Central Washington University

Similar documents
Lock Out/Tag Out Control of Hazardous Energy

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

LOCKOUT/TAGOUT PLAN August 2015

Lockout / Tag out Program

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Lockout/Tagout Program

LO/TO LOCKOUT/TAGOUT PROGRAM

LOCKOUT SYSTEM AND POLICIES

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Lockout / Tagout Program

Lockout / Tagout Program OSHA 29 CFR

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

University of Arkansas Office of Environmental Health and Safety

RiskTopics. Lockout/Tagout October 2017

Lockout/Tagout Safety Policy

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Lock Out - Tag Out Safety Program

Lockout/Tagout Program

Health and Fire Safety Review 2/15

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

THE UNIVERSITY OF NORTH CAROLINA

Facilities Management

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

H. Control of Hazardous Energy: Lockout/Tag Out

Lockout Tagout Policy

Lockout/Tagout - Control of Hazardous Energy Program

Hazardous Energy Control

Safety Manual: Hazardous Energy. January, 2017

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM

Management Plan for Lockout Tagout (LOTO) ISD #535

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

Control of Hazardous Energy Program (Lockout/Tagout)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

Health, Safety, Security and Environment

Sample Lockout/Tagout Policy

Lockout/Tagout - Energy Control Program

Lockout Tagout Program

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

LOCKOUT-TAGOUT PROGRAM

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

Product Information Report Lockout/Tagout Hazardous Energy Control

Gettysburg College. Energy Control Program

2523-LDG-E. Leader s Guide

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

LOCKOUT/TAGOUT PROGRAM

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

LOCKOUT/TAGOUT POLICY

Lockout / Tagout Safety Program

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Lockout/Tagout Manual

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Hazardous Energy Control (Lockout-Tagout)

Control of Hazardous Energy Program (LOTO)

Lockout Tagout Program

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Hazardous Energy Program Lockout/Tagout

Hazardous Energy Control Lockout/Tagout

University of Vermont Department of Physical Plant Burlington, Vermont

Elements of a Lockout/Tagout Program OSHA

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Bruce Koenecke. Key Account Manager Middletown, PA

MCW s Control of Hazardous Energy Program

LOCKOUT / TAGOUT PROGRAM

Lockout/Tagout Training Overview. Safety Fest 2013

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

230-LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy. Environmental Health and Safety

Lockout/Tagout Program

Lockout Tagout Program

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

LOCKOUT/TAGOUT PROGRAM

Energy Control Procedures Lockout/Tagout 29 CFR

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

CONTROL OF HAZARDOUS ENERGY

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

2008. AURORA PICTURES

Big 5 Site Training Support Information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

University of Tennessee Safety Program

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Transcription:

Central Washington University Lockout / Tagout (LOTO) Program Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg, WA 98926 P: 509-963-2252 2018 Lockout / Tagout (LOTO) Plan (Rev. 2/2017) Page ii

Table of Contents 1.0 Purpose... 1 2.0 Compliance... 1 3.0 Procedures... 1 Electrical Procedures... 2 Pressurized Lines Procedures... 2 Environmental Health & Safety Page i

