PSSI 3 High Voltage Metal-Enclosed Switchgear

Similar documents
PSSI 10 Plant and Apparatus Containing Dielectric Gas

PSSI 6 Demarcation of Work Areas in Substations

PSSI 1 High Voltage Switching

PSSI 36 General Confined Spaces, Tunnels, Culverts and Similar Spaces

Energy Networks Management Safety Procedures DEFINITIONS

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

PSSI 12 Low Voltage Apparatus

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

PROCEDURES FOR STANDBY

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

Power Unit 075. Maintain Substation Circuit Breakers

Isolation of power supplies

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES

SUBSTATION EXPLOSION BARRY GASS HIGH VOLTAGE TRAINING. Barry Gass Training Manager High Voltage Training South Africa

Power System Safety Rules. Revision

National Grid UK Electricity Transmission plc. Safety Rules and Guidance (Fifth Edition)

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

SAFETY RULES. For the Control, Operation and Maintenance of Electricity Transmission & Distribution System of

Original Date of Issue: 04/09

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

Status Date Prepared Reviewed Endorsed Approved

Electrical Safety Program

OPERATING CODE NO. 8 APPENDIX 2

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

The Statkraft Way. Switching Supervisor

Operating Process Work on Low Voltage or Mechanical Apparatus

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

These Instructions apply to all low-voltage installations where Operations Manager HV in Statnett has authority as Operations Manager LV.

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Hampstead Hill School Health and Safety Policy: Confined Spaces

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

Electrical Shore Connections

London Underground - Section 12 approved Switch Disconnectors

HV RUBBER GLOVE WORKING

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

Operating instructions Capacitive sensor KIA (M30) / / 2010

Hazard Sheet 8. Electricity. Electricity

Electrical Safety in the Food Industry

2. The purpose of this program is to achieve the following objectives:

STCP 01-1 Issue 005 Operational Switching

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6

Electrical Safety Work Practices

Status Date Prepared Reviewed Endorsed Approved

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014

LOCKOUT/TAGOUT PROGRAM

Operating Instructions

MOD JSP 375 VOLUME 3 CHAPTER 3 ELECTRICAL SYSTEMS

Spirax Compact FREME Flash Recovery Energy Management Equipment

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Gas Network Craftsperson

Lockout/Tagout Program

23.1 Functions, Basic Configuration, and Interfaces

Standard. Extra High Voltage (EHV) Indoor Gas Insulated Switchgear Standard R Version 1.0, June 2018

The invisible killer - electrical safety in the food and drink industry

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

SM6. instructions for use. connection with compartment for incoming cable from the top. MV distribution factory built assemblies at your service

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Code: NT GN-SP.ESS

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

Arc flash versus arc resistant; different concerns

These Instructions apply to all high-voltage installations where Statnett has operational responsibility.

STCP 01-1 Issue 008 Operational Switching

List all key terms and acronyms used in the procedure, and their definitions.

Maintaining electrical equipment/systems

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits

Permit-To-Work Guidance and Templates

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

DX 3 RCDs. Technical data Nature and consequences of electrical risks Direct and indirect contact. Direct contacts

Inspection and Testing of Signalling Inspection and Testing Principles

Operating Instructions

Access for Work on Low Voltage and Mechanical Apparatus

6 lockout operations every electrician MUST perform and respect

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

These Instructions apply to all high-voltage installations where Statnett has operational responsibility.

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Construction & Building Industry Safety Guideline. Electrical Isolations

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

GAS INSULATED SWITCHGEAR

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Appendix A: Energized Work Permit

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

PRO Energy Isolation

Advances in Low Voltage Motor Control Center (MCC) Technology Help Reduce Arc-Flash Hazards and Minimize Risks

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

I003 Lock Out - Tag Out - Try Out. Document information

Inspection and Testing

Transcription:

1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and Company Safety Instructions to achieve Safety from the System for personnel working on High Voltage metal-enclosed switchgear. It does not include pole mounted or exposed terminal substation switchgear. It also covers working on withdrawable Apparatus when removed from its service position. 2. ISSUE RECORD This is a Reference document. The current version is held on the EN Document Library. It is your responsibility to ensure you work to the current version. Issue Date Issue No. Author Amendment Details October 1998 1 Initial Issue. December 2007 2 Updated to accommodate new types of switchgear being supplied. September 2015 3 Phil Currie Document restructured extensively. Scope clarified. Additional Dangers identified. 10 Change to requirement for Senior Authorised Person to identify and prove switchgear not Live. 11 Clarification of Ring Main Unit earthing. 11 and (viii) Changes to Supervision of work on spouts. 3. ISSUE AUTHORITY Author Owner Issue Authority Name: Phil Currie Title: Operational Compliance Manager Name: Phil Currie Title: Operational Compliance Manager Name: Colin Taylor Title: Director, Engineering Services 4. REVIEW This is a Reference document which has a 5 year retention period after which a reminder will be issued to review and extend retention or archive. 5. DISTRIBUTION This Energy Networks Safety Instruction is maintained by EN Document Control and is part of the ScottishPower Safety Rules which is published to the SP Energy Networks Internet site. SP Power Systems Limited Page 1 of 5 PSSI 3

