Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

Similar documents
CITY OF BIRMINGHAM MULTI-MODAL TRANSPORTATION BOARD THURSDAY, DECEMBER 7, 2017 City Commission Room 151 Martin Street, Birmingham, Michigan

CITY OF BIRMINGHAM MULTI-MODAL TRANSPORTATION BOARD THURSDAY, AUGUST 3, 2017 City Commission Room 151 Martin Street, Birmingham, Michigan

CITY OF BIRMINGHAM MULTI-MODAL TRANSPORTATION BOARD THURSDAY, MARCH 1, City Commission Room 151 Martin Street, Birmingham, Michigan

CITY OF BIRMINGHAM MULTI-MODAL TRANSPORTATION BOARD THURSDAY, APRIL 9, 2014 City Commission Room 151 Martin Street, Birmingham, Michigan

City of Birmingham AD HOC RAIL DISTRICT COMMITTEE Monday, December 5, 2016 Meeting 3 p.m. City Commission Room 151 Martin St., Birmingham, Michigan

CITY OF BIRMINGHAM MULTI-MODAL TRANSPORTATION BOARD THURSDAY, JANUARY 4, 2018 City Commission Room 151 Martin Street, Birmingham, Michigan

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

City of Birmingham AD HOC RAIL DISTRICT COMMITTEE Thursday, July 20, 2016 Meeting. City Commission Room 151 Martin St., Birmingham, Michigan

MULTI-MODAL TRANSPORTATION BOARD THURSDAY, MARCH 2, :30 PM CITY COMMISSION ROOM 151 MARTIN STREET, BIRMINGHAM

CITY OF BIRMINGHAM PLANNING BOARD ACTION ITEMS OF WEDNESDAY, MAY 22, 2013

MULTI-MODAL TRANSPORTATION BOARD THURSDAY, NOVEMBER 20, :00 PM CITY COMMISSION ROOM 151 MARTIN STREET, BIRMINGHAM

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

City of Birmingham Draft Multi-modal Transportation Plan

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

SARGE LITTLEHALE COMMUNITY ROOM 22 ORINDA WAY

Non-Motorized Transportation 7-1

Henderson Ave. Complete Streets Project

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF NORWALK TRAFFIC AUTHORITY JULY 18, Mayor Harry Rilling, Chairman; Commissioner Fran Collier-Clemmons.

Environment and Public Works Committee Presentation

Duwamish Way-finding and CTR Report

Arlington s Master Transportation Plan

W. MAPLE RD. STEERING COMMITTEE. A subcommittee of the Multi-Modal Transportation Board

Roosevelt Estates Neighborhood Improvements

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Physical Implications of Complete Streets Policies

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Item No. 14 Town of Atherton

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Third Street Bridge & Corridor Project

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Complete Streets. Designing Streets for Everyone. Sarnia

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Long Island Rail Road Expansion Project Floral Park to Hicksville

Complete Streets Funding Program Project Prioritization Plan

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

ARLINGTON COUNTY, VIRGINIA

2.0 Existing Conditions

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

CITY OF ST. AUGUSTINE, FLORIDA. Lincolnville Community Redevelopment Area Steering Committee May 1, 2017

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Building Great Neighbourhoods QUEEN ALEXANDRA

City of Charlottesville Bicycle and Pedestrian Master Plan Update

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Lynchburg District Update

VILLAGE OF NILES TRAFFIC CALMING POLICY

Plant City Walk-Bike Plan

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Thank you for attending

TRANSPORTATION COMMISSION Agenda Staff Report

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Urban Planning and Land Use

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

City of Seattle Edward B. Murray, Mayor


Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M.

