City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents

Similar documents
Solana Beach Comprehensive Active Transportation Strategy (CATS)

C C C

Living Streets Policy

Basalt Creek Transportation Refinement Plan Recommendations

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Non-Motorized Transportation 7-1

Tonight is for you. Learn everything you can. Share all your ideas.

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

ACTIVE TRANSPORTATION

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Perryville TOD and Greenway Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Duwamish Way-finding and CTR Report

CONNECTING PEOPLE TO PLACES

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

IMPLEMENTATION STRATEGIES

RZC Appendix 8A Marymoor Subarea Street Requirements

Bicycle Master Plan Goals, Strategies, and Policies

TRANSPORTATION TRAINING TOPICS. April 6, 2010

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Executive Summary Route 30 Corridor Master Plan

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Rochester Downtown Bicycle Study 2009

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Transportation Master Plan Advisory Task Force

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

5 CIRCULATION AND STREET DESIGN

Active Transportation Infrastructure Investment A Business Case

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Environment and Public Works Committee Presentation

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

5. RUNNINGWAY GUIDELINES

Bicycle and Pedestrian Plans and Improvements

Chapter 5. Complete Streets and Walkable Communities.

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Berkeley Strategic Transportation Plan A-76

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

East Burke Transportation, Safety and Capacity Improvements

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

CHAPTER 7.0 IMPLEMENTATION

Physical Implications of Complete Streets Policies

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Chapter 4: Funding and Implementation

transportation element

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF BURIEN, WASHINGTON MEMORANDUM

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Regional Transportation Needs Within Southeastern Wisconsin

Transportation Corridor Studies: Summary of Recommendations

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Clackamas County Comprehensive Plan

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

CITY OF SPOKANE VALLEY Request for Council Action

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Omaha s Complete Streets Policy

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

San Jose Transportation Policy

Section 9. Implementation

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Building Great Neighbourhoods BONNIE DOON

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

STREET AND HIGHWAY PLAN

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Land Use Bicycle Spaces Required Type Residential

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Chapter 2: Standards for Access, Non-Motorized, and Transit

Project Update May 2018

Building Great Neighbourhoods QUEEN ALEXANDRA

Item No. 14 Town of Atherton

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Hennepin County Bicycle and Pedestrian Planning

Transcription:

City of Redmond 2015-2012 Transportation Improvement Program Adopted: September 16, 2014 Table of Contents 1. What is the Six-Year Transportation Improvement Program (TIP)?... 1 2. What is included in the TIP?... 1 A. Project Categories... 1 B. Project and Project Cost... 2 3. Developing the TIP... 4 4. Relationship of the TIP to other Transportation Documents... 4 A. Six-Year Capital Investment Program... 4 B. State and Federal Requirements... 5 5. Future Updates... 5 6. Contact Information... 5 Appendix A - Project List... 6 Appendix B - Project Location Map... 11 Appendix C - Project Descriptions... 13 Appendix D - TIP Update Map... 20 Appendix E - Transportation Planning Document Relationship Diagram... 22

Six-Year Transportation Improvement Program (TIP) Overview 1. What is the Six-Year Transportation Improvement Program (TIP)? The Six-Year Transportation Improvement Program, or TIP, is a short-range planning document that is annually updated based on needs and policies identified in the Redmond Comprehensive Plan and Transportation Facility Plan. It represents Redmond s current complete list of needed projects and programs for the next six years. The document also identifies secured or reasonably expected revenues and expenditures for each of the projects included in the TIP. Typically, projects listed in the first three years of the document are shown as having secured funding while projects in the last three years can be partially or completely unfunded. 2. What is included in the TIP? The central part of the TIP is Appendix A Project List, sorting projects into four categories and detailing estimated project expenditures. All other portions of this document are meant to support and further clarify the Project List, especially Appendix C Project Descriptions, which provides the planned scopes of the projects. A. Project Categories Projects contained in Redmond s TIP are organized based on geography, consistent with the vision for the City Redmond is a vibrant complete city: two urban centers and connected neighborhoods with high quality services for an engaged citizenry. The categories include the Downtown Urban Center, the Overlake Urban Center, Planning and Programs, and the Redmond Neighborhoods. The long-term vision for each is described below. Downtown Urban Center Downtown Redmond is a vibrant mix of businesses, residences, and open spaces. It is a destination where residents meet in their favorite bakery or take in an open-air concert at the Downtown Park. Residents and visitors walk along the tree-lined streets from shop to shop, or along the Sammamish River Trail, or Central Connector Trail, for exercise and relaxation. The Downtown Neighborhood is an urban village with a sense of its own history. The one square mile neighborhood houses approximately 13,000 residents and 12,400 jobs, providing support to the neighborhood s restaurants, shops, services, and cultural/entertainment venues. Downtown residents and workers rarely use their cars to get around the neighborhood, as light rail, convenient bus service, and friendly walking and bicycling environments provide fun, interesting, and healthy transit options within the neighborhood, as well as to Bellevue and downtown Seattle. Overlake Urban Center Redmond s adopted vision for Overlake in 2030 is a thriving neighborhood where 16,000 people live and 70,000 people work. In 2030, thousands of new residents walk from their homes to their jobs or to patronize neighborhood shops and services. Many stroll along a 2015 2020 Transportation Improvement Program 1

