Salvage of the USS GUITARRO (SSN 665)

Similar documents
Salvage of USS SQUALUS. Submarine Sunk

Estimate of the Salvage Situation

1. It is not possible to provide enough self-lift to raise both ends of the submarine.

The SDS Skip. Subsea Deployment Systems Ltd.

ASSIGNMENT 3. Textbook Assignment: Water System, Trim and Drain System, Air Systems, and Main Hydraulic System Chapters 9-12.

ASSIGNMENT 1. Assignment 1 Page 1 of 7

ASSIGNMENT 5. Assignment 5 Page 1 of 8

2.2 S0600-AA-PRO-160/CH-16, Underwater Ship Husbandry Manual, Cofferdams

1.0 PURPOSE AND NEED

Fully Submersible Heavy Lift Vessel

DEPARTMENT OF THE NAVY USS S4LVoR (ARS-52) C/O FLBET POST OFFICE SAN FRANCISCO. CALIFORNIA

G.L.M. : the on-board stability calculator... DEMONSTRATION OPERATOR S MANUAL

Fishing Vessel Stability

Submarines! Contact the National Museum of the U.S. Navy for Field Trip and School Visit opportunities!

NAVSEA STANDARD ITEM. 2.2 S0600-AA-PRO-160/CH-16, Underwater Ship Husbandry Manual, Cofferdams

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

MSC Guidelines for Review of Stability for Towing Vessels (M)

Chapter 2 Hydrostatics and Control

Structural Assessment. USS Yorktown CV-10

National Maritime Center

USS ALABAMA BATTLESHIP MEMORIAL PARK. Vocabulary

Testing Procedures of Watertight Compartments

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

Specification of Dafman Patrol Boat 13.6

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

S0300-A6-MAN-010 CHAPTER 2 STABILITY

5750 Ser C0/ Aug 01. From: Commanding Officer, USS SALVOR (ARS 52) To: Director of Naval History (N09BH)

PSI France DESCRIPTION Mise à Jour : 02/09/02 SMAL202 Version : 0 Page 1 sur 9

WEIGHTS AND STABILITY

TECHNICAL MEMORANDUM 002 EMORANNO. 001

H-1. Submarine Salvage Exercise of ex-uss HAKE. Exercise

Three Lines of Defence

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]

1. The Command History for USS SALVOR for 1989 is as follows: a. Command Com~osition and Oraanization (1) The mission of USS SALVOR is fourfold: (a)

Marine Safety Information Bulletin COAST GUARD GUIDANCE FOR DEAD SHIP MOVEMENT IN SECTOR HONOLULU CAPTAIN OF THE PORT ZONE.

Mount the actuator in the bracket provided and install a 24-foot EFTC cable to the actuator.

Ref: (a) OPNAVINST

Scuba Doo II Technical Report International Submarine Race #11 May 2, 2011

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

Challenges in Ship Design to Maintain Thrusters inside Ship

WEIGHTS AND STABILITY

Attachment 1 T&T Salvage, LLC Standard Tariff (Revision Date: 4 October 2013)

A Summary of Findings Which Caused. The Deep Dive of the USS CHOPPER (SS 342) 7 October, 1969

APPENDIX G FEASIBILITY STUDY

S.S. MONTEBELLO Assessment Radiation Detection Case Study

National Maritime Center

(5) Results of Operational Inspections (6) Commendatory Correspondence. Copy to: NAVSURFGRU MIDPAC

How Do Ships Float? Contact the National Museum of the United States Navy for Field Trip and School Visit Opportunities!

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh

WATERTIGHT INTEGRITY. Ship is divided into watertight compartments by means of transverse and longitudinal bulkheads bulkheads.

Unit Test Review. Pressure Valve Pump Surfactant Viscosity Plimsoll line Density Units for density Neutral buoyancy Pipeline pig

Fully Submersible Heavy Lift Vessel

ACTIVITY 1: Buoyancy Problems. OBJECTIVE: Practice and Reinforce concepts related to Fluid Pressure, primarily Buoyancy

HYPERBARIC INTERVENTION IN SUBMARINE RESCUE SUT June 8 th Doug Austin Director, Asia Pacific

In the liquid phase, molecules can flow freely from position to position by sliding over one another. A liquid takes the shape of its container.

