Rennick Yard Roller-Compacted Concrete Pavement

Similar documents
Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

High Performance Racetracks

Compaction Theory and Best Practices

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Managing Density For Asphalt Pavement

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

Pavement Management Program

City of Davis Pavement Management Program

SECTION 5: PEER CITY REVIEW

9 QUALITY ASSURANCE PROCEDURES

Challenges of Tack Coat

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

ASPHALT PLANT LEVEL 1

Calibration and Validation of the Shell Fatigue Model Using AC10 and AC14 Dense Graded Hot Mix Asphalt Fatigue Laboratory Data

Case Studies Using Falling Weight Deflectometer Data with Mechanistic Empirical Design and Analysis

DRAFT WSDOT PAVEMENT POLICY

Stop Chasing & Start Managing Density

Specifier Note: Retain or delete material(s) below to conform to project requirements.

50 Year Roads: Don't Accept Anything Less

FLORIDA DEPARTMENT OF TRANSPORTATION

Illinois Center for Transportation

T-24. A Practical Approach to Managing Density

Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41

Burns Cooley Dennis, Inc. Burns Cooley Dennis, Inc.

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

Best Practices for Smoothness & Density

Driving Indiana s Economic Growth

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Road Quality Working Group. June 11, 2015

2018 ROAD MAINTENANCE PROGRAM

Executive Summary. Introduction

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. April 18, 2014

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1


STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. January 15, 2016

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Chloride Stabilization of Unpaved Road Aggregate Surfacing *

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

MNDOT PAVEMENT DESIGN MANUAL

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

Downloaded from Downloaded from /1

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

Standard Test Procedures Manual

ASPHALT PAVING LEVEL 1

TexSys: Guide for Selecting HMA for Texas Flexible Pavements

NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Mechanical Stabilisation for Permanent Roads

COTA Project Data. Quantities Track Asphalt 50,000 ton base 18,000 ton binder 22,000 ton wearing. Bid/Contract Documents. Austin Industries.

Paving for Progress Municipal Streets Seminar

Expansion Joint Filler Evaluation APEL. Nomaflex

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Update on Performance of Thin Asphalt Overlays

Kentucky Transportation Center

New Mexico Transportation Funding Challenges

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

For the purpose of a runway surface friction assessment the following definitions apply: Definition/Description

Appendix B Existing ADOT Data Parameters

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

Binder Modified with a Combination of PPA and SBS: The NCAT Test Track Experience PPA Workshop April 7, 2009

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

In Place Density Determination of Asphalt Concrete by the Coring Method

ROLLER COMPACTED CONCRETE CEMENT TREATED BASE SOIL CEMENT PERVIOUS PAVEMENT INDUSTRIAL CONCRETE FLOOR SYSTEMS CONSULTING

Kraton Ultra-thin HMA / WMA Overlay Study

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

The Spartan Cap Athletic Field System

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

2016 Annual Inspection Report

TABLE OF CONTENTS LEGAL NOTICE

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

CCR Fugitive Dust Control Plan

Transcription:

RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955

Site Plan and Pavement Sections

BNSF Rennick Yard In 1986, the Burlington Northern Railroad (now BNSF Railway) converted an existing switching yard in Denver, Colorado to an intermodal facility, paving it with rollercompacted concrete (RCC). This facility has maintained continuous service over the last 29 years. In 2015, it underwent its first significant rehabilitation, consisting of a 2 inch cold mill and replace with stone matrix asphalt (SMA), along with localized full depth repair (patching). Rennick Yard Quick Facts: Location Pavement Area Denver, CO 28 Acres Use Intermodal Yard RCC Thickness 15 20 inches Initial Construction 1986 Design Life 20 years First Rehabilitation 2015 Container Movements Design Vehicle 600 per day Piggypacker PC 90, 110 Kip Wheel Load Originally, this intermodal facility was used for loading and unloading piggy back truck trailers onto rail cars. Over Trailer Parking Spaces 1307 time, the use has shifted with the major current activity being the exchange of standard 40 foot shipping containers between rail cars and truck trailers. Design The designer of the facility, Centennial Engineering, developed both conventional jointed plain concrete pavement (JPCP) and RCC pavement design alternatives. Judd Brothers, with Peltz Companies of Alliance, Nebraska as the paving sub contractor, bid the RCC alternative at a 10 percent savings. The RCC option was selected by BNSF as the best value alternative. Centennial Engineering completed the design of the pavement, assuming 10,000 repetitions of an 110,000 pound wheel load over a 20 year period. The design vehicle was a Piggypacker PC 90, a specialized vehicle similar to a fork lift used for lifting loaded semi trailers onto and off of railroad cars. Piggypacker (left, yellow) and modern container handlers (right, red). Page 1

