use sufficient personnel to carry the unit clear of the ground to the setup location. NEVER leave the inflatable unit unattended, inflated or deflated. IMPORTANT: Make sure that overhead obstructions or sharp or protruding ground objects will not interfere with inflation or damage the inflatable unit. 5. Ensure the area which the unit is to be used is clear of all protrusions and sharp objects which may damage the skin of the inflatable. The general area should be non-abrasive. Indoors on a smooth carpeted floor or outdoors on a flat soft grassy location is perfect. Safety mats should be placed in front of the inflatable where the passengers enter/exit the structure. 6..Place the folded unit in the middle of the cleared setup location and unfold. PLEASE NOTE how the structure is folded because this is the recommended method to use when repacking the unit in its transport packaging. Page 4

Tube Arch SETUP/TEAR DOWN 3 SETUP PROCEDURE CONT D 7. Connect the blower unit(s) to the inlet tube(s) at the back of the inflatable, ensuring that the deflation/maintenance zipper is closed, and that the exit holes around the structure are open. 8. The unit is now ready for inflation. Keep the area clear. IMPORTANT: Make sure that people or animals do not walk on the flat structure before inflation is attempted. This may damage your unit. 9. Plug the fan(s) into a 110 VAC outlet. The extension cord connected to this fan must be capable of carrying 15 amps. Extra long cords should be a minimum of #10/3 wire. Be sure to observe the instructions in the Electrical Connection Section of the Manual. 10. After the unit is inflated, inspect for signs of aging, such as cracks in wrinkles and tears, prior to operation. Cracks or tears should be repaired prior to operation. 11. All debris and moisture must be removed from the unit before operation. When fully inflated, the unit should fit comfortably in its space with 10 ft. of clear space on all sides. This will allow ease of access and necessary supervision. TEAR DOWN PROCEDURE 1. All debris and moisture must be removed from the unit prior to storage. NEVER LEAVE YOUR UNIT PACKED AWAY WET AS THIS WILL CAUSE MILDEW AND WILL DAMAGE THE UNIT. THIS IS NOT COVERED BY THE WARRANTY. 2. When deflating the unit, keep the ground area around the unit clear, and everyone away. 3. Switch off the blower motor, and remove the blower from the inlet. Unzip the deflation zipper on the backside of the unit after the blower has been removed (please refer to schematic for zipper placement at the bottom of the page). 4. Fold the unit up as neatly in the same way as it was unfolded during setup. Place the unit in its transport packaging. NEVER leave the inflatable unattended, inflated or deflated. Page 5

Tube Arch OPERATORS 1 DAILY INSPECTION RECORD THE FOLLOWING INSPECTION RECORD MUST BE COMPLETED ON A DAILY BASIS AND RE- TAINED IN THE PERMANENT FILE RECORD FOR YOU UNIT. MAKE EACH INSPECTION DAILY AND INITIAL THE APPROPRIATE BOX. MAKE COPIES OF THIS FORM AS REQUIRED FOR EACH WEEK S INSPECTION. THIS IS THE OPERATORS RESPONSIBILITY. WEEK OF: THROUGH: INSPECTION MON TUE WED THU FRI SAT SUN 1. CHECK FAN AND ELECTRIC CORD FOR CONDITION. 2. CHECK ALL TIEDOWN STAKES, SANDBAGS, ROPES. 3. REMOVE ALL DEBRIS AND MOISTURE. Page 6

Tube Arch MAINTENANCE 1 MAINTENANCE General Information: Proper maintenance of the inflatable is vital to safe operation, reduced operating costs, and longer life equipment. This Manual provides detailed information on scheduled maintenance and lubrication on the inflatable. It also includes troubleshooting information. This information must be immediately available to all operators of the inflatable. Contents: 1.0) MAINTENANCE SCHEDULE 2.0) MAINTENANCE LOG 3.0) SAFETY GENERAL SAFETY GUIDELINES 4.0) TROUBLESHOOTING PROCEDURES 1.0) MAINTENANCE SCHEDULE Daily Checks 1. Remove all debris and moisture from the inflatable. 2. Check all attachments to inflation fans. Check for air leaks or tears in the fabric. Check all tiedown stakes or sandbags for security. 3. Check power cord for proper installation and safety. 2.0) MAINTENANCE LOG SERVICE BULLETINS 1. 2. 3. 3.0) SAFETY The following is a list of general rules which should be observed by everyone. Remember that the key to a safe and successful operation is to have well trained and well supervised employees. General Safety Guidelines 1. All work must be performed by a competent, qualified repair technician, who is capable of understanding the function of the parts and their proper installation. 2. Inspect the inflatable before each day of operation to determine that no portion of the inflatable is damaged, missing, or worn in such a manner that unsafe conditions can develop. Page 7

Tube Arch MAINTENANCE 2 3.0) SAFETY (cont.) 3. Perform the Manufacturer s recommended maintenance procedures at the intervals specified and in the manner described in this manual. 4. Study each job carefully to determine all hazards so that necessary safeguards can be taken. 5. Protect your eyes by wearing approved safety glasses or goggles. 6. Where work to be performed is hazardous, at least two persons shall work together. 7. Clean up after each job, and properly dispose of surplus materials. 8. Keep a record of any repairs, and parts replaced and the date of replacement or repairs. 9. Make modifications and additions as outlined in manufacturer s service and safety bulletins. 4.0) TROUBLESHOOTING PROCEDURES Before calling the INFLATABLE IMAGES CUSTOMER SERVICE DEPARTMENT for help, be prepared with the following information. 1. Have the inflatable serial number and name available. 2. Have the service manual ready to use as a reference. 3. If the inflatable was previously owned, by whom? (I/I records often show changes made to an inflatable by previous owner.) 4. Have the same person make all calls. Be sure to get the name of the person to whom he is speaking to at the factory. All calls should then be made to that same person. 5. Have a phone number ready at which you can be reached. 6. Have shipping instructions ready. (How, when, and where to ship parts. 7. Have a list of any alterations, modifications, or kits that have been added to the inflatable. 8. The person calling the factory must be familiar with the problem and be able to describe symptoms of the inflatable problem (such as: was the problem gradual; did it suddenly quit; are any sounds occurring that are not normal; does the problem occur continuously, or is it intermittent; etc.). 9. Many times the problem that completely stops an inflatable from working is one of many simple things that are forgotten or overlooked. It can save several expensive phone calls or a more expensive visit by a factory representative, as well as valuable time to double check everything. Page 8

Tube Arch SERVICE BULLETINS 1 1.0) SERVICE BULLETIN LOG NO. DESCRIPTION DATE BY Page 9