Section 2 Strategic Alignment. Contents

Similar documents
THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

DRAFT for a State Policy for Healthy Spaces and Places

2. Context. Existing framework. The context. The challenge. Transport Strategy

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Living Streets response to the Draft London Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Launceston's Transport Futures. Greater travel options for the people of Launceston

Waitakere Recreational Cycling Plan NZRA Presentation

Warfield Neighbourhood Plan: 4.4 Infrastructure

TRAFF IC CALMING POLICY

Goals, Objectives, and Policies

What s the issue for transport in Cardiff?

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

AMATS Complete Streets Policy

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Draft Central District Plan

Speed Limit Policy Isle of Wight Council

Regional Walking and Cycling Strategy for the Waikato region

Draft Greater Sydney Region Plan

Living Streets Policy

9. Parking Supporting Statement

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

City of Waterloo Complete Streets Policy

Westminster s Joint Health and Wellbeing Strategy

Strategy for Walking & Cycling Action Plan

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Roads and public rights of way

Regional Cycling Plan

Active Transportation Infrastructure Investment A Business Case

City of Perth Cycle Plan 2029

GD 0043/18 ACTIVE TRAVEL STRATEGY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

City of Ottawa s Complete Streets Approach to Transportation Projects

Regional Cycle Programme Update

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

Sue Shikaze Health Promoter, HKPR District Health Unit Chair, Haliburton County Communities in Action Committee

Ann Arbor Downtown Street Plan

Delivering the. Strategy 7.0

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Welcome. If you have any questions or comments on the project, please contact:

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety

The Florida Bicycle and Pedestrian Partnership Council

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

Transport Policies. National Non- Motorised Transport Policy, Non-motorised specific transport. policy

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

Logan City Council Planning for Tennis Together

PDMS Report 2012, NZG Consultation Process National Membership Statistics, Casual Golf Membership Research.

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Our journey a 20 year Transport Manifesto for the North East

The previous chapters in this plan have established the value of this plan (Chapter 1), the

Transportation Master Plan Advisory Task Force

4.1 Introduction. 4.2 Aspects of walkable communities

STRATEGIC PLAN FOR PEDALS NT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Bicycle Master Plan Goals, Strategies, and Policies

Your views are important. Please fill in a form before you leave. Or alternatively

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Linking Transportation and Health in Nashville & Middle Tennessee

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Eastern PA Trail Summit October 1, 2018

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Report to COUNCIL for decision

Part 3: Active travel and public transport planning in new housing developments

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

Walking the Talk: Sustainable Transport and Urban Design in Four New Zealand Cities

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Road Safety Action Plan

Bristol City Council has produced a draft Bristol Transport Strategy document.

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

CHAPTER 7.0 IMPLEMENTATION

Manifesto for a safe, efficient and sustainable transport in NZ

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

The Value of Cycle Tourism

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Appendix N(b): Portishead Station Outline Travel Plan

Role Profile. Project Director (North or South dependent on candidate location)

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Design Principle Active Transport

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Local Government Road Safety Summit - 9 April 2018

MILTON ROAD LLF PROJECT UPDATE

Building An Active Travel Future for Northern Ireland Consultation Response

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

University of Leeds Travel Plan

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Wellington City Council. Cycle Network Development Programme Business Case

Welcome. Background. Goals. Vision

TRANSPORT AND MOVEMENT

WEST CENTRAL DRAFT DISTRICT PLAN SUBMISSION 3 HASSAL ST WESTMEAD

CONFLICT OF INTEREST POLICY

Seal Extension Guidelines. Asset Management and Systems

Environment and Public Works Committee Presentation

Eugene s Strategic Pedestrian and Bicycle Plan

Transcription:

Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy... 4 2.4.1 The Built Environment Strategy s Impact On the Code... 5 September 2009 Page 1

2 Strategic Alignment 2.1 General The Development Code (the Code) does not exist in a vacuum. Instead the Code is a tool that helps to implement a variety of strategic aims for the Western Bay of Plenty District Council. Historically the Code has been a largely technical document, aimed at ensuring the assets that either Council builds, or which are built by developers and then vested in Council, are built to an appropriate standard and that appropriate processes have been followed. This remains a core aim of the Code. However, this version of the Code is intended to be broader in scope than previous versions. It will outline the strategic context that Council operates within and which infrastructure development will need to support. This strategic context will have down-stream impacts on the form of infrastructure that needs to be developed, and the function that that infrastructure needs to fulfill. 2.2 SmartGrowth Strategy and Implementation Plan SmartGrowth is a strategy aimed at developing and implementing a plan for managing growth in the Western Bay of Plenty. This programme's social, economic and environmental goals can be achieved in a sustainable way leading up to 2050 and is being led by Environment Bay of Plenty, Tauranga City Council, Western Bay of Plenty District Council, and Tangata Whenua, on behalf of the community. The SmartGrowth Strategy has been developed to provide a clear and unambiguous signal to the community on the long-term strategy the sub-region will adopt to manage growth. Some of the key components within the Strategy include: Identification of the settlement pattern including an urban limit for the 50-year planning period Issues around location and nature of residential housing The principles of urban design Economic development (including the provision of adequate business land) Transportation and infrastructure development Open space and opportunities for sports, arts and leisure activities Within these areas and others in the Strategy there are a wide range of actions covering a full spectrum of issues. Detailed information is provided for each action including an explanation, timeframe for completion, a list of lead and support agencies and cost estimates. September 2009 Page 2