redesigned 152 Avenue Northeast, the neighborhood s main street. Others use new streets and urban pathways established as the neighborhood redeveloped. Light rail quickly and conveniently transports residents, employees, and visitors between two Overlake stations and regional destinations. For those preferring bicycles to trains, regional trails have been improved, reducing congestion at street crossings. Complete streets and new non-motorized crossings of State Route (SR) 520 make transit convenient for more people and provide new connections between Overlake Village and the Employment Area to the north. The Overlake of 2030 succeeds as a regional hub of activity because the community at large, together with private property owners and developers, established a vision and followed through on a strategy to achieve it. Planning and Programs Programs and planning efforts help achieve the City vision by meeting a particular transportation need (such as a mode or safety) in a systematic way, completing smaller scale projects and planning for the need over a long period of time. Plans help determine the future transportation network through citywide and corridor long studies. Redmond Neighborhoods As neighborhoods outside of Redmond s urban centers continue to mature, they build on assets such as natural beauty and diversity, maintain a welcoming atmosphere through gathering places, and continue improving public aspects such as safety and transportation. Redmond is known as the bicycle capital of the Northwest and throughout its neighborhoods, the City has developed an extensive system of bike paths and trails that are used for recreation, commuting and riding to schools, parks, and other destinations. Basic maintenance (including streets, utilities and improvements to all modes of transportation) provides needed services and mobility options for people, whether walking safely down the street or moving efficiently across town. B. Project and Project Cost The TIP Project List identifies the projects planned over the next six years and reports the amount of funds currently allocated to each project for each of those years. The estimated total project cost is also reported on the TIP Project List. To reduce confusion the total project cost for each project is included in the TIP even if the project was started prior to the first year covered in the TIP or the project is planned to continue beyond the final year covered in the TIP. Planned expenditures for each project are summarized into four funding categories in Appendix A. These four funding categories represent the following revenue sources used to fund projects: 2015 2020 Transportation Improvement Program 2

1. Unfunded - The portion of the project cost planned for the six-years included in the TIP currently without approved funding. 2. Local This includes the following funding categories: a. Funded by Other Local Jurisdictions Funds that come from partnerships with other jurisdictions and organizations. b. Capital Investment Program (CIP) The transportation portion of the CIP includes a variety of funding sources, including transfers from the City general fund, real estate excise tax, motor vehicle excise tax, motor vehicle fuel tax, sales tax on construction, and investment interest. c. Developer Currently, the largest source of developer contribution is in frontage improvements, although supplemental mitigation has also been significant in recent years. d. Business Transportation Tax (Business License Surcharge) $56 per employee limited duration surcharge on Redmond's business license fees is earmarked for transportation projects. e. Impact Fees Impact fees are assessed against building developments and improvements as they occur throughout the City. f. Other Miscellaneous funding sources that do not fit into the categories above. 3. Federal - Federal grant funding is available through many competitive processes included in Federal transportation legislation. 4. State - State grant funding is available through a variety of competitive programs. The Transportation Improvement Board (TIB) administers many of these programs. The Total Project Cost column included in Appendix A is based on varying levels of cost estimating. As the project moves from the planning level to a more detailed level of design, cost estimates are refined based on the more detailed information. The following defines the cost estimate types in order of increasing detail and certainty: 1. Pre-Project Planning Estimate: These project placeholders are allocations of funds used where a significant need has been identified, but planning efforts to develop a project scope are not yet significantly underway. Without some type of project scope it is very difficult to develop a detailed cost estimate. These cost estimates have the potential to change significantly as the project scope becomes more defined. 2. Planning Level Estimate / Engineer Estimate: These cost estimates are based on a generally defined scope that may include multiple alternatives. Cost estimates are usually based on limited fieldwork and general cost assumptions. No actual design work has been done prior to the development of these cost estimates. The cost estimate could still change significantly as design work begins but should be more reliable than the Pre-Project Planning Estimates. 3. Preliminary Design Report: These cost estimates are based on actual preliminary design work. If done for all facets of the project and there are not further additions to the project scope, these project estimates should represent a fairly dependable estimate of the total cost of the project. 2015 2020 Transportation Improvement Program 3

Cost estimates are updated as part of the TIP update. 3. Developing the TIP The annual TIP update starts with the previously adopted TIP. Projects in the previously adopted TIP are reviewed and projects that have been completed, or because of changing conditions, are no longer needed are removed from the TIP. The remaining projects carried over from the previous TIP are reviewed for changes to cost estimates, project funding, schedule, or scope during the update process to ensure that the best information is represented in the TIP. New projects are generated from many sources, including appointed commissions and committees representing bicycles and pedestrians, parks, traffic safety, and trails; elected officials; City of Redmond staff; and other interested individuals and groups. In many cases, City of Redmond staff use tools such as the Pavement Management Program, analysis of accident data, and transportation modeling to help identify potential new projects. Potential new projects undergo a review of scope, priority, schedule, financing concepts, and compatibility with the Redmond Comprehensive Plan and Transportation Master Plan. Updated projects from the previous TIP and new projects are then used to create a draft TIP project list. The phasing and funding of these projects in the draft TIP is based on an evaluation of project priority compared with priorities laid out in the Redmond Transportation Facility Plan, commitments to projects and programs that are already underway, partnerships the City has entered into with other jurisdictions and agencies, and new opportunities that arise to leverage local transportation funding in combination with other funding sources. Once the draft TIP has been developed, a public hearing is held to provide an opportunity for the community comment. Based on the results of the public hearing and comments from the Redmond City Council a final version of the TIP is developed. This final version is then adopted by the City Council. 4. Relationship of the TIP to other Transportation Documents A. Six-Year Capital Investment Program Once adopted, the TIP helps to guide funding and implementation priorities during the development of the transportation portion of the 6-Year Capital Investment Program (CIP). The CIP is a six-year financial plan addressing capital needs and is updated along with the development of Redmond s biennial operating budget. The CIP can be considered a subset of the TIP. The CIP shows the City-funded portion of projects and is constrained by current budget forecasts, whereas the TIP shows the complete project list with the variety of funding sources and partners involved. 2015 2020 Transportation Improvement Program 4