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

In the liquid phase, molecules can flow freely from position. another. A liquid takes the shape of its container. 19.

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE

Remember that you must check your boat before every outing. Visual check of the general condition of the shoes, stretcher, etc.

3. How many kilograms of air is in the room?

RAPID RESPONSE DAMAGE ASSESSMENT MOBILE OFFSHORE DRILLING UNITS

Definitions 13 FREE SURFACE EFFECT

Abstract. 1 Introduction

Perched Box Caisson Overview. January 2014

Progression 24LD Stern Drive

Figure 1: Level Pitch Positive Pitch Angle Negative Pitch Angle. Trim: The rotation of a vehicle from side to side. See Figure 2.

RULES PUBLICATION NO. 86/P EXPLANATORY NOTES TO SOLAS CONVENTION AND DIRECTIVE 2003/25/EC STABILITY AND SUBDIVISION REQUIREMENTS

MOTORWORKS SUBMARINE MODIFICATIONS

ITTC Recommended Procedures and Guidelines

UMass Boston Waterfront at a glance

UNDERWATER SHIP HUSBANDRY MANUALS CHAPTER 16 COFFERDAMS S0600-AA-PRO-160

GOM Diving Safety Work Group

Testing Procedures of Watertight Compartments

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ]

APPENDIX D Oil Loading Pipeline - Options

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

Chapter 3: Fluid Statics. 3-1 Pressure 3-2 Fluid Statics 3-3 Buoyancy and Stability 3-4 Rigid-Body Motion

The Metal Shark 75 Endurance is a welded aluminum pilothouse catamaran specially designed for use as a law enforcement, port security, and fire

GAS FORM-C. LOA LBP Breadth Depth Air draft (fm Summer LL) Draft (m)

PSSRA Work Package Overview The Mighty War Ship

National Maritime Center

FREE SURFACE EFFECTS. Partially-filled (slack) tanks can be dangerous; the number of slack tanks should be kept to a minimum.

MATING OF THE MOLIKPAQ DRILLING RIG

Rules for Classification and Construction Additional Rules and Guidelines

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

The Joys of Trimming out a Wet-Hull type R/C Submarine

We re Going Global. Vessel Loss Control. Technical Notes #36

GAS FORM C Main particulars

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

DQM Annual Hopper QA Checks

A Basic Guide to Europe Dinghy Rigging

U.S. COAST GUARD MARINE SAFETY CENTER PLAN REVIEW GUIDELINE

Students will be able to recall information about basic ballast and air systems on the Argonaut Jr.

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

Land Based Marine Fire Fighter Task Book

Transcription:

Salvage of the USS GUITARRO (SSN 665) I. Salvage of the USS GUITARRO (SSN 665) Brief USS GUITARRO (SSN 665) was in an advanced state of construction at the San Francisco Bay Naval Shipyard (mare Island Division). On the evening of 15 may 1969 uncontrolled flooding caused the GUITARRO to sink. Salvage operations were conducted by the Supervisor of Salvage. The submarine was refloated at 1119 on 18 may 1969 by dewatering with pumps through cofferdams which had been constructed for that purp83. Though the initial salvage plan envisioned expelling watel by means of compressed air through the salvage air fit.tings, this plan was abandoned in favor of pumping when it became obvious that pumping would be much faster. After the submarine was surfaced, residual water was removed from GUITARRO until a condition satisfactory for drydocking was reached. Salvage operations were completed when GUITARRO was docked at San Francisco Bay Naval Shipyard on the evening of 18 may 1969. The salvage operation, from beginning of mobilization through successful recovery, was particularly short; only 3 days passed between the date of sinking and drydocking of GUITARRO. The shipyard industrial assistance and complete availability of all services, especially cranes, made the salvage of GUITARRO possible in such a short time. A similar submarine sinking, far removed from the industrial plant capacity available at the San Francisco Bay Naval Shipyard, would present a much more complex problem and probably require much more time and effort for recovery. 1. 2. Narrative = On the evening of 15 may 1969, at approximately 213 local time, USS GUITARRO (SSN 665) sank alongside the pier at mare Island Naval Shipyard, Vallejo, California. The ship sank due to uncontrolled flooding which originated in the forward part of the ship. After sinking, the ship came to rest with approximately a 6 port list; the fairwater above the sail planes remained above water, as did the conning tower access trunk. At the time of sinking no fissionable material was aboard. The ship was in an advanced state of construction. With the exception of the reactor, essentially all equipment was aboard. Ballast tank flood ports were temporarily welded closed and temporary covers were installed on ballast tank vents. The forward and after access trunks were open for normal personnel access. The following temporary openings existed: 1-1