1.0 Purpose 1.1 This procedure establishes the minimum requirements for the lockout/tagout of energy isolating devices whenever maintenance or servicing is done on a machine or piece of equipment. It ensures that the machine or equipment is stopped and isolated from all potentially hazardous energy sources and locked out before employees begin to perform any servicing or maintenance where the unexpected energizing or start-up of the machine or equipment or release of stored energy could cause injury. 1.2 Whenever major replacement, repair, renovation, or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machines or equipment shall be designed to accept a lockout device [WAC 296-803-300]. 2.0 Compliance 2.1 Whenever it becomes necessary to perform maintenance, service, replacement or repair on a piece of equipment, all procedures in this chapter are to be followed to isolate it from the energy source. 2.2 Upon observing a machine or piece of equipment which is locked out or tagged out, no attempt shall be made to start, energize or use that machine or piece of equipment. 2.3 It is expressly forbidden for any person, other than a supervisor upon review or the one installing a red tag or lockout, to remove the lockout or red tag or activate the tagged power panel or piece of power equipment. Failure to follow this procedure could result in serious damage, injury and/or loss of life. It will be considered an extremely serious safety violation if a lockout device or tagout warning is bypassed, over-ridden or ignored. 3.0 Procedures 3.1 Persons working on powered or pressurized (p/p) equipment may be subject to serious injury or death due to unexpected operation of the equipment. Positive controls must be established and enforced to assure safe work around such equipment. The two energy sources that are of most concern are electricity and steam. 3.2 Exception: 3.2.1 The lockout/tagout procedures are not required when all of the following conditions are met: Work is being performed on p/p equipment in limited access locations away from other workers; and The location of the power shut off device remains within the sight of the person performing the work; and The person performing the work will not leave the equipment until the work is completed. 3.2.2 These conditions generally apply to persons performing maintenance or repairs of a short term nature. Whenever one of these conditions cannot be met, the following standard lockout/tagout procedures must be followed. 1 P a g e

3.3 Electrical Procedures 3.3.1 Notification Advise affected persons (building monitor, department head, etc.) and appropriate supervisor(s) as far in advance as possible. This should be done for situations such as major power outages, significant HVAC changes, power outages to areas with computers, etc. 3.3.2 Identify all power outages 3.3.3 Turn off all power sources 3.3.4 Place tag/padlock on the control or master switch Each lock must be tagged with the name of the person performing the work, description of the work, the date, and the department performing the work. Locks and tags are available from supervisors. If more than one person is working on the equipment, each worker must place their own lock and tag on the control or switch. If the control or switch is always in sight, the worker may choose to just tag the control or switch. 3.3.5 Exception - If the power source does not have a lockout capability, it must be disconnected and tagged. 3.3.6 Verifying Before starting work, make sure that equipment cannot be set in motion or energized by alternate sources, etc. 3.3.7 Removal When the job is finished, each worker shall remove their lock(s) and tag(s); one worker must not remove the lock or tag of another worker. In some circumstances supervisors may need to remove or grant permission to remove a workers lock or tag. This may only be done after a thorough inspection has been made of the area, by the supervisor or their representative, to assure that no person will be exposed to dangers as a result of activating the system. The supervisor will insure that the person whose name is on the lock or tag is contacted and notified that their lock or tag is being or has been removed. 3.3.8 Keys Each padlock will have only one key and a master, which shall be retained by the supervisor. If a key is lost, report it immediately to the supervisor. 3.4 Pressurized Lines Procedures 3.4.1 Notification - Advise affected persons (building monitor, department head, etc.) and appropriate supervisor(s) as far in advance as possible. This should be done for situations such as major power outages, significant HVAC changes, power outages to areas with computers, etc. 3.4.2 Identify All Sources of Pressure to Area Locate all pressure lines connected to the line being worked on. 3.4.3 Close and Lock-out Control Valve(s) 2 P a g e

Any section being worked on must be verified that it is double isolated by checking both valves (the one immediately preceding the T and the one following) to insure that they are both securely in the off position. 3.4.4 Place Tag/Padlock on the Control or Master Switch Each lock must be tagged with the name of the person performing the work, description of the work, the date, and the department performing the work. Locks and tags are available from supervisors. If more than one person is working on the equipment, each worker must place their own lock and tag on the control or switch. If the control or switch is always in sight, the worker may choose to just tag the control or switch. 3.4.5 Exception - If the power source does not have a lockout capability, it must be disconnected and tagged. 3.4.6 Verifying Before starting work, make sure that the line cannot be energized by an alternate source. 3.4.7 Bleed the Line 3.4.8 Long Term Shut Downs For long term closure of a line, the use of a blank flange between the power source and the job should be considered. 3.4.9 Upon Completion When the job is finished, remove the blank flange and open valves as appropriate. Then follow procedure 3.3.8 above. 3 P a g e