SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Similar documents
MASTER BICYCLE AND PEDESTRIAN PLAN

Non-Motorized Transportation 7-1

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Engineering - Bicycle and Pedestrian

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Solana Beach Comprehensive Active Transportation Strategy (CATS)

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

City of Madison: 2017 Capital Budget Capital Improvement Plan

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

CITY OF PORTSMOUTH PLANNING DEPARTMENT

5 CIRCULATION AND STREET DESIGN

Duwamish Way-finding and CTR Report

Living Streets Policy

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Chapter 5 Future Transportation

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Arlington s Master Transportation Plan

CONNECTING PEOPLE TO PLACES

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Basalt Creek Transportation Refinement Plan Recommendations

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Appendix C 3. Bicycle / Pedestrian Planning

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

TABLE OF CONTENTS. Executive Summary

Roosevelt Estates Neighborhood Improvements

Castro Valley Municipal Advisory Council March 19, 2018

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CITY OF LANCASTER PROPOSED NEW PROJECTS

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Transportation Corridor Studies: Summary of Recommendations

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Complete Streets Funding Program Project Prioritization Plan

Clackamas County Comprehensive Plan

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Prince George s County plans, policies, and projects

Omaha s Complete Streets Policy

Bicycle and Pedestrian Plans and Improvements

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Environment and Public Works Committee Presentation

Complete Streets Successes, Opportunities, and Challenges

HILLSDALE/US101 BICYCLE/PEDESTRIAN BRIDGE PROJECT

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Hennepin County Bicycle and Pedestrian Planning

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Peterborough Council on Aging

City of Saline. Complete Streets Ordinance

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

NJDOT Complete Streets Checklist

Chapter 3 DESIGN SPECIFICATIONS

Michael Parmer, Management Aide, City Manager's Office

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

TRANSPORTATION TRAINING TOPICS. April 6, 2010

5. RUNNINGWAY GUIDELINES

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Giles Run Connector Road

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Sacramento Grid 2.0. The Downtown Transportation Study

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

TRANSPORTATION & MOBILITY

East Burke Transportation, Safety and Capacity Improvements

Bicycle Facilities Planning

ITEM 3 ATTACHMENT A RESOLUTION NO

This chapter describes the proposed circulation system and transportation alternatives associated with

Meadow Woods Elementary School

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Shore Drive Safety Task Force. Report to the SDAC

Safe Streets. City of Lake Forest Park. March 21, 2017

RZC Appendix 8A Marymoor Subarea Street Requirements

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Appendix 3 Roadway and Bike/Ped Design Standards

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BONNIE DOON

CITY OF ELKO BICYCLE AND PATHWAY PLAN

AGENDA ITEM G-2 Public Works

The Bike Buzz in Richland. November 2017 Carl Berkowitz

City of Davis East Covell Corridor Plan

City of Waterloo Complete Streets Policy

Plant City Walk-Bike Plan

ADA TRANSITION PLAN 2013

Transcription:

SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility Improvements Recently completed Ongoing Near Term Planned

Planning Background ~ SR 203 Mobility Element Accepted in 2011/2012, In Process of Update in 2015/2016 Main Street Plan Accepted on February 19, 2014 North Village Specific Plan Adopted in 2000, Amended in 2014 Master Pedestrian Plan Accepted March 15, 2014

Planning Background ~ SR 203 Trail System Master Plan Pedestrian Master Plan General Bicycle Master Plan Local Transportation Commission State Transportation Improvement Program Eastern Sierra Transit Authority

Planning: Mobility Element Mobility Element Accepted in 2011/2012, In Process of Update in 2015/2016 Emphasizes Feet-First Transportation - emphasizes and prioritizes nonmotorized travel first, public transportation second, and vehicle last. Goal M.1. Create a safe and efficient complete streets network that is based on feet-first principles, accommodates all modes of transportation, and serves all users. Policy M.1.1. Plan, design, and construct all new streets as complete streets and work to retrofit and/or accommodate complete streets infrastructure or strategies on existing streets in ways that respect and maintain neighborhood character Policy M.1.5. Reduce conflicts between vehicles and pedestrians through improved access, design, and management, including driveways, frontage roads, and turn lanes. Goal M.8. Support feet-first objectives by providing a linked year-round recreational and commuter pedestrian system that is safe and comprehensive. Action M.8.3.1. Work with Caltrans to make State Route 203 within Town a complete street by providing improved pedestrian facilities and safety measures, including sidewalks and safe crossings. Goal M.10. Support feet-first objectives by providing a linked year-round recreational and commuter bicycle system that is safe and comprehensive. Action M.10.2.6. Work with Caltrans to make State Route 203 within Town a complete street by providing improved bicycle facilities and improved safety, including the installation of bike lanes, pavement markings, signage, and crossings.

Planning ~ Main Street Plan Main Street Plan Accepted February 19, 2014 Study Area: 1.5-mile Corridor of Main Street Focus: Providing a Plan to offer Pedestrian Opportunities Divided Design into 4 Categories: Downtown Main Street, West Main Street Area A, West Main Street Area B, Resort Gateway Area

Planning: North Village Specific Plan North Village Specific Plan Adopted in 2000, Amended in 2014 Achieve the following pedestrian objectives: provide for safe and continuous pedestrian movements (including) pedestrian crossing(s) mid-block on Minaret, and pedestrian crossings at the Main Street, Lake Mary Road, and Forest Trail intersections. Public places on each side of Minaret are connected by sidewalks, and paths for continuous pedestrian circulation within the pedestrian core and throughout North Village. These walks and pathways, along with the bicycle lanes on Minaret and Lake Mary Roads, connect to the community-wide trail and bikeway systems. Identifies future sidewalk on the west side of Minaret Road

