COLD-WEATHER APPLICATION OF GAS MIXTURE (SF 6 /N 2, SF 6 /CF 4 ) CIRCUIT BREAKERS: A UTILITY USER S PERSPECTIVE SUMMARY

SF 6. Gas Handling. DILO. Sustainably tight. Made in Germany

SF6 Leak Management, Repairs, and Considerations

Aerotest Breathing Air Systems

Axpo Power Ltd. 2) GE Grid Solutions

Aerotest Breathing Air Systems

SF 6. Gas Handling. DILO. Sustainably tight. Made in Germany

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

Field Instruction Storage, Handling, Transport and Disposal of Sulphur Hexafluoride (SF6) Gas

SUBSTATION EXPLOSION BARRY GASS HIGH VOLTAGE TRAINING. Barry Gass Training Manager High Voltage Training South Africa

Neil Kane Managing Director EMT UK

LOW-CURRENT INTERRUPTION IN SF 6-ALTERNATIVES

23.1 Functions, Basic Configuration, and Interfaces

What I have learned about SF 6 gas testing.a Practical explanation

Power Unit 075. Maintain Substation Circuit Breakers

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

Environmental and Safety Concerns with SF 6 Gas

EU minimum requirements. Training and certification for personnel and companies

This multi-functional device allows the determination of up to six quality parameters with only one measurement:

Innovation Electrical Industry

PSSI 3 High Voltage Metal-Enclosed Switchgear

Type CAP. CapSwitcher. Capacitor Switching Device kv 38 kv INSTALLATION & INSTRUCTION MANUAL

TECHNICAL PAPER PRESENTATION

SF 6 Product Guide. Gas Analysis Instruments and Accessories

Lubricating Oils Hydraulic Oils Turbine Oils Cutting and Cooling Mineral Oils Compressor Oils Synthetic Fluids Insulating Oils Quenching Oils

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Vortex Dual. Refrigerant Recovery Machine

973-SF 6 Analyzer. Precise and Stable SF 6 Gas Analyzer REFLECTING YOUR STANDARDS

SAMPLING SYSTEMS FOR LIQUIDS AND GASES FOR ALL TYPES OF APPLICATIONS

Categorizing Faults via DGA. GE Grid Solutions M&D

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

CIRCUIT BREAKER POLE MERLIN AND GERRIN MAKE AT TATA POWER COMPANY

Spot the Hazards: Review Confined Space Hazards Missed by Most Safety Professionals, and the PPE Solutions that Meet OSHA Requirements

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems

F-Gas Compliance. To provide a process for F-Gas Leak Testing in accordance with legislative requirements.

Working in Gas Hazard Areas

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

SHOP SAFETY INSPECTIONS

This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum.

ROLE DESCRIPTIONS BY COMPETENCY LEVEL

AN EXPERIMENTAL AND ANALYTICAL STUDY OF PLASMA CLOSING SWITCHES FILLED WITH ENVIRONMENTALLY FRIENDLY GASES

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

Thermo Environmental 48C Carbon Monoxide QA Plan Section I Electronic Calibration Branch Responsibilities

Title: Standard Operating Procedure for Sabio 2010 and 4010 Dilution Calibrator

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:

Chapter 6 Leak detection

B kv pilot installation with a ketone based insulation gas with first experience from operation in the grid. D. TEHLAR ABB - Switzerland

High Pressure Compressed Air and Gas Solutions

METHOD 3A - DETERMINATION OF OXYGEN AND CARBON DIOXIDE CONCENTRATIONS IN EMISSIONS FROM STATIONARY SOURCES (INSTRUMENTAL ANALYZER PROCEDURE)

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

PSSI 10 Plant and Apparatus Containing Dielectric Gas

Valve test benches. Systems overview

Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course

GAS INSULATED SWITCHGEAR

Delayed Coker Safe Sampling Tar or Spalled Coke

Product Guide. Gas Analysis and Detection Equipment

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

OPERATION MANUAL BFX-2

Please refer F 90 of the present manual for the identification of the valves used in the detector.

