BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN

Similar documents
S T A T I O N A R E A P L A N

Complete Streets. Designing Streets for Everyone. Sarnia

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Fulton Market Streetscape

Streetscape: Core Shopping District

Tonight is for you. Learn everything you can. Share all your ideas.

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

STONY PLAIN ROAD STREETSCAPE


Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

FONTAINE AVENUE STUDY Final Report

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

MARTIN LUTHER KING JR. WAY

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

5 CIRCULATION AND STREET DESIGN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

42nd Ave N Reconstruction

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

Executive Summary Route 30 Corridor Master Plan

Derby Street. Project Updates. Salem, Massachusetts

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

City of Margate, Florida. Neighborhood Traffic Management Manual

Mainstreet Master Plan Land Use

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Polk Streetscape Project

Illustrated Principles of Good Planning

NEWMARKET UPHAM S CORNER

Ocean Park Boulevard Green Street Project Community Workshop

A Guide to Great Streets: The Basics. September 25, 2009

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Route 79/Davol Street Corridor Study

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

COMPLETE STREETS PLANNER S PORTFOLIO

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Observations and Ideas: Toomer s Corner Streetscape Improvements

NJDOT Complete Streets Checklist

Functional, Preliminary Design and Detailed Design

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan

Why invest in the 1 Street S.W. Corridor?

4 GENERIC COST ESTIMATING TOOL

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Omaha s Complete Streets Policy

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Safe Routes to School Action Plan Aberdeen, Idaho

Option W: N. Washington Street Project

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Forest Hills Improvement Initiative

Miami Health District

Pre-Construction Meeting

122 Avenue: 107 Street to Fort Road

Chapter 3: Multi-Modal Circulation and Streetscapes

What Is a Complete Street?

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

City of Darlington Beautification Report

Complete Streets Funding Program Project Prioritization Plan

Transportation and General Civil Engineering Projects

1.3 Pedestrian Environments

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Broad Street Bicycle Boulevard Design Guidelines

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Living Streets Policy

Elm Street Business District: Streetscape and Signage Plan

CURBSIDE ACTIVITY DESIGN

Introduction. North 12 th Complete Street Project Overview

Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

10.0 CURB EXTENSIONS GUIDELINE

York Boulevard Streetscape Master Plan

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Welcome to the Quebec Alternatives Analysis Public Meeting

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Blair/Williamson Intersection Expressed Needs

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

STREETSCAPE CONCEPT PLAN

Final Sidewalk Feasibility Study

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Transcription:

BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN December 22, 2009 PREPARED BY: with Wilbur Smith Associates, Transporation Planners PREPARED FOR: Bloomfield Development Corporation PROJECT FUNDING BY: Offi ce of Senator Ferlo

THIS PAGE LEFT INTENTIONALLY BLANK

PROJECT INTRODUCTION AND BACKGROUND Home to one of Pittsburgh s largest and most active business districts along Liberty Avenue, Bloomfield, also known as Little Italy, attracts visitors not only from nearby neighborhoods but from the entire Pittsburgh region. The community has much to offer in its shops, Italian markets, restaurants, and beyond. Proud of their heritage, residents who represent generations of families are deeply rooted in the community, and will be an important factor in creating and implementing a successful plan for the Bloomfield Gateway and Streetscape Improvement project. The Bloomfield Development Corporation, through a CDCP Grant and funding from the Office of Senator Ferlo and Mainstreets Pittsburgh, is seeking to improve four sites within the commercial corridor along Liberty Avenue in the Bloomfield neighborhood of the City of Pittsburgh. These sites include Liberty Avenue between 40th Street and the Bloomfield Bridge intersection; the current Shur Save grocery store site; the Bloomfield Bridge Intersection; and Liberty Avenue between Mathilda Street and Millvale Avenue in front of West Penn Hospital. In each area identified, this study focuses on enhancing the streetscape with special attention to improving pedestrian safety and traffic flow. This study also seeks to establish these areas as prominent gateways and portals to the Bloomfield business district corridor. Consideration of the Little Italy theme has been incorporated where possible. ASSUMPTIONS Any development alternative beyond a replacement project will probably require the need for a parking garage to meet parking requirements for the use (Assume $40k per space below grade, $30k per space above grade deck) Any additional development on site will probably not meet the bulk requirements The prime marketable edges are: Liberty Ave, Howley Ave, and Ella (to the corner of Liberty) Any chosen path of development will require a full, in-depth traffic study The NW corner of the Shur Save site will remain residential Any chosen development will require a community review, planning review and design review Any major gesture at the Mathilda / Millvale section of Liberty will require a larger coordination effort between the business owners and the hospital Any major gesture to improve the flow at the Bloomfield Bridge intersection should be pursued only after a full, in depth traffic study of that area and in coordination with the City of Pittsburgh

