American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of

Similar documents
American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of

Updated June 12, 2017

Updated August 1, 2016

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

Updated August 1, 2016

American Association of State Highway and Transportation Officials

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.


American Association of State Highway and Transportation Officials. Virginia. for

AASHTO is in receipt of the following member department interstate application.

Geometric Design Tables

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

American Association of State Highway and Transportation Officials

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Roadway Design Manual

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways)

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Long Island Rail Road Expansion Project Floral Park to Hicksville

Off-road Trails. Guidance

CHAPTER 6H. TYPICAL APPLICATIONS

Roadway Design Manual

South Carolina Department of Transportation. Engineering Directive

Roads that are intended to be included in the VDOT system of maintained roadways must meet the standards and specifications prescribed by the VDOT.

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Designing with the Railroad

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

FOR HISTORICAL REFERENCE ONLY

Access Management in the Vicinity of Intersections

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Page 2D-10 Added the following language at the end of the paragraph under REFINING HORIZONTAL ALIGNMENT ; See Chapter 2A, Section 2A-6.

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 1 STANDARD PRACTICES

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION, WATERWAYS AND RAIL DIVISION CHAPTER RAILROAD GRADE CROSSING STANDARDS

Railroad Inspection Procedure Manual

Who is Toole Design Group?

American Association of State Highway and Transportation Officials

Route 47 (North Main Street) Reconstruction

Design Criteria. Design Criteria

TRAFFIC SIGNAL WARRANT STUDY

INDEX. Geometric Design Guide for Canadian Roads INDEX

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

November 2012: The following Traffic and Safety Notes were revised:

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Active Transportation Facility Glossary

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

APPENDIXB. Traffic Operations Technical Memorandum

PENNDOT HPMS DATA COLLECTION GUIDE

Memorandum. Exhibit 60 SSDP To: Jenny Bailey, Senior Planner. From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

TABLE OF CONTENTS. General... A. New Construction/Reconstruction (4R)...B. Resurfacing, Restoration and Rehabilitation (3R)...C

Introduction to Roadway Design

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

SECTION 3 STREET DESIGN

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

City of Margate, Florida. Neighborhood Traffic Management Manual

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Intersection Traffic Control Feasibility Study

US Hwy. 64/264 Pedestrian Crossing at the Little Bridge Alternatives Analysis Public Meeting

General References Definitions. (1) Design Guidance. (2) Supporting Information

SECTION A-1-GEOMETRIC DESIGN STANDARDS

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

TOWN OF PAYSON TRAFFIC CALMING MANUAL

CURBSIDE ACTIVITY DESIGN

5. RUNNINGWAY GUIDELINES

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

700 Multi-Modal Considerations

Development of Guidelines for Bicycle Use of Controlled Access Facilities in Virginia

Chapter #4 Traffic Control Devices and Laws

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

2012 by the American Association of State Highway and Transportation Officials. All rights reserved. Duplication is a violation of applicable law.

APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Appendix B Existing ADOT Data Parameters

On Road Bikeways Part 1: Bicycle Lane Design

General Design Factors

Town of Clarkstown Traffic Calming Program. Table of Contents

Town of Orangetown Neighborhood Traffic Calming Program

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Transcription:

American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of for: Elimination of a U.S. (Interstate) Route Establishment of a U.S. (Interstate) Route Extension of a U.S. (Interstate)Route Relocation of a U.S. (Interstate) Route 40 Establishment of a U.S. Alternate Route AASHTO Use Only Action taken by SCOH: Establishment of a Temporary U.S. Route **Recognition of a Business Route on U.S. (Interstate) Route **Recognition of a By-Pass Route on U.S. Route Between Lawrence and US 59 The following states or states are involved: Kansas ** Recognition of A local vicinity map needed on page 3. On page 6 a short statement to the effect that there are no deficiencies on proposed routing, if true, will suffice. If there are deficiencies, they should be indicated in accordance with page 5 instructions. All applications requesting Interstate establishment or changes are subject to concurrence and approval by the FHWA DATE SUBMITTED:4/1/2013 SUBMIT APPLICATION ELECTRONICALLY TO usroutes@aashto.org *Bike Routes: this form is not applicable for US Bicycle Route System

