Requirements for the Ethylene MACT

Similar documents
Proposed Uniform Standards for Equipment Leaks

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

Inspection Manual: Federal Equipment Leak Regulations for the Chemical Manufacturing Industry Volume I: Inspection Manual

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

:-. EPA COURSE #380 TECHNIQUES INSPECTION EMISSION SOURCES FOR, FUGITIVE VOC CHECKLIST

VOC Process Equipment Clearing, Cleaning, and Routine Maintenance. Individual Unit Function: Environmental Procedure No.: PA Page: 1 of 10

LGSS Liquefied Gas & VSS Vapor (Gas) LGSS VSS LGSS. Features and Benefits

Frequently Asked Questions Directive 056 Facilities Technical

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

The purpose of this rule is to limit volatile organic compound (VOC) emissions from the storage of organic liquids.

Energy Control Procedures Lockout/Tagout 29 CFR

Safety Selector Valves Dual Pressure Relief Device System

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

NORMAL OPERATING PROCEDURES Operating Parameter Information

O&M MANUAL HIGHLIGHTS

It s Just Calibration How Hard Can It Be?

ONSHORE GAS GATHERING FAQS

HYDROSTATIC LEAK TEST PROCEDURE

OPERATING PROCEDURES

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

9.0 Equipment Cleaning and Repair

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

COMMITTEE DRAFT. API 520 Part I 10 th Edition Ballot Item 2.1. This ballot covers the following item:

IC67 - Pre-Instructional Survey

SYNTHETIC MINOR OPERATING PERMIT

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

Model General Permit Template. SERIES 13 Tanks. Template # SJV-TK

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Efficient Pigging of Gathering Lines. Energy Management Workshop for Upstream and Midstream Operations

6.6 Relief Devices. Introduction

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

Discussion on Fugitive Emissions Standards Rich Davis

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Best Management Practice. Fugitive Emissions at Natural Gas Transmission and Storage Facilities

Product Bulletin No.: D99-RRV2015-PIB-001

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

PIP PNE00012 Piping Examination and Leak Test Guide

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

Subpart E. Pressure Testing

Committee on NFPA 85

Welcome to the LESER Seminar, Taipei 28. June Design_of_safety_relief_valves_250804_Cal

OPERATION MANUAL NTF-60 Plus

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017

Line and Equipment Opening Global Safety Team-Safety Workshop Ana Caroline Trindade The Dow Chemical Company

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

RESILIENT SEATED BUTTERFLY VALVES FUNCTIONAL SAFETY MANUAL

RULES PUBLICATION NO. 119/P

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

CCR Fugitive Dust Control Plan

Testing Procedures of Watertight Compartments

MSC Guidelines for Vents, Fills and Sounds

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

a. Next, lift the lever on pressure reducing valve to allow street pressure water into the system.

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

REDUCING EMISSIONS WHEN TAKING COMPRESSORS OFF-LINE

Safe Work Permits A Safety Advantage

2.1 Contractor The company that supplies the hot tap machine and its operating personnel.

Assessment of Benzene Fenceline Monitoring Data for Corrective Action Planning and Near-field Source Correction

Tool Box Talk. Confined Space Entry New Construction Standard (2015)

GAS COMPRESSION SYSTEM

8 Process Equipment Integrity

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

SAFETY AND HEALTH STANDARD CONFINED SPACE ENTRY REQUIREMENTS Effective Date: 06/10/10 Standard: 16.2 Document Number: KUCSH0038 Rev: 07

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

LOCKOUT/TAGOUT PLAN August 2015

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

(b) Venting or flaring shall only be authorized by the Commission under the following circumstances:

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Title: Contaminated Equipment

SECTION PRESSURE TESTING OF PIPING

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

ANDERSON GREENWOOD TANK BLANKETING REGULATORS

FisherPak Instructions

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Huntsman Corporation Australia Pty Ltd. Botany Site NSW. Environment Protection Licence Reporting Period: to

ACCU-PULSE Installation and Operation Instructions

Transcription:

Requirements for the Ethylene MACT Fugitive Emissions 40 CFR Part 63 Subpart UU 63.1019-63.1039 TX Technology Showcase Houston, Texas March 18, 2003 Bruce C. Davis DuPont Engineering Technology 1

Presentation Overview Review key definitions Review MACT UU (Equipment Leaks) Applicability Review MACT YY (Ethylene MACT) Applicability Assessment Methods Summarize MACT UU Equipment Leak Requirements Summarize MACT UU Reporting and Record keeping requirements 2