THIS PAGE LEFT INTENTIONALLY BLANK

FEEDBACK / COMMUNITY INPUT / PROJECT PROCESS PROCESS Burt Hill and transportation consultant, Wilbur Smith Associates, provided preliminary design services for the Bloomfield Development Corporation (BDC) to provide a gateway and streetscape improvement plan for four sites along Liberty Avenue, the main street of Bloomfield. This project included a number of community stakeholders as part of the design process. The client, a committee of the Bloomfield Development Corporation, the Community Design Center of Pittsburgh, Senator Ferlo s Office, Mainstreets Pittsburgh, business owners, and members of the community helped to define the direction of the study. Public input was incorporated throughout the process. Burt Hill conducted 3 meetings with the BDC Committee between June and August 2009 to discuss design issues. Burt Hill and Wilbur Smith presented their concepts to the Bloomfield community at 2 public meetings. Project Committee Meetings were held on: June 25, 2009 July 23, 2009 August 13, 2009 Community Meetings were held on: June 30, 2009 August 25, 2009 PROJECT GOALS Public Presentation at West Penn Hospital Community Feedback Example Create new Gateway Improve Identity of Bloomfield s Main Street Pedestrian Safety Improvements Aesthetic Improvements Maximize On-Street Parking Define street parking through design elements Maintain Existing Curbs Reduce traffic congestion Incorporate Bike Lanes Re-knit Existing Building Fabric of Upper and Lower Liberty Ave.

THIS PAGE LEFT INTENTIONALLY BLANK

SITE I & II SHUR SAVE PARCEL AND THE INTERSECTION OF THE BLOOMFIELD BRIDGE, LIBERTY AVE, MAIN STREET, & HOWLEY STREET

SITE I & II - SITE CONTEXT AND ANALYSIS View towards Bloomfield Bridge View towards lower Liberty Ave. CONSTRAINTS OPPORTUNITIES View inbound along oversized Howley Ave. Underutilized traffic lanes - Main St. spur & Liberty Ave. curb side merge lanes. Too much pavement - Heat Island Effect with dark asphalt pavement. Limited trees are planted. Unsightly utility poles and wires exist. Illegal or unsafe street parking occurs. Merging lanes backs up traffic. Long distance, illdefined pedestrian crossings. Damaged pavement at center of lanes. Howley is a one way street only northbound. Generous width of sidewalks to accommodate new trees and new urban furniture. Retail & commercial typical at street level to blend with existing context. Plenty of pedestrians with mix of visitors and neighbors. Create a stronger identity. Introduce better pedestrian lighting. Introduce consistent banners for events. Reknit upper and lower Liberty through developing Shur Save site. Eliminate Main Street spur to increase development parcel of Shur Save site and re-knit building fabric of Liberty Ave.

SITE I - SITE CONTEXT AND ANALYSIS Longitudinal Liberty Street section of proposed development with existing context. Development will reknit the building fabric of upper and lower Liberty Avenue. +0 +8 Development opportunities at Site I - Shur Save Parcel +16 Site I Shur Save Site - Existing grade slopes from Ella Street towards the intersection of Liberty Avenue and Main Street. This allows for an opportunity to place parking access from Howley Street and possibly Gangwish Street. Building massing opportunities at Site I - Shur Save Parcel

