DEPARTMENT OF LABOUR NO. R FEBRUARY 2017

Similar documents
Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

User Instructions 1789 Parapet Wall Anchor

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor

User Instruction Manual Tripod Anchorage Connectors

FALL PROTECTION GUIDELINE

OCCUPATIONAL HEALTH AND SAFETY ACT FALL PROTECTION REGULATIONS

11.4 FALL-ARREST SYSTEM AND EQUIPMENT CHECKLIST (Must answer yes to all applicable questions)

User Instructions 1790 Rail Anchor

New Mexico Institute of Mining & Technology. Fall Protection Program

You may order this publication from WCB Publications and Videos, Please quote ordering number BK60.

User Instruction Manual Fixed Beam Anchor

Security and confidence at height.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

CORPORATE SAFETY MANUAL

Floor Mount Socket. T: +44 (0) F: +44 (0)

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Serial Number: Lot Number: Purchase Date: General Factors Accepted / Rejected Supportive Details or Comments. Accepted Rejected.

Respond to non-routine situations and perform rescues when using high ropes courses

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

ROOF ANCHOR / D-RING ANCHOR PLATE

Installation and Training Manual

LOW ANGLE ROPE RESCUE OPERATIONAL

Technical Briefing Note

BEAMGUARD SAFETY POST TM INSTRUCTIONS

Lifting Equipment Protocol

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

MSA Latchways Ladder System

Subchapter 4. Construction Safety Orders Article 24. Fall Protection. Return to index New query

Team Building /Leadership Challenge Risk Assessment - Management Plan

Standard colour of ropes: red.

Tower Climber Orientation.

Methods of installation of ADSS fiber optic cables

Fall Protection Checklist. Guardrail System

Operation & Maintenance instructions for the Söll Vi-Go type fall protection system with guided type fall arrester

FALL PROTECTION COMPARISON BETWEEN VARIOUS OSHA STANDARDS, NAVY and EM 385 (2008) REQUIREMENTS

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Overview (key points)

Zip-Line Kit Instructions

Instructions for the following series products:

Region: USA Language: EN Number : TB0031 Revision : B. Total Page: 3 Page n : 1 First Issue: 10/2014 Rev. Date: 10/08/2014

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

User Instruction Manual Fixed Beam Anchor

Operating instructions. Bolt-on Bar Joist Anchorage

BEAMGUARD SAFETY POST TM

High Ropes Review Pre Launch Check

SECURITY AND CONFIDENCE AT HEIGHT

5. An Operating Procedures Outline Sheet (OPOS) shall be developed as required in Section 3282(p) (1)(C).

LAD-SAF LAD-SAF VERTICAL SAFETY SYSTEM THE ULTIMATE IN FALL PROTECTION

Table of Contents Beam Trolley

DEFINITIONS ROPE ACCESS

SafeWaze Fall Protection Technical Data Sheet. General Information. Inspection and Examination

Doc No: FPP CARDINAL SURVEYS COMPANY. Safety Management System. Initial Revision Date: Version Revision No. 02 FALL PROTECTION

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

User Instruction Manual. Fixed Beam Anchor

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

Figure 1 - Cable Grip Horizontal Lifeline Termination ZORBIT ENERGY ABSORBER RELEASE TAB

Personal Fall Arrest System. User s. Manual. Part Number January 2014 (Replaces July 2013)

PMI Crane-Tek TM Rescue Solution KT36176 (25m) KT36166 (66m) KT36174 (100m)

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

USER MANUAL Do not throw away these instructions. Read and understand these instructions prior to use of the Lad Grab Safety System.

1 of 9 12/30/15, 3:44 PM

Pre-Climbing Inspections

Regulation to amend the Safety Code for the construction industry. Draft Regulation. 6. Section 64 is amended by replacing

Risk Assessment Mobile Climbing Wall

Donaghys Winch Ropes. Handling & Installation Guide

Safewaze FS983 Cable Safety Climb System Ladder Mount Instructions

Risk Control at United Fire Group

Reaching new heights in Fall Protection Solutions.

XTS-Impact. XTS-Terminal (hold)

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

ZIGZAG Experience. Important / remember. Failure to heed any of these warnings may result in severe injury or death.

Check with local zoning official for property line distance requirements.

CHOKER JOKER LIGHT CAMBIUM SAVER

Made in the USA. For Fall Protection Only. SafeLok Part Description

FALL PROTECTION (SAF-SPI-06)

Manual winch MANISTOR 100 and 200

PERSONAL FALL PROTECTION

Tower Accessories & Hardware

Rope and Challenge Course Activity-Specific Plan

FALL RANGE PROTECTION

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

Personal Protective Equipment

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

PORTABLE LIGHTNING MAST PROTECTION PLP SERIES INSTRUCTION MANUAL

8. Fall Protection Procedures WAC

Low Wind High Yields Series

Figure 1 - Parts Identification

Manual for the. Installation. Use and Maintenance. "Söll-GlideLoc" fall arrest system. Ho-Ver turn table