Due to the way the trailer is supported in front of the Piggypacker and the need to counter balance the trailer, extremely high loads are generated through the two wheels on the front axle. The design methodology used was the Portland Cement Association s Thickness Design of Concrete Pavements Carrying Heavy Industrial Vehicles (1973). The flexural strength of the RCC was set at 700 psi, which was determined from laboratory testing of beams sawn from a test section. The modulus of subgrade reaction used in design was 170 pci. These inputs yielded a required RCC thickness of 15 inches. In some areas adjacent to the rail lines where the traffic loading would be most concentrated, the RCC was placed on an additional 5 inches of RCC. This bottom 5 inches of RCC was not purposefully bonded to the upper 15 inches of RCC, and thus the bottom 5 inches of RCC acted as a stabilized base. Rennick Yard RCC Mix Cement 485 lb/yd 3 Fly Ash 75 lb/yd 3 Aggregate 3390 lb/yd 3 Water 217 lb/yd 3 w/c ratio 0.39 Maximum Dry Density 1 142.2 pcf Optimum moisture content 1 5.4% Laboratory Compressive Strength (28 day) 2 4280 psi Laboratory Flexural Strength (28 day) 2 630 psi Field Flexural Strength (28 day) 3 702 psi 1: Modified proctor (ATSM D1557) 2: At 99% density and 5.5% moisture content 3: Average of three specimens: 775 psi (100% density), 670 psi (96% density) and 660 psi (95% density) The RCC mix design was performed by Ground Engineering. The aggregate gradation was the standard Colorado DOT hot mix asphalt gradation of the time for a ¾ inch nominal maximum aggregate size. The subgrade consists of sandy clay, with pockets of unconsolidated clay. These soft clay pockets were excavated and filled with granular material, and then the entire site was covered with two (2) feet of granular borrow. The design incorporates a four foot wide trench drain running the length of the facility, with the outfall being to the south. Construction RCC pavement construction ran from April to May 1986. The RCC mix was produced and placed by Peltz Companies as a subcontractor to Judd Brothers. Peltz set up an ARAN ASR 2000 continuous mix pugmill on site, which kept the typical haul time from the plant to the pavers under 5 minutes. The plant produced an average 1,000 cubic yards of RCC for every day of paving. Two ABG Titan 410 pavers with tamping screeds along with Bomag 10 ton vibratory rollers were used for paving and compaction. The pavers alone were able to place the RCC mix at 95% density, with remaining compaction provided by the rollers. The pavers incorporated a 15 degree shoe for placing and densifying the longitudinal edges of the mat. Page 2

In the high trafficked areas, paving started with placement of the 5 inch thick RCC base layer. This base layer was allowed to cure for seven days before the 15 inches of RCC was placed. Placement of the 15 inch thick RCC layer was originally performed in two 7.5 inch lifts; however this practice was changed during construction to first placing one 9 inch lift followed by one 6 inch lift. This change was made to reduce the amount of rolling necessary to densify the surface lift and to Longitudinal joint detail produce a smoother surface. Placement of the two lifts was performed concurrently, with no more than one hour passing between the placement of the first and second lifts, and typically far less. RCC Paving Sequence No controlled or sawn joints, either longitudinal or transverse were created. Load transfer across adjacent paving lanes was enhanced by staggering the edge of the two lifts by approximately 1.5 inches. Curing was accomplished by continually keeping the surface wet by periodically sprinkling the RCC with water. Water trucks were employed for this purpose for a period of seven days, with two or three trucks operating during the day, and one operating through the night. No curing compound or membrane was used. Loading Since 1986, the Rennick Yard has supported an average of 600 trailer or container movements per day. Container picks are currently performed using two Taylor TETCP 1100l loaded trailer/container handlers, and one MI Jack MJ 800 rubber tire gantry crane. The maximum loaded axle weight of the TETCP 1100l is 302,200 pounds, distributed over four, 140 psi tires. The maximum wheel load of the MJ 800 is 83,890 pounds at 91 psi. Page 3

T Current Condition The condition of the Rennick Yard RCC pavement as of July 2015 ranges from excellent to poor. In areas used solely for trailer parking, the pavement is mostly in excellent condition. The joints remain tight and the surface texture is remarkably similar to a just constructed RCC pavement. RCC in excellent condition in trailer parking area The RCC pavement adjacent to the gantry crane runway (eastern portion of the yard) ranges from fair condition in the north, to good condition in the south. Distresses are predominantly related to raveling of joints, with some load related cracking. Notably, raveling was more severe on the joints between paving lanes than cracks within the paving lane, indicating that the raveling is likely exacerbated by lower density at the joint. This damage was mostly removed in areas that received a two (2) inch mill. Page 4

