Edit this text for your title

Similar documents
Edit this text for your title

Deepwater Challenges Pipeline Installation Case

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011

Feasibility of Steel Lazy Wave Risers in the North Sea

Intro r duct u io i n o - 3 -

Learn more at

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

RIGID RISERS FOR TANKER FPSOs

A New Thermoplastic Composite Riser for Deepwater Application

Learn more at

The Impact of Composites on Future Deepwater Riser Configurations

First South East European Regional CIGRÉ Conference, Portoroz Deep Water Power Cable Systems? Indeed!

Vessel Weighing. Load Cells VPG TRANSDUCERS. Application Note VPG-06 TECH NOTE. Scope. Accuracy. Mode of Operation. Mechanical Considerations

E02 Rigid hinged stinger with piggyback line

OMAE S&R Paper 6129

Vessel Weighing. Load Cells and Weigh Modules VPG TRANSDUCERS. Technical Note VPGT-06. Scope. Accuracy. Mode of Operation. Mechanical Considerations

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING

FPSO Riser Solutions for Harsh environments

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Corrugated Hose Loop Calculations

Potential and Kinetic Energy: The Roller Coaster Lab Student Version

Grouped SLOR Deep Water Riser System and Installation Assessment

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

Risers for Deepwater FPSO s

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

TLP Minimum tendon tension design and tendon down-stroke investigation

MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Global Buckling Design for Flexible Flowlines

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft

Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

The most versatile Fall Protection EVER

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

The Relationship between the Depth Embedded Pipe Pile and the Force of Clamping Jaw

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson

Fully Submersible Heavy Lift Vessel

IMCA Competence Assessment Portfolio June 2013

THE ARENA TABLE OF CONTENTS 6 THE ARENA OVERVIEW Dimensions and Tolerances... 2

Trine Risøy, Bergen,

PHYS 101 Previous Exam Problems

High-Level Study on the Potential Impact of Rollers on Subsea Power Cables

WAVE CYBER HANDLING &

Learn more at

Engineering and Design Rules for Hopper Scales

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES

PLEASE NOTE: Pressures for 200mm (8ins) and 250mm (10ins) are based on the use of METALFLEX Braided Braid

Level 3 Cambridge Technical in Engineering 05822/05823/05824/05825/05873 Unit 3: Principles of mechanical engineering

Safety Tips from the WorkSafe People

Davorin Matanović DRILLING LINE (ROPE) AND BLOCKS

IMCA Competence Assessment Portfolio June 2013

Ropes for Subsea Cable Laying

Saab Seaeye Cougar XT Compact

Figure 1 Schematic of opposing air bearing concept

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

What prompted the collapse of the Chirajara Bridge?

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

Technip Presentation. Deep Water Umbilicals Challenges. & Technology Solutions. Ian Probyn R&D Business Development Manager

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

RPSEA UDW Forum June 22 & 23, Secure Energy for America

INTERLOCKED METAL HOSE

SECTION FACILITY FALL PROTECTION PART I - GENERAL

Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Visual Observation of Nucleate Boiling and Sliding Phenomena of Boiling Bubbles on a Horizontal Tube Heater

Fully Submersible Heavy Lift Vessel

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater

TENSOREX C+ TENSOREX C+

Stevpris installation

Security and confidence at height.

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

ASPIRE for Integrity Management Support for Upstream Assets. Payam Jamshidi, TWI Ltd Sebastian Hartmann, Innospection Ltd

ADDENDUM. Page iii, replace Foreword with: FOREWORD

SYMBIOZ M. 50 > 120 Kg 110 > 260 lbs. 70 > 140 Kg 150 > 300 lbs. 60 > 120 Kg 130 > 260 lbs > 120 Kg 110 > 260 lbs. 40 > 100 Kg 90 > 220 lbs

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

USA (Bartlett, IL) Division

Minimal Structures for Marginal Nova Scotia Developments

Summary of Architecture Parallel Session. G. Hallewell/CPP Marseille P. Piattelli/ LNS Catania

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Learn more at

Permanent buoyancy systems. matrix composites & engineering

Physics and Body Mechanics for Suspension bondage

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology

A fitting debut PIPELAYING

Fall Protection Guidelines. Individual Unit Function: Safety Procedure No.: SOP-0111 Page: 1 of 13. Preparer: Owner: Approver: Safety Safety Safety

TARPON A Minimal Facilities Platform

Application of pushover analysis in estimating seismic demands for large-span spatial structure

GATE INSTALLATION INSTRUCTIONS

(a) Calculate the speed of the sphere as it passes through the lowest point of its path.

