CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

Similar documents
INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

USG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE

Domed Ceilings and Barrel Vaults

Steps for W17, W14,W07, Wing Assembly Sonex #815

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

Ceiling System. Installation Instructions Curvatura 2 x 2

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

rondo aluminium components

INSTALLING YOUR CLC RUDDER

BALL STOP INSTALLTION GUIDE

Installation Instructions Topo Ceiling System

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted.

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Assembly Instructions. -Cantilever Boat Lifts

602 STRINGING MACHINE OWNER'S MANUAL

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

Troyer s Gourd Rack 8 unit F R H O P

TECHNICAL DATA. Trimpac 244a. September 16, 2013

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

A A A T E C H N O L O G Y

Soling Building Tips II

Installation of 2 Tier In Line Greeting Card Rack

SYSTEMS CEILING. [ Between us, ideas become reality. ] AXIOM Perimeter Trim

200 STRINGING MACHINE

INSTRUCTION MANUAL. January 23, 2003, Revision 0

Continental Industries TRANSITION FITTINGS or FAX Visit

DELUXE LOW PROFILE 18 & 30 STARTING PLATFORMS

Page 1 of 1 04/19/13 SBR

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Utility Anchor System

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

830 SureFlo Soap Systems Installation Instructions. Foam Soap Cabinet... Pages 2-9 Liquid Soap Cabinet... Pages 10-19

Football Equipment. 5 9/16" Gooseneck Goalposts

1500 Follow Spot Yoke

Operating & Maintenance MANUAL

GAS DISTRIBUTION PRODUCTS TRANSITION FITTINGS

Advantage Lockers & Bike

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

RATLINER Assembly Instructions.

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

K13.12 FACE FIXED PANIC EXIT DEVICE K13 DOORS

CIRRUS AIRPLANE MAINTENANCE MANUAL

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

Engineering Data Sheet

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Chapter 9 Accessories

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:


Mounting and Operating Instructions EB 8546 EN. Supply Pressure Regulator Type Fig. 1 Supply pressure regulators

Quality Plastic Pipe Fittings. Technical Data. Fabricated PVC Fittings IPS Class 100, 125, 160, 200 SCH 40 & SCH 80 Solvent Weld & Gasketed

Installation and Maintenance Manual. Compact Medical Gas Outlets

Continental Industries STEEL SERVICE TEES or FAX Visit

GEMLUX FISHING SYSTEM INSTALLATION AND USER GUIDE

F13.11 PARALLEL HINGES F13 PROJECT-OUT WINDOWS AND TOP HUNG WINDOWS

TECHNICAL DATA. Q = C v P S

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171

RAI-M series RUDDER ANGLE INDICATOR SYSTEM

SIMPLAIR PIPING TOOL. JXT Company

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

Evolution. Radiant Panels. Radiant panel system LPHW up to 90 C Suspended ceiling grid or sofit mounting Vertical wall surface mounting

X-6FC STRINGING MACHINE OWNER'S MANUAL. Issue 1 - May Copyright 2004 GAMMA Sports - All Rights Reserved

THOR 10 HAMMER CAGE INSTRUCTIONS

1/10 th Scale 1956 Ted Jones Classic Hydroplane

TECHNICAL DATA. Q= Cv S

American Flagpole & Flag Co. 1(800)

2 in. 18 Gauge Brad Nailer. User manual

CamRT Sun Top Bimini Installation Instructions

RUDDER KIT INSTRUCTIONS

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D

5. STRUCTURAL ANALYSIS

1. Section Summary for loose climbing equipment provided by Owner. 2. Section "Cast in Place Concrete"

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Anti-flood device Model B-1

LIQUID LEVEL GAUGE FOR WELDING ZGAU 716 O&M, 717 O&M, 718 O&M, 719 O&M

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

Inserta Products, Inc.

Velocity - AMD USER GUIDE CPU WATER BLOCK. 2nd Revision, October 19th 2018

LED LIGHTING FIXTURES FOR CONTROLLED ENVIRONMENTS

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Carbo Racing Foil Instruction Manual Unit 0, 1, 2, 3

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

SECTION 23iS/U: SIDE SKINS

Transcription:

