Reach poles & cables system. product guide

Similar documents
CABLES-ONLY SYSTEM PRODUCT GUIDE

BALL STOP INSTALLTION GUIDE

MODEL TRIPEX PULLEY SYSTEM

THOR 10 HAMMER CAGE INSTRUCTIONS

MODEL / SINGLE and DUPLEX PULLEY SYSTEMS

MODEL CHEST PULLEY SYSTEM

Nautique Triton Clamping Board Rack V2

Retractable Security Cover for a Swim Spa

Xtender30. Home Batting Cage. Assembly Instructions

CHAPTER 5 REWIND STARTERS

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

ASSEMBLY MANUAL HOBIE CATSY

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

Zip-Line Kit Instructions

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Model: 5100 OmniSteel Volleyball System

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

200 PSI COMPRESSORS - MODEL NUMBERS

100C Air Compressor Kit

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Assembly Instructions & Manual. Configuration subject to change

Installation Guide Wall Mounted Angled Flagpole

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

RIDE Inc. Rigscape Drilling Rig Procedures

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

EUROBUNGY-TRAMPOLINE

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

SOLO TRIPOD SERIES Operator s Manual

Backboard and Rim Owners Manual

Security and confidence at height.

A. TO PREPARE THE MACHINE FOR USE.

FOLD AND ROLL PLAYBACK TABLE TENNIS TABLE

STERN MOTOR FOOT CONTROL KIT For use with the Torqeedo 403 Ultralight

IMPORTANT SAFETY INSTRUCTIONS

SKED-EVAC Tripod Instructions

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

A-FRAME RESIN IN & OUT FLIP UP LADDER

Tripod Series OPERATOR S MANUAL

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

FOLD AND ROLL PLAYBACK TABLE TENNIS TABLE

Operator s Manual. Series 2100 Contractor Lifts

w w w.ro swellmarine. com Part 1 Installation Part # C # C

BEAMGUARD SAFETY POST TM INSTRUCTIONS

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

User Instruction Manual Tripod Anchorage Connectors

Trampoline Installation Instructions

Trilogy Theory of Operation

Fiber Cable Puller with Tuf-Lugger lite

GV Standard X-Vent. Setup, Commissioning & Installation Guide

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

Telescoping Attic Stair Operating Instructions

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Trampoline & Enclosure Assembly Instructions

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

STAND AID 1600/ ECONOSTAND

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

OPERATIONAL CHECK LIST

Model PSI Compressor with 3-Gallon Air Tank 12VDC

SASK-A-POLE OWNERS AND USERS MANUAL

MANITOWOC MODEL TON CAPACITY

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Hobie Island Spinnaker Instructions

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

How to install AEA s 10 meter meteorological tower

Rescue Assist Kit. The Rescue Kit Includes:

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

RIDE Inc. Rigscape Service Rig Procedures

VERSA BIKE RACK INSTRUCTIONS

Safety Tips from the WorkSafe People

RUDDER KIT INSTRUCTIONS

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

Figure 1 - Cable Grip Horizontal Lifeline Termination ZORBIT ENERGY ABSORBER RELEASE TAB

Operator s Manual Series 2400 Material Lift

44in Side Discharge Mower for Wheel Horse XL 440H Lawn Tractors Model No Serial No and Up

Trampoline & Enclosure Assembly Instructions

SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER OCEAN BLUE ABOVE GROUND POOL LADDERS

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

Retractable Hose Reel with 3/8" x 50' PVC Hose

Boat Boat Loader Fitting Instructions

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

COMPACT. VERSATILE. SAFE.

