How severely could the risk hurt someone? Low/Insignificant First aid

Similar documents
How severely could the risk hurt someone?

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Temporary load-bearing support for structural alterations or repairs

SAFE WORK METHOD STATEMENT Part B

Safe Work Method Statement

WORK METHOD STATEMENT TERMITE PROTECTION

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

SAFE WORK METHOD STATEMENT Part 1

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

SAFE WORK METHOD STATEMENT SWMS No Version

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SAFE WORK METHOD STATEMENT

Safe Work Method Statement

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WORK METHOD STATEMENT STRUCTURAL STEEL

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT CARPENTER

WORK METHOD STATEMENT CARPET LAYING

Safe Work Method Statement (SWMS)

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

SAFE WORK METHOD STATEMENT

Safe work method statements

SAFE WORK METHOD STATEMENTS

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Work Activity (e.g. Road Work): Work Location:.

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

Appendix 4C - Sample SWMS Trenching

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

What is an induction? Contribute to OH&S Processes

Safe Work Method Statement

INTERNATIONAL LIFE SAVING FEDERATION LIFESAVING POSITION STATEMENT - LPS 19 USE OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

The Sample Company Pty Ltd

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Contractor OHS Induction. AOHS-05-GUI September 2016

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

Hazard Management Making your workplace safer

Safe Work Method Statement Required for all High Risk Activities identified for the Project

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

PPE and Tools PPE and Tools

Safe Work Method Statement (SWMS)

WORK METHOD STATEMENT ELECTRICAL

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Personal Protective Equipment

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SAFE WORK METHOD STATEMENT (SWMS)

Important Safety Information Enclosed

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

SAFE WORK METHOD STATEMENT

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Responsibilities / Accountability

Conducting An Effective. Welcome!

EMA, Inc. SITE SAFETY PLAN

Safe Work Method Statement

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

OFFICE OF STATE HUMAN RESOURCES

PART 4: IMPLEMENTATION & OP

University of Vermont Department of Physical Plant Personal Protective Equipment Program

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Procedure: Work health and safety hazard management

PERSONAL PROTECTIVE EQUIPMENT

WORK METHOD STATEMENT RENDERING

1.1 OHS Policy and Responsibilities

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

Potential risk of injury to staff

Bondi Pipe Freezing PO Box 440 Bondi Jct NSW 1355 ABN SAFE WORK METHOD STATEMENT

CONFINED SPACE PROGRAM

Safe Work Method Statement Tasks

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Two Main Risks Associated with Foundry Work

TOOL BOX TALK NO3. Use of P.P.E

in Australian Workplaces

Monash University Academy of Performing Arts Safety Induction

75 Years of Health and Safety Guidance

Northern Kentucky University Issue Date: 11/02/2018 Revised Date: Title: PERSONAL PROTECTIVE EQUIPMENT PROCEDURE OBJECTIVE AND PURPOSE

Management of risk. Definition of terms. Managing risks. Risk

HS329 Risk Management Procedure

University College Dublin Machinery/Equipment Risk Assessment Template

Personal Protective Equipment 29 CFR 1926

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Safe Work Practices / Procedures / Instruction CONFINED SPACE

1. SHEWMS DETAILS. Project No. Valid From

Transcription:

Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised by: Robert Raams ABN: 3 0 879 20 Signature: Address: Unit 2/3 Jack Williams Dr, Penrith Date WMS Updated: Next Revision Date: Contact: Robert Raams Risk Matrix Phone: (02) 722 22 If the hazard is rated 1,2 or 3 - take action immediately Safety Equipment Used (eg harness) If risk rating cannot be reduced to, or Stop work and seek solutions How likely is it to occur? Hazardous Chemicals How severely could the risk hurt someone? Very Likely Likely Unlikely Very Unlikely Could happen any time Could happen sometime Could happen but unlikely Could happen, but probably never will Product Name SDS Extreme Kill or permanently disable 1 1 2 3 Ennis Road Marking Paint High Long term illness and lost time 1 2 3 Medium Medical attention and time off work 2 3 Low/Insignificant First aid 3 Personal Protective Equipment Select PPE appropriate for the job tasks. Report any defects immediately All repairs to be carried out by licensed or qualified person - Follow isolation, lock-out, tag-out process. Safety Boots Hi-Vis Shirt/Pants Gloves Safety Glasses Hearing Protection Hard Hat Long Sleeves/Pants Face Shield Dust Mask Respirator Sun Hat Other List Above

