Built for Champions: Mattamy National Cycling Centre Takes Off

Similar documents
NUWALL METAL WALL PANEL METL-SPAN CONCEALED FASTENER SINGLE-SKIN PANELS

Advantage Lockers & Bike

2018 Women s World Team Trials June 9, 2018 Toronto Pan American Sport Centre (TPASC)

Track Ontario Cup #2

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

Flexible & Intelligent

SOLAR ENERGY. solutions. adhesives, sealants, and Potting encapsulants For solar energy applications

Ontario Track Ontario Cup #1

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

Canadian Sport Tourism Alliance Congress Ottawa


Smart Choice for Residential Projects

1800CPB2 Service Regulators Maximum Inlet Pressure 125 PSIG

Insulated Door Components. Tension Spring System. High performance hardware door system for residential applications

Grade 2 Interconnected Locksets DORMA J200

Hot Tub Pre-Delivery Guide

REFERENCE SPECIFICATION FOR END

Verizon FTTP ClearCurve Solution An Evolant Solutions Product

LPCorp.com

Mogul Coach GUIDE FOR TECHNICAL WORKSHOP FACILITATOR TSM 2

PRO-ROD TM COILED ROD. Reduce Maintenance Increase Production Enhance Profit

Gas Cylinder Cabinets

8 GORGEOUS WATERFRONT HOMES BUILT WITH ICF

ARENA SYSTEMS TO SUIT YOUR SPORT

Evaporator (DX) Freon Applications 1 12 Tons MHF

Football Equipment. 5 9/16" Gooseneck Goalposts

Membership Requirements

Blue Whale Spa :- Site Preparation and Delivery

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

Special Olympics Unified Cup Guidelines. Version 1.0/ English

Rate of Flow Valve Series 120

OPEN INTERNATIONAL RULES OF COMPETITIONS 2017/2018 SEASON

ASCENT SIT-STAND DESKS

CANADIAN TAEKWON-DO DELEGATION

2019 Canada Winter Games Archery Technical Package

National Officials Certification Program

TEST REPORT EN Degrees of protection provided by enclosures (IP Code)

Revisions to the Regulations for Agility Trials

GEMINO - 100% ROLLATOR FOR YOU

Call for Team BC Chef de Mission

WHO WE ARE WHAT WE DO WALLTOPIA IS THE WORLD'S LEADING CLIMBING WALL MANUFACTURER

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

GREEN STANDARD FOR EVALUATING FOOTBALL STADIUMS FOR THE 2018 FIFA WORLD CUP

REVIEW ALL INSTALLATION NOTES PRIOR TO INSTALLATION!

1800C and 1800C-HC Service Regulators

STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS

TUFF-EDGE F. Web Slings. 85% Higher Retained Strength * 30% Better Edge Cut Resistance

2018 Ontario Bike Summit Overview

Swim Ontario Comprehensive Facility Rules Compliance Document

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification.

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response.

Alley OUR BUSINESS SUMMARY

THE HOME OF BEAUTIFUL POOL DESIGN

Installation Instructions

TO THE DRAWINGS AND THE PROJECT MANUAL

INSTALLATION GUIDE Gas Rangetops

MV-105 MEDIUM VOLTAGE CABLE. 5kV, 8kV, 15kV, 25kV & 35kV

Residential Road_Lighting Class S5

Milton International Challenge. Technical Guide

LEGISLATIVE DEVELOPMENTS IMPACTING PETROLEUM CONTRACTORS

BARCOL-AIR RADIANT WAVE (BRW) Your Wave Radiant Cooling or Heating RADIANT WAVE

Casing Spacer Technology Leaders

The Corporation of the Town of Milton

Contact us : Tourism Hamilton HAMiLTon Sharon Murphy Bring it on

M E E T I N G G U I D E

PRC CO ² -LASER PRESENTATION

RoofSafe. Anchor. Ready to spring into action when you need it most. The innovative NEW RoofSafe Anchor. with

Trifecta High-Pressure Systems

2011 CANADA WINTER GAMES ARCHERY (INDOOR) TECHNICAL PACKAGE

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

Level 4 Certification Course Guide

kg Wrestle-Off Information Package Saturday, August 18, 2018 Location: University of Calgary

LRD SERIES. Specification LED Retrofit Downlight

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

The OCV Series 8000 float control valves are designed to maintain a SERIES FEATURES

Ontario High Performance System

GT 1100 model. Semi in-ground. Versatility Redefined

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule

ADD SOME CLARITY TO YOUR LIFE.