B. State and Federal Requirements State law requires that each city develop a local TIP and that it be annually updated (RCW 35.77.010). It is also requires that projects be included in the TIP in order for cities to compete for transportation funding grants from most Federal and State sources. Federal grant funded and regionally significant projects from the first three years of the City s TIP are included in the Regional TIP, which is assembled by the Puget Sound Regional Council for King, Kitsap, Pierce, and Snohomish Counties. The regional TIPs (RTIP) from around the State are then combined to form the State TIP (STIP), which is approved by the Governor and then submitted to the Federal Highway Administration and Federal Transit Authority for their review and approval. 5. Future Updates The TIP is an excellent guide to assist with planning transportation investments. The initiatives for next year s update remain much the same as the prior year. Review and update cost estimates included in the TIP. Further develop program reporting as part of TIP. 6. Contact Information Should you have questions or wish further information, please contact either of the following City staff: Don Cairns, Transportation Planning & Engineering Manager, (425) 556-2834, dcairns@redmond.gov Patrick McGrath, Associate Planner, (425) 556-2870, pbmcgrath@redmond.gov 2015 2020 Transportation Improvement Program 5

Appendix A - Project List All Six-Year TIP projects and programs are arranged into four categories: Downtown Urban Center, the Overlake Urban Center, Planning and Programs, and the Redmond Neighborhoods. The types of projects and programs included in each of these categories are described below: Downtown Urban Center Projects and corridor planning located in Downtown. Overlake Urban Center Projects and corridor planning located in Overlake Planning and Programs Citywide planning and programs. Redmond Neighborhoods Projects and corridor planning located in Redmond neighborhoods. 2015 2020 Transportation Improvement Program 6

PROPOSED 15-20 City of Redmond Six-Year Transportation Improvement Program Project List Street or Project From To Proj Start Proj End Un Funded Six-Year Project Information (All Dollars in Thousands) Local Federal State Total Total Project Cost * DOWNTOWN URBAN CENTER B43 Cleveland Street East 164th Ave NE Avondale Way 2018 2020 2,200 0 1,500 B47 159th Pl NE Sidewalk Bear Creek Parkway Leary Way 2018 2020 600 0 600 C53 Redmond Way and Cleveland Street Couplet Conversion 160th Ave NE 170th Ave NE 2015 2017 18,875 5,000 23,875 25,625 P20 NE 90th St Bridge Deck Preventative Sammamish River Trail Sammamish River Trail (east) 2016 2017 1,640 0 1,640 Maintenance (west) P23 Cleveland Street Sidewalk Rehabilitation 164th Ave NE 168th Ave NE 2017 2017 1,300 0 1,300 23,875 30,665 B37 OVERLAKE URBAN CENTER SR 520 Trail Grade Separation at NE 40th St SR 520 Bike Trail SR 520 Bike Trail 2019 2020 5,250 0 5,250 B40 Overlake Village Bicycle-Pedestrian 2800 Block NE 31st Street 2015 2020 3,746 5,000 1,607 10,353 10,529 Bridge B41 Overlake Transit Center Pedestrian & Overlake Transit Center 3800 Block 2015 2020 28,900 28,900 28,900 Bicycle Bridge C45 156th Ave NE and Bel-Red Southbound Bel-Red Rd 156th Ave NE 2017 2018 2,400 2,400 2,400 Right Turn Lane C46 148th Ave NE and NE 51st Street Westbound Right-Turn Lane NE 51st St 148th Ave NE 2017 2018 1,000 1,000 1,000 C47 NE 31st St Improvements 152nd Ave NE 156th Ave NE 2019 2020 2,600 0 2,600 C48 West Lake Sammamish Parkway Bellevue-Redmond Rd West Lake Sammamish 2019 2020 9,000 0 9,000 Widening & Roundabout Phase 3 (Part 1) Parkway C56 Overlake Access Ramp SR 520 150th Ave NE 2015 2019 33,000 1,500 1,500 34,500 C57 152nd Avenue NE Improvements NE 24th St Ne 31st St 2015 2019 14,000 7,100 7,100 21,100 C59 NE 40th Street Rechannelization SR 520 Bel-Red Rd 2019 2020 1,400 0 1,400 C60 NE 40th Street Reconstruction 156th Ave NE 163rd Ave NE 2019 2020 3,200 0 3,200 C61 27th Street and 28th Street New Connection 152nd Ave NE 156th Ave NE 2015 2016 14,300 14,300 14,300 September 02,2014 9:45:18AM *Total Project Cost represents the total estimated cost of the project. The funding represented in the six-year TIP may be less than the total project funding for two reasons. One, the project is underway and has expended money during years prior to the first year of the TIP. Two, the project is planned for the later years of the TIP and will not be completed by final year in the TIP. Page 1 of 4 N:\vbapps\TIP\reports\TIP_ProjList_Council_.rpt