100 SERIES SATURATION DIVING SYSTEM

Module # 8 DISTILLATION AND ABSORPTION COLUMN

Casing Spacer Technology Leaders

Transcription:

Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014

Installation of flexibles and cables Typical products Rigid pipes Flexible pipes Cables and umbilicals Installation and installation analyses Installation of end terminations Regular laying Special challenges: shallow water, deep water, slopes, turns etc Waiting on weather

Typical product categories Pipe Rigid Flexible Cable Electric Umbilicals Beam theory. Axial load Compression Bedning moment Courtesy: Nexans Courtesy: NKT Flexibles Courtesy: Nexans Courtesy: Bredero Shaw

Rigid pipe Large diameter Heavy High laying tension High bending radius Large deck space Expensive equipment Some plastic deformation acceptable Straightening before over-boarding Avoid repeated plastic bending Thermal insulation (wax formation) Concrete weight layers (gas pipes) Courtesy: Bredero Shaw

Flexible pipes Low elastic bending radius Less expensive laying vessels / equipment More competition Separate layers for Axial load Outer pressure Inner pressure Courtesy: NKT Flexibles

Cables Power cables and umbilicals Smaller bending radius, lower unit weight Less expensive vessels / equipment High density Heavy load on a fully loaded vessel Structural capacity and vessel stability Limited plastic bending Courtesy: Nexans

Typical installation vessels Installation vessel with horizontal tensioner and chute Installation vessel with lay tower Pipe lay vessel with reel and lay ramp Pipe lay vessel with stinger DP vessel Anchor vessel Pipe lay vessel with J-lay tower

Installation vessel with horizontal tensioner and chute Aker Connector

Tensioner / Caterpillar Used to pay in / out product, and to maintain/ support cable tension Belts with pads press against the product Sufficient force to Pull in and overcome friction over chute Support maximum cable tension (e.g. storm) High tension + low radial load capacity => long tensioner / many pads Internal friction in the cable may be lower than friction between cable and pads!

Chute Cable installation Provides continuous support Introduces vessel heading restrictions At maximum design tension Chute structural capacity Product integrity (bending + tension) Over-bending at tip of chute (top angle from analyses)

Installation vessel with lay tower Seven Seas Scandi Neptune Pertinacia

Pipe lay vessel with reel and lay ramp

Pipe lay vessel with stinger

Stinger Provides support for pipes Rollers to reduce friction (=> point loads) Stinger radius above elastic bending radius of pipe Departure angle high enough to prevent over-bending Avoid lift-up of pipe in stinger Will impact vessel motion characteristics NOTE: picture shows stinger in elevated, not operational mode

Pipe lay vessel with J-lay tower Pipe sections raised into vertical Vertical welding of pipe sections Pipe tension supported by clamps

Installation analyses Establish weather criteria and a plan for laying (laying tables) Ensure robust and safe operations for personnel, equipment and flexible product Low tension: over bending, axial compression, loop formation High tension: rupture, tensioner capacity, free spans Ensure that all tolerances are accounted for Determine and verify survival conditions

Installation analyses Shore landing Pull-in to shore Shallow lay

Installation analyses Uphill vs downhill lay Downhill lay More flexible catenary (reduced risk of cable overbending/compression) May cause high seabed tension and free spans Uphill lay Less flexible catenary (due to geometry) => reduced weather criteria Risk of cable sliding downhill

Installation analyses Laying in steep slopes Difficulty in assessing where actual touchdown point is => step-by-step analyses as input to operational procedures

Installation analyses General considerations (analyses) Deep water High top tension, tensioner capacity Combined tension and bending at vessel interface Curve lay Sliding of product Low lay tension (risk of over-bending/compression) Possible solution: Laying around preinstalled piles etc

Installation analyses Installation of buoyancy elements Step-by step analyses to Determine vessel movements vs. pay-out of pipe/cable Establish procedure for attachment/lowering of clump weight Main challenges Over-bending/compression at vessel interface due to buoyancy

Installation analyses Pull-in to platform Step-by step analyses to Determine lowering of pipe/cable from vessel vs pull-in to platform Main challenges Vessel positioning (available space) Seabed clearance Over-bending at I-tube inlet

Survival condition Cutting of product More critical for power cables and umbilicals Installation of buoyancy elements Establish flexible S - shaped configuration Step by step analysis to ensure product capacity while over boarding buoyancy Analysis gives guidance in when to pay in / pay out after installation Analyses: can the vessel maintain heading and position?