COOPER POWER SERIES. 200 A 15 and 25 kv class elbow with integral jacket seal* for use on tape and wire shielded cable installation instructions

Similar documents
COOPER POWER SERIES. 200 A 15/25 kv class deadbreak straight connector installation instructions. Deadbreak Apparatus Connectors MN650043EN

COOPER POWER SERIES. 200 A 15 and 25 kv class elbow with optional integral jacket seal installation instructions. Loadbreak Connectors MN650008EN

COOPER POWER SERIES. 200 A 15/25 kv class elbow installation instructions. Deadbreak Apparatus Connectors MN650042EN

S Loadbreak Apparatus Connectors WARNING: WARNING:

COOPER POWER SERIES. 200 A 35 kv class LE series elbow installation instructions. Loadbreak Apparatus Connectors MN650010EN

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions

COOPER POWER SERIES. 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions. Loadbreak Apparatus Connectors MN650056EN

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

DT400/436 Tee Connector Installation Instructions

COOPER POWER SERIES. 200 A 15, 25, and 35 KV class insulated standoff bushing installation instructions. Loadbreak Apparatus Connectors MN650039EN

COOPER POWER SERIES. 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions. Deadbreak Apparatus Connectors MN650050EN

COOPER POWER SERIES. DS250 deadbreak straight connector installation instructions interface A. Connectors MN650027EN

COOPER POWER SERIES. 600 Ampere Deadbreak Grounded Standoff Bushing 15 & 25 kv and 35 kv Class Installation Instructions. Bushings MN650045EN

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013

COOPER POWER SERIES. DE250 deadbreak elbow connector installation instructions interface A. Screened Separable Connectors MN650025EN

COOPER POWER SERIES. 600 A 15, 25 and 35 kv class bushing adapter installation instructions. Deadbreak Apparatus Connectors MN650058EN

COOPER POWER SERIES. Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions. Tap-Changer Switch MN800015EN

COOPER POWER SERIES. EL Bay-O-Net Current-Limiting Fuse Installation Instructions. Fusing Equipment MN132023EN

COOPER POWER SERIES. Series winding ratio test procedure instructions. Voltage Regulators MN225060EN. 120 Vac VOLTMETER

COOPER POWER SERIES. UltraSIL Polymer-Housed Distribution-Class MOV Surge Arrester Installation Instructions. Surge Arresters MN235006EN

DAI630TB2669 Dead Front Arrester Installation Instruction

Effective March 2015 Supersedes S August 2002

COOPER POWER SERIES. 600 A 35 kv class PUSH-OP deadbreak connector installation instructions. Deadbreak Apparatus Connectors MN650052EN

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN

Effective May 2017 Supersedes July 2009 (S ) 600 A 35 kv Class T-OP II connector assembly installation instructions 200 A PROTECTIVE CAP LRTP

COOPER POWER SERIES. QD8 Quik-Drive tap-changer VR or VL reversing switch stationary contact assembly kit number A48 installation instructions

COOPER POWER SERIES. Under-oil arrester disconnector installation/operation instructions. OEM Equipment MN800010EN

600 A 35 kv class PUSH-OP deadbreak connector installation instructions

COOPER POWER. SERIES VariSTAR type composite light-duty under-oil (CLU) MOV arrester installation instructions. Surge Arresters MN235023EN

COOPER POWER SERIES. 50 A 2:1 series multiple (dual voltage) switch cap/wrench, lever or hotstick operable handles installation instructions

COOPER POWER SERIES. UltraSIL polymer-housed VariSTAR surge arrester IEC for MV systems to 36 kv installation instructions

COOPER POWER SERIES. Operation Counter Replacement Instructions. Reclosers MN280047EN. Effective May 2016 Supersedes S December 2003

COOPER POWER. SERIES VariSTAR type AZE station class surge arresters installation and maintenance instructions. Surge Arresters MN235022EN 0.