/ ARLINGTON COUNTY, VIRGINIA

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle & Pedestrian Advisory Committee

PRESS RELEASE San Joaquin Council of Governments

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

MASTER BICYCLE AND PEDESTRIAN PLAN

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Steps to Conducting a Complete Streets Assessment

5 CIRCULATION AND STREET DESIGN

Notes from BPAC Meeting January 20, 2011

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Water Street Promenade Engineering and Design Services

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Chapter 5 Future Transportation

City of Turlock Traffic Calming Program

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Transcription:

CITY OF BIRMINGHAM START-UP MEETING OF THE MULTI-MODAL TRANSPORTATION BOARD THURSDAY, JUNE 19, 2014 City Commission Room 151 Martin Street, Birmingham, Michigan Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held. A. ROLL CALL Present: Absent: Board Members Lara Edwards, Andy Lawson, Johanna Slanga, Amanda Warner Jeff Surnow, Adriana Tatuch Administration: Brendan Cousino, Asst. City Engineer Jana Ecker, Planning Director Paul O'Meara, City Engineer B. INTRODUCTIONS Members described their area of residence in the City along with their background and qualifications for appointment to the board. C. ELECTION OF CHAIR AND VICE-CHAIR Johanna Slanga was nominated as chair. Andy Lawson was nominated as vice-chair. Carole Salutes was nominated as secretary. All were in favor of the nominations and none were opposed. D. REVIEW AGENDA At this time it was noted that the new Ad Hoc Parking Study Committee is seeking a volunteer from the MMTB to sit on that committee temporarily (3 to 6 months) once per month. Chair Slanga volunteered to be the representative on the Ad Hoc Parking Study Committee. All were in favor of Chair Slanga as the representative from the MMTB to the Ad Hoc Parking Study Committee and none were opposed.

Page 2 E. ESTABLISH DATE AND TIME FOR REGULAR MEETING SCHEDULE Members determined that regular meetings will be held the first Thursday of the month at 6 p.m. The next meeting will be on July 10 because of the July 4 holiday. F. OVERVIEW OF NEW MULTI-MODAL REVIEW PROCESS 1. Multi-Modal Transportation Board Authority and Duties Ms. Ecker gave an overview of specific matters that this board will be responsible for reviewing: all road reconstruction, all road resurfacing, sidewalk and pedestrian crossings, intersection and bridge projects, bicycle improvements, transit facilities, Ordinance amendments that are related to transportation or transportation infrastructure network, appeals of Police Dept. decisions on stop signs. Some of the general duties of this board will be the implementation of the Multi- Modal Plan, recommendations to the City Commission about projects City projects, a forum for people that have concerns about transportation issues. G. OVERVIEW OF BIRMINGHAM MULTI-MODAL TRANSPORTATION PLANS 1. 2013 Multi-Modal Transportation Plan The main points of the Plan were briefly discussed. 2. Downtown Bicycle Parking Plan Downtown Birmingham bike rack locations were noted. A black U was selected as the design for the bike racks and they have been installed in many places. Moving forward, this board will be reviewing the Bicycle Parking Plan. H. REVIEW OF PHASE 1 IMPLEMENTATION PROGRESS 1. 2014 and 2015 Street Projects 2014 Projects Mr. O'Meara put up a map that highlighted all of their projects for the next year. The majority of the projects the City plans to undertake during the 2014 construction season are already designed and bid. Some are currently under construction. The two most significant projects, which are Lincoln Ave. and N. Eton Rd., were reviewed by the former Multi-Modal Steering Committee, and approved by the City Commission. At this time, N. Eton Rd. is planned to be started the week of June 30, and Lincoln Ave. should start about the first week of August.

Page 3 One local street is planned for resurfacing, that being W. Frank St. from Southfield Rd. to Bates St.. The top layer of asphalt will be removed and replaced. No changes are planned to the width of the street, and the curbs will be maintained. The Americans with Disabilities Act (ADA) mandates that all handicap ramps must be rebuilt to current standards. The design effort is getting more complex and more expensive. Modifications are proposed at all of the intersections, including Southfield Rd., Watkins St., Stanley Dr., Chester St., and Bates St. With respect to bike improvements, most of this segment of Frank St. is designated as a Phase 3 neighborhood connector route in the Master Plan. The understanding is that the route would be signed to encourage bicycling between various destinations, and at some select locations, traffic calming measures. As a relatively quiet, narrow residential street, they do not see the need to implement traffic calming measures here. Further, signing should be done in the future when this board has the time to review and determine the validity of each selected route. There were no comments from the public at this time. Moved and Seconded to recommend to the City Commission that the Multi- Modal Transportation Board endorses the Engineering Dept. s plans for the resurfacing of W. Frank St., implementing the handicap ramp improvements as designed. Phase 3 neighborhood connector route recommendations found in the Multi-Modal Master Plan should be implemented as part of a broader effort involving other streets at a later date. No one in the audience wished to comment on the motion. Motion carried, 4-0. VOICE VOTE Yeas: Edwards, Lawson, Slang, Warner Nays: None Absent: Surnow, Tatuch 2015 Projects The following lists all the street improvement projects planned at this time: 1. Oak St. Reconstruction Glenhurst Dr. to Lakepark Ave. 2. Maryland Blvd. Reconstruction Southlawn Blvd. to 14 Mile Rd. 3. Henrietta St. Reconstruction Northlawn Blvd. to 14 Mile Rd. 4. Southlawn Blvd. Reconstruction Bates St. to Pierce St. 5. Mansfield Rd. Resurfacing Sheffield Rd. to Bradford Rd. 6. Martin St. Reconstruction Southfield Rd. to Chester St. 7. Chester St. Resurfacing Maple Rd. to Martin St. 8. Derby Rd. Resurfacing CN Railroad Bridge to Eton Rd.