The purpose of the United States (U.S.) Numbered Highway System is to facilitate travel on the main interstate highways, over the shortest routes and the best available roads. A route should form continuity of available facilities through two or more states that accommodate the most important and heaviest motor traffic flow in the area. The routes comprising the National System of Interstate and Defense Highways will be marked with its own distinctive route marker shield and will have a numbering system that is separate and apart from the U.S. Numbered Highway System. For the convenience of the motorist, there must be continuity and a uniform pattern of marking and numbering these Interstate routes without regard to state lines. The U.S. Numbered System was established in 1926 and the Interstate Numbered System was established in 1956. Both have reached the period of review, revision, and consolidation. They now need perfecting rather than expansion. Therefore, any proposed alteration in the established systems should be extremely meritorious and thoroughly, though concisely, explained in order that the Special Committee on U.S. Route Numbering and the Standing Committee on Highways of the Association may give prompt and proper consideration to each and every request made by a member department. Explanation and Reasons for the Request: (Keep concise and pertinent.) To meet the transportation needs of the city and state for access management, commercial development, and planned growth including future transportation projects. Date facility available to traffic 4/5/2014 Does the petition propose a new routing over a portion of an existing U.S. Route? Yes Lawrence If so, where? US 59 through Does the petition propose a new routing over a portion of an existing Interstate Route? No If so, where? 2

Map of state, or portion thereof, indicating proposed addition or change in the U.S. Numbered or Interstate Numbered System: Send your PDF color map to usroutes@aashto.org or mvitale@aashto.org with this application. (Indicate termini and control points on the map for the route, and number them in sequence. Use the same numbers in column 1 tabulation, page 6, when listing mileage. Towns, cities, major highway intersections and state lines to be used as control points. The top of column 1, page 6, will be one terminus, and column 1 will give the log of the route as needed to describe the route in the Association publication U.S. Numbered Highways if the application is approved by the Standing Committee on Highways.) 3

US 40 Douglas County OP 10,Z 70 CONTROL PT.# 3 ACCUM. Mileage 54 CONTROL PT.# 1 ACCUM. Mileage 44 > > 40 40 24 40 59./ 24 DOUGLAS COUNTY OP 32 LEAVENWORTH COUNTY LEAVENWORTH COUNTY DOUGLAS COUNTY 59 Potter Lake 40 CITY OF LAWRENCE Clinton Lake 40 OP 10 40 OP 10./ 59 > 59 CONTROL PT.# 2 ACCUM. Mileage 47 Proposed Alignment Old Alignment

The State agrees and pledges its good faith that it will not erect, remove, or change any U.S. or Interstate Route Markers on any road without the authorization, consent, or approval of the Standing Committee on Highways of the American Association of State Highway and Transportation Officials, not withstanding the fact that the changes proposed are entirely within this State. The weighted average daily traffic volume along the proposed route, as shown on the map on page 3, is 15,500 as compared to 6480 for the year 2012 for all other U.S. Numbered Routes in the State. The Purpose and Policy in the Establishment and Development of the United States Numbered Highways, as Retained from October 3, 1991 or the Purpose and Policy in the Establishment of a Marking System of the Routes Comprising the National System of Interstate and Defense Highways as Retained from August 10, 1973 has been read and is accepted. In our opinion, this petition complies with the above applicable policy. (Signature) Chief Executive Officer (Member Department) This petition is authorized by official action of under date of as follows: (Copy excerpt from minutes.) A letter from your Chief Executive Officer with the CEO s signature is sufficient when submitting your application, if you choose not to include the signature on this form. 4