PROPOSED 15-20 City of Redmond Six-Year Transportation Improvement Program Project List Street or Project From To Proj Start Proj End Un Funded Six-Year Project Information (All Dollars in Thousands) Local Federal State Total Total Project Cost * C62 Overlake Access Ramp Local Connection Overlake Access Ramp 152nd Ave NE 2018 2020 18,339 261 261 18,600 roundabout terminus L8 148th Avenue NE Corridor Master Plan Bel-Red Rd SR 520 Interchange 2018 2020 500 0 500 L13 Overlake Village Street Design NE 24th St NE 20th St 2018 2019 160 0 160 Guidelines - South of 24th P18 148th Avenue NE Rehabilitation SR 520 Redmond Way 2020 2020 3,000 0 3,000 P21 NE 51st St Preservation, 148th Ave NE to 148th Ave NE 156th Ave NE 2015 2016 525 750 1,275 1,275 156th Ave NE S47 NE 51st Street at 150th Avenue NE NE 51st St 150th Ave NE 2017 2017 700 700 700 Traffic Signal PLANNING AND PROGRAMS 67,789 158,414 B1 Bicycle Program 2015 2020 574 2,200 2,200 2,774 B2 Pedestrian Program 2015 2020 9,900 9,900 9,900 L9 Sound Transit East Link 2015 2020 300 0 300 L12 Transportation Master Plan Update 2018 2018 200 200 200 M1 TDM - Transportation Demand 2015 2020 2,090 3,712 3,712 5,802 Management (R-Trip) M6 Parking Management Program 2015 2020 865 865 865 M7 Transportation Management Programs 2015 2020 150 150 150 M13 Citywide Commute Trip Reduction (CTR) 2015 2020 172 583 755 755 Program M14 Growth and Transportation Efficiency 2015 2020 520 912 1,432 1,432 Center (GTEC) Implementation P1 Pavement Management Program 2015 2020 3,341 8,700 1,668 10,368 13,709 P2 Bridge Repair Program 2015 2020 450 450 450 S1 Neighborhood Traffic Calming Program 2015 2020 227 682 682 909 S2 Channelization Program 2015 2020 450 450 450 September 02,2014 9:45:18AM *Total Project Cost represents the total estimated cost of the project. The funding represented in the six-year TIP may be less than the total project funding for two reasons. One, the project is underway and has expended money during years prior to the first year of the TIP. Two, the project is planned for the later years of the TIP and will not be completed by final year in the TIP. Page 2 of 4 N:\vbapps\TIP\reports\TIP_ProjList_Council_.rpt

PROPOSED 15-20 City of Redmond Six-Year Transportation Improvement Program Project List Street or Project From To Proj Start Proj End Un Funded Six-Year Project Information (All Dollars in Thousands) Local Federal State Total Total Project Cost * S4 Engineering Contingency Program 2015 2020 150 450 450 450 S5 Street Light Program 2015 2020 14 300 300 314 S29 Transportation Concurrency Program 2015 2020 600 600 600 S38 Targeted Safety Improvement Program 2015 2020 659 2,058 2,058 2,717 (TSIP) S51 ADA Program 2015 2020 300 300 300 T12 Transit Service Program 2015 2020 1,050 0 1,050 REDMOND NEIGHBORHOODS 34,872 43,127 B19 Puget Sound Energy Trail, Rose Hill 132nd Avenue NE Willows Road 2020 2020 1,250 0 1,250 Extension B23 Redmond Way Sidewalk 142nd Ave NE 148th Ave NE 2015 2016 420 1,400 1,400 1,820 B38 Redmond Central Connector Phase 2 Sammamish River Trestle NE 100th St 2015 2015 918 2,800 2,261 5,979 6,461 B42 Redmond Central Connector Phase 3 NE 100th St NE 124th St 2020 2020 1,950 0 1,950 B45 Red-Wood Road Sidewalk NE 109th St 10800 Block 2016 2017 605 0 605 B46 134th Avenue NE Sidewalk NE 75th St NE 80th St 2016 2016 400 100 100 500 B48 West Lake Sammamish Parkway NE 40th St South city limits 2019 2020 14,804 0 0 Sidewalk B49 NE 80th St Trail Connection 185th Ave NE 188th Ave NE 2019 2019 1,598 1,598 1,598 C18 116th Street Widening Red-Wood Road 167th Place 2020 2020 1,500 0 1,500 C43 Union Hill Road Widening Phase 3 188th Ave NE East city limits 2015 2015 680 1,785 2,465 4,383 C44 Redmond Way & 140th Ave NE Redmond Way 140th Ave 2017 2018 1,950 1,950 1,950 Intersection Widening C51 NE 73rd Street Extension 185th Ave NE 188th Ave NE 2019 2020 10,250 10,250 10,250 P6 Avondale Road Bridge Rehabilitation at Avondale Road Bear Creek 2016 2017 100 100 100 Bear Creek P12 NE 95th Street Bridge Replacement Bear Creek Bear Creek 2015 2017 450 450 450 P15 Willows Road Rehabilitation NE 90th St NE 124th St 2020 2020 2,000 0 2,000 September 02,2014 9:45:18AM *Total Project Cost represents the total estimated cost of the project. The funding represented in the six-year TIP may be less than the total project funding for two reasons. One, the project is underway and has expended money during years prior to the first year of the TIP. Two, the project is planned for the later years of the TIP and will not be completed by final year in the TIP. Page 3 of 4 N:\vbapps\TIP\reports\TIP_ProjList_Council_.rpt

PROPOSED 15-20 City of Redmond Six-Year Transportation Improvement Program Project List Street or Project From To Proj Start Proj End Un Funded Six-Year Project Information (All Dollars in Thousands) Local Federal State Total Total Project Cost * P19 Avondale Road Rehabilitation Union Hill Rd NE 116th St 2020 2020 2,000 0 2,000 P22 Union Hill Bridge Deck Preventative Avondale Rd Avondale Way 2018 2020 1,350 0 1,350 Maintenance S40 NE 124th Street and 162nd Place NE NE 124th St 162nd Pl NE 2020 2020 625 275 275 900 Signal S44 NE 76th St and 185th Ave NE NE 76th St 185th Ave NE 2017 2018 650 650 650 Intersection Improvements S48 NE 116th St and 172nd Ave NE NE 116th St 172nd Ave NE 2015 2015 1,425 1,425 6,600 Roundabout S49 NE 87th St and 148th Ave NE Pedestrian NE 87th St 148th Ave NE 2015 2015 100 100 100 Improvements 26,742 46,417 TOTAL 131,498 129,412 16,130 7,736 153,278 278,623 September 02,2014 9:45:18AM *Total Project Cost represents the total estimated cost of the project. The funding represented in the six-year TIP may be less than the total project funding for two reasons. One, the project is underway and has expended money during years prior to the first year of the TIP. Two, the project is planned for the later years of the TIP and will not be completed by final year in the TIP. Page 4 of 4 N:\vbapps\TIP\reports\TIP_ProjList_Council_.rpt