SmartGrowth s impact on the Code SmartGrowth identifies the Code as a key implementation document that will incorporate changes and initiatives arising from SmartGrowth such as: Sustainable infrastructure Comprehensive urban design (urban design guidelines) Maximum and minimum levels of service Technical engineering Communications technology SmartGrowth also acknowledges that changes will need to be made to the District Plan in order to give effect to some of the above issues in the Code. For this reason, the Code has been restructured at the same time as the District Plan, and gives effect to the District Plan, with direct links between the two documents. The following Council strategies are therefore given effect through the Code. 2.3 Walking and Cycling Strategy Draft Vision: To create a safe and accessible walking and cycling environment which encourages people to walk and cycle for both leisure and as transportation. In order to fulfill the Vision for walking and cycling within the District three key objectives have been developed. These are: i. To make walking and cycling a more viable and convenient method of transport within the District ii. To improve the safety of walking and cycling within the District iii. To ensure that cycling and walking are promoted in the Council s land use and transport planning policies Achieving the Strategy Objectives A series of policies has been developed. These policies are statements of Council commitment. i. To make walking and cycling a more viable and convenient method of transport within the District: The future sustainability of our towns will be greatly improved by increasing the level of walking and cycling within the community. To date the Council has made investment into footpaths and road improvements but there remains a need to maximise the potential that walking and cycling can make to local transportation networks, the environment and the health of our communities. September 2009 Page 3

ii. To improve the safety of walking and cycling within the District: Whilst the safety of cyclists and pedestrians is clearly an important issue in terms of existing crash statistics, it is the perception of walking and especially cycling safety, which is one of the most significant factors to address. Despite a relatively low level of overall crashes involving pedestrians and cyclists, the safety issue is one which residents commonly cite as that which puts them off walking and cycling. iii. To ensure that cycling and walking are promoted in Council s land use and transport planning, engineering and development policies. In order to provide a legislative framework which ensures that the objectives of the walking and cycling strategy are met, Council policies must reflect the aims of the strategy and incorporate the actions within departmental agendas. The policy context for this strategy has illustrated how walking and cycling links to many sectors (health, environment and transport) and it is therefore crucial that the aims of the strategy are communicated across all departments and between regional and local organisations to ensure emerging policy reflects this. 2.4 Built Environment Strategy Vision: The Western Bay of Plenty District Council guides development to ensure that the environment is valued, people enjoy a healthy and safe lifestyle that offers a choice for our diverse community; a District that residents love. The Built Environment Strategy aims to guide the development of a sustainable built environment, taking the surrounding environment into consideration. The Strategy is based on: The community outcomes as included in SmartFuture The built environment directives included in SmartGrowth and the Bay of Plenty Regional Policy Statement National strategies, e.g. New Zealand Urban Design Protocol and National Guidelines for Crime Prevention through Environmental Design Council would like to encourage a different way of thinking in executing development. It is about how my development can contribute to the community as opposed to how the community can contribute towards my development. The objectives of the Built Environment Strategy are as follow: Provide guidelines to manage the effects of growth in both urban and rural areas Ensure that the scale of new development is in relation to the existing built environment Ensure proper integration between the public and private environment Promote the diversification of transport options September 2009 Page 4

Prevent crime through environmental design principles Protect and promote our heritage Recognise the relationship of Tangata Whenua to the built environment Ensure the development of functional and quality open space systems Ensure that the built environment caters for the entire community Build on the existing local identity and pride in the community Avoid or mitigate adverse effects of development on our natural environment Address issues related to affordability with diversity of housing options Integrate live, work and play principles 2.4.1 The Built Environment Strategy s Impact on the Code The Built Environment Strategy advocates for more sustainable practices and encourages the following: Using designs and materials that will minimise stormwater run-off Treatment of stormwater at household and neighbourhood level before entering waterway Development of energy efficient buildings Use of renewable energy Practices that will save water September 2009 Page 5