, CO FFERDAMS ARE IN POSITION. TUG (Y TM) AND CR ANE LIFTING BR IDLE ON THE STE RN PREVENT THE SUBMARIN E FROM RO LLING OVER DUR ING PUMPI NG OPE RATIONS. FIGU RE 1 1 H I I N IT j -:r;.-" :::r ljj Dl f-' c:: Dl to CD ---1) CD C ljj ljj Cl C H --l ):::> ::u ::u /""' ljj ljj Z m Ul H

Salvage of the USS GUITARRO (SSN 665) I. ENG IN EROOM COFFER DAM 2 FEET HIGH, 5 INCHES IN DIAMETER. FIGURE 1-2 1-3

Sal vage o f t he USS GU 1T ARRO (SSN 665) I. --------------------------------------- w I Z w LU W LL LL U W. w m LU w W Z U Z W LU LL 1-4

Salvage of the USS CUITARRO (SSN 665) I. Sonar space. On the top side of the hull were two openings. A bolted access cover had been removed. A temporary access about 22 inches square had been cut. Two normally tight cable ways into the sonar space at FR.11 were not watertight due to work in progress. Reactor compartment. A temporary access (approximately 12 feet square) existed in the top of the hull for installing reactor components. Auxiliary machinery Room Two (AmR-2). A temporary services opening existed in the top of the hull for power and ventilation. A temporary services trunk was welded to this opening, but was nontight at the top where cables and ventilation ducts entered. Hole for missing engineroom high salvage air fitting. Initial efforts through the night and early morning of 15 16 may were concerned with closing internal watertight doors and hatches, clearing some of the maze of temporary service wires that cluttered the topside of the submarine, and closing or patching temporary access openings. Air hoses were rigged to the salvage air fittings in the forward two spaces (crew's living and operations spaces). Pressure was applied and these spaces were found to be watertight. At 83 on 16 may, after a review of the situation, it was determined that essentially all of the flood water must be removed from the submarine. Since approximately one-third of the hull was sunk into the mud, it was anticipated that some positive buoyancy would be required to overcome the effect of mud suction. The basic salvage plan was to make the hull watertight, then remove the flood water. Two basic means were available: Air Blow - The preferred way to raise a sunken submarine is by expelling flood water with air through the salvage air system. Erect Cofferdams - Since the conning tower access hatch was above water and the after access hatch and reactor compartments were only about 15 feet below the surface, it was feasible to pump water out through cofferdams. 1-5

.. I--i I IFE rt :::r m m.-.. ld Ql c::: Ql LD m --r:, / 1 FABRI\..ATlON OF REACTOR COMPARTMENT PATCH WITH ATIACHED COFFERDAM. NOTE FLEXIBLE FOAM ON THE PATCH FOR EASE-OF SEATING, AND TIE-DOWN POINTS FOR SECURING THE PATCH. c ld ld Cl C I--i --1 ::D ::::lj ::::lj...-... U) U) Z m u-i I--i

Salvage of the USS GU1TARRO (SSN 665) I. CRANE LIFT ING REACTOR COMPARTMENT PATCH AND COFFERDAM INTO POSITION. THE COFFERDAM IS FABRICATED FROM 25 POUND PLATE, IS 2 FEET HIGH, AND IS 5 INCH ES IN DIAMETER. FIGURE 1 5 1-7