5023 HAZEL JONES ROAD, BOSSIER CITY, LA 71111 888.315.1561 800.877.8746 FAX SALES@GORDONCLEANROOM.COM GORDONCLEANROOM.COM AN EMPLOYEE OWNED COMPANY CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division 13 21 13 WS-20 SERIES GRID GUIDE SPECIFICATIONS PART I: GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General and Supplementary Conditions and Division 1 apply to work specified in the Section. 1.2 DESCRIPTION OF WORK A. Furnish and install Gordon extruded aluminum grid ceiling systems as manufactured by Gordon, Inc. and as indicated on drawings including notes and details. All material and workmanship shall be of the highest quality, assembly and installation shall be in accordance with Gordon detailed instructions and specifications. 1.3 WORK INCLUDED A. Work of this Section includes the installation of the Cleanroom ceiling grid system including but not necessarily limited to the following: 1. Aluminum ceiling grid: As specified in this Section. 2. Gel: As specified in this Section. 3. Threaded starter rod and turnbuckle: As specified in this Section. 4. Blank ceiling panels: As specified in this Section. 1.4 RELATED WORK A. Intermediate steel framing B. Air Filter Systems and Equipment C. Lay-in and/or surface mounted light fixtures 1.5 PERFORMANCE A. Completed ceiling system shall be capable of providing Cleanroom Classification Rating as required and indicated for area installed. Page 1 of 5

PART 2: PRODUCTS 2.1 ACCEPTABLE MANUFACTURER A. Gordon, Inc, WS-20 Gel Seal Grid 2.2 CEILING SUPPORT MATERIALS AND ACCESSORIES A. 2 Ceiling Grid and Suspension Accessories 1. WS-20 Gel Seal Grid The 2 wide grid profile shall be extruded aluminum alloy 6063-T5. Exposed surfaces shall have clear anodized or powder coat white finish. Grid profile shall have a continuous integral screw boss within the web to facilitate ease of field installation. Grid components shall consist of 12-0 long main tees and 4 and/or 2 long WS-20 Series finished to match gird. Cross tee ends shall be square cut to provide a fully non-progressive ceiling system. As an option, grid members may be supplied with a continuous thread boss ScrewSlot to allow for simple attachment of teardrop light fixtures or other accessories without the need for drilling. A removeable extruded plastic trim finish strip in a color to match the extrusion is installed where the grid member may be exposed. 2. Suspension Accessories a. Grid connectors Zinc plated 14-gauge steel connectors shall be used to join main tee splice joints, corners and grid intersections. All connectors to have a minimum of two ¼ 20 bolts per connector leg. b. Threaded start rod Threaded start rod to be 9 long, ASTM rated, left/right hand ¼ 20, Zinc plated steel. Spacing to be as per load requirements. c. Turnbuckle- Turnbuckle to be 4 long, ASTM rated, left/right hand Zinc plated. Spacing to be as per load requirements 3. Ceiling system shall be level overall with 0.10 and shall be level within 0.062 in any 10-0 direction. 2.3 BLANK CEILING PANELS A. Aluminum panels Blank ceiling panels shall be of inverted pan design, fabricated of minimum.060 thick aluminum and having down-turned knife edges with welded corner seams. Panel dimensions shall be as shown in project drawings. Blank ceiling panels shall have white powdercoat finish to match the ceiling grid. B. Hold down clips for blank panels to be 2 long extruded aluminum with hole in top for ¼ 20 x 3/8 long screw. Clip shall be fastened to the threaded web of the grid. 1. Manufacturer a. Gordon, Inc. Page 2 of 5

PART 3: INSTALLATION 3.1 WS-20 GRID INSTALLATION 3.2 General - Coordinate all work with other trades to be performed in or on ceiling System including light fixtures, HVAC equipment, sprinkler systems and wall partition systems. A. Wall Angle Installation 1. Position wall angle at proper ceiling height on center of wall using laser leveling tool and attached with fasteners appropriate for existing wall type. Note: Proper care must be taken to accurately locate the first notch of the perimeter wall angle according to dimensions depicted in the project drawings. This first notch shall serve as a reference for the entire ceiling installation. Continue installing toward the corners and then around the room until complete. Corners can be field cut with a power miter saw using a carbide tipped blade. All joints must fit tight with no gaps. 2. Optional Perimeter Main Tee and Z trim Installation: When utilizing main tee extrusions around the perimeter, a Z trim, furnished by Gordon, serves to trim the finished ceiling grid to the wall. Using a laser leveling device, attach the Z trim to the wall around the entire perimeter. A gasket tape is often applied to effect a seal between the Z trim and the wall. It is recommended to apply a bead of owner-approved sealant caulk to fully seal the Z trim to wall interface. After the Z trim is installed, the perimeter main tees are suspended utilizing the threaded starter rods and turnbuckles to draw up the grid members so that the downward turned knife edge of the Z trim fits securely in the center of the gel channel. B. Grid Installation 1. Hang 12 long main tees at required distance from wall angle and then continue hanging at 48 or 48-1/2 on center, or as required, position 4 cross tees between main tees at notch locations and hand tighten connector bolts. Note: Proper care must be taken to carefully align the cross tee ends with the main tee notch to avoid leaving a gap in the gel channel intersection. When all cross tees are installed in proper alignment, tighten all bolts and ensure proper seal at gasket intersections. 2. Level entire ceiling to within 0.10 overall and. Or 0.06 in any 10 length. 3. Brace grid for seismic conditions when required by local code. Install in accordance with UBC Standard No. 47 8 and ICBO No, 1461 for aluminum grid. C. Gel Installation 1. Using a compatible sealant caulk, seal all grid penetrations and seams between grid members at grid intersections. This is important to prevent any leakage of the liquid gel material when it is poured into the ceiling grid. Allow the sealant to cure for the recommended amount of time according to gel manufacturer s instructions. 2. In final preparation for gel pour, thoroughly wipe the inside of the gel channel with a dilution of isopropyl alcohol and water. During the wipe Page 3 of 5