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

CANADIAN DEAF SPORTS ASSOCIATION

Flexible hoses - Non-metallic materials

High Pressure Breathing Air Compressors

Swim Ontario Strategic Plan. World Leader in swimming development at all levels

Isofrigo. Cold rooms in Verona. Detail of the internal side

OUR LOGO. CLIC Sargent Visual Identity Guidelines. November 2015

ISE Subsea Tools and Toolsleds

bike shelters & parking

All technical data may be changed MADE IN ITALY BY NARDI COMPRESSORI

2017 LOCKHEED MARTIN CORPORATION. ALL RIGHTS RESERVED

Canadian Gymnaestrada

Getting Started with the Articulated Shank (Version 1) Some ideas for tying different types of articulated flies

Event Details: Schedule for participants on March 24 th, :00 Move from hotel to Reception Hall Reception Party 17:30 20:00

Bicycle Parking. A Guide for Business Owners & Cyclists in the City of Brockville

RSL. Reech Sports. Multi-Use Games Areas. Consult.Design.Build

ARCA cabinet NEW. High performance polycarbonate cabinet. Protection in demanding environments

City of Crystal Lake Community Development Department

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS

2 COUNTY OF SUFFOLK STATE OF NEW YORK X 4 HISTORIC PRESERVATION COMMISSION

Transcription:

January 2015 Mattamy National Cycling Centre Milton, Ontario, Canada 01 Built for Champions: Mattamy National Cycling Centre Takes Off Location Milton, Ontario, Canada Wall Products KS Series Micro Rib Optimo Finishes Ascot White Kynar Driftwood Kynar Zinc Grey Kynar

January 2015 Mattamy National Cycling Centre Milton, Ontario, Canada 02 Overview The 17th annual Pan American Games was headed to Canada, but the Toronto 2015 Organizing Committee needed a suitable host venue for the Games cycling tournament. This prompted the construction of a brand new velodrome. Wall Product KS Series Micro Rib Optimo To be ready by the opening ceremonies, KS Series Micro Rib and Optimo panel systems were specified to help increase build-speed and to ensure the venue was worthy of international competition. The quick installation of the KS Series Micro Rib and Optimo also allowed the velodrome to meet its off season goals of hosting the Canadian Track Championships and Milton International Challenge in preparation for hosting the 2015 Pan American Games.

January 2015 Mattamy National Cycling Centre Milton, Ontario 03 The Home of Canadian Cycling Business Challenge: The project to bring Canada s first world class indoor cycling velodrome to Milton, Ontario was not without its obstacles. The velodrome s exterior cylinder shape was designed to wrap around the Category 1-certified indoor track. While this looked impressive, the building s unique design presented equally distinctive challenges. Technical support Andrew Toma, Business Development Manager at Kingspan Insulated Panels, explained, Trying to work with a continuous radius around the building meant 36 module panels were needed. Kingspan Solution: With that noted, the Optimo and KS Series Micro Rib were specified as part of the Design-Build proposal with Bouygues Construction (General Contractor) and CannonDesign (Architect).

January 2015 Mattamy National Cycling Centre Milton, Ontario, Canada 04 A Speedy Response Architectural Benefits: While the project was affected by the harsh winter winds, the use of Kingspan s KS Series Micro Rib and Optimo helped combat this. Dressed in Ascot White, Driftwood, and Zinc Grey, these panel systems were added for their aesthetic appeal and much more besides. Energy Installation Benefits: Their flexibility allows these panel systems to be installed both vertically and horizontally. The ease of installation proved to be a valuable asset to the project s build-speed as there was little time to spare before the 2015 Pan Am Games. Resilience Factory built, they were assembled offsite and ready to be installed on arrival. This helped eliminate any additional weather-related setbacks. The ease of installation also meant that less trades were needed, phasing out the worry of scheduling delays.

January 2015 Mattamy National Cycling Centre Milton, Ontario, Canada 05 Bringing Home The Silver Owner Benefits: Creating an energy efficient building was of great importance to the construction of the Mattamy National Cycling Centre. The Kingspan insulated metal wall panels provided the building with superior air and weather-tightness by eliminating heat loss or heat gain. Flexibility The insulated core of the Kingspan IMPs provided superior thermal performance thanks to a high R-value. These performance benefits helped the velodrome achieve the highly regarded energy efficient LEED Silver certification. After much hard work and dedication, the velodrome was completed in January of 2015. It is now recognized as a worldclass venue designed as a Category 1- certified indoor 250-metre timber track, which features two 42-degree angle banks.

Contact For more information on the products used in this project, please email Info.NA@kingspanpanels.com