H I CD U1 CJ r- c:::: CJ LO m o """1J c-r ::J m c U1 (J] Cl C H -I :P :: :: o ELECTRIC PUMP DEWATERING SUBMARINE COMPARTMENT THROUGH CO FFE RDAM. NOTE ELECTRI C CONTROLS, POWER CABLES, AND CRANE HOOK SUPPO RTING TH E PUMP IN PLACE. FIGURE 1-6 ------ (J] U1 Z m m I Ul H

Salvage of the USS GU1TARRO (SSN 665) I. The salvage plan actually used both methods. The forward two spaces were blown for about eight hours. When it became obvious that pumping would be much faster than blowing, the blow was secured and pumping became the primary means for dewatering. Pumping had two additional advantages: Since the submarine could be entered during pumping operations, the exact status of buoyancy was known at all times. This permitted the final refloating to be a controlled operation. Pumping permitted the removal of residual water that could not be expelled by blowing. Low reserve buoyancy made the removal of this water essential. Calculations indicated that the ship was in a stable condition, though righting arms were quite low due to the flooding water. As flooding water was removed stability continually improved because of the lowering of the center of gravity. The only concern was the possibility of developing an upsetting moment caused by a free surface effect on the watertight deck of the torpedo room. This was avoided by stripping this space of all water prior to the refloating effort. The daylight hours of 16 may were spent in clearing an access through the maze of temporary service lines by divers so that all hull openings could be identified, templated, and made ready for patches. Cofferdams had been designed and were being constructed by shipyard personnel. The 15 ton crane was connected to GU1TARRO aft to provide additional stability. During the evening of 16 may preparations were made to blow the main ballast tanks forward. Temporary protective plates over the vent valves were removed by divers. Since three vent valves were closed hydraulically, it was necessary for divers to remove the entire vent valve mechanism. This job was completed with the assistance of a dockside crane on 17 may. On 17 may all patching was completed. Cofferdams were installed on the after access hatch and on the patch for the reactor compartment. Blow fittings were installed on main ballast tanks forward, and a fitting to pump the sonar dome underwater was installed. At 5 the forward two spaces were pressurized and water expulsion commenced. This blow continued until 124, when it was decided to shift to pumping. These spaces were vented, and at 1825 the conning tower access hatch was opened. Salvage crews entered the submarine and found the water level forced down to about three feet below the upper level. Prior to the entry of personnel into the submarine, careful checks were made for chlorine and hydrogen gas; none was found. 1-9

Salvage of the USS CU1TARRO (SSN 665) I. en en w CJ CJ «> cc «cc w l- CC UJ >...J W co ;-' :c l- cc s: «z w en cc w => :c CJ I- w r: en w :c l- cc CJ w => I...J C!) «:c u. 1-1

