Update on Traffic Implications of Viking Lakes Development Including Vikings Practice Facility

Similar documents
Preliminary Engineering Study

Bus Rapid Transit Plans

Project Update May 2018

DAKOTA COUNTY PLANNING COMMISSION

FINAL Albertville Business Park AUAR Update Traffic Study

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No

Fields of St. Croix HOA Meeting. October 27, 2016

Intersection Traffic Control Feasibility Study

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

STREET AND HIGHWAY PLAN

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

US 1 Express Lanes Public Kick-Off Meeting

City of Charlottesville Bicycle and Pedestrian Master Plan Update

WELCOME TO OPEN HOUSE # 1 June 14, 2017

City of Hanover TRANSPORTATION STUDY

TRANSPORTATION IMPROVEMENT STRATEGY

Enhancing Return on Investment for MnPASS Express Lanes

Land Use and Transportation Town Hall September 17, 2018

ACTION TRANSMITTAL No

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Introduction and Authority

Rochester Downtown Bicycle Study 2009

TAP Members. TAP Chair: Jeff Hulsether City of Brainerd LOCAL ROAD RESEARCH BOARD. Farideh Amiri. Olmsted County/City of Rochester.

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

Basalt Creek Transportation Refinement Plan Recommendations

TABLE OF CONTENTS. Executive Summary

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Traffic Calming Policy

Durham Region Long Term Transit Strategy

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Diamond Springs Parkway Project

Preliminary Transportation Analysis

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

11. TRANSPORTATION 11.1 INTRODUCTION

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Chapter 6: Transportation

NEWMARKET CENTRE Mobility Hub Profile

MnPASS System Today and the Future

Montgomery County Life Sciences Center Loop Trail

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

City of Moorhead Committee of the Whole Meeting

CHAPTER THREE MOBILITY

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Arterial Transitway Corridors Study. Sept. 26, 2011

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

I-35W Solutions Alliance Project Update July 13, 2017

Dakota County CSAH 31. Corridor Transportation Study


Pavement Markings (1 of 3)

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

5.0 Roadway System Plan

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

LANE ELIMINATION PROJECTS

Highway 111 Corridor Study

Route 15 Congestion Report Findings

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

#!! "$% ##! &! # '#! % $ #!

Frequently Asked Questions (FAQ)

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Minneapolis-St. Paul International Airport Noise Oversight Committee (NOC)

DRAFT 04/18/2017. This transportation plan includes the following information:

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Bicycle and Pedestrian Plans and Improvements

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

DON MILLS-SHEPPARD Mobility Hub Profile

Financial Project ID No(s).: and ETDM No(s).: and 14181

Hennepin County Transportation Department

Overview. Existing Conditions. Corridor Description. Assessment

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

MONTGOMERY COUNTY COUNCIL MEMORANDUM

Committed to Service

tattersall park RBY EBSCO RETAIL PROPERTIES

Welcome to the Open House

3.0 Future Conditions

Committed to Service

City of Davenport CitiBus Public Transportation Study. April 2015

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Transcription:

Update on Traffic Implications of Viking Lakes Development Including Vikings Practice Facility Physical Development Committee of the Whole February 13, 2018 Mark Krebsbach, Transportation Director Brian Sorenson, Assistant County Engineer

Viking Lakes Development Traffic Agenda Regional Roadway System Visioning Study (RRSVS) Background, Findings/Recommendations, Implementation Viking Lakes Alternative Urban Areawide Review (AUAR) Viking Lakes Event Travel Demand Management Plan (ETDMP) Mendota Heights Traffic Study Next Steps

Regional Roadway System Visioning Study Background 2030 Comprehensive Plans 4300 Acres of planned development Viking Lakes mixed use development 200 Acres

Regional Roadway System Visioning Study Background Multi-Agency Study Minnesota Department of Transportation (MnDOT) Metropolitan Council Federal Highway Administration (FHWA) Eagan, Inver Grove Heights, Mendota Heights and Sunfish Lake Public Engagement Lead by Dakota County 140,000 additional daily trips Viking Lakes up to 40,000 trips

Regional Roadway System Visioning Study Findings Largest remaining tract of undeveloped land on the beltway Attractive due to proximity to Airport, St Paul/Mpls downtowns, Bloomington strip, MOA 60% of the trips involve destinations outside of Eagan, Inver Grove Heights, Mendota Heights, and Sunfish Lake Planned growth in Rosemount, Farmington has impacts 2030 Comprehensive Plans did not include full buildout of the area (up to additional 74,000 trips) But RRSVS did Without a new interchange on I-494 (Argenta), major capacity issues on TH 55/149, TH 3, and I-494(I-35E to TH 149)

Regional Roadway System Visioning Study Recommendations Many improvements across the system to support future growth New interchange helps to Balance impacts Address weaving issue on I-494 Reduce improvements needed on TH 55/TH 149 Supporting roadway improvements prior to new interchange

Regional Roadway System Visioning Study Website Website: www.co.dakota.mn.us (Search Visioning or Vikings ) Includes Summary Report Recommendations FAQ s Resolutions Projects resulting from the Study

RRSVS Implementation Projects Completed or Planned for 2018

RRSVS Implementation Future Projects Vikings Parkway/65th Street Connection Planning CSAH 26 2 to 4 lane Preliminary Engineering CSAH 26/CSAH 63 Intersection Realignment of CSAH 63 to Arterial alignment Construction 2020? Argenta R/W acquisition south of I-494 I-494/CSAH 63 Interchange Planning Interchange Review Approval, Regional consistency (2014) Sales & Use Tax Eligible ($75 million) Not currently a regional priority Preliminary engineering 2-4 years?

Viking Lakes Development Traffic Eagan AUAR Alternative Urban Areawide Review April 2016 200 acre development site Retail, Office, Hotel, Residential, athletic complex,10,000 seat stadium Development phased over 15 years Traffic Impact Study AUAR is a living document to be updated every 5 years Mitigation Strategies TH 55/Argenta addressed by County project Signal Timing Adjustments Needed for Events Event Travel Demand Management Plan (ETDMP) Needed Traffic monitoring program

Viking Lakes Development Traffic Draft Event Travel Demand Management Plan Event Attendance from 500 21,000 21,000 is Training Camp Saturday Largest weekday attendance is 6,600 (4,000 vehicles) Variety of approaches dependent on event size and timing MnDOT Traffic signal optimization Offsite parking Law enforcement to manage key intersections Traveler communication and signage Majority of Traffic uses I-494 to/from TH 149 Interim approach for CSAH 26/Argenta Similar management approach used for outlet mall

Viking Lakes Development Traffic Mendota Heights Traffic Study Traffic Study Considered Viking Lakes Development IGH NW Area Development Mendota Plaza / Village Developments Similar traffic projections but 10 years added (to 2040) Assumed no Interchange Delaware Avenue Issues Identified TH 149 @ TH 110 TH 149 @ Wentworth, Marie Argenta Interchange reduces traffic demand on Delaware

Viking Lakes Development Traffic Next Steps County/City staff meetings First meeting 2/8/2018 Complete ETDMP Eagan beginning Traffic Monitoring Program Involving County, MnDOT Regular traffic volume reviews Identify need for improvements & make adjustments to ETDMP Board Goal - Quarterly updates Annual review of improvement needs with CIP City comprehensive plan updates Dakota County Transportation Plan update Revisit RRSVS findings

Viking Lakes Development Traffic Questions / Discussion