Instructions for Preparation of Page 6 Column 1: Control Points and Mileage. Top of column is one terminus of road. Indicate control points by identical number as shown on map on page 3. Show mileage between control points in miles and tenths. Column 2: Pavement Type. Code High type, heavy duty H Intermediate type I Low type, dustless L (show in red) Not paved N (show in red) Column 3: Pavement Condition Code Excellent E Good G Fair F (show in red) Poor P (show in red) NOTE: In columns 2 and 3, where pavements types and conditions change, the location of the change shall be indicated by a short horizontal line at the proper place opposite the mileage log and the proper code letter (shown above) shall be entered in the respective column between the locations so indicated. Column 4: Columns 5 & 6 Columns 7 & 8 Column 9: Column 10: Column 11 Traffic. Indicate average daily traffic volumes in this column. Points of changes in these data to be indicated by short horizontal lines opposite the appropriate mileage point on the mileage log. Any existing main line rail crossing that is not separated shall be indicated at the appropriate mileage point by RXR - black if signalized - red if not protected by signals. Pavement Width and Shoulder Width. These columns to be completed by comparing standards of highway involved with applicable AASHTO standards. Entries that fall to the right of the tolerance lines (dashed) should be shaded in red. If there are no deficiencies indicate by use of the word NONE. Major Structures. Show in these columns those structures that do not meet AASHTO standards. Show by horizontal line sufficiently long to indicate percentage of deficiency. Portion on right of tolerance line shall be shown in red. Indicate length of structure in feet immediately under the line. Any sub-standard highway underpass structure shall be shown opposite the appropriate mileage point by the designation LP with the vertical clearance in feet following and shown in red. If there are no deficiencies indicate by the use of the word NONE. Vertical Sight Distance. Items to be shown in this column as a horizontal line, the length of which will indicate the deficiency as determined in accordance with comparisons with comparable AASHTO standards. Portions of the line past the tolerance line shall be shown in red. Horizontal Curvature. Curves in excess of AASHTO applicable standards to be shown in this column by a short horizontal line with degree of curve shown immediately above the line. To be shown in red. Percent Grades. Show by horizontal lines opposite proper mileage point on mileage log. Show percent of grade above the line and length of grade in feet immediately below. To be shown in red. What follows is an Excel worksheet that you can open by right clicking your mouse and select Worksheet Object you can then Edit, Open or Convert but you must first unlock the form as show when inserting maps.. 5

Mileage Control Points and Mileage Pavement Type Pavement Condition Traffic ADT 28500 34100 13000 7500 6400 9340 1 2 3 4 5 6 7 8 9 Comparison to Applicable AASHTO Design Standards 10 11 44 #1:44 Pavement Width Deficiency Shoulder Width Deficiency Major Structures Roadway Width Deficiency H - Loading Deficiency Percent Percent Percent Percent Vertical Sight Distance Deficiency Percent Show When In Excess of Standard Horizontal Curvature Percent Grade 10 20 30 40 20 40 60 80 10 20 30 40 20 40 60 80 20 40 60 80 Degree Length 46 #2:47 48 H E There are no deficiencies compared to AASHTO design standards 50 52 54 #3:54 56 58 60 Attach additional sheet here if necessary 6

Contact Information: Kyle Gonterwitz 785-296-4899 kyleg@ksdot.org The following description will be provided to the AASHTO Highways Special Committee on U. S. Route Number (USRN). Where does the route begin? The route change begins at AASHTO log mile 44 Where is it going? The route goes through Lawrence, KS from US 59 to West Lawrence What type of facility is it traveling over? The proposed route is partially access controlled, multilane, undivided, with curb and gutter for the part in town, and shoulders for the part bypassing town Explain the direction (north, east, south, and west) The prevailing direction in the proposed area is east/west, with AASHTO miles accumulating from East to West Name the focal point city or cities Lawrence, KS Total number of miles the route will cover 10 miles Where does it end? The proposed route change ends at AASHTO log mile 54, at the West City Limit of Lawrence KS, at the center of the interchange of US40 with Kansas State Highway 10. Begin your description here: US Route State Type Intersection Number Point to Point 7 Accumulated Remarks Kansas City 0 0 State Line Joins U.S. 69, crosses U.S. Kansas City 2 2 169 Kansas City 1 3 Leaves U.S. 69 Kansas City 2 5 Crosses I-635 Kansas City 7 12 Crosses I-435 Bonner Leaves I-70; U.S. 73 joins Springs 4 16 and ends Victory 2 18 NONE Jct. N. Lawrence 23 41 Leaves U.S. 24, joins U.S. 59 N. Lawrence 1 42 Crosses I-70 Lawrence 5 47 Leaves U.S. 59 W. Lawrence 7 54 NONE W. of Big Springs 11 65 Crosses I-70 Topeka 7 72 Joins I-70 Topeka 4 76 Crosses U.S. 75 Topeka 4 80 Joins U.S. 75 Leaves U.S. 75 I-470 joins Topeka 3 83 and ends City 56 139 U.S. 40 Bus. begins and leaves 40 Kansas Business City 0 0 Route begins, leaves I-70 and U.S. 40