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

V-Major, V-Compact. Reciprocating Compressors. Intelligent Air Technology

MEDICAL EQUIPMENT CATALOG

Gas-Detection Instruments

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

TOUCH IOT SWIMMING POOL MONITOR

PERFORMANCE SPECIFICATION PROPELLANT, HYDROGEN

Required Courses. Total Hours 39

MODEL 9061 ULTRASONIC LEAK DETECTOR INSTALLATION & MAINTENANCE

UNIVERSAL MASK TEST SYSTEM

Operating Instructions for

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

Prepared By: Environmental. File Name: WEL-ESOP Effective Date: 17 Sep 2007 Document Owner: EMD

CSA Sample Draw Aspirator Adapter Operator s Manual

Installation Instructions

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

R E D I C O N T R O L S

SAMPLING SYSTEMS FOR LIQUIDS, GASES AND OTHERS APPLICATIONS.

ADDENDUM IMPORTANT DOCUMENT INVITATION TO BID ADDENDUM. OPENING DATE & TIME: January 3, 2018 at 3:00PM

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

Official Journal of the European Union L 92/3

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

TECHNICAL DATA. Q = C v P S

Standard. Extra High Voltage (EHV) Indoor Gas Insulated Switchgear Standard R Version 1.0, June 2018

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

MATERIAL SAFETY DATA SHEET

Session Topics. Industrial Hygiene from an OSHA Perspective. Health Hazards in Shops. Labeling Example 1/27/2014. Shop Safety: Health & Ventilation

LGSS Liquefied Gas & VSS Vapor (Gas) LGSS VSS LGSS. Features and Benefits

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Vortex Dual. Refrigerant Recovery Machine. English Español Français Deutsch Italiano Nederlands Svenska 中文

RAM 4021 Operation Manual

Transcription:

DILO 2 nd Annual SF 6 Gas Management Seminar Tampa FL, November 2017 Zero Emissions. No Substitutes. Insulating Gas Management Program Manitoba Hydro November 16, 2017 Doug Dyck Interrupting Equipment Maintenance Specialist Manitoba Hydro Canada www.dilo.com www.dilodirect.com

Outline Manitoba Hydro Background Insulating Gas in Manitoba Hydro Insulating Gas Management Program January 2013 Chapter Title Page 2

January 2013 Chaptier Title Page 3

January 2013 Chapter Title Page 4

January 2013 Chapter Title Page 5

Doug Dyck 2016 to present, Interrupting Equipment Section/IGMP 2014 2016, Insulating Gas Management Program (IGMP) 2013, Manitoba Hydro International in KSA 1996 2012, Interrupting Equipment Section 1985 1996, Electrical Technician, T&D Substations January 2013 Chapter Title Page 6

National Grid Saudi Arabia January 2013 Chapter Title Page 7

Insulating Gas in Manitoba Hydro Mid 70 s SF6 6 bays Siemens 230 kv Text January 2013 Chapter Title Page 8

Insulating Gas in Manitoba Hydro Mid 70 s SF6 4 bays Alstom 115 kv January 2013 Page 9

Insulating Gas in Manitoba Hydro SF6 (sulphur hexafluoride) Equipment operating temp of -50 ⁰C, SF6 is mixed CF4 (carbon tetrafluoride) or N2 (nitrogen) SF6/CF4 Full interrupting rating SF6/N2 Reduced interrupting rating January 2013 Page 10

Gas Insulated Equipment (GIE) 230 kv Live Tank Circuit Breaker January 2013 Page 11

Gas Insulated Equipment (GIE) 115 kv Dead Tank Circuit Breaker January 2013 Page 12

Gas Insulated Equipment (GIE) 230 kv Gas Insulated Switchgear (GIS) January 2013 Page 13

Gas Insulated Equipment (GIE) 66 kv Dead Tank Circuit Breaker January 2013 Page 14

Insulating Gas Management Program January 2013 Page 15

Insulating Gas Management Program Educate, equip and empower all staff to work with insulating gas in a safe and environmentally responsible manner January 2013 Page 16