Appendix B - Project Location Map This map represents all of the projects that can be mapped from the TIP. Projects that were not mapped include programs and planning studies (e.g. Transportation Demand Management, pavement management, Transportation Master Planning). 2015 2020 Transportation Improvement Program 11

NE 116th ST NE 124th ST C18 S40 S50 NE 116th ST S48. P15 B42 B45 154th PL NE NE 109th ST 160th 162nd NE 110th ST 172nd AVONDALE RD NE NE 104th ST B19 C44 NE 80th ST B46 B23 WILLOWS RD NE S49 P17 OLD REDMOND RD B38 154th B47 P14 C58 RED-WOOD RD NE P20 160th M16 NE 85th ST 161st BEAR CREEK PKWY S34 B43 166th S41 NE 80th ST 170th 171st 171st B44 C53 C53 P22 P6 180th C8 P19 AVONDALE RD NE UNION HILL RD NE 76th ST S44 B49 188th P12 C52 C43 140th C46 148th 154th S47 P21 C51 185th E LK SAMMAMISH PKWY NE 51st ST C48 P18 150th B37 156th C60 NE 40th ST BEL-RED RD W LK SAMMAMISH PKWY S42 P S C B T LEGEND TIP Project Type & Number Preservation Safety and System Management Streets Bikes and Pedestrians Transit and HOV L8 2015-2020 TIP Projects 0 0.5 1 Mile C62 L18 B41 152nd C56 B40 NE 31st ST BEL-RED RD C57 P16 C47 C61 C45 L13 C59 172nd 180th NE 24th ST B48 2015-2020 TIP Project Location Map September 16, 2014 2015-2020 Transportation Improvement Program 12

Appendix C - Project Descriptions More detailed project descriptions are provided in this section for the projects included in the TIP. 2015 2020 Transportation Improvement Program 13

TIP - Project Descriptions DOWNTOWN URBAN CENTER B43 B47 C53 P20 P23 Cleveland Street East Enhance pedestrian facilities to complete buildout of Cleveland Street for two-way operation. 159th Pl NE Sidewalk Construct sidewalk on 159th Place from Leary Way to Bear Creek Parkway Redmond Way and Cleveland Street Couplet Conversion Convert Redmond Way from 160th Ave NE to Avondale Way to one through lane in each direction and center turn lane. Convert Cleveland Street to one through lane in each direction. A realignment of the streets at eastern and western ends will improve traffic flow and include gateway treatments. Pedestrian improvements will be constructed on Redmond Way. A BAT lane will be completed from the Bear Creek Bridge near SR 520 to 168th Ave with a queue jump at Avondale Way. NE 90th St Bridge Deck Preventative Maintenance Bridge deck preventative maintenance study. Construct per study (anticipating overlay). Cleveland Street Sidewalk Rehabilitation Repair damaged sidewalk on Cleveland Street between 164th Ave NE and 168th Ave NE. OVERLAKE URBAN CENTER B37 B40 B41 C45 C46 C47 SR 520 Trail Grade Separation at NE 40th St Grade separate SR 520 Trail at NE 40th St to improve bicycle and pedestrian access along the 520 Trail, reduce conflicts between vehicles and nonmotorized users and improve vehicle operations at the intersection. Overlake Village Bicycle-Pedestrian Bridge Design and construct a new bicycle and pedestrian bridge over SR 520 locating the southern landing at the East Link Light Rail Overlake Village Station and Overlake Regional Growth Center with the north landing in the vicinity of the SR 520 Trail and NE 31st Street. Overlake Transit Center Pedestrian & Bicycle Bridge Design and construct a new pedestrian and bike connection over SR 520 between the Overlake Transit Center and west side of SR 520 and 520 Trail (in the vicinity of the NE 38th Street alignment) and the SR 520 Trail, integrating with the future light rail station. 156th Ave NE and Bel-Red Southbound Right Turn Lane Construct a southbound right-turn lane. Construction planned to begin after the construction of at least 1,400,000 net new gross square feet on the Main campus, or sooner at Microsoft's option. Improvements could also be triggered by the Group Health development. 148th Ave NE and NE 51st Street Westbound Right-Turn Lane Add a second right-turn lane from westbound NE 51st Street to northbound 148th Avenue NE. NE 31st St Improvements Improve NE 31st Street between 152nd Ave NE and 156th Ave NE, including the addition of green bicycle lanes. Construction additional westbound left-turn lane at the intersection with 156th Ave NE. C48 West Lake Sammamish Parkway Widening & Roundabout Phase 3 (Part 1) C56 Project includes removing exiting traffic signal at Bel-Red Road and West Lake Sammamish intersection. Install 2-lane roundabout at Bel-Red Road and West Lake Sammamish intersection and improve pedestrian facilities. Extend Sammamish River Trail from existing terminus at NE 51st Street down to the intersection of Bel-Red Road and West Lake Sammamish Parkway. Overlake Access Ramp Construct eastbound access ramp from SR 520 to roundabout terminus at 150th Ave NE. Ramp would diverge from eastbound 148th Ave NE off-ramp, be grade-separated from 148th Ave NE and connect with City streets at 150th Ave NE. The ramp would include 1 general purpose lane, and auxilary lanes and HOV/Transit treatments as applicable. PROPOSED 15-20 14