Safe Work Method Statement No: WMS-0 Task: Line Marking No Activity Possible Hazards Possible Risks Risk Score Risk Controls Risk Score (1 ) AFTER Controls Person Responsible Possible Product / Environment Hazards Product / Environment Risk Control 1 Site establishment Un-inducted personnel, incorrect PPE, nonconformance to project policies All staff to be industry inducted (Green / White card), project inducted, wearing correct PPE, and have any required client paperwork completed (toolbox, pre-start etc.) Leading Hand Interference with public vehicles / pedestrians Death, body impact injuries Client to ensure that work area is sufficiently barricaded, and Traffic Control Plan in place if required to ensure no access / interference to site by members of the public Leading Hand Personnel / members of the public being injured Notify persons nearby, apply TCP if working near roadway 2 Unload paint and equipment Manual handling Use correct manual handling procedures Spillage of paint Ensure paint lids are secure and containers in good condition 3 Prime machine with paint Inhalation, airborne particles Respiratory conditions Refer to MSDS for paint product, wear correct PPE gloves, dust mask, safety glasses Spillage of paint Take care when priming, use plastic drop sheet to contain overspray Measure and set out area to be line marked Slips, trips, falls Struck by moving machine Body impact injuries Remain alert to ground conditions where footing is placed, steel capped boots mus be worn Ensure traffic and pedestrian management plan is in place, work within designated work areas Start machine and proceed to paint marked out surface Wash-up machine with water and Noise UV exposure Inhalation, airborne particles Hearing loss Sunburn, skin cancer Respiratory conditions 3 Wear correct PPE hearing protection Wear wide brimmed hat and apply sunscreen at regular intervals as required Refer to MSDS for paint product, wear correct PPE gloves, dust mask, safety glasses

clear all paint lines 7 Reload machine and paint into trailer Struck by moving vehicle Manual handling Body impact injuries Ensure traffic and pedestrian management plans are in place, work within designate work area Use correct manual handling techniques, team lift where possible 8 Remove barricades and hats once paint has dried Struck by moving vehicle Manual handling Body impact injuries Ensure traffic and pedestrian management plans are in place, work within designate work area Use correct manual handling techniques, team lift where possible 9 General Hazards encountered that are not covered by this SWMS or the work changes and new hazards are presented 1 Stop work or source alternative duties, gather the work group and supervisor together and discuss the identified hazard or condition that has resulted in the work ceasing, review the SWMS to incorporate the identified hazard or change, agree on the mitigation or management method required to rectify, eliminate and reduce exposure to the hazard or change, sign off on the revision then continue with the revised procedure, submit the revision of the SWMS to the Safety Manager for approval Crew Leader, Leading Hand,

Plant / Equipment Maintenance of Plant / Equipment Plant / Equipment Maintenance of Plant / Equipment Line Marking Machine Maintenance Log Personal Qualifications & Experience Personnel, Duties and Responsibilities Training Required to Complete Works Construction Industry General Induction (Green / White Card) Crew Leader Leading Hand Supervisor to be trained in hazard identification, risk assessment and control Ongoing safety training and toolbox talks

NSW Legislation Work Health & Safety Act 2011 OHS Amendment (Dangerous Goods) Act 2003 Workers' Compensation (Dust Diseases) Act 192 Workers' Compensation Act 1987; Workplace Injury Management and Workers' Compensation Act 1998 Work Health & Safety Regulation 2011 Australian Standards AS 1319:199 Safety signs for the occupational environment AS 190:200 The storage and handling of flammable and combustible liquids OHS Amendment (Dangerous Goods) Regulation 200 AS/NZS 1270:2002 Acoustics Hearing protector AS/NZS 1337.1:2010 Personal eye protection Eye and face protectors for occupational applications Workers' Compensation (Dust Diseases) Regulation 2008 AS/NZS 2210.1:2010 Safety, protective and occupational footwear Guide to selection, care and use AS/NZS 370:2010 In-service safety inspection and testing of electrical equipment Workers Compensation Regulation 2003 AS/NZS 72:200 In-service safety inspection and testing repaired electrical equipment AS/NZS 31000:2009 Risk management Principles and guidelines AS/NZS 129:200 Occupational noise control AS/NZS 1800:1998 The selection, care and use of industrial safety helmets AS/NZS 399:199 Sun protective clothing AS/NZS/ISO 00079.1:2009 Classification of hazardous areas AS/NZS 211.1:2000 Occupational protective gloves Selection, use and maintenance WorkCover Codes of Practice NSW Subject Matter for National COP AS/NZS 02:2011 High visibility safety garments Garments for high risk applications National Codes of Practice Amenities for construction work Consultation Work health and safety consultation, cooperation and coordination Subject Matter for National COP First aid National Codes of Practice Fist aid in the workplace Excavation work Construction Construction work Hazardous chemicals Managing risks of hazardous chemicals in the workplace Formwork Demolition Demolition Manual handling Hazardous manual tasks Moving plant on construction sites Electrical Managing electrical risks at the workplace Noise Managing noise and preventing hearing loss at work Work near overhead power lines Excavation Excavation work Plant Managing risks of plant in the workplace Work in hot or cold environments Falls Managing falls at workplaces Risk Management How to manage work health and safety risks Workplace amenities Facilities Managing the work environment and facilities National Standards / Other Standards National Exposure Standards Atmospheric Contaminants in the Occupational Environment [NOHSC 1003 (199)] National Code of Practice for Noise Management and Protection of Hearing at Work [3 rd Edition] National Standard for Occupational Noise [NOHSC 1007 (2000)] Lend Lease Global Minimum Requirements

Declaration by Workers (All persons present to sign and date the form) I have been consulted and have assisted in the development of this WMS I have read and understand how I am to carry out the activities listed in this WMS I have been given training in the safe use of the equipment and/or the job task/s to be performed Where identified, I have the appropriate licence/qualifications and experience to perform the job task I have been given the opportunity to comment on the content of the WMS I have been supplied with the personal protective equipment identified in this WMS I have read and understand the requirements set out in the safety data sheets for any hazardous chemicals identified in this WMS Date Name Signature Date Name Signature