Salvage of the USS CUITARRO (SSN 665) I. z c. 2 I c. 2 r r w 1-1 1

Sa lvage of the USS CU ITARRO (SSN 665) I. I-12

Salvage of the USS CUITARRO (SSN 665) I. At 17 pumping commenced through the reactor compartment cofferdam and at 2355 pumping commenced through the enginsroom cofferdam. The recommended dewatering sequence was followed as a guide, but when it became apparent stability would not be a problem, the sequence was modified. It was decided to completely dewater the submarine with the exception of AmR-2. This flood water was used as ballast to prevent the submarine from surfacing until all preparations had been made. Pumping and stripping operations continued through the early morning of 18 may. By about 13 pumping and stripping operations had been completed with the exception of AmR-2. All was now in readiness for the first refloating effort. At 157 pumps were started on AmR-2 and a 2 ton strain was taken on the floating crane shackled to the stern. At 1119 the submarine rose to the surface. On surfacing the submarine trimmed by the stern, with the top of the rudder below water. The after trim was probably caused by water from AmR-2 moving aft into the engineroom as the submarine surfaced. Salvage crews then entered the submarine for the final stripping effort. At about 17 stripping operations were complete and the submarine was sufficiently buoyant to enter drydock. On the evening of 18 may USS CUITARRO entered Drydock #3, mare Island Naval Shipyard, and salvage operations were terminated. I.3. Buoyancy - Detail Discussion of Weight, Buoyancy, and Recommended Sequence of Actons to COITARRO (SSN 665) Weight Factors (A) Stability, FIoat Available evidence indicates that the submarine was floating at the top of the boot topping (which is 6" above normal diving trim draft). This indicates the displacement, prior to start of accidental flooding, was 4266 tons. At the time main Ballast 1, 2A, and 2B were full, main Ballast 3A and 3B contained 3 tons, the forward sonar tank was dry. Estimating the initial condition on the basis of the condition A weight of the SSN 662, on the assumption that SSN 662 and SSN 665 are both very close to calculated (which was the case in 662), gives: NOTE Reference Submarine Cuidance Plan, Figure I-15 for compartmentation details. I-13

Salvage of the USS GUITARRO (SSN 665) I. Condition A 42 Tons - Including Sonar Tank 143 - Sonar Tank 3859 + 273 main Ballast Tank 1, 2A & 2B, Partial main Ballast Tank 3A & 38 and Variable Ballast 4132 49 Internal Tanks 483 Tons Therefore, initial condition range was between 483 tons and 4226 tons. The flooded weight on the bottom is based on design dimensions minus permeability factor times density of water (measured). Variable ballast tanks are also considered on the basis of the reported initial condition which is calculated to be 8.18 tons. minimum weight calculation assumes no further flooding occurred. maximum weight calculation assumes complete flooding of remaining volume which would be about 78 tons. main Ballast Tank 3A and 36 flooded an additional 58 tons. Forward sonar dome flooded 143 tons. Based on the recommended sequence of actions in the following section, Recommended Sequence, the estimated minimum and maximum weights are shown in Table I. The net weight holding the ship on the bottom is shown in Table II. stability (8) Condition on bottom with all internal compartments flooded, Bow Sonar Tanks and main Ballast Tanks 1, 2, & 3 flooded, main Ballast Tanks 4, 5, and 6 dry, and assuming that all internal tanks are dry, which would be the worst case, positive stability (BG) equals about.17a. Dewater Operations Compartment, Forward Room. and Sonar spher e. BG =.53 ft. Dewa ter Eng in e Room... BG =.82 ft. Fill main Ballast Tanks 4 and 5.... Be; =.8 ft. Dewater Auxiliary machinery Room Be; =.82 ft. Blow main Ballast Tank as recommended Be; = will increase Recommended Sequence (C) The submarine should remain on the bottom until a controlled effort to raise it is ready. I-14

Salvag e of the USS GUITARRO (SS N 665 ) I. LU 2 oc LU W 2 I oc 2 U w 2 2 W 2 LU LU W... 2 > 2 I LU oc w LU u oc w oc u LU u u 1-15

Salva ge o f t he USS CU 1TA RRO (S SN 665 ) I. > oc Q. 2 oc w w oc tn oc oc Q. oc 2 w U 2 OC w w u U tn W 2 2 w U w w 2 2 u Z 2 w u. 2 w oc 1-1 6

Salvage of the USS GUITARRO (SSN 66S) I. Precise weights and conditions are not achievable; a bandwith of possible error, on both sides of the best estimate, is required to insure control. The potential error quantities are: condition of variable tanks amount of residual water ramaining lack of precise knowledge of initial weight of the ship before the casualty An excessive trim circumstance is undesirable during the transitory conditions. The following sequence is proposed: Dewater Operations Compartment and Forward Room and strip to lower flat (deck). Dewater Engine Room and strip to bottom of bilges. Fill aft main Ballast Tank group Tanks SA and 5B. Dewater Auxiliary machinery Room. Do not dewater Reactor Compartment or Forward Sonar Tank. Blow main Ballast Tanks in following sequence: 1. SA, 5B, and 1 2. 3A and 3B 3. 4A and 4B and 2A and 2B Ship should rise (See Table II) If ship does not break free, refill main ballast tanks and pump down Reactor Compartment. Blow forward and aft main ballast tanks per prior sequence. ------"------------------------------------------------------------------------ 1-17