SITE I - DEVELOPMENT CONCEPT 1 (PREFERRED SOLUTION) SITE I - DEVELOPMENT CONCEPT 2 Plan Plan Section Development option with ground floor retail along Liberty Ave, select serice hotel above, grocery store, townhomes facing existing housing fabric. Multilevel parking deck with access from Howley St. and Gangwish St. Bring development parcel and building edge to the sidewalk at Liberty Avenue where the Main Street Spur lane once existed. This is the highest and best use of the property. Development option with ground floor retail and upper level condominiums fronting public greenspace area along Liberty Ave. Bring development parcel and building edge to the sidewalk at Liberty Avenue where the Main Street spur lane once existed. Grocery store at corner of Liberty Ave. and Ella Street. Parking deck is required to accommodate off-street parking requirements. Section

SITE I - DEVELOPMENT CONCEPT 3 SITE I & II - ZONING ANALYSIS Existing site is a parking lot and a stand-alone grocery store View toward Shur Save Grocery Store along Howley Street. Note no street trees and one way northbound. Plan Grade change along Main Street spur Landscaped island serves as gateway into Bloomfield neighborhood. Section Development option with ground floor retail and upper level apartments fronting public greenspace area along Liberty Ave. Bring development parcel and building edge to the sidewalk at Liberty Avenue where the Main Street Spur lane once existed. Grocery store at corner of Liberty Ave. and Ella Street. Surface parking provided. This is not a highest and best use of the property but does incorporate added uses in addition to the grocery store fronting the main street. Address scale of existing housing fabric on Gangwish Street.

SITE II - INTERSECTION CONCEPT 1 (PREFERRED SOLUTION) SITE II - INTERSECTION CONCEPT 2 BUMP-OUT PLAN This plan concept incorporates the following opportunities: Decrease the crossing distance for pedestrians by shortening crosswalk distance. Decreases drive lanes along Liberty Ave. due to perceived underutilized lanes (Right inbound and outbound lanes). Eliminates the Main St. Spur in front of the Shur Save site. Improves crosswalk indicators/painting. Reduces illegal parking by defining parking locations with curb bump-outs. Remove corner curb cut at Gulf Gasoline Station to allow for pedestrian crosswalk (must be coordinated with parcel owner). Proposal to turn Howley St. into two-way street to Gangwish St., then one way only from Gangwish northbound. Improve lane designation of Main Street. Additional street trees helps to green Liberty Ave. No changes to Bloomfield Bridge. BOULEVARD PLAN This plan concept incorporates the following opportunities: Decrease the crossing distance for pedestrians by shortening crosswalk distance. Decreases drive lanes along Liberty Ave due to underutilized lanes (Right inbound and outbound lanes). Eliminates the Main St. Spur in front of the Shur Save site. Improves crosswalk indicators/painting. Remove corner curb cut at Gulf Station to allow for pedestrian crosswalk (must be coordinated with parcel owner). Proposal to turn Howley St. into two-way street to Gangwish St., then one way only from Gangwish northbound. Improve lane designation of Main Street. No change to Bloomfield Bridge. The boulevard scheme includes trees along the sidewalks and down the center median of the streets. This scheme introduces street parking only permitted at certain times of the day, most likely during off-peak traffic.

8 SITE I & II - FINAL CONCEPT 7 TOWNHOMES PARKING GARAGE Aerial Image of Site I & Site II 5 RETAIL GROUND LEVEL HOTEL UPPER LEVELS 6 2 GROCERY STORE 25K SF 3a 4 3a 4 3b 3b ELLA ST. Streetscape improvements include the following: new curb bump-outs define parking spaces (1) and shorten crosswalk distance for pedestrians (2). Replace parking meters with more efficient pay and display system, place utility lines underground, provide new urban furniture including benches, trash containers, bike racks, and combined signal/light poles in lieu of existing cobra-head lights. Bus shelters should be placed in appropriate locations to prevent conflicts with visibility. Reinforce and high-light bike lanes inbound and outbound west of Bloomfield Bridge intersection (3a). Repaint combined traffic/bike sharrow lane markings east of Bloomfield Bridge intersection (3b). Street trees with a vehicle-friendly canopy are to be planted throughout the Liberty Ave. corridor (4). Crosswalks may be raised/textured and visible with new reflective paint and signage. Eliminate the Main St. Spur in front of the Shur Save Grocery Store site thus increasing development opportunities and relinking the building fabric of upper and lower Liberty Avenue (5). Reduce corner curb cut at Gulf Gasoline Station to allow for pedestrian crosswalk (must be coordinated with parcel owner) (6). Proposal to turn Howley St. into two-way street to Gangwish St. (7), then one way only from Gangwish St. northbound (8).