down, carefully inspect ceiling grid to assure that all seams and penetrations have been properly sealed. 3. Install gel per manufacturer s recommendations and instructions. WS INSTALLATION INSTRUCTIONS WS-20 grid is usually hung either directly from the deck or from Unistrut or a similar intermediate support system. Below is an installation sequence for installing the grid. STEP 1 Place wall angle or perimeter tee on protected surface with the face down. Locate a 3-way connector 12 from one end and 24 on center thereafter. Connectors will be centered exactly above the notches in the upturned flange of the tee. STEP 2 Position the perimeter wall angle, or perimeter tee, at the proper ceiling height. WS-20 wall angle or perimeter tee first run parallel to the main tee and should fall directly below the first run of Unistrut. The WS-20 perimeter tee/zee option would also follow the same line. The wall angle or perimeter tee that is notched 24 o.c., runs parallel to the main tee. After determining the correct stating point, the point where the first notch occurs, attach the wall angle, or perimeter tee, using conventional drywall fasteners such as screws or nails. The first notch will allow for perimeter zee dimension when using the perimeter tee. Wall angle must be tight against the wall and eventually sealed. STEP 3 Place a main tee face down on a protected surface, such as a carpeted table or floor. Attach the 4-wat connectors to the main tees. Position the center hole of the connector exactly 12 from the end of the main tee for 24 modules or 12-1/4 from the end for 24-1/2 modules. Then install 4- way connectors 24 or 24-1/2 o.c., as required for the job. Connectors will be located exactly in the center of the notch on the upturned flange of the tee. Insert two of the factory supplied bolts into the two holes closest to the center of the connector. Hand start these bolts and do not tighten, Install all connectors onto the main tee the same way. Leave off the last 4-way connector since this tee will be cut in at the wall. Screw a ¼ nut up ½: onto the right hand side of the starter rod. Then insert the right hand end Page 4 of 5

of the RH/LH 9 starter rod into the coined (threaded) center hole of the connectors at a maximum of 48 or 48-1/2 o.c., as required, using vise grip pliers clamped onto the non-threaded shank of the starter rod. The rod should be nearly bottomed-out into the screw slot of the tee. Screw the turnbuckle onto the top of this rod. Repeat until all starter rods and turnbuckles are installed. STEP 4 Position the first run of the main tee running perpendicular to the wall angle. Once the first main tee is in position, secure each 4-way connector to the previously installed ¼ all thread rods supplied by others and secured to the structure above. Spacing for these rods should be a maximum of 48 or 48-1/2 o.c., as required. Additional main tees may now be installed using a 4 cross tee as a spacer. Level the main tee using the turnbuckles. Repeat until all main tees are in place. STEP 5 Main tees are spliced together with the main tee splice connector. Additional main tees may now be installed in the same manner using a 4 cross tee as a spacer. STEP 6 After at least two main tees are in place, install the first row of cross tees by inserting the cross tee into the 3-way connector at the perimeter. Spread the main tees and repeat installing into the 4-way connector. Verify at this time that the main tee is directly under the Unistrut and cross tee is perpendicular to the main. Secure the cross tee to both the perimeter 3-way connector and the main 4-way connector. Repeat until all cross tees are in place. Verify that the openings are 23-1/2 X47-1/2 net inside and fit various elements that will be dropping into the opening before proceeding. STEP 7 Install all bolts on connectors and then securely tighten when entire ceiling grid system has been installed and level to within 0.10 overall or to 0.06 in any 10 length. STEP 8 Seal all intersections and joints before pouring gel. Page 5 of 5