FALL PROTECTION GUIDELINE

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

SECURITY AND CONFIDENCE AT HEIGHT

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Skyline Horizontal Lifeline System

Figure 1 - Parts Identification

Transcription:

Reach poles & cables system product guide

Phantom Indoor Batting Cage reach poles & cables system This reach poles & cables system is engineered to maximize your interior space. This guide will walk you through setting up your wall anchors, attaching reach poles, attaching tensioning halyards, and raising your batting cage so you can start hitting balls. Lowering and storing your batting cage is also described in this product guide. Parts & Hardware Phantom Tensioned Indoor Batting Cage net [1] mounting the Wall anchors ➊ Define one of your walls as the tensioning wall and the opposite as the anchoring wall (see Fig. 1). Your tensioning wall will include the tensioning assembly with tensioning halyards that hang toward the floor. These halyards can be gathered and pulled to the side, or lifted and moved out of reach, if necessary. Take any doorways, bleachers, or obstacles into consideration when determining your tensioning and anchoring walls to avoid interfering halyards. ➋ Position and install wall anchors and 3/8" eyebolts 7.5 feet apart on both your tensioning and anchor walls (anchors and eyebolts not included, wall anchors must be rated to support a minimum 250 lb load). Reference Fig. 1 to determine the mounting height on the tensioning wall mounting height on your anchoring wall is always 14 feet. Total Span refers to the distance between the tensioning wall and the anchoring wall. Top supporting cables (already installed) [3] 2:1 tensioning assemblies with black nylon tensioning halyards [3] Telescoping Reach Poles [3] FIG. 1 positioning of Wall anchors Optional intermediate cables [3] (included for total span of 69'+ for 55 ft cage, and and with total span of 84'+ for 70 ft cage) Things you ll need (not included with your kit): 3/8" steel eyebolts [6] Wall anchors to receive 3/8" eyebolts rated to support a minimum 250 lb load [6] Drill Step ladder Pliers tensioning wall See table Recommended Tensioning Wall Mounting Heights mounting Height Total Span 55' Cage 70' Cage total Span always 14' total Span 14 ft up to 80 ft up to 100 ft 14 ft 6 in 80 90 ft 100 110 ft 15 ft 90 100 ft 110 120 ft Call for assistance 100+ ft 120+ ft anchoring wall 2 3

anchoring wall Reach poles tensioning halyards ➊ Once all wall anchors and eyebolts are installed, extend the reach poles to their full length and lock in place. Then, connect the hook at the end of the reach pole to an eyebolt on the anchoring wall (see Fig. 3). This should be done from the ground no need for a ladder for all 3 reach poles. FIG. 3 Reach Pole-to-eyebolt Collapsed Reach Pole Fully Extended Reach Pole Anchoring Wall Hook Eyebolt ➊ Moving to the tensioning wall, attach a tensioning block to each eyebolt on the tensioning wall. To attach, unscrew the clevis pin to release the clevis. Then hang the clevis onto the wall-mounted eyebolt. Reposition the block within the clevis and screw the pin back in, tightening by hand. Make one last 1/4 turn with a pliers to ensure it is secure. Clevis Clevis Pin Cam-lock Tensioning Block eye bolt Tensioning Block Reach Pole ➋ Attach the bit clip on the end of the reach pole to the corresponding steel ring on the batting cage net (see Fig. 4). ➌ With all three reach poles connected to the anchoring wall s eyebolt s and the net s steel rings, you are now ready to continue installation with the tensioning end of your batting cage. FIG. 4 attach Bit clip Steel Ring Reach Pole ➋ During initial installation as well as when the cage is not in use you want to prevent the bit clip from sliding up and out of reach toward the block. To keep the bit clip easily accessible for when you need it, attach the bit clip below the halyard knot located about 9 feet from the end of the halyard (see Fig. 5). Halyards should be routinely secured in this way when the batting cage is not in use. FIG. 5 Tensioning Halyards When cage is not setup secure bit clip here, below halyard knot 4 5