SITE II - BEFORE AND AFTER STREET SECTIONS 20 +/- SIDEWALK DRIVE Outbound DRIVE Outbound TURN Inbound DRIVE Inbound DRIVE Inbound MAIN STREET SPUR SIDEWALK SIDEWALK DRIVE Outbound DRIVE Outbound DRIVE / TURN Inbound DRIVE PARKING Inbound SIDEWALK EXISTING STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Existing street conditions are as follows - 2 outbound lanes, 2 inbound lanes, 1 inbound turn lane to Bloomfield Bridge, 1 single Main Street Spur towards Main Street from Bloomfield Bridge intersection. Perceived underutilized right lanes due to merging traffic outbound and inbound. No street parking adjacent Bloomfield Bridge intersection on Liberty Ave. until east of Ella Street or west of Main Street for both inbound and outbound traffic. PROPOSED STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Proposed street improvements are as follows - 2 outbound lanes and 2 inbound lanes, one of which will serve as a turning lane onto the Bloomfield Bridge. Elliminate the underutilized Main Street Spur to allow for additional real estate to develope the Shur Save Site Parcel and to better define and link future building fabric with both Upper and Lower Liberty Ave. This will depend on the city vacating their Right of Way. Provide street parking along inbound lane. Additional street trees help to green the street. Indicate combined drive/bike sharrow lanes.

SITE I & II - BEFORE & AFTER CONCEPT PERSPECTIVES Existing view inbound towards Main St. Spur and landscaped island at image center. Existing view outbound towards Bloomfield Bridge intersection and Shur Save Grocery Store. Proposed view inbound along Liberty Ave. to intersection adjacent new street fronting grocery store. Proposed view from lower Liberty Ave. outbound towards the Bloomfield Bridge Intersection.

SITE I & II - COMPARISON CHART & ZONING ANALYSIS

SITE III UPPER LIBERTY AVENUE - S. MATHILDA STREET TO S. MILLVALE AVENUE

SITE III - SITE CONTEXT AND ANALYSIS COMMERCIAL COMMERCIAL COMMERCIAL CONSTRAINTS Limited trees are planted. Unsightly & exposed utility poles and wires. Illegal or unsafe street parking. Sharrow bike lane markings are worn out and need repainted. Traffic queues at intersections due to double parked vehicles. Long pedestrian crosswalks. Illegal parking and spaces at intersections impairs sight distance especially for left turns. Sunoco corner curb-cut is close to intersection and is a safety concern. OPPORTUNITIES Increase vehicular visibility turning onto Liberty Ave. from Mahtilda and Millvale. Define parking and West Penn Hospital drop-off with bump-out curbcuts. Generous width of sidewalks to accommodate new trees and new urban furniture. Create a stronger identity. Introduce better pedestrian lighting. Introduce consistent banners for events. Position urban street furniture to add to the character of the Bloomfield Main Street.

SITE III - FINAL CONCEPT 1 Streetscape improvements include the following: new curb bump-outs define parking spaces (1), the drop-off location at West Penn Hospital s Liberty entrance (2), and shorten crosswalk distance for pedestrians (3). Replace parking meters with more efficient pay and display system (4), remove utility lines and place underground, provide new urban furniture including benches, trash containers, bike racks, and combined signal/light poles in lieu of existing cobra-head lights. Bus shelters should be placed in appropriate locations to prevent conflicts with visibility (5). Repaint combined drive/bike sharrow lane markings (6). Additional street trees with a vehicle-friendly canopy are to be planted throughout the Liberty Ave. corridor (7). Crosswalks may be raised/textured and made visible with new bright/reflective painting and on-street signage (8). 3 5 8 1 1 6 2 6 7 4 1 4 1 8 3 1 Aerial Image of Site III

SITE III - BEFORE AND AFTER STREET SECTIONS SIDEWALK PARKING DRIVE / BIKE Outbound DRIVE / BIKE Inbound PARKING SIDEWALK SIDEWALK PARKING DRIVE / BIKE Outbound DRIVE / BIKE Inbound PARKING SIDEWALK EXISTING STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Single drive lane in each direction shared with bicycle traffic. Limited street trees. Metered parking both sides of street. PROPOSED STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Keep single lane traffic in each direction. Defined parking by bump-out curb cuts, introduce pay & display parking to maximize on-street parking, add street trees to both sidewalk and bump-out locations. Indicate combined drive/bike sharrow lanes with fresh paint and improved signage.

