DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)

Similar documents
Estimated on-the-ground start and end dates: 1 June October 2018

U.S. Army Corps of Engineers (USACE) P.O. Box 428 Smithville, MO

Management Plan for the Obey River Trout Fishery

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

IMPACTS OF A REDUCTION IN FISH PRODUCTION FROM SERVICE TROUT MITIGATION HATCHERIES IN THE SOUTHEAST

Quemahoning Reservoir

Lake Taneycomo Fisheries Management. Shane Bush : Fisheries Management Biologist

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

U.S. Fish and Wildlife Service Native American Crosscut Funding

Fisheries Management Zone 10:

U.S. Army Corps of Engineers

FACT SHEET I. LOCATION

LCCMR Work Program Final Report. Total Biennial Project Budget

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Pennsylvania Fish & Boat Commission Biologist Report. Wilmore Dam. Cambria County. May 2011 Trap Net, Electrofishing and Hoop Net Survey


Eastern Brook Trout. Roadmap to

Overview of Recreational Pond Management

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

Lake Texoma Advisory Committee

Columbia Lake Dam Removal Project

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

North Carolina Wildlife Resources Commission Agency Overview. Appropriations Subcommittee on Natural and Economic Resources February 22, 2011

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

COMMUNITY WATERSHED PROJECT

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation

Chagrin River TMDL Appendices. Appendix F

The Blue Heron Slough Conservation Bank

D.B. Wilson Station CCR Landfill

Outstanding Iowa Waters, Trout Streams & Value to Northeast Iowa

Crawford Reservoir. FISH SURVEY AND MANAGEMENT INFORMATION Eric Gardunio, Fish Biologist Montrose Service Center

ATTACHMENT F. Minnesota Department of Natural Resources. Marsh Lake Ecosystem Restoration Project

Area Fish Stocking. Area Happenings

Conserving the Forests, Lakes and Streams of Northeast Michigan

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Recreational Saltwater Fishing Industry Trends and Economic Impact January 2007

Indiana Administrative Code Page IAC Aquaculture permit Authority: IC Affected: IC Sec. 17. (a) A person must not

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

TABLE ROCK LAKE 2014 ANNUAL LAKE REPORT. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

Outreach Announcement

Engbretson Underwater Photography Traits of Ineffective Cribs

SKIATOOK LAKE MANAGEMENT PLAN

Rookery Bay National Estuarine Research Reserve. Team OCEAN at Rookery Bay

Brook Trout in Massachusetts: A Troubled History, A Hopeful Future

DEPARTMENT OF THE ARMY SOUTH ATLANTIC DIVISION, CORPS OF ENGINEERS ROOM 9M15, 60 FORSYTH ST., S.W. ATLANTA GA

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

TRCP National Sportsmen s Survey Online/phone survey of 1,000 hunters and anglers throughout the United States

Rebirth of the Pigeon River: Song of the Morning Dam Removal Project

FINAL Caples Lake Fisheries Management Plan. Version 4.0

Spearfish Canyon State Park & Bismarck Lake

Blue River Restoration Project

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement

Western native Trout Status report

2016 Volunteer Program Annual Report

Tunica Cutoff 2018 REEL FACTS Keith Meals Fisheries Biologist

Department of Agricultural and Resource Economics, Fort Collins, CO

Restoring the Iconicc Lower Cache River

ARkAnsAs tennessee Primary Partner: Primary Partner: Habitat Work: Habitat Work:

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Hiwassee River Basin Overview 3

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Don Pedro Project Relicensing

natural low-water ' conditionson tamed Mississippi, new life springs, up Vl ' V ' ' - "

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

Fisheries and Lake Management Planning. CAP Mtg Nov21,2012 Brett Tregunno Aquatic Biologist, Kawartha Conservation

A. PURPOSE B. BACKGROUND

East Branch Dam Safety Modification Project

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Trout Buffer Variance

Fish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013

BASS LAKE PLANNING UNIT Willow Creek Watershed

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

JAP Additional Information Sheet

Proposed Changes to Bag and Size Limits Minnesota/Wisconsin Border Waters of the Mississippi River

Water Resources Report RKLD Annual Meeting July 30, 2016

Culvert Replacement and Stream Restoration in Wolfden Run, Garrett County, Maryland

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

Fisheries Survey of White Rapids Flowage, Marinette County Wisconsin during Waterbody Identification Code

East Metro Forest Lake (2,251 acres): Coon Lake (1,481 acres):

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Blue River Restoration Project William D. Linfield, P.E.

Coldwater Fish Production

COMMISSION ORDER 40: FISH MANAGEMENT RECOMMENDATIONS

Proposed Shuswap River Boating Regulations Open House

Trout Unlimited and the Kittatinny Ridge Coalition.