TIP - Project Descriptions OVERLAKE URBAN CENTER C57 C59 C60 C61 C62 L8 L13 P18 P21 S47 152nd Avenue NE Improvements 152nd Ave NE will include one through lane in each direction, turn lanes, cycle tracks, on-street parking, sidewalks and additional pedestrian amenities, per the Overlake Village Street Design Guidelines. Developers will complete the improvements as required through frontage improvements and development agreements. The Group Health Development Agreement requires completion of improvements on 152nd Ave NE along Group Health's frontage. NE 40th Street Rechannelization Between SR 520 to 156th Avenue NE and 163rd Avenue NE and Bel-Red Road, resize vehicular lane width to 10 feet and add a 5 foot bike lane in the westbound direction. Improvements include sidewalks in both directions, a 5 foot bike lane in the westbound direction, one 10 foot vehicular lane in both directions, an 11 foot turn lane, streetscape, stormwater treatments, street lights, and utilities. NE 40th Street Reconstruction Add bike lanes on both sides. Improvements include two vehicular lanes in each direction, one turn lane, bike lanes and sidewalks on both sides, streetscape including gateway wayfinding and art elements, stormwater treatment, utilities, street lights, right-of-way and easement acquisition. 27th Street and 28th Street New Connection Construct a new east west street between 152nd Avenue NE and 156th Avenue NE with a three lane public roadway (narrowing to two lanes adjacent to the future park) with parking and bike lanes along both sides of the street, and intersection improvements at 152nd Ave NE and 156th Ave NE. The 156th intersection improvements will include frontage improvements on the west side of 156th from about 300 feet north of the intersection to about 700 feet south of the intersection. Overlake Access Ramp Local Connection Construct local street connections from the roundabout terminus of the Overlake Access Ramp to 152nd Avenue via the proposed 26th Street alignment and the proposed 28th Street alignment. 148th Avenue NE Corridor Master Plan In a partnership with the City of Bellevue develop a corridor master plan for 148th Ave NE. The corridor master plan will complete a preliminary design for the corridor, which will add vehicle capacity to accommodate anticipated future growth in the corridor. The corridor master plan would include sidewalk and landscaping improvements; low impact development techniques, including ways to accommodate stormwater; and take into consideration existing and planned land uses along the corridor. It would also be developed in coordination with Sound Transit's future light rail alignment. Overlake Village Street Design Guidelines - South of 24th Develop street design guidelines for Overlake Village south of NE 24th St. 148th Avenue NE Rehabilitation Reconstruct portions of and provide overlay of 148th Avenue from SR 520 to Redmond Way. Make drainage improvements where needed. Examine roadway channelization for improved efficiencies. NE 51st St Preservation, 148th Ave NE to 156th Ave NE Conduct pavement analysis; construct pavement overlay, spot repairs, and other related work per pavement analysis report. NE 51st Street at 150th Avenue NE Traffic Signal Add north leg (on private property) to intersection of 150th Avenue NE and NE 51st Street and signalize this intersection. North leg improvements include two southbound left-turn lanes, one through lane in each direction, bike lanes, sidewalks, transit amenities, street lights, utilities, and stormwater drainage. Relocate eastbound transit stop to far side of new intersection. PLANNING AND PROGRAMS PROPOSED 15-20 15

TIP - Project Descriptions PLANNING AND PROGRAMS B1 B2 L9 L12 M1 M6 M7 M13 M14 P1 P2 Bicycle Program This program improves and completes the City's network of bicycle facilities according to the Transportation Master Plan to create a more comfortable bicycling environment that attracts more cyclists of all skill levels. This is accomplished by providing new and improving existing bicycle connections, improving transit access by bike, addressing bicycle safety issues, providing cyclist education and encouragement, and providing bicycle parking and wayfinding. Pedestrian Program This program helps create a quality walking environment which will encourage more people to get out walking. This is accomplished by completing missing links in the pedestrian system in accordance with the TMP to provide new pedestrian connections in and between neighborhoods, improve transit access, improve pedestrian safety and enhance an energy efficient transportation alternative to driving. Sound Transit East Link Sound Transit is rapidly designing East Link light rail into Overlake and then into Downtown. This effort requires substantial City attention to Sound Transit's design to achieve a light rail system that is consistent with Redmond's interests. Consultants and City staff will focus on: station access (e.g. pedestrian and bike facilities, additional street and access connections, and transit), station design, transit oriented development feasibility, how the system will fit with future development, and efforts to extend light rail to Downtown Redmond. Transportation Master Plan Update Completes periodic major update to the Transportation Master Plan. Work requires consultant assistance to update TMP, traffic forecast modeling, travel diary survey, cost estimation updates, and revision to impact fees. TDM - Transportation Demand Management (R-Trip) The Redmond Trip Resource and Incentive Program (R-TRIP) provides grant funding and staff assistance to Redmond businesses to implement or enhance employee commute trip reduction programs. Direct to commuter incentives, small business assistance, employee recognition, residential programs, and new TDM initiatives are included. Parking Management Program The Parking Management Program implements various parking management and monitoring programs and forms parking partnerships to better manage parking supply. Downtown and Overlake are the emphasis areas. Transportation Management Programs Provide annual program review and notifications, and negotiate updates to development required TMP's when initiated by building owner. Citywide Commute Trip Reduction (CTR) Program Administers and implements the citywide commute trip reduction (CTR) program (state mandate). Growth and Transportation Efficiency Center (GTEC) Implementation Implements Growth and Transportation Efficiency Center (G-TEC) program as an enhancement to CTR and R-TRIP(M1 and M13) that leverages additional State and local funding to provide enhanced commute trip reduction infrastructure, marketing and implementation support and increased incentives for reducing commute trips and improving alternative transportation and mobility in urban centers. Pavement Management Program Addresses routine pavement needs, including an annual inventory, outreach, street overlays, and major maintenance for the 144 miles of pavement throughout the City. Rehabilitation of principal arterials is addressed through specific project allocations. Bridge Repair Program The purpose of the Bridge Program is to maintain the structural integrity and safety of all 18 of the City's bridges. Bridge inspections are performed every two years for most bridges, and yearly for bridges with scouring potential. PROPOSED 15-20 163