Effective January 2017 Supersedes July 2011 (I ) VariSTAR Type AZG4 Surge Arresters Installation and Maintenance Instructions

S Surge Arresters

COOPER POWER SERIES. Types E, 4E, V4E, H, 4H, V4H, L, and V4L single-phase recloser installation and operation instructions. Reclosers MN280051EN

COOPER POWER SERIES. VFI SF6-insulated vacuum fault interrupter installation, operation and maintenance instructions. Switchgear MN285004EN

Installation Instructions for the Walking Beam Interlock for Eaton EHD, FDB, FD, HFD, FDC, FW, HFW, FWC, Circuit Breakers and Molded Case Switches

ROPV R40 E Series User Manual

TECHNICAL BULLETIN PINPOINT CONDUIT COUPLING AND SPLICING RECOMMENDATIONS

Effective May 2017 Supersedes August 2005 (S )

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

ESA Elbow Sealing Adapter Kit

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Booster Pump PB4-60 Replacement Kits

Norrsken Family Booklet

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS Grips

S Surge Arresters. Handling and Storage. Standards. Acceptance and Initial Inspection

750 Cable Cutter INSTRUCTION MANUAL

The Outer Seal is highly abrasion resistant and provides mechanical stiffness to the splice in order to better match the cable stiffness.

Teledyne Oil & Gas North Williamson Blvd. Daytona Beach, FL USA (phone) (fax)

E2K-L. Liquid Level Sensor That Is Unaffected by the Color of the Pipe or Liquid. Liquid Level Sensor. Ordering Information

INSTALLATION & MAINTENANCE INSTRUCTION

Pressure Dump Valve Service Kit for Series 2300 Units

2000 lb manual winch

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product.

SASK-A-POLE OWNERS AND USERS MANUAL

Media-Isolated Mag Plus Probe Low Pressure-ISO Kit

General No. 25 and D-25 Handy Operating Instructions

DK ton, Double-acting, Die-type Crimping Tool

This document to be used with Hurley traditional Davits

Type BBS-03, BBS-05, BBS-06, BBS-25

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)

Bimini Top, Bimini Top Plus for Jeep Wrangler Vehicles Items # , # and #

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

Inspection Recommendations

3M Liqui-Cel EXF-4x13 and 4x28 Series Membrane Contactors

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

INSTRUCTION MANUAL. January 23, 2003, Revision 0

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Operation Manual Enabling Pole-Top Communication Via the TripSaver II Magnet Tool

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

Hydraulic Punch Drivers

DuPont Personal Protection Instruction Manual for Universal Pressure Test Kit No

Spectrum AquaLight (SAL ) Color Underwater Light Owner s Manual

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Operating Instructions

Fiber Cable Puller with Tuf-Lugger lite

User Manual 1 P a g e Rev. V1.6-EN 11/08/2014

Medium voltage standard-duty, heavyduty, and extreme-duty single-phase, unfused capacitor units and accessories

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

Instruction Manual. Model TC1-S TopSide Clamp. top side clamp. For your personal safety READ and UNDERSTAND instructions before using tools.

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

S Vacuum Switches. Contents. Type VCS-1 Single-Phase Vacuum Capacitor Switch Installation and Operation Instructions

FLEXIBLE SHAFTING (Wet & Dry)

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Portable Massage Table User Manual

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

3 Scotch-Weld Polyurethane Reactive Adhesive Applicator Replacement Part Installation Guide

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION

3M Liqui-Cel EXF-10x28 Series Membrane Contactor

Model No Product Name Handpiece Only Complete System

DISASSEMBLING & REASSEMBLING CARTRIDGE INSTALLING SEATPOST ON BIKE

SANTA CRUZ BICYCLES Cable Routing Procedure MY17

Bimini Top, Bimini Top Plus for Jeep Wrangler (TJ) Vehicles Items #141042XX and #143002XX

Transcription:

Loadbreak Connectors MN650009EN Effective May 2015 Supersedes S500-10-8 March 2011 COOPER POWER SERIES 200 A 15 and 25 kv class elbow with integral jacket seal* for use on tape and wire shielded cable installation instructions *US Patent 7,661,979

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation s ( Eaton ) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations and descriptions contained herein. The information contained in this manual is subject to change without notice. ii 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