Load related cracking in gantry crane runway In areas that required full depth patching, delamination of the top two lifts was evident and moisture was often visible at the lift interface. No coring or test pits were performed in intact areas as part of this study, making it impossible to determine whether delamination is widespread, or if it is only associated with the more severely distressed areas. Page 5

T Full depth repair, showing moisture accumulation and delamination at layer interface The RCC pavement at the western portion of the yard, which is primarily trafficked by trailer/container handlers, ranges from poor condition in the north, to fair condition in the south. Load related cracking, having an appearance similar to alligator or block cracking, becomes widespread at the northwestern portion of the yard. Cracks and joints have substantial raveling. Site operations personnel note that this raveling has predominantly occurred after treatment with magnesium chloride brine anti icing began in 2011. Page 6

Load related cracking in container side loading area 2015 Rehabilitation After 29 years of minimal maintenance costs, BNSF has budgeted $2.5 million for rehabilitation of the Rennick Yard pavement in 2015, with HDR serving as the design engineer. The planned treatment is 2 inches of cold milling, partial and full depth patching as necessary, and overlay with stone matrix asphalt. HDR estimates that approximately 20% of the area will require partial depth patching and a further 20% will require full depth patching. Partial depth patching includes removing the in place RCC to the bottom of the surface lift, and replacing with SMA. Full depth patching includes removing all of the existing RCC and filling to the bottom of the surface lift with conventional concrete, and then overlaying with SMA to match the existing grade. Life Cycle Cost The initial cost of paving in 1986 was $3.3 million. Including $2.5 million for the current rehabilitation and an assumed $50,000 for minor maintenance every three years, the total cost of the pavement to date is $6.2 million in non discounted dollars, with 29 years of documented good service and an expected 10 years or more of remaining service life. In 1986 dollars, the total life cycle cost comes to $4.0, using the OMB nominal rate of 5.7% for the period of 1986 to 2016. It should be noted that this Page 7

nominal rate is significantly higher than the discount rate typically used for public agency life cycle cost analyses, as those analyses typically do not use inflated future costs. Life Cycle Costs for the Rennick Yard Pavement Summary The Rennick Yard RCC pavement, although designed for 20 years of service, is now receiving its first rehabilitation after 29 years of service. For most of that life, the pavement provided good to excellent serviceability, with a notable decline in condition at about year 25. Based on conversations with site personnel, this decline coincided with the facility implementing magnesium chloride brine anti icing practices. Page 8

The most predominant distress type evident in July 2015 is raveling of the joints. It is most likely that this deterioration is related to the relatively low density or poor curing at the joints, which would increase localized permeability and reduce strength. But the role of the magnesium chloride brine antiicing/deicers should not be ignored. It is well documented that chemical deicers physically amplify freeze thaw distress in concrete, increasing the level of saturation and the development of damaging pressures within the concrete as pore solution freezes (Taylor 2011). Further, recent evidence suggest that magnesium chloride deicers can contribute to chemical degradation of concrete as well (Weiss and Farnam 2015). In combination, the switch to these magnesium chloride brine anti icing/deicing solutions may have contributed to a more rapid development of joint raveling than would be expected with a standard solid sodium chloride deicer or no deicer at all. While accounts of the construction process do not reveal any deficiencies in the process of densifying the joints relative to current RCC construction practice, the use of curing compound in lieu of wet curing is now recommended. The quantity of partial depth patching would likely have been substantially reduced had maintenance been performed a few years earlier, before the joints raveled to their current depth. References Delva, Kevin L. Rennick Yard RCC Pavement Design and Construction, Roller Compacted Concrete II, ASCE, 1988. Intermodal terminal paved with roller compacted concrete, Rocky Mountain Construction, May 1986. Pavement Performance Evaluation: Burlington Northern & Santa Fe Railroad Intermodal Facility, Ground Engineering Consultants, 2011. Taylor, P. Preventing Joint Deterioration in Concrete Pavements A Summary of Current Knowledge, National Center for Concrete Pavement Technology, Iowa State University, 2011. Weiss, J., and Y. Farnam. Concrete Pavement Joint Deterioration: Recent Findings to Reduce the Potential for Damage. National Center for Concrete Pavement Technology. Iowa State University, 2015. Page 9

Collaboration. Commitment. Confidence. SM www.ncenet.com