40 Kansas Business 40 Kansas Business City 3 3 NONE Jct. S. City 1 4 Jct. S. City 3 142 Route ends, rejoins I-70 and U.S. 40 U.S. 40 Bus. rejoins and ends City 1 143 Crosses U.S. 77 Abilene 20 163 NONE Solomon 8 171 NONE I-135 begins and leaves, Salina 16 187 crosses U.S. 81 Russell 62 249 Jct. S. Russell 4 253 U.S. 40 Bus. begins and leaves Crosses U.S. 281; U.S. 40 Bus. rejoins & ends Jct. N. Hays 26 279 Crosses U.S. 183; U.S. 183 Bypass begins and joins Jct. N.W. Hays 2 281 Leaves U.S. 183 Bypass U.S. 40 Bus. begins and WaKeeney 29 310 leaves 40 Kansas Business WaKeeney 0 0 Route begins, leaves I-70 and U.S. 40 40 Kansas Business WaKeeney 1 1 Joins U.S. 283 Route ends, rejoins I-70 and 40 Kansas Business WaKeeney 1 2 U.S. 40 WaKeeney 1 311 Crosses U.S. 283; U.S. 40 Bus. rejoins & ends Oakley 51 362 Leaves I-70 Jct. S. Oakley 2 364 Joins U.S. 83 Oakley 1 365 Leaves U.S. 83 Sharon Springs 52 417 NONE State Line 16 433 NONE 8

American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of for: Elimination of a U.S. (Interstate) Route 40 Bus AASHTO Use Only Establishment of a U.S. (Interstate) Route Action taken by SCOH: Extension of a U.S. (Interstate)Route Relocation of a U.S. (Interstate) Route Establishment of a U.S. Alternate Route Establishment of a Temporary U.S. Route **Recognition of a Business Route on U.S. (Interstate) Route **Recognition of a By-Pass Route on U.S. Route Between US 40 and US 40 The following states or states are involved: Kansas ** Recognition of A local vicinity map needed on page 3. On page 6 a short statement to the effect that there are no deficiencies on proposed routing, if true, will suffice. If there are deficiencies, they should be indicated in accordance with page 5 instructions. All applications requesting Interstate establishment or changes are subject to concurrence and approval by the FHWA DATE SUBMITTED:4/1/2013 SUBMIT APPLICATION ELECTRONICALLY TO usroutes@aashto.org *Bike Routes: this form is not applicable for US Bicycle Route System

The purpose of the United States (U.S.) Numbered Highway System is to facilitate travel on the main interstate highways, over the shortest routes and the best available roads. A route should form continuity of available facilities through two or more states that accommodate the most important and heaviest motor traffic flow in the area. The routes comprising the National System of Interstate and Defense Highways will be marked with its own distinctive route marker shield and will have a numbering system that is separate and apart from the U.S. Numbered Highway System. For the convenience of the motorist, there must be continuity and a uniform pattern of marking and numbering these Interstate routes without regard to state lines. The U.S. Numbered System was established in 1926 and the Interstate Numbered System was established in 1956. Both have reached the period of review, revision, and consolidation. They now need perfecting rather than expansion. Therefore, any proposed alteration in the established systems should be extremely meritorious and thoroughly, though concisely, explained in order that the Special Committee on U.S. Route Numbering and the Standing Committee on Highways of the Association may give prompt and proper consideration to each and every request made by a member department. Explanation and Reasons for the Request: (Keep concise and pertinent.) In the interest of public safety, convenience, and welfare, the Secretary of Transportation proposes to withdraw US 40B from the state highway system and turn back the facility to Local Public Authorities, Date facility available to traffic 9/5/2013 Does the petition propose a new routing over a portion of an existing U.S. Route? No If so, where? Does the petition propose a new routing over a portion of an existing Interstate Route? No If so, where? 2