TIP - Project Descriptions PLANNING AND PROGRAMS S1 S2 S4 S5 S29 S38 S51 T12 Neighborhood Traffic Calming Program The Neighborhood Traffic Calming Program investigates, evaluates, and resolves smaller scale traffic safety problems (excessive neighborhood speed or volume) and concerns regarding school children and pedestrians. Channelization Program The purpose of the Channelization Program is to 1) install new pavement markings where they are missing and where they are most needed to provide an acceptable level of guidance for pedestrians, bicyclists, and motorists and 2) to repair crosswalks and stop bars. New markings provided by this program include lane lines, edge lines, crosswalks, stop bars, legends, and raised/reflective markers and other channelization needed to safely direct traffic on public roadways. Engineering Contingency Program The Engineering Contingency Program funds engineering and construction activities undertaken in response to emergency situations (e.g. a retaining wall failure) that occur during the year and that are not covered by other programs or operating budgets. This program is in place to provide immediate funding for those unexpected needs.. Street Light Program The Street Light Program identifies, prioritizes, and installs lighting improvements in areas where users are most exposed, such as at crosswalks, intersections, and along walking routes. Transportation Concurrency Program The Transportation Concurrency Program provides analysis tools and performance measure data to assist implementation of the Transportation Master Plan (TMP). The purpose of these analysis tools and performance measures is twofold: 1) to ensure that project and program delivery is aligned with the TMP strategies, and 2) to track TMP implementation to ensure that it achieves the transportation vision while meeting state requirements to provide sufficient capacity to accommodate growth. Targeted Safety Improvement Program (TSIP) The primary purpose of the Targeted Safety Improvement Program is to identify existing and potential traffic safety problem areas and implement projects to prevent incidents, injuries, deaths, and their related losses. This is achieved through proactive collision prevention, reactive collision response, and multimodal safety consistent with the Transportation Master Plan. ADA Program The ADA Program makes improvements to the City's infrastructure such as the construction of curb ramps to accommodate people with disabilities under the Americans with Disabilities Act (ADA). Transit Service Program The Transit Service Program provides partnership resources to improve important local and regional transit connections to our employment and urban centers. The purpose of the Transit Service Program is to enhance and support transit service as a real travel choice, increase the person-carrying capacity of our transportation system, and support the development of better neighborhood connections to major employment areas and our urban centers. REDMOND NEIGHBORHOODS B19 B23 Puget Sound Energy Trail, Rose Hill Extension Extend paved Puget Sound Energy Trail from its terminus west of Willows Road to NE 93rd Ct, which connects to 132nd Ave NE. Redmond Way Sidewalk Construct new sidewalk on north side of Redmond Way from 142nd Ave NE to 148th Ave NE. B38 Redmond Central Connector Phase 2 Extend the Redmond Central Connector to 100th Street. Rebuild or replace the old rail trestle over the Sammamish River to meet current standards. PROPOSED 15-20 17

TIP - Project Descriptions REDMOND NEIGHBORHOODS B42 Redmond Central Connector Phase 3 B45 B46 B48 B49 C18 Complete the third phase of the Redmond Central Connector paved shared-use path up to 124th Street. Red-Wood Road Sidewalk Construct sidewalk (may need to be cantilevered) on the west side of Red-Wood Road from NE 109th Street to existing sidewalk at approximately 10800 Block. 134th Avenue NE Sidewalk Construct sidewalk on 134th Avenue NE between NE 75th Street and NE 80th Street. West Lake Sammamish Parkway Sidewalk Complete sidewalk on west side of West Lake Sammamish Parkway between NE 40th St and south city limits. NE 80th St Trail Connection Construct new NE 80th St trail from 185th Ave NE to 188th Ave NE. 116th Street Widening Based on the design report for this section of roadway, construct the portions of this roadway not completed by the subdivision developers. C43 Union Hill Road Widening Phase 3 C44 C51 P6 P12 P15 P19 P22 S40 S44 Widen Union Hill Rd from 188th Ave NE to eastern city limits. Improvements include 2 through lanes in each direction, left-turn lane, bike lanes, curb, gutter, sidewalks, street lights, stormwater ponds, underground power and utility pole relocation, right-of-way and easement acquisition. Redmond Way & 140th Ave NE Intersection Widening Convert northbound lanes to one left turn lane and one left, through, right turn lane and add bike lane. NE 73rd Street Extension Construct new NE 73rd St for neighborhood access and circulation from 185th Ave NE to 188th Ave NE. Improvements include one through lane in each direction, left turn lanes, bike lanes, sidewalks, streets lights, traffic control, storm drainage, right-of-way and easements. Avondale Road Bridge Rehabilitation at Bear Creek The yearly inspection of this bridge in conjunction with the bridge inventory process determines the need for bridge repair. The bridge will eventually need pile reinforcement and bank stabilization. NE 95th Street Bridge Replacement The NE 95th Street Bridge over Bear Creek is a 20 foot span wooden bridge that needs to be replaced because of deteriorating wood and the short span is constricting a major salmon stream and does not meet State Requirements. The replacement will be a 40 foot span concrete structure. Willows Road Rehabilitation This project repairs fatigued pavement areas, includes a two inch thick HMA overlay, and the replacement of all channelization and signal loops on Willows Road from NE 90th Street to NE 124th Street. In addition, examine restriping existing roadway to improve efficiency. Avondale Road Rehabilitation Reconstruct/overlay the roadway. Replace channelization and signal looks. Examine pavement markings for improved efficiency and safety. Union Hill Bridge Deck Preventative Maintenance Bridge deck preventative maintenance study. Construct per study (anticipating overlay). NE 124th Street and 162nd Place NE Signal Construct a new traffic signal at 124th Avenue NE and 162nd Place NE. Includes the addition of turn lanes on NE 124th and modifications on 162nd Place for sight distance. NE 76th St and 185th Ave NE Intersection Improvements Install new traffic signal or roundabout at intersection of NE 76th St and 185th Ave NE. PROPOSED 15-20 18