Planning: Pedestrian Master Plan Pedestrian Master Plan Accepted March 15, 2014 Identified all SR-203 sidewalks For implementation

Projects Identified in Planning Studies Objective: Construct sidewalk facilities adjacent to SR-203; Install bicycle lanes adjacent to SR-203; Improve current drainage facilities; Update lighting to meet Town Standards Current Projects Identified in Planning Studies: SR-203 (North Main Street) Sidewalk and Safety Project North side Main Street, from the Lake Mary Road/Minaret Road intersection to the Main Street/Sierra Boulevard intersection(route203,4.8/5.3) SR-203 (West Minaret Road) Sidewalk and Safety Project West side Minaret Road from Lake Mary Road/Minaret Road intersection to the 8050 Driveway 2016 CFD Project East side Minaret Road from Forest Trail to Burgers Lower Main Street Sidewalk Project South side Main Street, from Manzanita Road/South Frontage Road intersection to Laurel Mountain Road/South Frontage Road(Route203,5.3/5.6) North side Main Street, from 3330 Main Street to Main Street/Forest Trail intersection (Route 203, 5.4/5.6) Not currently programmed South side Main Street, from the Lake Mary Road/Minaret Boulevard intersection to Main Street/Mountain Boulevard intersection (Route203,4.8/5.3)

Phasing ~ SR 203 2016 CFD Project SR-203, Phase 1 (North Main St.) Sidewalk and Safety Project SR 203, Phase 3: Lower Main Street Project SR-203, Phase 2 (West Minaret Rd) Sidewalk and Safety Project Future MUP: To be determined Note: All blue line are existing sidewalks or multi-use paths.

2016 CFD Project 2016 CFD Project Construction: Summer 2016 Status: Spiess Construction. Start date: August 31. Scope: Construction of sidewalk, curb and gutter, transit pull out and shelter, drainage improvements, and street lighting for Minaret Road and Forest Trail. Location: Forest Trail from Berner Street to Minaret Road and Minaret Road from Forest Trail to Burgers Cost (without contingencies): $928,692.50

SR-203, Phase 1 (North Main St) Sidewalk and Safety Project Construction: Summer 2016/2017 Current Status: Recommended for award September 7. Spiess Construction. May begin September 2016, majority of work summer 2017. Scope: Construction of sidewalk, curb and gutter, pedestrian ramp at northeast corner Main/Minaret, bus turnout and shelter, reconstruct retaining walls, drainage improvements, and street lighting. Location: Main Street from Mountain Boulevard to Minaret Road Cost (without contingencies): $2,537,400.63 Agreements: Cooperative Agreement with Caltrans/STIP Funds; Private Developer contribution SR-203, Phase 1 (North Main St.) Sidewalk and Safety Project

SR-203, Phase 2 (West Minaret Rd) Sidewalk and Safety Project Proposed Construction Date: Summer 2017 Current Status: Initial development of project plans, specifications and estimates. Initiating possible right of way process. Scope: Construction of a sidewalk, bus turnout, reconstruction of two retaining walls, drainage improvements, and street lighting Location: Minaret Road from Lake Mary Road to 8050 Driveway Estimated Cost (without contingencies): $850,000 Agreements: Cooperative Agreement with Caltrans, Private Developer contribution to be included SR-203, Phase 2 (West Minaret Rd) Sidewalk and Safety Project

SR 203, Phase 3 ~ Lower Main St Sidewalks Proposed Construction Date: Summer 2019 Current Status: Applied for ATP Grant, awaiting results. Requested STIP funding in 2018/2020 Fiscal Years for programming. Scope: Construction of sidewalk from Sierra Boulevard to Forest Trail (intermittent) and from Manzanita Road to Laurel Mountain Road, retaining wall from Mountain Blvd to Sierra Blvd, drainage improvements, and street lighting Location: Main Street from Mountain Boulevard to Laurel Mountain Road Estimated Cost (without contingencies): $4,000,000 Agreements: Cooperative Agreement with Caltrans SR 203, Phase 3: Lower Main Street Project

Bike Lanes Town initiated an Encroachment Permit in 2011 for needed bike signs and pavement markings from SR- 203/Minaret Road intersection to the Welcome Center Driveway

Multi-use Paths and Sidewalks Multi-Use Paths (MUP) versus Sidewalks Multi-Use Path: Signed as Trail Signage Sidewalks: Signed by Municipal Signage

Recently Completed Town- Wide Mobility Improvements Lakes Basin Path (2011) Meadow Lane Connector Path (2011) Sherwin Street Bridge (2011) Sierra Park Sidewalks(2011) Tavern Road Sidewalks(2012) Sierra Nevada Sidewalks(2013) College Connector Path (2013) Canyon Boulevard Sidewalks (2014) Meridian Boulevard Sidewalks (2014) Waterford Bridge and Multi-use Path (2014) Trails End Park Improvements (2015) Mammoth Elementary School Improvements (2015) North Village Ramp Improvements (2016)

Recently Completed Town- Wide Mobility Improvements

On-Going Mobility Improvements (2016) 2016 CFD Project Hillside Drive Parking Lot Lake Mary Road to Lake George Road Multi-use Path Meridian Multi-use Path Repair North Main Street Sidewalks Old Mammoth Road Concrete Improvements

On-going Mobility Improvements

Programmed Mobility Improvements SR-203 (West Minaret Road) Sidewalk and Safety Project (2017) Mammoth Creek Gap Closure Project (2018) Lower Main Street Sidewalk Project (2019)

Programmed Mobility Improvements

Town-Wide Mobility Improvements