SITE III - BEFORE & AFTER CONCEPT PERSPECTIVES Existing view inbound of West Penn Hospital Liberty Ave. entry. Existing street trees and parking spaces impairing view from Mahtilda towards Liberty Ave. Proposed view inbound towards West Penn Hospital drop-off Zone. Proposed bump-out at S. Mathilda / Liberty Intersection to improve visibility and pedestrian safety.

THIS PAGE LEFT INTENTIONALLY BLANK

SITE IV LOWER LIBERTY AVENUE - 40TH STREET TO THE BLOOMFIELD BRIDGE INTERSECTION

SITE IV - SITE CONTEXT AND ANALYSIS CONSTRAINTS Traffic speed at 40th Street intersection is dangerous combined with change in street elevation. Limited trees are planted. Unsightly utility poles and wires exist. Illegal or unsafe street parking occurs. Merging & turn lanes back up traffic at rush hours. Crosswalks have faded markings. OPPORTUNITIES Generous width of sidewalks to accommodate new trees and new urban furniture. Retail & commercial typical at street level to blend with exising context. Plenty of pedestrians with mix of visitors and neighbors. Create a stronger identity. Introduce better pedestrian lighting. Introduce consistent signage or banners for neighborhood events. Opportunity to provide zones for permanent parking. Outdoor dining opportunities at wide sidewalks.

SITE IV - FINAL CONCEPT 2 1 6 1 5 5 4 4 3 1 1 2 6 Streetscape improvements include the following: New curb bump-outs define parking spaces and shorten crosswalk distance for pedestrians (1). Replace parking meters with more efficient pay and display system (2), remove utility lines and place underground, provide new urban furniture including benches, trash containers, bike racks, and combined signal/light poles in lieu of existing cobra-head lights. Bus shelters should be placed in appropriate locations to prevent conflicts with visibility (3). Repaint bike lane markings (4). Additional street trees with a vehicle-friendly canopy are to be planted throughout the Liberty Ave. Corridor (5). Crosswalks may be raised/textured and made visible with new bright/reflective painting and on-street signage (6). Aerial Image of Site IV

SITE IV - BEFORE AND AFTER STREET SECTIONS 20 8 17 17 8 20 20 8 7 10 10 7 8 20 SIDEWALK PARKING DRIVE DRIVE PARKING SIDEWALK SIDEWALK PARKING BIKE DRIVE DRIVE BIKE PARKING SIDEWALK EXISTING STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Limited street trees. Metered parking both sides of street. Bike lane is not well defined. PROPOSED STREET SECTION AND PARTIAL PLAN OF LIBERTY AVE. Coordinate single lane traffic in each direction. Define parking with bump-out curb cuts, introduce pay & display parking to maximize on-street parking, add street trees to both sidewalk and bump-out locations. Indicate bike lanes with paint and improved signage.

SITE IV - BEFORE & AFTER CONCEPT PERSPECTIVES Existing view inbound/north west at Liberty Ave. and Canoe Way Existing view outbound/east at Liberty Ave. and Canoe Way View of new crosswalk, bump-out, street trees and bike lane at Liberty Ave. and Canoe Way View north along Liberty Ave. adjacent future development along street edge with outdoor dining, new street trees, and new automobile/pedestrian light poles with banners.

SITE IV - ADDITIONAL DESIGN OPPORTUNITIES Existing view east of baseball field entrance before Bloomfield Bridge on-ramp. Existing views of underutilized coblestone spaces adjacent to Bloomfield Bridge along Liberty Ave. Improve design of cobblestone areas adjacent Bloomfield Bridge / park entrance with new trees, bushes and groundcover. Introduce public art and pedestrian lighting. Improve access and signage to the new baseball field just south of Liberty Ave. by way of public art and improved pedestrian lightning.