Contents SAFETY INFORMATION Safety Information...iv PRODUCT INFORMATION Introduction...1 Acceptance and Initial Inspection....1 Handling and Storage...1 Quality Standards...1 INSTALLATION INSTRUCTIONS Installation Instructions....2 Preparation of Tape and Wire Shielded Cable....2 Elbow Installation...6 Loadbreak Probe Installation...7 OPERATING PROCEDURES Loadmake Operation...9 Fault Close...9 Loadbreak Operation...9 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 iii

! SAFETY FOR LIFE Safety for life! SAFETY FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety in its Cooper Power series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service. We strongly urge that you always follow all locally approved safety procedures and safety instructions when working around high voltage lines and equipment, and support our Safety For Life mission. Safety information The instructions in this manual are not intended as a substitute for proper training or adequate experience in the safe operation of the equipment described. Only competent technicians who are familiar with this equipment should install, operate, and service it. A competent technician has these qualifications: Is thoroughly familiar with these instructions. Is trained in industry-accepted high and low-voltage safe operating practices and procedures. Is trained and authorized to energize, de-energize, clear, and ground power distribution equipment. Is trained in the care and use of protective equipment such as arc flash clothing, safety glasses, face shield, hard hat, rubber gloves, clampstick, hotstick, etc. Following is important safety information. For safe installation and operation of this equipment, be sure to read and understand all cautions and warnings. Hazard Statement Definitions This manual may contain four types of hazard statements: DANGER Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. CAUTION: Indicates a potentially hazardous situation which, if not avoided, may result in equipment damage only. Safety instructions Following are general caution and warning statements that apply to this equipment. Additional statements, related to specific tasks and procedures, are located throughout the manual. DANGER Hazardous voltage. Contact with hazardous voltage will cause death or severe personal injury. Follow all locally approved safety procedures when working around highand low-voltage lines and equipment. G103.3 WARNING Before installing, operating, maintaining, or testing this equipment, carefully read and understand the contents of this manual. Improper operation, handling or maintenance can result in death, severe personal injury, and equipment damage. G101.0 WARNING This equipment is not intended to protect human life. Follow all locally approved procedures and safety practices when installing or operating this equipment. Failure to comply can result in death, severe personal injury and equipment damage. G102.1 WARNING Power distribution and transmission equipment must be properly selected for the intended application. It must be installed and serviced by competent personnel who have been trained and understand proper safety procedures. These instructions are written for such personnel and are not a substitute for adequate training and experience in safety procedures. Failure to properly select, install or maintain power distribution and transmission equipment can result in death, severe personal injury, and equipment damage. G122.3 iv 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

SEMI-CONDUCTING SHIELD LOCKING RING MOLDED ON INSULATED SLEEVE PULLING EYE LOADBREAK PROBE COPPERTOP CONNECTOR ARC FOLLOWER SEMI-CONDUCTIVE INSERT ENCAPSULATED SEMI-CONDUCTIVE INSERT DRAIN WIRE TAB TEST POINT INSULATION ENCAPSULATED CONDUCTIVE INSERT ENDS LOADBREAK BAND EPDM INSULATION Line illustration of 200 A 25 kv expanded range POSI-BREAK elbow. Product information WARNING All associated apparatus must be de-energized during any hands-on installation or maintenance. Failure to comply could result in death, severe personal injury and equipment damage. Introduction Eaton's Cooper Power series loadbreak elbow connector is a fully-shielded and insulated plug-in termination for connecting underground cable to transformers, switching cabinets and junctions equipped with loadbreak bushings. The elbow connector and bushing insert comprise the essential components of all loadbreak connections. Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment Additional information These instructions cannot cover all details or variations in the equipment, procedures, or process described nor provide directions for meeting every possible contingency during installation, operation, or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for the user's purpose, please contact your Eaton representative. WARNING Optional Capacitive Test Point Operating Instructions: Use only voltage indicating instruments specifically designed for test points. Use of convention al volt age sensing devices may provide false No Voltage indications. The test point must be dry and free of con tam i nants when checking for voltage. After indication is taken: clean, dry, and lubricate the test point cap with silicone grease and assemble to the test point. Always consider the termination to be energized until the test point No Voltage indication is confirmed by other means. Failure to comply could result in death or severe personal injury. Acceptance and initial inspection Each loadbreak elbow connector is completely inspected and tested at the factory. It is in good condition when accepted by the carrier for shipment. Upon receipt of a loadbreak elbow connector kit, inspect the connector thoroughly for damage and loss of parts incurred during shipment. If damage or loss is discovered, file a claim with the carrier immediately. Handling and storage If the loadbreak elbow connector is to be stored for an appreciable time before installation, provide a clean, dry storage area. Locate the connector so as to minimize the possibility of physical damage. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 1

