BULL TROUT OPERATIONAL PLAN

Similar documents
Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

FISH PASSAGE CENTER 847 NE 19 th Avenue, #250, Portland, OR Phone: (503) Fax: (503) us at

Prospect No. 3 Hydroelectric Project FERC Project No. P Fish Passage Facilities Study Report: Biological Evaluation

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

April 14, Subject: Rocky Reach Hydroelectric Project, FERC No Rock Island Hydroelectric Project, FERC No

Survival Testing at Rocky Reach and Rock Island Dams

Technical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM

Monitoring the Behavior of Acoustically Tagged Chinook and Steelhead Smolts Approaching Rocky Reach Dam on the Columbia River

Technical Report Draft

Within Phase I, researchers have identified four tasks that they think are essential for designing the most informative study.

2016 Annual Work Plan

ADULT LAMPREY PASSAGE AND ENUMERATION STUDY PLAN, WELLS DAM WELLS HYDROELECTRIC PROJECT FERC NO. 2149

BULL TROUT MANAGEMENT PLAN WELLS HYDROELECTRIC PROJECT FERC PROJECT NO. 2149

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Follow this and additional works at:

Lewis River Fish Passage Program 2014 Annual Report (30-day review Draft)

Technical Report EVALUATION OF ADULT CHINOOK SALMON PASSAGE AT PRIEST RAPIDS DAM WITH ORIFICE GATES OPEN AND CLOSED

MCCAW REACH RESTORATION

E.D. Chapman, A.R. Hearn, A.P. Klimley, P.E. LaCivita, W.N. Brostoff & A.M. Bremner

Technical Report

Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers. Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA

An Evaluation of Adult Chinook Salmon and Steelhead Behavior at the North-shore Counting Window of Lower Monumental Dam using Radiotelemetry: 2004

Final Bull Trout Genetics Monitoring Plan for the Wallowa Falls Hydroelectric Project. (FERC No. P-308) June 2017

Technical Report

ATTACHMENT G. Document submitted to the Federal Energy Regulatory Commission

FISH PASSAGE CENTER 847 NE 19 th Avenue, #250, Portland, OR Phone: (503) Fax: (503) us at

Smolt Monitoring Protocol at COE Dams On the Lower Snake and Lower Columbia rivers

From: Michael A. Jepson, Tami C. Clabough, and Christopher C. Caudill

Dave Clugston U.S. Army, Corps of Engineers, Portland District. Tami Clabough, Eric Johnson, Dan Joosten, and Chris Peery

EVALUATION OF FISHWAY MODIFICATIONS TO IMPROVE PASSAGE OF ADULT CHINOOK SALMON AND STEELHEAD THROUGH THE TRANSITION POOL AT LOWER GRANITE DAM, 2008

Dave Clugston U.S. Army, Corps of Engineers, Portland District. Tami Clabough, Eric Johnson, Dan Joosten, and Chris Peery

MEMORANDUM. DATE: June 15, RE: Fishway Inspections May 2001

Incidental Take Permits for HCP Plan Species

INFLUENCE OF WATER TEMPERATURE ON ADULT SALMON AND STEELHEAD PASSAGE AND BEHAVIOR AT LOWER GRANITE DAM, 2008

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Elwha River Ecosystem Restoration:

Technical Report 99-1

Rocky Reach Fish Forum Wednesday, 5 October :00 4:00 p.m. Chelan PUD Second Floor Conference Room Wenatchee, WA

P U B L I C U T I L I T Y D I S T R I C T N O.

october 2013 A few things inside Collecting young fish Mayfield Dam turns 50 Understanding Mayfield Lake

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

Annex C Temporary Fish Passage Plan

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT: SUMMER FACT SHEET NO. 1 Columbia River Compact June 13, 2012

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Date: 25 September Introduction

Wenatchee Spring Chinook Relative Reproductive Success Study. Andrew Murdoch (WDFW) Michael Ford (NOAA) Michael Hughes (WDFW)

Proposed Study Plan 1100 ft Whooshh Fish Transport System. June 2016

OXBOW FISH HATCHERY AND HELLS CANYON FISH TRAP

ENTRANCES USED AND PASSAGE THROUGH FISHWAYS FOR ADULT CHINOOK SALMON AND STEELHEAD

ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2000 ANNUAL REPORT. Larry R. Basham, Field Operations Coordinator

The Dipnetter. December published for tribal fishers by the Columbia River Inter-Tribal Fish Commission

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Columbia Lake Dam Removal Project