Page 4 Oak St. Reconstruction Glenhurst Dr. to Lakepark Ave. a.) Oak St. Reconstruction East of Chesterfield Ave. i) Cross-Section The existing pavement is 40 ft. wide, measured from the face of the curbs. Mr. O'Meara said one suggestion would be to have no parking and bike lanes. This would be as narrow as 30 ft. wide. It is important that the level of parking demand be established. He recommended obtaining this by polling the immediate neighbors along with others in the neighborhood. It was discussed that the bike lanes could be protected with a small curb but there would be a lot of interruptions for driveways and cross streets. The most important decision to make relative to this project is the width of the street, and how that width will be used. ii) Enhanced Crosswalks (Bumpouts) The Master Plan proposes bumpouts at Chesterfield, Suffield, Puritan, and Lakepark. If the City proceeds to install a 30 ft. wide pavement with no parking lanes, bumpouts will not be feasible, as bumpouts would interfere with the new bike lanes. This question will have to be revisited if the City elects to build a street with one or two parking lanes. b.) Oak St. Reconstruction Glenhurst to Chesterfield Mr. O'Meara discussed Oak St. in front of Quarton Elementary School. 1. All busses use Chesterfield Ave. 2. The south side of Oak St. is the designated parent drop off and pick up area. The number of parents using this area daily is large. Just last year, the school paved a wider sidewalk on this side of the street to improve this operation. They are suggesting that an extra lane be provided the full length of this block so that there is room for parents to stand on the south side of the road to unload or load children. The area would remain a No Parking zone, or Resident Only parking. 3. The school staff believes that the residents on the north side of the road would prefer that there be no parking allowed during school hours. However, it is unclear if this is their preference for other hours or days of the week. It was suggested that a curb be added to the 6 ft. bike lane on the north side. No curb on the south side should be installed, as it would be a shared lane Mr. O'Meara recommended a survey of these residents as well, to find out what their preference would be. Using the above information, there are several options that could be built, including the parking lane on one or both sides. Although the block and a half to the west of Glenhurst Dr. (to the Birmingham City limit) is not a part of this project, they intend to recommend that parking be eliminated on this section (similar to