63 subpart YY Applicability In Table 7 @ 63.1103(e): Provisions For Equipment as Defined at Sec 63.1101 that contains or contacts organic HAP The equipment contains contains or contacts 5 weightpercent organic HAP and the equipment is not in vacuum service Comply with the requirements of 63 subpart UU. 3

Compliance during shutdowns Compliance is required at all times except when lines are drained and depressurized. 4

Key Definitions Equipment is defined in subpart YY in 63.1101. Ethylene Production or production unit is defined in subpart YY at 63.1103(e)(2) 5

Summary of 63 subpart UU Applicability At 63.1019 the following exemptions are provided: Equipment in vacuum service Equipment in service < 300 hrs/yr Lines and equipment not containing process fluids 6

Equipment Leaks: Applicability Assessment Procedures (subpart YY) The owner must demonstrate the each piece of equipment is not in organic HAP service. Equipment is presumed to be in HAP service unless the owner provides this demonstration 7

Applicability Assessment subpart YY To be considered not in HAP service, the expected organic HAP content must not exceed 5 wgt % on an annual average basis. If analytical methods are used, Method 18 is required. 8

Applicability Assessment subpart YY An owner may use good engineering judgment rather than analytical procedures to determine HAP content 9

Summary of subpart UU Equipment identification requirements are provided at 63.1022 and are: Equipment needs to be identified via physical tagging or via a plant site plan, log entries, by designation of process unit or affected facility boundaries by a weather proof identification or other appropriate method. 10

Equipment Identification subpart UU Connectors need not be individually identified if all connectors in a designated area or length of pipe are identified as a group and the number of connectors is indicated. Connectors need to be identified no later than the completion of the initial monitoring survey. 11

Equipment Identification subpart UU Identify equipment routed to a process or fuel gas system or equipment routed to a closed vent system and control device. Identify pressure relief devices equipped with rupture disks. Identify instrumentation systems subject to visual, audio or olfactory monitoring. 12

Equipment Identification subpart UU Identify equipment in service less than 300 hrs per year. Identify equipment that is unsafe or difficult to monitor In a new source, difficult to monitor valves are limited to 3 %. The plan to monitor this equipment at least annually is required 13

Equipment Identification subpart UU Identify connectors that are unsafe to repair. Identify compressors operating with an instrument reading of less than 500 ppm Retain the information, data and analysis used to determine that equipment is in heavy liquid service. 14

Valve LDAR Requirements For Valves in gas/vapor or light liquid service: The leak definition is 500 ppm. An owner may group the valves into subgroups for % leaker calcs per the rules @ 40 CFR 63.1025(b)(4) After an initial check, if the percent leaking valves is 2 % or at least 2 valves, the source must monitor monthly If the percent leaking valves is < 2 % and < 2 valves, whichever is greater, the source may monitor quarterly 15

Valve LDAR Requirements If the percent leaking valves is < 1 %, the source may monitor once every 2 quarters. If the percent leaking valves is < 0.5 %, the source may monitor once per year. If the percent leaking valves is < 0.25 %, the source may monitor once every 2 years. 16

Valve % Leaker Calculations When determining the monitoring frequency for each process unit or valve subgroup, the percent leaking valves from the last two monitoring periods shall be averaged to determine the frequency for < semi annual monitoring. 17

Valve % Leaker Calculations When determining monitoring frequency for each process unit or valve subgroup subject to annual or biennial (once every 2 years) monitoring frequencies, the percent leaking valves shall be the arithmetic average of the percent leaking valves from the last three monitoring periods. 18

Valve % Leaker Calculations Non-repairables are included in the calculation the first time they occur. After the first time, they can be excluded. There is an upper limit of 1 % on this exclusion. The number above 1 % must be included. 19

Pumps (light liquid) & Agitators Weekly visual checks are required (with records) A leak is 5000 ppm for polymerizing monomers, 2000 ppm for food and medical service and 1000 ppm for other pumps. For 1000 ppm pumps, a repair attempt is not required until 2000 ppm An agitator leak is 10,000 ppm Monthly OVA checks (initially completed by the compliance deadline). 20

Notes on the Compliance Date The nominal compliance date is 3 years from July, 12, 2002. The actual compliance date is August 1, 2005 per 63.1108(d)(2)(i) & (ii) 21

Pumps (light liquid) & Agitators If the % leaking pumps is 10 % on a six month rolling average or if 3 or more pumps are leaking (whichever is greater), the owner must implement a Quality Improvement Program. See 63.1035 for details. The equipment is exempt from periodic OVA checks if equipped with a dual mechanical seal with a barrier fluid system or a shaft that does not penetrate the seal housing. 22

Pumps (light liquid) & Agitators Equipment is also exempt from routine OVA checks if equipped with a closed vent seal system routed back to the seals, a process or a control device. 23