Quality standards ISO 9001 Certified Quality Management System Installation procedures Cable stripping and scoring tools, available from various tool manufacturers, are recommended for use when installing loadbreak elbows. After preparing the cable, the elbow housing is pushed onto the cable. The load-break probe is threaded into the coppertop connector using the supplied installation tool or an approved equivalent. Use a clampstick to perform loadmake and loadbreak operations. (See page 9 for operating instructions.) Complete elbow kit includes: Standard Elbow Body or Elbow Body with Jacket Seal Coppertop Compression Connector Loadbreak Probe Probe Installation Tool Silicone Lubricant Mastic Strips (Jacket Seal Elbow Only) Installation Instruction Sheet Tools/Accessories needed: Tape Measure Wire Brush Knife Cable Stripping Tool Crimping Tool Cable Cleaner Cable Cutters Clampstick Personal Protection Equipment Preparation of tape and wire shielded cable Cable Training Position cable vertically so that it is centered between apparatus bushing and parking pocket, parallel to the apparatus frontplate. Provide adequate slack in the cable to permit unrestricted movement of the elbow connector from the apparatus bushing to a standoff bushing or portable feedthru. Once installed, the cable should enter the elbow connector in a straight line. Avoid a tight bend radius at the cable entrance of the elbow that causes the elbow to bend. (See Figure 1.) Correct Incorrect Figure 1. Proper Cable Training. 2 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

Step 1 Step 2 Step 3 Step 4 2 1 / 8 " (54 mm) CONDUCTOR FIRST CRIMP PLACED BELOW KNURL TAPE SHIELD 7 1 / 2 " (191 mm) CLEAN EXCESS INHIBITOR GREASE 8 1 / 2 " (216 mm) INSULATION SHIELD INSULATION SHIELD INSULATION SHIELD 1" (25 mm) SEMI-CONDUCTIVE TAPE CABLE JACKET Step 1. Measure down from top of the cable 8-1/2" (216 mm). Remove cable jacket (if jacketed cable is used) to expose metallic shielding tape or wires. (Tape shielded cable shown.) Step 2. Remove 7-1/2" (191 mm) of metallic shielding leaving a minimum of 1" (25 mm) exposed at cable jacket end. Bind end of metallic shield with two highly stretched wraps of semi-conductive tape. Step 3. Measure down from the top of the cable 2-1/8" (54 mm). Remove the insulation and conductor shield to expose the bare conductor. Take care not to nick the conductor. Step 4. Clean the exposed conductor using a wire brush. Note: The probe (male contact) should be preassembled into the threads of the compression connector prior to crimping to ensure proper thread engagement. Place the coppertop (bimetal) connector on the conductor. Make sure the threaded hole in connector faces the apparatus bushing. Crimp the connector in place using a tool and die combination and minimum suggested number of crimps () as shown in Table 1 of page 8. Start crimping just below the knurled line and rotate each successive crimp to prevent bowing. Do not overlap crimps. Clean excessive inhibitor grease from coppertop connector by wiping toward threaded eye. Smooth any sharp edges on the crimp connector surface. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 3

Step 5 Step 6 Step 7 1 / 8 " BEVEL (3 mm) 6 7 / 8 " (175 mm) INSULATION INSULATION INSULATION TRIM EXCESS GROUND BRAID CONSTANT FORCE SPRING Step 5. Measure down from the top of the connector 6-7/8" (175 mm). Remove the insulation shield. Take care not to nick or gouge the insulation. Place a 1/8" bevel on the insulation to ease elbow installation. Step 6. Position performed ground braid with long end along cable jacket. Wrap braid around the cable metallic/wire shield and cut off excess (do not overlap braid onto itself). Step 7. Secure in place with constant force spring supplied. Cinch (tighten) last lap of spring. 4 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