TIP - Project Descriptions REDMOND NEIGHBORHOODS S48 S49 NE 116th St and 172nd Ave NE Roundabout Construct roundabout to improve safety and access. Complete trail, sidewalk, bicycle lanes, signalized pedestrian crossing west of 169th Ct NE, and utility improvements from 167th Avenue to 174th Avenue. NE 87th St and 148th Ave NE Pedestrian Improvements Install intersection improvements that facilitate safe crossing of 148th Avenue for pedestrians and bicycles. PROPOSED 15-20 19

Appendix D - TIP Update Map The TIP Update Map shows how this year s TIP has changed from last year. There are four categories, Completed Projects, Removed Projects, and New Projects. Completed Projects are anticipated to be built by the end of 2014, so will not be included in this year s TIP. Removed Projects will no longer be constructed within the foreseeable next six years. While they do not appear on the current TIP, they may be brought into a future TIP when it seems likely the project will be built in a six year time frame. New Projects appear for the first time in the new TIP. 2015 2020 Transportation Improvement Program 20

150th NE 116th ST NE 124th ST S50 NE 116th ST. 154th PL NE NE 109th ST 160th NE 111th ST NE 110th ST 172nd AVONDALE RD NE NE 104th ST NE 80th ST 140th WILLOWS RD NE REDMOND WAY OLD REDMOND RD P20 NE 90th ST 154th 154th C58 B47 NE 60th ST RED-WOOD RD NE P14 160th NE 85th ST 159th PL NE 161st S34 166th S41 169th B44 M16 171st 171st 170th PL NE AVONDALE WAY NE P22 NE 76th ST AVONDALE RD NE 178th PL NE 180th UNION HILL RD B49 185th E LK SAMMAMISH PKWY NE NOVELTY HILL RD C52 188th S42 P S C B T LEGEND TIP Project Type & Number Preservation Safety and System Management Streets Bikes and Pedestrians Transit and HOV Completed Projects from 14-19 Removed Projects from 14-19 New Projects for 15-20 0 0.5 1 Mile 148th P21 NE 36th ST 152nd NE 20th ST NE 51st ST 156th P16 NE 31st ST L13 NE 40th ST BEL-RED RD W LK SAMMAMISH PKWY 172nd 180th NE 24th ST B48 2015-2020 TIP Update Map September 16, 2014 2015-2020 Transportation Improvement Program 21

Appendix E - Transportation Planning Document Relationship Diagram The purpose of Figure 1 is to illustrate the relationship between some of the key planning and financial documents that are used in transportation planning. The figure is designed so that the long-range planning documents are at the top and progress down towards implementation and construction of particular projects and programs. A brief description of each document is included below. Figure 1 - Transportation Planning Flow Chart Transportation Master Plan (TMP) Comprehensive Plan Transportation Facilities Plan (TFP) Emergencies and Opportunities 6-Year Transportation Improvement Program (TIP) Transportation Capital Investment Program (CIP) City Designs and Constructs Specific Projects Developer or Outside Agency Designs and Constructs Projects Transportation Planning Flow Chart Definitions Transportation Master Plan (TMP) and Comprehensive Plan: These documents include the vision, strategies, and ultimate transportation plan for the community. 2015 2020 Transportation Improvement Program 22

Transportation Facilities Plan (TFP): Facilities elements of Comprehensive Plan modeled to balance planned concurrency with target land use for target year. These are updated periodically and at five-year intervals. 6 -Year Transportation Improvement Program (TIP): Annually updated plan for all committed and needed improvements in the next six years. Required by RCW. Capital Investment Program (CIP): City funded projects updated with the twoyear budget cycle. Developers and Outside Agency Designs and Constructs Projects: Projects constructed and paid for by developers and outside agencies (e.g. WSDOT, Sound Transit, and Bellevue). In some cases the City contributes some funding to these projects. City Designs and Constructs Specific Projects: These are the individual CIP projects that the City of Redmond designs and builds. NOTES: 1. Council approves every step of the process from the Transportation Master Plan through acceptance of construction of city projects. 2. In addition to the Transportation Facilities Plan, the City of Redmond Comprehensive Plan and Transportation Master Plan include several other key elements such as: Vision, Goals, Policies, modal elements, performance monitoring, regional transportation, 3-year Priority Action Plan and Thoroughfare Plan. 2015 2020 Transportation Improvement Program 23