Final Minutes of the February 27, 2018 HCP Coordinating Committees Meeting

SUBMITTED TO: Steve Hemstrom Public Utility District No.1 of Chelan County 327 North Wenatchee Avenue Wenatchee, WA 98807

Subject: Wells Hydroelectric Project FERC Project No Annual Report Anadromous Fish Agreement and Habitat Conservation Plan

I. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Government Highline Diversion Dam on the Upper Colorado River

Technical Report 99-6 EVALUATION OF RUNNING TURBINE 1 AT MAXIMUM CAPACITY ON PASSAGE OF ADULT SALMON AND STEELHEAD AT JOHN DAY DAM

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Pacific Lamprey Upstream Passage Modifications Literature Review and Analysis and Recommendations for Passage Improvements in the Rocky Reach Fishway

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

IDAHO COOPERATIVE FISH AND WILDLIFE RESEARCH UNIT

COLUMBIA LAKE DAM REMOVAL PROJECT

Recreational Sturgeon Commercial Shad MANAGEMENT GUIDELINES

APPENDIX B. Final reports on chinook salmon spawning surveys - Sultan River, Washington Report

Backgrounder and Frequently Asked Questions

Technical Report MIGRATION BEHAVIOR OF ADULT CHINOOK SALMON AND STEELHEAD RELEASED IN THE FOREBAY OF BONNEVILLE DAM,

Project Award Presentation

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Spilling Water at Hydroelectric Projects in the Columbia and Snake Rivers How Does It Benefit Salmon?

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

Evaluation of Submerged Orifice Gate Usage by Adult Chinook Salmon and Steelhead at John Day Dam During 2003

IDAHO COOPERATIVE FISH AND WILDLIFE RESEARCH UNIT

Yakima/Klickitat Fisheries Project

Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry

Claytor Lake View of the Claytor Lake dam from Claytor Lake State Park s boat ramp.

Columbia Lake Dam Removal Project

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

JOINT STAFF REPORT WINTER FACT SHEET NO. 9 Columbia River Compact March 18, 2004

2016 Milltown Fishway Research Trap Report St. Croix River, New Brunswick and Maine R. Goreham and H. Almeda Summary 1

2010 Lower Fraser River Sockeye Recreational Hook and Release Mortality Study

Appendix C Wenatchee Subbasin Plan

Strategies for mitigating ecological effects of hatchery programs

San Joaquin River Restoration Program, 2013 Chinook Salmon Trap and Haul Summary

SUMMARY OF OPERATIONS AT THE SAFE HARBOR FISH PASSAGE FACILITY SPRING 2017

SALMON FACTS. Chinook Salmon. Oncorhynchus tshawytscha

PLEASE BRING YOUR LUNCH

Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report

EVALUATION OF SEA LION PREDATION IN THE BONNEVILLE DAM TAILRACE

Evaluation of Volitional Entry and Passage of Adult Pacific Salmonids through a Novel Fish Passage Technology

Savannah River, Georgia and South Carolina

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017

Fish Tracking Project OHRC & Toledo Jr/Sr H.S.

Southern Oregon Coastal Cutthroat Trout

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Transcription:

BULL TROUT OPERATIONAL PLAN ROCKY REACH HYDROELECTRIC PROJECT FERC Project No. 2145 April 10, 2001 Public Utility District No. 1 of Chelan County Wenatchee, Washington

BULL TROUT OPERATIONAL PLAN This document is a step-by-step description of procedures that will be used at Rocky Reach and Rock Island dams to trap and tag bull trout during the 2001 Mid-Columbia study. These procedures have been developed to minimize stress on bull trout as well as to minimize adverse effects on other species that use the ladder at each project. In the event we discover that the operation of the trap affects the migration or behavior of anadromous fish, we will cease operation of the trap and identify methods that will minimize effects. The traps will operate within a time window beginning in mid-april through early July, or until desired numbers of bull trout are tagged, at both Rocky Reach and Rock Island dams. Most tagging activity and trap operation is expected to occur from late May through June. A detailed description of the tagging schedule is provided in the Bull Trout Study Plan. It is possible that trapping could end earlier if the desired sample size of bull trout is reached before the end of July. The PUD will schedule daily trapping operations. The traps will be manned between 8 am and 5 pm, Monday through Friday, adjusted as needed if bull trout passage occurs outside this time window. The trap will only be operated until the number of bull trout required for the study have been trapped. Hours of operation will be limited to the period of time needed to trap the desired number of bull trout in a day. At each project (Rocky Reach and Rock Island) one person located near the viewing window of each ladder will monitor fish passage. These individuals will operate the pneumatic gates (open gate for capture and close gate for passage), which will direct bull trout into the capture facility. When a lone bull trout enters the viewing area, the operator will open the pneumatic gate, which will trap the trout as it moves upstream. It is possible that not all bull trout will immediately swim into the trapping facility. In such an event, the operator can activate a system that will release a stream of bubbles downstream of the fish to entice it to move into the capture facility. To avoid potential adverse effects on salmonids immediately downstream of the window, the bubble system will only be used as a last resort. Chelan PUD will consult with NMFS if use of the bubble system appears necessary. The gate will remain open until the target fish enters the trapping facility or for a maximum of three minutes, after which it should be closed and fish allowed to pass.. If other non-target species (e.g., salmon or steelhead) enter the viewing area before the bull trout enters the trap, the operator will close the pneumatic gate allowing both the bull trout and non-target species to pass through the ladder exit. The operation is designed to capture only bull trout and therefore we expect no incidental catches. However, in the unlikely event that a non-target species is captured, the operator will open the gate to allow the fish to swim out of the trap. If the fish does not swim out Operational Plan Rocky Reach Project No. 2145 April 10, 2001 Page 1 SS/2664