tensioning halyards (continued) Take-down & Storage ➌ If intermediate cables were included with your batting cage: Attach a bit clip from an intermediate cable to the tensioning halyard block. Then, attach the other bit clip to the corresponding FIG. 6 tensioning halyard-to-cage attachment steel ring, attaching all three intermediate cables to the batting cage net (see Fig. 6). ➌ If you do not have intermediate cables : Simply attach the bit clips from the tensioning halyards directly to the steel rings on the batting cage. Tensioning Halyard Block Intermediate Cable Steel Ring ➍ Grab the end of one of the tensioning halyards and pull straight down to hoist the cage up into position. As the cable tension increases, the halyard will slide into the cam-lock and be held in place automatically if/when the halyard is released. Be sure you are pulling straight down, parallel with the wall, to engage the cam-lock. If you pull outward away from the wall the cam-lock may not engage properly. Repeat this step for each of the three tensioning halyards and adjust as necessary until desired cage height is reached. Note: It is not necessary to apply excessive tension on the batting cage. It is designed to function properly under minimal tension, with as much as 24 inches of sag across the total span. You re ready to start hitting. Your initial installation is now complete. Continue to the next page for take-down and storage instructions, as well as the steps for routine setup of your batting cage. Watch & learn with the Setup Video! BeaconAthletics.com/phantomsetup Scan this code with your smart phone ➊ Pull the tensioning halyards away from the wall toward the batting cage to disengage the cam-locks and free the halyards so this end of the cage will drop to the floor freely. Be sure to hold onto the halyards securely to prevent them from slipping through your hands uncontrollably. ➋ Disconnect the tensioning halyards from the batting cage steel rings. To prevent the bit clip from sliding up and out of reach, attach the bit clip below the halyard knot located about 18 inches from the end of the halyard as described during initial installation (see page 4, Fig. 3). ➌ With the tensioning end now on the floor, bring the outermost supporting cables running the full length of the batting cage in toward the center supporting cable. Gather each side of the cage net inward until you have about 2 feet wide of net, with the supporting cables on top. The goal is to avoid tangling the supporting cables and losing track of the steel rings. ➍ Carefully place the batting cage into the bottom of laundry bin or rolling storage container (the Phantom Batting Cage Net Hamper is recommended, see back page). Continue loading the cage into the container, moving toward the anchoring wall until you reach the still-connected anchoring halyards. ➏ Disconnect the reach poles and condense the them to their shortened length for storage. ➐ Place the rest of the cage into the storage container after gathering the anchoring end of the cage, similar to Step 3. To ensure that you don t lose track of the steel rings, leave them hanging over the edge of your storage container as shown. routine 5-minute Setup ➊ Roll your storage container to the anchoring wall. ➋ Attach the reach poles to the anchor wall eye bolts and batting cage steel rings as described during initial installation (see page 4, Fig. 3). ➌ Spread the cage net out across the floor while rolling the storage container toward the tensioning wall. ➍ Attach the tensioning halyards to the steel rings on the batting cage. ➎ Erect the batting cage by pulling straight down on each tensioning halyard as described in the previous page (see page 6, Step 3). For visual reference, scan the QR Code (left) to watch the Phantom Cage Setup on your smart phone. 6 7

recommended storage hamper Phantom Batting Cage Net Hamper Easy, mobile storage. Take the awkwardness out of storing a large net, and add mobility and efficiency to cage setup. This 10 cubic foot poly hamper is perfect to store and transport your Phantom Batting Cage. The cage goes from storage to ready to use in less than 5 minutes with this hamper. The hamper measures 43" x 28" and is 30" tall with four swivel casters. Ships via freight. Net hamper. 43"L x 28"W x 30"H. 65 lbs 105-745-109 $295.99 http://beaconathletics.com/store/indoor/phantom-cage-net-hamper/ Your satisfaction is our ultimate goal. Contact us at beaconathletics.com/contact or call 800-747-5985 if you have any questions. www.beaconathletics.com CALL 800-747-5985 FAX 608-836-0724 8233 FORSYTHIA STREET STE. 120, MIDDLETON, WI 53562 Copyright 2012, Beacon Athletics, A division of Rainbow Group, LLC. All Rights reserved. This material may not be republished, rewritten or redistributed including electronically cached without the prior written consent of Beacon Athletics.