S.R.A. Fully Engineered Product Range

CHAPTER 10 FALL PROTECTION

An introduction to Rigging for Trail Work

CARES Technical Approval Report TA1-B & C 5059

3-WAY FALL ARREST AND RECOVERY SRL USER MANUAL

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Visual unlocked indicator

GUIDELINES FOR USE -GUARD

User Instruction Manual For Davit Rescue System

Operating manual Mobile Man Anchor IM-200 Reference No. IM 200

Transcription:

Labour, Department of/ Arbeid, Departement van R. 136 Occupational Health and Safety Act (85/1993): Driven machinery regulations incorporation of the code of practice for zip line 40622 STAATSKOERANT, 17 FEBRUARIE 2017 No. 40622 19 R No. DEPARTMENT OF LABOUR NO. R. 136 17 FEBRUARY 2017 notice. this of publication of days 90 within Safety), and Health Occupational Inspector: Chief the of attention the for 0001( Pretoria, 117, x Bag Private Labour, of Department General, Director the to practice of code proposed the on representations or comments substantiated any submit to invited are persons Interested 2015 Regulations, Machinery Driven the into line zip for practice of code the the incorporate to Safety and Health Occupational for Council Advisory the of recommendation the on 1993 Act, Safety and Health Occupational the of 43 section of terms in intends, Labour of Inspector Chief The REGULATIONS MACHINERY DRIVEN OF DE THE OF INRPORATION LINE ZIP FOR PRACTICE 85 ACT SAFETY, 1993 OF AND HEALTH OCCUPATIONAL

20 No. 40622 GOVERNMENT GAZETTE, 17 FEBRUARY 2017 rope wire Steel for Requirements 5. 5.1 Suitability person. competent a of supervision the under out carried be shall installations all of erection Erection 4. The welds B case the equivalents. acceptable or grade for -1 9606 SANS of requirements relevant the with comply shall welds all structure welded of in but construction welded or riverted bolted, be may installation the of part form that structure Steel structure Steel 3.2 adequate. is ratio capacity -bearing soil to size base the that ensure to out carried be shall survey soil a necessary where and Regulations Buildings National the of requirements relevant the with comply shall Foundations Foundation 3.1 loading; part component each of mass the G.) unloaded and -loaded shock loaded, rope with structures and anchors to applied Forces F.) unloaded and -loaded shock loaded, rope with terminations rope to applied Forces E.) unloaded and -loaded shock loaded, rope with rope the to applied forces The D.) wind include to and factors safety required the including loading, of conditions all accommodate to able be must devices tensioning and anchorages trestles, masts, for foundations C.)The cross; to are slides and built be to are foundations which on ground the of nature The B.) activity. of type this for suitability location's The A.) following: the for made be shall provisions Due industry. the in with practice good acceptable to conform shall lines zip commercial of design The 3. construction and Design line. zip the of use for operator the pay to required not is user the which in ones i.e lines, zip private or -commercial non cover to meant not is practice of code This public. the by accessed be may that lines zip or lines zip commercial of maintenance and operation construction, aspects, safety general the covers practice of code This Scope 2. operation. safe its ensure to as such installation and design this of certification the for responsible be shall field this in experience having engineer professional registered A approval. for him to submitted be drawings and calculations design of set complete a that require will Inspector Chief The 1993). of 85 (Act 1993 Act, Safety and Health Occupational the of regulations relevant the to drawn is practice of code this of users of attention The to solely intended are lines. zip of operation and installation the in safety ensure practice of code this in made recommendations and down laid requirements The Introduction 1. a of means by along cable. a below suspended harness a to connected pulley traverse people that points two between fixed cable a is line Zip tour. the complete safely to required is what understands and tour the before trained sufficiently been has who somebody is individual Competent Definitions lines zip commercial of operation and installation The PRACTICE OF DE