Step 8 Step 9 Step 10 Step 11 DO NOT COVER CONSTANT FORCE SPRING ALL THE WAY INSTALLED SOLDER BLOCK ½" (13 mm) FIRST MASTIC APPLIED SECOND MASTIC APPLIED OVER SOLDER BLOCK TRANSITION POINT THIRD MASTIC APPLIED OVER CONSTANT FORCE SPRING CABLE JACKET Step 8. Select one of three mastic strips. Remove liner and wrap one layer of mastic around the cable jacket 1/2" (13 mm) from the cut edge of the jacket, underneath the solder-block area of the braid. (Do not stretch the mastic while applying.) Step 9 Apply second mastic strip layer directly over the solder-block and first layer of mastic. Press in place. Step 10 Add the third strip of mastic at the transition point of the cable jacket and braided ground strap/constant force spring. Press in place. STEP 11. Start at the end of the metallic shield and apply two halflapped layers of vinyl tape (not supplied) over the constant force spring and mastic seal. Extend the tape application onto the cable jacket 1/4" (6 mm) beyond the mastic seal. Note: Do not cover the exposed insulation shield. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 5

Step 12 Step 13 AB AB Step 12 Clean the insulation with a lint free cloth saturated with a cleaning solution. Wipe the insulation toward the insulation shield. Apply a thin coating of supplied lubricant to the insulation. Clean and lubricate the cable entrance of the elbow. Place elbow on cable. With a twisting motion, push the elbow onto the cable until the threaded eye of the coppertop connector is aligned with the elbow. Step 13 Apply a thin layer of supplied silicone grease over the cable and vinyl tape. Grasping the thumbholes of the jacket seal, pull down firmly over the cable until all of the vinyl tape if covered. 6 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

Step 14 PROBE AB Step 14 Push down and twist the elbow to align the coppertop compression connector, the threaded hole in the connector should be centered with respect to the hole in the elbow and perpendicular to the probe axis. By hand, insert the probe into the elbow along the center axis of the interface and thread the loadbreak probe into the coppertop connector. A thin layer of silicone lubricant applied to the last 1/4" of the probe body (not on the threads) can aid in installation, especially when installing a POSI-BREAK elbow probe. Note: If installing a POSI-BREAK elbow, be sure to use a POSI-BREAK probe with black insulating sleeve. After at least three full turns or when the probe is seated (five (5) 1/2 turns) onto the connector, use the provided installation tool to properly torque the loadbreak probe. Proper torque is applied when the tool twists at least 180 (1/2 turn). Note: If a different installation tool is used it must apply a torque of 100 to 120 lbf-in (11.0-13.5 N-m). Clean and lubricate bushing and elbow interface areas with a thin even coating of the silicone lubricant provided. Attach a drain wire lead from the ground braid to the drain wire eye of the elbow. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 7

Table 1. Crimp Chart CONNECTOR 5/8 DIAMETER 3/4 DIAMETER CONDUCTOR SIZE NO. 4 THRU 2/0 STRANDED 3/0-4/0 STRANDED Burndy Thomas and Betts Kearney ACA Conductor Accessories TOOL Y34 Y35 OR Y39 MD6 Y34 Y35 OR Y39 MD6 A243 U243 UBG W243 WBG U247 U247 U467 W247 DIE (2) (2) (2) (3) (2) (2) (2) (2) (5) A25AR U25ART U687 BG (4) W687 A27AR U27ART (2) (2) (2) NOSE (2) (2) (1) TOOL UT-3 UT-5 UT-15 UT-5 UT-15 DIE 5/8 (4) TV (4) 54 H (2) TV (4) 66 (2) TOOL WH2, WH3, BH4, WH4, WH2, WH3, BH4, WH4, O PH2, PH13 O PH2, PH13 DIE 5/8 737 (3) 747 (2) 737 (3) 747 (2) 9/16 (3) 9/16 (2) 572 (2) NOSE (4) TOOL 12 A 12 A DIE B24 EA (2) B39 EA (2) Anderson Tool VC-5, VC-6 VC-5, VC-6 Edison Electric Institute 8 A 10 A - REFERENCE ( ) Minimum suggested number of crimps. 8 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