Map of state, or portion thereof, indicating proposed addition or change in the U.S. Numbered or Interstate Numbered System: Send your PDF color map to usroutes@aashto.org or mvitale@aashto.org with this application. (Indicate termini and control points on the map for the route, and number them in sequence. Use the same numbers in column 1 tabulation, page 6, when listing mileage. Towns, cities, major highway intersections and state lines to be used as control points. The top of column 1, page 6, will be one terminus, and column 1 will give the log of the route as needed to describe the route in the Association publication U.S. Numbered Highways if the application is approved by the Standing Committee on Highways.) 3

40B Russell County./ 281 281 CITY OF RUSSELL 281 >./ 281 CONTROL PT.# 2 ACCUM. Mileage 5./ 40B 40B RUSSELL COUNTY,Z 40 70 > 40 Fossil Lake 40 281 TERMINUS PT.# 3 ACCUM. Mileage 6./ 40B TERMINUS PT.# 1 ACCUM. Mileage 0 >./ 281 Proposed Alignment Old Alignment

The State agrees and pledges its good faith that it will not erect, remove, or change any U.S. or Interstate Route Markers on any road without the authorization, consent, or approval of the Standing Committee on Highways of the American Association of State Highway and Transportation Officials, not withstanding the fact that the changes proposed are entirely within this State. The weighted average daily traffic volume along the proposed route, as shown on the map on page 3, is 2200 as compared to 6480 for the year 2012 for all other U.S. Numbered Routes in the State. The Purpose and Policy in the Establishment and Development of the United States Numbered Highways, as Retained from October 3, 1991 or the Purpose and Policy in the Establishment of a Marking System of the Routes Comprising the National System of Interstate and Defense Highways as Retained from August 10, 1973 has been read and is accepted. In our opinion, this petition complies with the above applicable policy. (Signature) Chief Executive Officer (Member Department) This petition is authorized by official action of under date of as follows: (Copy excerpt from minutes.) A letter from your Chief Executive Officer with the CEO s signature is sufficient when submitting your application, if you choose not to include the signature on this form. 4

Instructions for Preparation of Page 6 Column 1: Control Points and Mileage. Top of column is one terminus of road. Indicate control points by identical number as shown on map on page 3. Show mileage between control points in miles and tenths. Column 2: Pavement Type. Code High type, heavy duty H Intermediate type I Low type, dustless L (show in red) Not paved N (show in red) Column 3: Pavement Condition Code Excellent E Good G Fair F (show in red) Poor P (show in red) NOTE: In columns 2 and 3, where pavements types and conditions change, the location of the change shall be indicated by a short horizontal line at the proper place opposite the mileage log and the proper code letter (shown above) shall be entered in the respective column between the locations so indicated. Column 4: Columns 5 & 6 Columns 7 & 8 Column 9: Column 10: Column 11 Traffic. Indicate average daily traffic volumes in this column. Points of changes in these data to be indicated by short horizontal lines opposite the appropriate mileage point on the mileage log. Any existing main line rail crossing that is not separated shall be indicated at the appropriate mileage point by RXR - black if signalized - red if not protected by signals. Pavement Width and Shoulder Width. These columns to be completed by comparing standards of highway involved with applicable AASHTO standards. Entries that fall to the right of the tolerance lines (dashed) should be shaded in red. If there are no deficiencies indicate by use of the word NONE. Major Structures. Show in these columns those structures that do not meet AASHTO standards. Show by horizontal line sufficiently long to indicate percentage of deficiency. Portion on right of tolerance line shall be shown in red. Indicate length of structure in feet immediately under the line. Any sub-standard highway underpass structure shall be shown opposite the appropriate mileage point by the designation LP with the vertical clearance in feet following and shown in red. If there are no deficiencies indicate by the use of the word NONE. Vertical Sight Distance. Items to be shown in this column as a horizontal line, the length of which will indicate the deficiency as determined in accordance with comparisons with comparable AASHTO standards. Portions of the line past the tolerance line shall be shown in red. Horizontal Curvature. Curves in excess of AASHTO applicable standards to be shown in this column by a short horizontal line with degree of curve shown immediately above the line. To be shown in red. Percent Grades. Show by horizontal lines opposite proper mileage point on mileage log. Show percent of grade above the line and length of grade in feet immediately below. To be shown in red. What follows is an Excel worksheet that you can open by right clicking your mouse and select Worksheet Object you can then Edit, Open or Convert but you must first unlock the form as show when inserting maps.. 5