6. CONTENTS 1. SCOPE... 1 2. ISSUE RECORD... 1 3. ISSUE AUTHORITY... 1 4. REVIEW... 1 5. DISTRIBUTION... 1 6. CONTENTS... 2 7. DEFINITIONS... 3 8. PLANT AND APPARATUS IDENTIFICATION... 3 9. DANGERS... 3 10. GENERAL REQUIREMENTS FOR WORK ON METAL-ENCLOSED SWITCHGEAR... 3 11. WORK ON METAL-ENCLOSED SWITCHGEAR WITH SPOUTS: ACCESS TO SPOUTS OR COMPARTMENTS WHICH CONTAIN HV CONDUCTORS... 4 12. WORK ON WITHDRAWABLE APPARATUS... 5 SP Power Systems Limited Page 2 of 5 PSSI 3

7. DEFINITIONS Terms printed in bold type are as defined in the ScottishPower Safety Rules (Electrical and Mechanical). 8. PLANT AND APPARATUS IDENTIFICATION Plant and Apparatus on which work or testing is to be carried out shall be readily identifiable or have fixed to it a means of identification which will remain effective throughout the work or testing. 9. DANGERS The main Dangers to personnel working on metal-enclosed switchgear are electric shock, burns, poisoning, asphyxiation, injuries arising from the release of stored mechanical energy or release of pressure arising from: (viii) (ix) (x) (xi) The application of an Earthing Device to Live Apparatus; The incorrect sequence and method of application or removal of Earthing Devices; Gaining access to Live conductors; Wrongly identifying switchgear; Inadequate precautions to suppress or safely discharge any induced or impressed voltages; Work on switchgear containing Sulphur Hexafluoride (SF6); Confined space working; Dangerous contents left within chamber or tank; Remote operation of switchgear; Exposed Live Apparatus adjacent to point of work; Inadequate precautions established to control the release of stored mechanical energy or pressurised gas. 10. GENERAL REQUIREMENTS FOR WORK ON METAL-ENCLOSED SWITCHGEAR The configuration of metal-enclosed switchgear requires particular care from the Senior Authorised Person to avoid Danger from possible Live conductors in the same compartment as the Earthed conductors to be worked upon. The Senior Authorised Person shall familiarise himself with the layout and connectivity of metal-enclosed switchgear and also ensure he understands the implications of gas insulation zones and the importance of maintaining their integrity. Reference shall be made to PSSI 10. Where work is to take place within a metal-enclosed compartment, all accessible HV conductors within that compartment shall be Isolated from all points of supply from which they can be made Live, including from any voltage transformer(s). Where reasonably practicable, Primary Earths shall be applied between all Points of Isolation and the point of work. The HV conductors shall be released for work under a Permit for Work. Where it is not reasonably practicable to apply Primary Earths between all HV Points of Isolation and the point of work, they shall be placed in an alternative position to achieve a similar electrical effect. Such a position could be as indicated in PSSI 2 section 10.5. For SF6 Gas Insulated Switchgear (GIS) the distance of 9m quoted in PSSI 2 can be extended to 30m provided the full intent of this section is met. Thus single point busbar earthing may be acceptable. SP Power Systems Limited Page 3 of 5 PSSI 3