Dry Creek Project. The Dry Creek Habitat Enhancement Project provides a. Slowing velocity, creating refuge are key to habitat project

LCCMR Work Program Final Report. Total Biennial Project Budget

Go Fish Education Center

Assateague Island National Seashore North End Restoration Project Timeline

MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend

JadEco, LLC PO BOX 445 Shannon, IL 61078

City of Santa Cruz Interim Tarplant Management

Fisheries Resources in White Pine County

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson

FISH COMMUNITIES AND FISHERIES OF THE THOUSAND ISLANDS AND MIDDLE CORRIDOR

The Sand Beaches of New Hampshire and Maine

offered for sale RIVER BEND RESERVE A Recreational Investment Opportunity offered by

Water in the Deschutes Who needs it?

Transcription:

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP) A. Applicant Information: US Army Corps of Engineers, Dale Hollow Lake POC: Gregg Nivens 5050 Dale Hollow Dam Road Celina, TN 38551 (931)243-3136 Gregory.T.Nivens@usace.army.mil Allison Walker, Natural Resources Specialist 110 9 th Avenue South Nashville, TN 37203 (615) 736-7988 Allison.H.Walker@usace.army.mil B. Project Information: Description of Location - Dale Hollow Lake borders the Tennessee-Kentucky state line. Dale Hollow Dam and Lake were completed in 1943. Although the dam was built for flood control and power generation, it has become a recreational oasis for more than 3 million visitors each year. The dam is located on the Obey River, about three miles east of Celina, Tennessee. Surrounded by a thick expanse of forest, the clear blue lake creates a scenic backdrop for a variety of water and land recreational activities. Dale Hollow is also renowned for its fishing opportunities. In addition to yielding the world record Smallmouth Bass and being known as a trophy Smallmouth lake, the Obey River below Dale Hollow Dam is also known for excellent rainbow and brown trout fishing. With 27,700 surface acres of water and 620 miles of shoreline, there is plenty of space for fishermen and other visitors to explore the lake. Secluded tie-ups are located around the shore, offering visitors a peaceful nature experience. The Dale Hollow National Fish Hatchery is located a short distance below the dam. Operated by the U.S. Fish and Wildlife Service, the hatchery is the largest federal trout hatchery east of the Mississippi, producing 1.5 million trout annually. Over the years since impoundment, both time and wave action from bigger and faster boats has taken a tremendous toll on the shoreline in critical fishing habitat locations. Reservoir Region Southern Appalachians, 36.5373, -85.4506

U.S. Congressional Districts TN-6 (Rep. Diane Black), and KY-1 (Rep. Ed Whitfield) Project objective(s): The work to be performed is planned at the Trooper Island site on Dale Hollow Lake. The planned work will include one the following habitat management activity. Additional information about the sites will be included on the site map as an attachment to the proposal. Bank Stabilization Rock riprap will be placed in areas that experience significant shoreline erosion. Work will stop siltation and turbidity from erosion, as well as limit excessive nutrients from soils and minerals entering the water. These structures also provide excellent habitat for macroinvertebrates and shelter for young fish. Estimated on-the-ground start and end dates (not award date): Bank stabilization work is planned for late summer (August) into the winter (November) of 2016. This time of year is ideal for state and federal agencies, as it is after the busy recreation season and easier to perform work. Amount of grant requested: $16,000 Estimated total cost of project: $48,042 Details under section D. below List of partners (to be considered a partner they must appear in the budget table and provide either cash or in-kind contributions to the project) US Army Corps of Engineers (USACE) Trooper Island (Kentucky State Police) Tennessee Wildlife Resources Agency (TWRA) Reservoir Fisheries Habitat Partnership (RFHP) US Fish and Wildlife Service (USFWS) technical advising

C. Project Description: Aquatic Habitat Restoration/Protection Project Objectives. Bank Stabilization is planned for this habitat improvement project at Dale Hollow Lake. Many places on Dale Hollow are experiencing tremendous bank erosion due to wave action and other lake processes. The proposed mitigation for this erosion is the installation of rock riprap along the shoreline in these places. This will hold the bank in place and prevent further degradation of the shoreline. It will reduce excessive vegetation in these areas, and the rocks will provide refuge for young fish. This method of bank stabilization is selected because it is a natural resources standard method and has proven to be effective. Any funds received from the RFHP would be used to purchase rock for riprap. Rock will be placed using a US Army Corps of Engineers work barge, and work done with crews from Trooper Island and Kentucky State Police form the Trooper Island site. Work will be done by the US Army Corps of Engineers using their work barge on the Sewell Bend site. Fish species that would benefit from this project: Bass, Crappie, Walleye, Bluegill, and other native warm water species. Site Specific Information The Trooper Island Site at Dale Hollow Lake have been identified for habitat improvement Site Work to be Performed Priority Impairments Being Addressed Siltation/turbidity and excessive nutrients 400 linear feet of riparian area stabilized; Significantly reduced sedimentation rate Trooper Island 400 linear feet of rock riprap bank stabilization Degraded shorelines and/or loss of sensitive habitats 400 linear feet of shoreline habitat created by rock riprap Structural habitat Rock structure serves as habitat Increased use by a children s camp, introducing underprivileged children to outdoor activities. Monitoring Plan: Monitoring will be completed by USACE staff at Dale Hollow Lake with input from the Trooper Island staff. Monitoring will be conducted for two years following implementation, quarterly if not more frequently. The primary area of interest for the monitoring will be to ensure that the stabilization structures are maintaining the bank in a desired and effective manner. Visual inspections will be completed and recorded to meet the objectives of the monitoring plan