Bull Trout Operational Plan of the trap, the operator will close the gate to prevent trapping of additional fish and remove the upstream pickets of the capture area, allowing the non-target species to exit the trap. If any listed chinook or steelhead are trapped, operations should be discontinued immediately and consultation initiated with NMFS. Once a lone bull trout is trapped, no additional trapping of bull trout will take place until that fish is processed and released (at no time will more than one bull trout be captured at the same time). An activity log of all trap operations will be kept during the study. The log will include time of day and total time the trap was open, whether or not any anadromous salmonids were caught, whether they left the trap through the upstream leads or back out the entrance, and whether they continued upstream or moved back down through the ladder. A record of the time required for anadromous salmonids to enter the counting window following activation of the trap will also be kept. After capturing a bull trout, the trap operator will immediately contact the tagging crew responsible for tagging bull trout, who will arrive on site as soon as possible. Several tagging crews are available to tag bull trout; therefore, the period of time between capture and tagging will be minimized. Two tagging specialists will process trout, one surgically implants tags while the other records data, controls anesthetic water, and monitors fish condition. At Rocky Reach and Rock Island, the tagging operation will be done outside the fishway. We have designed the study so that no more than two bull trout will be captured on a given day and this would occur rarely. Bull trout captured at the Rocky Reach, Rock Island and Wells dams will remain in their respective traps until all personnel, tagging stations, tags and release vehicles are present and have been prepared. That is, all surgical equipment will be sterilized and prepared before anesthetic is administered to bull trout. Buffered solutions of MS222 anesthetic will be prepared and ready for use when the bull trout are removed from the trap. Radio tags will be tested to confirm tag operation and channel code combination. Release vehicles (boats and trucks), containers, and personnel will be ready prior to tag implantation to reduce holding and travel time associated with fish release. The capture vessel holding the bull trout will be raised slowly to a level that allows water to drain from the upper six inches of the tank. A net will be draped over the tank to prevent the fish from jumping out. At the same time, the tagging crew will add the predetermined amount of MS-222 solution to the vessel. To ensure that none of the MS- 222 solution enters the ladder, the tagging crew will add the MS-222 only when the top of the capture tank is flush with the wooden floor. If any solution splashes out of the tank, it will be immediately wiped off the wooden floor with dry towels. Rocky Reach Project No. 2145 Operational Plan SS/2664 Page 2 April 10, 2001

Bull Trout Operational Plan While the fish succumbs to the MS-222, the tagging crew will slowly raise the capture vessel clear of the picketed enclosure and carefully move it to the surgical station. Once fully anesthetized, the tagging crew will gently remove the bull trout from the capture tank and place the fish on the surgical table where water containing MS-222 will be flushed across the gills of the fish. At Rocky Reach the anesthetized bull trout will be placed in a recovery tank and transported to the off-ladder tagging site. A trained biologist will surgically implant the radio-transmitter into the anesthetized trout following procedures described in the Bull Trout Study Plan. Once surgery is complete, the tagging crew will carefully transfer the trout to the recovery tank. Transportation and release of the recovered trout will follow procedures described in the Bull Trout Study Plan. After the bull trout is released, the tagging crew will drain all anesthetic water from the capture vessel, and rinse the vessel with freshwater. Both the anesthetic and rinse water will be disposed of on the ground away from the river. The capture tank will then be placed back into the trap facility so that trapping can resume. All surgical equipment will be sterilized and made ready for the next operation. Operational Plan Rocky Reach Project No. 2145 April 10, 2001 Page 3 SS/2664