Salvage of the USS CU1TARRO (SSN 665) I. Bottom Breakout Forces When CU1TARRO sank approximately one-third of the hull settled into a very soft mud. In view of the anticipated difficulty in completely dewatering GUITARRO, it was feared that bottom breakout forces due to mud suction might become important. Preparations were made to overcome the mud suction effect if required. These included (1) hydraulic lances connected to a jetting pump for washout of mud, (2) the use of tugs to rock GU1TARRO, and (3) the use of a 15 ton crane to provide additional lift. GUITARRO surfaced before any of these actions were required. The initial surfacing displacement of GU1TARRO was about 8 tons. This force is estimated to be approximately the bottom breakout force. 1-18

FORWARD BALLAST TANK BLOW FITTINGS CONNECTE D FOR BLOWING WITH AIR. FIGU RE 1-12 '...,... - - I.,.;:., tfi, _4 J. ).:'..,... '-;-:-y-:.... ",.... ' I, - - I-!

Salvage of the USS GU1TARRO (SSN 665) I. Cl a:: «3: a:: u.. e,:, Z..J Z I.«a::. w Q., w e,:, «>..J «CI) M... a:: a:: w «a:: l => (!) ::> (!) u.. 1-2

Salvage of the USS CUITARRO (SSN 665) I....: u.. <{ (!) 2 ::.:: -' Z <{ a: w Q.. W (!) <{ > -' <! en q... a:. a: w <{ a:!:: ::> (!) ::> (!) u. ----- --------- I-21

Salvage of the USS GUITARRO (SSN 665) I. TABLE I ESTIMATED MINIMUM AND MAXIMUM WEIGHT FOR VARIOUS CONDITIONS ESTIMATED WEIGHT Minimum Maximum Original Condition (Calculated Displ acemen t)............ All Compartments. 483 4226 2752 2752 Flooded Condition Sonar Dome.... Internal Tanks and Partial Main Ballast Tank 3.. 143 143 o 136 6978 7257 Dewater Operations Compartment (- 113)... Dewater Forward Compartment (-262)... Dewater Engine Room (-84)..... Fill Main Ballast Tank 5A and B (+137).. Dewater Auxiliary Machinery Room (-281). Retain Reactor Compartment Water and Sonar Tank (31 and 143).... 5875 6154 5613 5892 489 588 4946 5225 4665 4944 4665 4944 ESTIMATED MINIMUM AND MAXIMUM WEIGHT FOR VARIOUS CONDITIONS. TABLE 1-1 1-22

Salvage of the USS GUITARRO (SSN 665) I. TABLE II WEIGHT, DISPLACEmENT, AND NET WEIGHT HOLDING SHIP ON BOTTom, ASSUmING REACTOR compartment FLOODED minimum maximum maximum WITHOUT WITHOUT WITH 15 TONS RESIDUAL RESIDUAL RESIDUAL Weight Submerged..... 4665 4944 594 Submarine Displacement... 4684 4684 4684 Net Weight Holding Ship to Bottom... -19 26 41 Blow main Ballast Tanks 5A and B Plus main Ballast Tank 1. -221 58 28 Blow main Ballast Tanks 3A and B... -39-3 12 Blow main Ballast Tanks 2A and B... -391-112 38 EIGHT, DISPLACEmENT, AND NET WEIGHT HOLDING SHIP ON BOTTom, ASSUmING REACTOR compartment FLOODED. TABLE 1-2 1-23

Classes of US NAVY Submarines 1.5. 1. 5. US NAVY Submarines The US NAVY operates several classes of submarines. For complete specifications, booklet of general plans, stability information or other information necessary for submarine salvage, contact: Supervisor of Salvage (Ships DOC) Naval Ship Systems Command Department of the Navy Washington, D.C. 236 1-24