Connectors A leak is defined as 500 ppm After an initial OVA compliance check within one year of the compliance date, ongoing OVA checks are required per: If the % leaking connectors is 0.5 %, the source must monitor connectors once per year. 24

Connectors If the % leaking connectors is 0.25 % and < 0.5 %, the source may monitor connectors once every four years, provided 40 % of connectors are monitored during the first two years. If the % leaking connectors is < 0.35 %, the source may monitor connectors once every 8 years. 25

Connectors 50 % of connectors must be checked within the first 4 years and If the % leaking connectors is 0.35 %, the source must complete the monitoring within the next 6 months and re-establish a monitoring frequency. 26

Closed Vent Systems and Control Equipment Closed Vt Syst. & contr. Dev; Emissions routed to fuel gas system or process Devices Leak Prevention Standard Hard Piped: Conduct initial OVA (leaks > 500 ppm) Conduct annual visual, auditory, olfactory leak check Repair Requirement First attempt 5 days, Final 15 days 27

Closed Vent Systems and Control Devices Note there are separate monitoring requirements for closed vent systems using duct work. These are found in subpart SS 63.983 and are not discussed here Subparts YY and UU do not required hard piped closed vent systems. 28

Compressors Leak Prevention Standard Equip with a barrier fluid seal system meeting 63.1031 design Standards or Operate < 500 ppm based on annual checks Repair Requirement First attempt 5 days, Final 15 days 29

Open Ended Valves or Lines Leak Prevention Standard 63.1033 Equip with a cap, blind flange or second valve that seals the line when not in use except for valves or lines which contain material which may pose a safety hazard and valves designed to open as part of an emergency shutdown system Repair Requirement None 30

Pressure Relief Devices in Gas/Vapor Service Leak Prevention Standard 63.1030 Install a rupture disk upstream of the PRV or Operate with an OVA reading of < 500 ppm VOC Repair Requirement After pressure release, demonstrate < 500 ppmv within 5 days After release, install a new rupture disk within 5 days, if previously equipped. 31

Heavy Liquid Service Equipment PRV s in Liquid Service, Inst. Systems Leak Prevention Standard 63.1029 If evidence of a leak is found by visual, auditory, olfactory or other, OVA monitoring is required within 5 days Repair Requirement OVA monitoring is not required if all indications of leak are eliminated within 5 days and repair is verified by soap bubble or pressure test 32

Heavy Liquid Service Equipment PRV s in Liquid Service, Inst. Systems Leak Prevention Standard 63.1029 Leaks exist when: 5000 ppm pumps (monomer service) 2000 ppm all other pumps 500 ppm for valves, conn, PRV s, Inst Systems 10,000 ppm for agitators Repair Requirement First attempt 5 days Final Repair 15 days 33

Sampling Connection Systems Leak Prevention Standard 63.1032 Equip with closed purge, closed loop, or closed vent system to capture sample purge and route process fluid to 1. Process 2. Fuel Gas System 3. Subpart UU compliant control device or waste or waste water management unit as spec @ 63.1032(c)(4) Repair Requirement None 34

Recordkeeping Recordkeeping requirements are found at 63.1038 which is provided in the notes. 35

Recordkeeping General equipment leak records required are: General & specific equipment identity Written plan for difficult and unsafe to monitor Identity of Compressors operating at < 500 ppmv Records of the determination of Heavy Liquid equipment 36

Recordkeeping Maintain a record of the identity and explanation for any equipment that is unsafe to repair. Maintain records of leaking equipment for 5 years and connectors for 5 years beyond last use (8 + 5 or 13 years). 37

Recordkeeping Keep leak repair records Keep delay of repair records Specific equipment leak records are provided at 63.1038(c) See notes for slide 31. 38

Reporting Requirements Reporting Requirements are found at 63.1039 which is included in the notes. Note 63.1039(b)(4) for PRV s and compressors subject to < 500 ppm all monitoring data is required to be reported. 39

Initial Notification The initial notification shall be postmarked within one year of July 12, 2002 for existing sources or within one year of applicability for new sources. For equipment leaks, the initial notification must identify the process units subject to equipment leak rules. 40

Initial Compliance Status Report Due 240 days after July 12, 2005 or by March 9, 2006 Content of the initial compliance status report for Fugitive emissions is given at 63.1039(a)(1) (3) 41

Periodic Reports Due no later than 60 days after the end of each 6 month compliance period. First report is due on the last day of the month that includes the date 8 months after the initial compliance status report. 42

Periodic Reports Content for periodic reports is given at 63.1039(b) See notes for slide 36. 43