For work on circuits connected to double busbar switchgear provided with circuit earthing options on only one of each pair of busbar disconnectors, the closure of this one earth switch to provide a Primary Earth between the pair of busbar disconnectors and the point of work is acceptable. Similarly when working on circuit busbar disconnectors, the Primary Earth on the busbar side may be provided by a single busbar earth switch. Where the busbars are to be broken and this will disconnect the Apparatus to be worked on from the single Primary Earth during the course of the work, a further Primary Earth shall, where reasonably practicable, be applied to earth the disconnected section of busbar. If this is not reasonably practicable, there shall be a Primary Earth applied between each HV Point of Isolation connected to the disconnected section of busbar or a job specific procedure, to specify the isolation and earthing requirements, shall be written and Approved prior to commencement of the work. When it is necessary to gain access to HV conductors the Senior Authorised Person issuing the Permit for Work shall identify the point of access and provide Personal Supervision for the removal of covers and when initial access is made to all conductors to be worked upon. Where the whole switchboard to be worked on does not contain any Live HV conductors the requirement for a Senior Authorised Person to provide Personal Supervision may be relaxed. The Senior Authorised Person shall, where practicable, prove the HV conductors not Live with an Approved voltage indicator immediately before they are worked upon unless it can be established that the HV conductors are or have been Earthed after the Permit for Work has been issued. The voltage indicator shall be tested immediately before and immediately after use. Danger Notices shall be attached on, or adjacent to, any Live Apparatus at the limits of the work area. Drain Earths shall be applied where induced voltage, impressed voltages or inadvertent backfeed may cause Danger. 11. WORK ON METAL-ENCLOSED SWITCHGEAR WITH SPOUTS: ACCESS TO SPOUTS OR COMPARTMENTS WHICH CONTAIN HV CONDUCTORS In addition to the requirements of section 10 above, the following precautions shall be adhered to where applicable: Where duplicate switches in one tank or on-load busbar selectors are installed and it is impossible to isolate them from all points of supply then all switches that can be closed onto the busbar on which work is to be carried out shall be Isolated by having their mechanisms Locked in the open position. The shutters of spouts which are, or may become, Live shall be Locked shut. Shutters of spouts on which work is not to be done shall also be Locked shut except for the spouts at which Earthing Devices are to be applied. For work on busbars of a multi-panel switchboard, an Earthing Device shall be applied, as detailed in the Company Safety Instructions, on the Isolated section of busbars at a panel other than that on which work is to be carried out. Inserting the hand or any tool into spouts for this purpose is strictly forbidden. All Earthing Devices shall, where reasonably practicable, be Locked in the Earthed position. For work on a ring main unit Isolated and Earthed at remote position(s) there is no requirement to apply an Earthing Device to the busbars. SP Power Systems Limited Page 4 of 5 PSSI 3

(viii) For work on busbar spouts the Senior Authorised Person issuing the Permit for Work shall identify the spouts to be worked on. Two Persons shall be present during work on busbar spouts. The work shall be carried out by the recipient of the Permit for Work or under his Personal Supervision. The recipient of the Permit for Work shall prove each spout is not Live by means of an Approved voltage indicator immediately before the spout is worked on. The voltage indicator shall be tested immediately before and immediately after use. When work is required on busbar spouts of a multi panel switchboard, an Earthing Device shall be applied to the busbar while work is carried out. If this Earthing Device is a Primary Earth and it is necessary to work on the panel where this Earthing Device has been applied then the associated Safety Document(s) shall be cancelled, the Earthing Device moved to an alternative position, and new Safety Document(s) issued. When work is to be carried out on circuit spouts, voltage transformer spouts or single panel busbar spouts, Primary Earths shall be applied as detailed in the Company Safety Instructions to the circuit between each Point of Isolation and the point of work except where such a Point of Isolation is on the Low Voltage side of a transformer. Inserting the hand or any tool into spouts for this purpose is strictly forbidden. All Primary Earths shall, where reasonably practicable, be Locked in the Earthed position. When work is to be carried out on circuit spouts, voltage transformer spouts or single panel busbar spouts and the work to be carried out will involve the removal of the Primary Earths at the point of work, then before a Permit for Work is issued, alternative Primary Earths shall, where reasonably practicable, be applied. However, if this is not reasonably practicable, then whilst this work is in progress no other work shall be carried out on the circuit connected to the spouts being worked on. Where Primary Earths are applied to the circuit spouts, voltage transformer spouts or single panel busbar spouts to be worked on, the Primary Earths shall be removed immediately prior to the work commencing. Work on the spouts shall then be carried out under the Personal Supervision of a Senior Authorised Person. Where the Primary Earths are not applied to the spouts to be worked on then work on the spouts shall be carried out by the recipient of the Permit for Work or under the Personal Supervision of the recipient of the Permit for Work. He shall prove each spout not Live by means of an Approved voltage indicator immediately before the spout is worked on. The voltage indicator shall be tested immediately before and immediately after use. When there is a need to prove voltage transformer spouts not Live and the Safety Rules stipulate the use of an Approved voltage indicator, an acceptable means of proving not Live is to use an Approved voltage indicator at the voltage transformer secondary fuses with the fuses removed. A test to prove the circuit Live shall be made before the circuit is switched out and then a test made to prove not Live after the circuit is switched out. These tests shall be made on all output phases from the voltage transformer. The voltage indicator itself shall be proved against a known voltage source after the final test. 12. WORK ON WITHDRAWABLE APPARATUS After withdrawable Apparatus has been removed from its service position and electrically and mechanically discharged, a Safety Document is unnecessary for the purpose of working on the withdrawn Apparatus unless the work is to be done whilst it is within the confines of a switchroom or similar place when a Limited Work Certificate shall be issued for the work. In such a case the Senior Authorised Person signing part 3 of the Limited Work Certificate shall, where reasonably practicable, ensure that the shutters of any available busbar, circuit or other spout in the switchroom which is, or is considered to be, Live has been Locked shut. SP Power Systems Limited Page 5 of 5 PSSI 3