GENERAL COST OF IMPROVEMENTS General Road and Sidewalk Improvements Cost $ Unit Milling and Repaving Road Surface 45 SY Concrete Sidewalks 60 SY Concrete Curb 50 LF Concrete Curb ADA Ramps 1,000 EACH Utility Relocations Manholes (grade adjustment) 1,000 EACH Utility Relocations Vaults (minor) 2,500 EACH Utility Relocations - Water & Sewer 120 LF Drainage Bicycle Safe Grate Inlet 3,000 EACH Pavement Markings (bike lane) 6 LF Street Signage - New 30 LF Street Signage - Relocate 10 LF Streetscaping - New Tree & Pit 500 EACH Streetscaping - Nurture Existing Tree 200 EACH Streetscaping - Bus Shelter 6,000 EACH Streetscaping - Bike Racks 1,500 EACH Streetscaping Components per Block 25,000 BLOCK Streetscaping Components per Intersection 10,000 INTERSECTION Light Poles - 15' Pedestrian 8,000 EACH Light Poles - 30' Street 9,500 EACH (includes foundation, poles, luminaires) Traffic Resignalization 225,000 INTERSECTION (includes hardware, controller, detection) All work is to be considered preliminary and not for construction purposes. Field dimensional verification and review of all applicable zoning, building and other municipal codes should be reviewed before final recommendations can be made. Additional costs will include Maintenance & Protection of Traffic, Mobilization, Construction Inspections, Consultation During Construction and Contingency Costs. Comperable to Penn Avenue Reconstruction Unit Cost Estimate +/- 2008 Our preliminary streetscape improvement cost estimate per the recommendations outlined in this report is between $250k to $950k.

MISCELOUS IMPROVEMENT IMAGES Street trees, pedestrian crosswalk, street lighting and upgraded pavement Streetscape improvements via building signage Pay and display parking machine Bump-out curb cut along Forbes Ave. in Oakland Bike lane marking Public Art streetscape improvements Street level storefront transparency and building signage and lighting improves public realm of sidewalk Zip Car designated parking Crosswalk signage

Bloomfield Development Corporation 103 Daly Building 366 Gross Street Pittsburgh, PA 15224 Karla Owens, Executive Director bloomfieldbusinessassociation@verizon.net Community Design Center of Pittsburgh 938 Penn Avenue, 6th Floor Pittsburgh, PA 15222 Andrea Lavin, Design Fund Manager alavin@cdcp.org Office of Senator Ferlo 3519 Butler Street Pittsburgh, PA 15201 Mainstreets Pittsburgh is a program of the Urban Redevelopment Authority and is funded in part by the City of Pittsburgh, Mayor Luke Ravenstahl, and Pennsylvania Department of Community and Economic Development City of Pittsburgh Department of City Planning Offi ce of Senator Ferlo The project team would like to thank members of the community that contributed their time and effort to this study. All comments were well received and appreciated. We would also like to thank again the Bloomfield Development Corporation, for the investment that they are making to their community. Additional thanks to the following for their assistance and support: Karla Owens BDC Executive Director Ben Forman BDC, BBA President Terry Aiello BDC Member Andrea Lavin - CDCP, Design Fund Manager Joe Kramer State Senator Ferlo s Office Dan Gilman Office of Councilman Peduto Sean Capperis Office of Councilman Dowd Amanda Broadwater - City of Pittsburgh Municipal Traffic Engineer Patrick Roberts - City of Pittsburgh Transportation Planner Stephen Patchan - City of Pittsburgh Bicycle Pedestrian Coordinator Shelly Martz - City of Pittsburgh Neighborhood Planner Nancy Grover - West Penn Hospital Representative Mark Davis Business Owner Dana Acton Business Owner CREDITS Background aerial photos provided by Google Wilbur Smith Associates 503 Martindale Street Pittsburgh, PA 15212 Erin M. North, AICP, EIT enorth@wilbursmith.com Burt Hill 650 Smithfield Street Suite 2600 Pittsburgh, PA 15222 Edgar J. Smith II, RA, LEED AP edgar.smith@burthill.com

2009