STAATSKOERANT, 17 FEBRUARIE 2017 No. 40622 21 a require not maintained and inspected regularly purpose, for fit be must but certification, recognized do harnesses" "safety regular to addition in used etc. chairs bosons and harnesses Ride shall helmets, industry. climbing mountain and adventure the to acceptable certification) recognized internationally similar or CE SASS, as (such standard rating safety recognized internationally or national a carry and used being is it purpose the for fit be shall tails) cow draws, quick lanyards, carabiners, pulleys, harnesses (including lines zip the along people transport and secure to used equipment safety All Equipment Safety 7. activity. the begin they before dangers such acknowledge and of aware made be to are tour cable or line zip the along travel who people guaranteed, be cannot capabilities foundation and anchoring term long whose and standards structural know any to conform not do that organisms are trees living As sound. structurally and healthy remain they ensure to trees such on out carried be to are inspections Regular engineer. or arborist an i.e field, the in specialist or person experienced suitably a by purpose for fit approved and inspected be to are they platforms, support to or, lines zip for points attachment anchor as used be trees Should Anchors as Trees 6. %. 20 by reduced be shall purposes calculation for rope the of strength the fitted, so are ropes When 813. SANS of 1 table in prescribed number appropriate the least at be shall used clamps of number The 813. SANS of 1 table in given torque test appropriate the to equal torque a of use the by tightened be should -bolt U the on Nuts ") horse dead a saddle "Never ( load the take not does that rope of portion the on fitted be shall -bolt U the and used, are they which on rope the for size correct the of be shall clamps The fixed. be otherwise cannot end the when or required rope of length exact the predetermine to impossible is it when only permitted be shall clamps of use the by made joints general, In steel. forged from made clamps for specification equivalent acceptable an or 813 SANS of requirements the with comply shall and pattern Bulldog or Crosby the of made be shall Clamps Clamps Crosby 5.5.3 the of strength the fitted so are ropes when but % 10 by reduced be shall purposes ends, rope of finishing the for preferred Fittings Swaged 5.5.2 calculation for rope are fittings Swaged rope. the of diameter distance clear the and rope the of diameter the the times 000 times 200 1 3 least at be shall splices successive between least at be shall rope a in splice a of length The Splices Rope 5.5.1 fittings and Joints Rope 5.5 1. to 5 to equal least at be shall ropes of ratios load working maximum to load breaking The ratios load working maximum to load Breaking 5.4.1 Factors Design 5.4 testing. and inspection after -used re be can section undamaged an then strength adequate of be to found and tested is section specimen undamaged an if However used. re be not ideally should rope Used intended. is rope the which for purpose the for adequate is and station testing approved an at test actual by determined been has rope the of end the from cut specimen the of part undamaged an of force breaking the unless installed be not shall use in previously been has which rope A Rope Used 5.3 supplied. rope the to relation in force breaking ultimate the showing supplier the from obtained be must certificate test rope A supplied. be shall test actual by obtained as force breaking the and manufacturer the by guaranteed be shall rope new a of load breaking The Rope New 5.2 less no of diameter with wire steel of made be shall lines construction. suitable a of be and 10mm than zip commercial of operation the in used rope Any

22 No. 40622 GOVERNMENT GAZETTE, 17 FEBRUARY 2017 CD _ N a 3" 'W n Ñ Ñ G. tnnc = N O ' rt Q g N r,; 0 (D N z- co (L a- 3 rt O UI Ç 01 = u) c y O Q. 0 C m.-c O. 3 ato E O 7 Ñ fl) rt 3 ß o (ND 1D C) 3 (D """ 3 0' 3 CD (0 ÿ SD (D úcn (D SU Pr) (D O O Ñ '7Z v 5 ó c y G C y 13 m (0 z- Ó 3 co rt S S (D Records 10.3 accident. or incident an of event the in followed be to procedures emergency d) and schedule); a by accompanied (preferably measures maintenance on c)information instructions; operating detailed b) devices; safety and speeds, operating load working maximum its detailing installation the of description A ) information: following the least at contains that manual instruction an of copy one least at provide shall operator he manual Operations 10.2 to instruction adequate receive concerned. equipment the with conversant fully are they that ensure should lines zip of maintenance and operation the with involved persons All General 10.1 Maintenance 10. replacement. cable or modification after or months 36 exceeding not intervals at thereafter and conditions operating normal the to possible as close as conditions under out carried be to is This load. working maximum the of 120% with tested load be to are lines zip the begins operation commercial Before Testing Performance 9. operation. of hours during all at available be to is certification aid first suitable with member staff A tour. the during encountered be that hazards and risks potential all with deal and identify to able be should operators and Guides line a on safety person's another for responsibility take and equipment the operate to permitted are they ore industry tourism adventure the in practice good acceptable per as assessed and experienced suitably and instruction adequate receive should and lines zip of operation the with involved operators and guides Operators and Guides 8.4 'dents. impact such of risk the reduce to place in put be to is device braking suitable a cables, the along elling persons to injuries impact of severity and likelihood the increase that lines zip steep or long of case he Device Braking 8.3 of transfer controlled and safe the competent or and operators the cable. each along ple ensure to slide each of end and start the at individual) (briefed ividual between employed be to is communication of form adequate and lear Communication 8.2 carabiner. -locking self automatic an with made be to is connections these of one least at and above, 6 Point in described as equipment rated safety correct with made be to only are connections Such /cable./trolley pulley and harness between places two least at in connected be to times all at are people slide cable or line zip the along sliding When attachment Cable 8.1 Operation 8.

STAATSKOERANT, 17 FEBRUARIE 2017 No. 40622 23 out. carried inspection visual daily the of details and dates f) test. each out carrying person the of signature the and made, adjustments and out carried tests periodic of details and dates e) and taken; action and stoppages, for reason times, dates, giving -downs, shut than other stoppages, of details d) inspection; the out carrying person the of signature the and inspection, each on report a inspections, periodic of dates c) them; changing for reasons the and changed, were they which on dates the installed, were they which on dates the ropes, the of particulars b) /deputies; deputy his of address(es) and name(s) the and installation the of charge in person the of address and name a) recorded: is information following the which in site on kept be shall book log or register A