Quality of Life Dale Hollow Lake crosses the border of Tennessee and Kentucky and is in a rural region of both states. The lake has long drawn in recreational tourism to the area, with guests enjoying the beautiful scenery, quiet countryside, and great fishing. When the lake was impounded the vegetation in the flooded areas created great fish habitat, but as decades have passed, this vegetation has degraded and little structure exists in the lake. This project would help sustain an economy to the region that s driven largely by fishing. Fishing is an activity that can be enjoyed by all generations, making it ideal for families to spend time together. It also promotes outdoor recreation, which has become of increasing importance in younger generations especially in southern states that have some of the highest obesity rates. The Trooper Island site is of special note for improving quality of life as it will create habitat along the shoreline of a camp for underprivileged children. This area will give them an improved area to learn the sport and to enjoy time in nature. The camp gives children an opportunity to try new activities that they will hopefully be able to enjoy their whole lives. Stabilizing areas of eroding shoreline has a direct and immediate impact on ecological health. It will keep the lake intact and reduce the sedimentation into the lake. It will also help preserve and establish riparian vegetation at risk of eroding as well. Partnerships, Fund Leveraging, and Promotion The types of work selected for this project were selected not only for their effectiveness, but also for their community involvement in the implementation. Placement of stabilizing riprap will leverage a long running partnership between USACE and TWRA. Provisions to protect the restoration project site after project completion: The project described in this proposal is designed to be self-sustaining once implemented. List of required permits: None. Project timeline: Bank stabilization efforts are planned for fall of 2016. Materials will be purchased with any funds received in the August-November timeframe, and installation done around October-December. Work will be done by loading a USACE barge with rock materials and transporting the riprap by barge to the Trooper Island site. Once there, Trooper Island (Kentucky State Police) funded staff and machinery will place the bank stabilization materials. Funds Received Bank Stabilization Materials Purchased (funds spent on materials) Bank Stabilization installed June July Aug Sept Oct Nov Dec Jan 2016 2017

D. Budget: Amount requested through Reservoir Fisheries Habitat Partnership: $16,000 Amount of in-kind contributions: $4,522 Categories Partner Contribution Amount Cash or In-Kind Timeline (anticipated date of expenditures) Reservoir Fisheries Habitat Partnership (RFHP) Construction Costs/Materials $16,000 Cash Aug-Nov 2016 US Army Corps of Engineers (USACE) Administrative/Technical Services $1,536 Labor August 2015 (planning) Construction Costs/Materials $1,000 Machinery Aug-Nov 2016 Labor (paid) $3,840 Labor Aug-Nov 2016 Miscellaneous (outreach materials) Trooper Island/Kentucky State Police (KYSP) Administrative/Technical Services $144 Labor August 2015 (planning) Construction Costs/Materials $8,400 Machinery Labor (paid) $15,600 Labor Aug-Nov 2016 Tennessee Wildlife Resources Agency (TWRA) Administrative/Technical Services $528 Labor US Fish and Wildlife Service (USFWS) Administrative/Technical Services $144 Labor August 2015 (planning) August 2015 (planning) Dale Hollow Sport Fish Friday Volunteer Services $850 Volunteer Labor Aug-Nov 2016 Total Direct Costs $48,042 * Volunteer labor should be calculated at $10/hr for age 16 and under; $18/hr other volunteers; agency staff labor rates @ $24/hr

Budget narrative: Administrative & Planning Costs: These costs are associated with the planning and development of this project Labor (hrs) Unit Cost per Unit Total Cost Sponsored by Non-Federal Entity Non-Federal Funding Entity USACE 64 $ 24 $ 1,536 TWRA 22 $ 24 $ 528 $ 264 TWRA (Mixture of federal and state funding) Kentucky State Police 6 $ 24 $ 144 $ 144 KY State Police USFWS 6 $ 24 $ 144 Total $ 2,352 $ 408 Trooper Island Site: These costs are the actual materials and installation costs of rock riprap at the project site. Unit Cost per Unit Total Cost Sponsored by Non-Federal Entity Non-Federal Funding Entity Riprap Bank Stabilization (rock, linear feet) 400 $ 40 $ 16,000 $ 16,000 RFHP Labor (hrs) USACE 160 $ 24 $ 3,840 USACE Kentucky State Police 300 $ 24 $ 15,600 $ 15,600 KYSP Dale Hollow Sport Fish Friday 45 $ 18 $ 850 $ 850 Volunteer labor from a local sportsman s club Barge Operation Cost (gas, USACE funded) $ 1,000 Other Large Equipment Cost (Kentucky State Police funded) $ 8,400 $ 8,400 KYSP Total $ 45,690 $ 40,850

Optional supporting materials: 1. Map of the proposed project location 2. Aerial or on-the-ground photos of the proposed project site. Trooper Island August 2015