Insulating Gas Management Program 1. Environmental Compliance 2. Central Services 3. Standards & Procedures 4. Certification Training January 2013 Page 17

1. Environmental Compliance a.government Regulations b.insulating Gas Release Reporting c.insulating Gas Inventory January 2013 Page 18

1. Environmental Compliance a.government Regulations Greenhouse Gas Emission Reporting CEA/EC Annex A: Emission Estimation and Reporting Protocol for Electric Utilities Transportation of Dangerous Goods (TDG) Material Safety Data Sheet (MSDS) January 2013 Page 19

1. Environmental Compliance b. Insulating Gas Release Reporting Release Report CMMS Annual reporting January 2013 Page 20

1. Environmental Compliance c. Insulating Gas Inventory Insulating Gas Inventory & Tracking Cylinder Storage Gas Insulated Equipment CMMS January 2013 Page 21

Insulating Gas Management Program 1. Environmental Compliance 2. Central Services 3. Standards & Procedures 4. Certification Training January 2013 Page 22

2. Central Services a. Operations b. Field Service c. Work Shop January 2013 Page 23

2. Central Services a. Operations Procurement of: Insulating gas Cylinders Inventory control Shipping, TDG requirements Data entry to CMMS Operating Procedures: Instruments Equipment January 2013 Page 24

2. Central Services b. Field Service January 2013 Page 25

2. Central Services c. Work Shop January 2013 Page 26

Insulating Gas Management Program 1. Environmental Compliance 2. Central Services 3. Standards & Procedures 4. Certification Training January 2013 Page 27

3. Standards & Procedures a. Safety b. Testing & Instruments c. Monitoring & Detection d. Handling & Equipment e. Resource & Reference January 2013 Page 28

3. Standards & Procedures a. Safety January 2013 Page 29

3. Standards & Procedures b. Testing & Instruments January 2013 Page 30

3. Standards & Procedures b. Testing & Instruments Multi-function SF6 analyzer January 2013 Page 31

3. Standards & Procedures b. Testing & Instruments Pressure gauge Cylinder scale Gas detector Density Monitor Test Kit January 2013 Page 32

3. Standards & Procedures c. Monitoring & Detection January 2013 Page 33

3. Standards & Procedures c. Monitoring & Detection Density Monitor Testing January 2013 Page 34

3. Standards & Procedures c. Monitoring & Detection January 2013 Page 35

3. Standards & Procedures d. Handling & Equipment January 2013 Page 36

3. Standards & Procedures d. Handling & Equipment Handling Processes Preparation Recovery/Reclaiming Evacuation Filling / Top-up January 2013 Page 37

3. Standards & Procedures d. Handling & Equipment January 2013 Page 38

3. Standards & Procedures d. Handling & Equipment Vacuum pump Gas compressor Gas collection bag Fill Kit January 2013 Page 39

3. Standards & Procedures d. Handling & Equipment Equipment Adapters Hose Coupling January 2013 Page 40

3. Standards & Procedures e. Resource & Reference January 2013 Page 41

Insulating Gas Management Program 1. Environmental Compliance 2. Central Services 3. Standards & Procedures 4. Certification Training January 2013 Page 42

4. Certification Training January 2013 Page 43

4. Certification Training Insulating Gas Awareness CBT Level 1 Testing & Handling Equipment Level 2 Testing & Density Monitor Check Level 3 Handling (no decomposition) Level 4 Handling (with decomposition) January 2013 Page 44

1. Environmental Compliance 2. Central Services Insulating Gas Management Program 3. Standards & Procedures 4. Certification Training January 2013 Page 45

DILO 2 nd Annual SF 6 Gas Management Seminar Tampa FL, November 2017 Zero Emissions. No Substitutes. Questions? Doug Dyck Manitoba Hydro 820 Taylor Ave (4) Winnipeg, MB Canada djdyck@hydro.mb.ca 204-360-4823 www.dilo.com www.dilodirect.com