Operating procedures WARNING The operator should always use personal protective equipment (insulated gloves, clampstick and eye protection) whenever operating the elbow. The operator should always be in the best possible operating position, providing firm footing and enabling a secure grasp of the clampstick, while maintaining positive control of the elbow before, during and immediately after operation. If there is any question regarding the operator s operating position, de-energize the elbow before operation. The operator should not be looking directly at the connector during the moment of circuit interruption or connection. Failure to comply could result in death or serious injury. Do not connect two different phases of a multiple-phase system. Before closing a single-phase loop, make certain both ends of the loop are the same phase. Loadmake operation Area must be clear of obstructions or contaminations that would interfere with the operation of the loadbreak elbow. Securely fasten a clampstick to the pulling eye of the elbow. Place the loadbreak elbow over the bushing, inserting the white arc follower of the probe into the bushing approximately 2-1/2 (64 mm) until a slight resistance is felt. This will align and stabilize the elbow. Turn your back to the bushing and grasp the clampstick securely and obtain good footing. Slam the elbow onto the bushing with one quick and continuous motion. Turn around and apply a force to the clampstick to push the elbow onto the bushing. A popping or snapping sound is often heard when this operation is performed. To check that the elbow is properly latched apply a gentle pull force to the clampstick. When latched properly the elbow will not slide back off of the bushing. As a last operation, push on the clampstick to seat the elbow all the way onto the bushing again. This insures that the elbow is latched and was not dislodged during the latching check in previous step above. Fault close 1. It is not recommended that operations be made on known faults. 2. If a fault is experienced, the elbow connector, probe, and the bushing must be replaced. Loadbreak operation Area must be clear of obstructions or contaminants that would interfere with this operation. Use clampstick to secure standoff insulator or portable feedthru in bracket. Ground devices to system ground per appropriate Installation Instructions. All associated apparatus must also be grounded. Secure elbow eye firmly onto clampstick and lock. Twist clampstick clockwise until the elbow rotates slightly on bushing about 1/4 (6 mm). This action will break any surface friction between outer surface of bushing and inner surface of elbow. Withdraw elbow from bushing with a fast, firm, straight motion. Minimum amount of travel of elbow to break load is 9 (229 mm). Use clampstick to place elbow on lubricated standoff insulator or portable feedthru. (Follow loadmake instructions.) Place an insulated protective cap with ground wire attached to system ground on any exposed energized bushing using clampstick. Follow the same operating procedures as for the elbow as outlined above under Loadmake Operation. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 9

This page intentionally left blank. 10 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015

This page intentionally left blank. 200 A 15 AND 25 KV CLASS ELBOW WITH INTEGRAL JACKET SEAL INSTRUCTIONS MN650009EN May 2015 11

2 1 / 8 " (54 mm) 6 7 / 8 " (175 mm)! SAFETY FOR LIFE Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton.com Eaton s Cooper Power Systems Division 2300 Badger Drive Waukesha, WI 53188 United States Eaton.com/cooperpowerseries 2015 Eaton All Rights Reserved Printed in USA Publication No. MN650009EN Rev 00 (Supersedes S500108 Rev 04) Eaton, Cooper Power, POSI-BREAK, and Kearney are valuable trademarks of Eaton in the U.S. and other countries. You are not permitted to use these trademarks without the prior written consent of Eaton. Burndy is a registered trademark of FCI. Thomas and Betts is a registered trademark of Thomas and Betts. ACA Conductor Accessories is a division of AFL Telecommunications LLC. Anderson is a registered trademark of Hubbell Power Systems. For Eaton's Cooper Power series loadbreak elbow product information call 1-877-277-4636 or visit: www.eaton.com/cooperpowerseries.