Mileage Control Points and Mileage Pavement Type Pavement Condition Traffic ADT 730 910 1080 4890 1 2 3 4 5 6 7 8 9 Comparison to Applicable AASHTO Design Standards 10 11 0 #1:0 Pavement Width Deficiency Shoulder Width Deficiency Major Structures Roadway Width Deficiency H - Loading Deficiency Percent Percent Percent Percent Vertical Sight Distance Deficiency Percent Show When In Excess of Standard Horizontal Curvature Percent Grade 10 20 30 40 20 40 60 80 10 20 30 40 20 40 60 80 20 40 60 80 Degree Length 1 2 3 H E There are no deficiencies compared to AASHTO design standards 4 5 #2:5 6 #3:6 7 8 Attach additional sheet here if necessary 6

Contact Information: Kyle Gonterwitz 785-296-4899 kyleg@ksdot.org The following description will be provided to the AASHTO Highways Special Committee on U. S. Route Number (USRN). Where does the route begin? US 40 East of Russell, KS Where is it going? Through the City of Russell, KS What type of facility is it traveling over? Mostly Two Lane, Undivided, with multiple at-grade intersections. The part that rides US81 is four lane divided, partially access controlled, Explain the direction (north, east, south, and west): The prevailing direction is from East/West, with AASHTO miles accumulating from East to West. Name the focal point city or cities: Russell, KS Total number of miles the route will cover: 6 miles Where does it end? US 40 South of Russell, KS Begin your description here: US Route State Type Intersection Number Point to Point 7 Accumulated Remarks Kansas City 0 0 State Line Joins U.S. 69, crosses U.S. Kansas City 2 2 169 Kansas City 1 3 Leaves U.S. 69 Kansas City 2 5 Crosses I-635 Kansas City 7 12 Crosses I-435 Bonner Leaves I-70; U.S. 73 joins Springs 4 16 and ends Victory 2 18 NONE Jct. N. Lawrence 23 41 Leaves U.S. 24, joins U.S. 59 N. Lawrence 1 42 Crosses I-70 Lawrence 5 47 Leaves U.S. 59 W. Lawrence 7 54 NONE W. of Big Springs 11 65 Crosses I-70 Topeka 7 72 Joins I-70 Topeka 4 76 Crosses U.S. 75 Topeka 4 80 Joins U.S. 75 Leaves U.S. 75 I-470 joins Topeka 3 83 and ends City 56 139 U.S. 40 Bus. begins and leaves 40 Kansas Business City 0 0 40 Kansas Business 3 3 NONE Route begins, leaves I-70 and U.S. 40

City Jct. S. 40 Kansas Business City 1 4 Route ends, rejoins I-70 and U.S. 40 Jct. S. City 3 142 U.S. 40 Bus. rejoins and ends City 1 143 Crosses U.S. 77 Abilene 20 163 NONE Solomon 8 171 NONE I-135 begins and leaves, Salina 16 187 crosses U.S. 81 Russell 62 249 Jct. S. Russell 4 253 U.S. 40 Bus. begins and leaves Crosses U.S. 281; U.S. 40 Bus. rejoins & ends Jct. N. Hays 26 279 Crosses U.S. 183; U.S. 183 Bypass begins and joins Jct. N.W. Hays 2 281 Leaves U.S. 183 Bypass U.S. 40 Bus. begins and WaKeeney 29 310 leaves 40 Kansas Business WaKeeney 0 0 Route begins, leaves I-70 and U.S. 40 40 Kansas Business WaKeeney 1 1 Joins U.S. 283 Route ends, rejoins I-70 and 40 Kansas Business WaKeeney 1 2 U.S. 40 WaKeeney 1 311 Crosses U.S. 283; U.S. 40 Bus. rejoins & ends Oakley 51 362 Leaves I-70 Jct. S. Oakley 2 364 Joins U.S. 83 Oakley 1 365 Leaves U.S. 83 Sharon Springs 52 417 NONE State Line 16 433 NONE 8