Page 5 the section east of Chesterfield Ave.), and that bike lanes be striped. The road is wider here, so both the travel lanes and the bike lanes would be wider than what is really necessary. With bike lanes being built both east and west of the school, bike lanes through the section in front of the school should be considered as well. Unfortunately, providing parking and bike lanes results in a 46 ft. wide road, 6 ft. wider than it is currently. It is recommended that the street widening be implemented all on the south side, to ensure that none of the existing trees in front of the homes would be removed. All trees on the south side (five trees of medium size) would have to be removed. Installing the road at 46 ft. on this block may feel excessively wide. The bike lanes could be deleted, to keep it at 36 ft. (4 ft. narrower than it is currently). Assuming that students heading to school are some of the bikers, this may seem short sighted. With either width, the City would work with the school to provide a wider sidewalk area along their building frontage to aid with parent pick up. It is also recommended that bumpouts be considered at the Glenhurst Dr. intersection, as this is an important crossing for the school. The size of the bumpouts will have to be determined once the width of the new street is finalized. c.) Oak St. Reconstruction Chesterfield Ave. Intersection The traffic signal at this intersection has been identified as one within the City that likely is not warranted. Operating and maintaining a traffic signal is an ongoing expense to the City that may not be appropriate. They agree that a traffic engineer should be hired to study the intersection. Now that school will not be in session for the summer, the study likely will not be able to gather necessary data on school traffic patterns until September. The board wanted to look at the language of the poll before it goes out to residents. Mr. O'Meara will put together the language regarding parking for the board's approval at the next meeting before it is sent out. After that step he will hire a consultant for the traffic study. Then the board will hold a public hearing to hear what the residents think about the direction the board is going. Maryland Blvd. Reconstruction Southlawn Blvd. to 14 Mile Rd. Henrietta St. Reconstruction Northlawn Blvd. to 14 Mile Rd. Southlawn Blvd. Reconstruction Bates St. to Pierce St. Mansfield Rd. Resurfacing Sheffield Rd. to Bradford Rd. The City intends to reconstruct or resurface all of the above street segments together in one street paving contract. The federally mandated ADA requirements dictate that all handicap ramps within the project areas must be removed and replaced to meet current standards. Only one of the four streets (Southlawn Blvd.) is mentioned in the Master Plan, being part of a neighborhood connector route to be built in Phase 2. Similar to

Page 6 Frank St. mentioned above, the neighborhood connector route is a collection of signs that can be added later, and does not need to be implemented with a street paving project. Martin St. Reconstruction Southfield Rd. to Chester St. Chester St. Resurfacing Maple Rd. to Martin St. The Martin St. project (adjacent to the Chester St. Structure) addresses a suggested project found in the Downtown Birmingham 2016 Plan. The goal is to remove the parking control equipment that is in the vacated right-of-way, and make modifications so that this block can function as a full two-way street. The City is currently working with a property owner on this block to acquire the necessary right-of-way, so further discussions are not appropriate at this time. The Chester St. project is a resurfacing project for the one short block adjacent to the Chester St. Structure. Since the work abuts the Maple Rd. intersection, it is appropriate to review the needed multi-modal improvements in that area, particularly at the southwest corner. A more conservative corner can be constructed here that will still accommodate large trucks, but improve the area for pedestrians. Derby Rd. Resurfacing CN Railroad Bridge to Eton Rd. The above segment of Derby Rd. is scheduled for resurfacing in late 2015. As a resurfacing project, the widths will not be changing. The Master Plan suggests that shared lane markings be added to the entire half mile of Derby Rd. from Adams Rd. to Eton Rd., as a phase 1 improvement. At the time this project is completed, the N. Eton Rd. bike lanes will be in service, ending at Derby Rd. It is recommended that the shared lane markings be added to this resurfacing job, as well as the segment west of the railroad bridge. The shared lane markings will provide an important link for bicyclists riding through this part of the City. This segment of Derby Rd. is labeled as part of a Phase 2 neighborhood connector route. This route involves other streets to the west that will require further discussion at a later date. Since adding signs for a route does not need to be done as a part of the resurfacing project, it is recommended that this be postponed to a later date. Similar to all of our other street projects, handicap ramps along the route will have to be replaced to meet current ADA standards. This work will be included as a part of the project. Moved and Seconded to endorse the Engineering Dept. s direction relative to its 2015 street project plans, and to return to the board as needed as plans and information gathering progresses.

Page 7 No one in the audience commented on the motion. Motion carried, 4-0. VOICE VOTE Yeas: Edwards, Lawson, Slang, Warner Nays: None Absent: Surnow, Tatuch I. MEETING OPEN TO THE PUBLIC FOR ITEMS NOT ON THE AGENDA (no one spoke) J. MISCELLANEOUS BUSINESS AND COMMUNICATIONS a. Communications Ms. Ecker advised there will be an overview of the W. Maple Rd. 2016 Project coming up and all of the letters will come back then. b. Draft Agenda for the next Regular Multi-Modal Transportation Board Meeting 2015 Street Project Updates Overview of W. Maple Rd. 2016 Project Review of Draft RFP for Transportation Engineer/Planner Consultant c. Other Business (none) K. ADJOURNMENT It was noted the next meeting will be on Thursday, July 10 at 6 p.m. No further business being evident, board members motioned to adjourn. Jana Ecker, Planning Director Paul O'Meara, City Engineer