THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Similar documents
THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

Asbestos Operations and Maintenance Plan

WILL NOT DISTURB ASBESTOS CONTAINING MATERIAL!

Asbestos Regulation and Compliance

ASBESTOS INVENTORY CONTROL

FINAL Designated Substances Survey Report Women s Residence 674 Dundas Street West, Toronto, Ontario

Hazard Communication Program

WAYNE COUNTY BOARD OF EDUCATION. Asbestos Operations and Maintenance Program

Chapter 7 Inspector Safety

ASBESTOS OPERATIONS AND MAINTENANCE SAFETY PROGRAM

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

TATTVAM ENVIRONMENTAL AND ENGINEERING SOLUTIONS, LLC. Indoor Air Quality Report for Weston Public Schools Weston, CT.

Asbestos Management Plan

CSU Channel Islands Lead Operations and Maintenance Program

BEGINNING THE MEETING

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

Escondido Union High School District. Hazard Communication Plan

The Children s Hospital of Philadelphia Committee for the Protection of Human Subjects Policies and Procedures. Cooperative Agreements

BSR GPTC Z TR GM References and Reporting Page 1 of 8

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

ontario regulation 629/05 made under the occupational health and safety act

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

SILICA EXPOSURE CONTROL PLAN

HAZARD COMMUNICATION PROGRAM

Confined Space Entry Written Program

Procedure: Pressure equipment safety

PLEASE DO NOT WRITE ON THIS EXAM

PLEASE DO NOT WRITE ON THIS EXAM

BASKETBALL 11. Rules In This Section Shall Pertain To Both Boys And Girls Basketball Unless Otherwise Specified.

RISK MANAGEMENT AND SAFETY COURSE DESCRIPTION CATALOG & CONTACT INFORMATION

TABLE OF CONTENTS PART 2 - CONFINED SPACES

Testing Procedures of Watertight Compartments

CONFINED SPACE ENTRY WRITTEN PLAN

Pressure Relief Device Investigation Testing Lessons Learned

Hazard Communication Program

Laboratory results indicate all short-term radon tests at Glencoe High School tested below 4.0 pci/l.

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

CONFINED SPACE POLICY


Estates & Facilities Management - Management and Control of Asbestos Policy and Procedures

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

LOCATION OF WORK WRITTEN BY: APPROVED BY: DATE LAST REVISION Schools in PTSD Lorie Carriere Gordon Howe June 24, 2010 November 14, 2017

HAZARD ASSESSMENT FOR ORANGE COUNTY SCHOOLS

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

OPERATIONAL GUIDELINE P R O C E D U R E

Additional requirements for all types of entry are described in Section Determining the Applicable Entry Method

Unit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813)

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

Hazardous Energy Program Lockout/Tagout

SECTION LEAD-BASED PAINT REMOVAL AND DISPOSAL

Hazardous Energy Control

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Title: Benzene Awareness Effective Date: 11/14/2014 Control Number: THG_0037 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

FAQs: Confined Spaces in Residential Construction

2018 INSPECTION REPORT

Slips, Trips and Falls

Management Plan for Confined Spaces

General Safety and Health Provisions for Construction Self Inspection Checklist

Procedure: Confined space safety

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

SAFEWORK PRACTICES EQUIVALENCY PROCEDURE FOR ACCESSING FLOATING ROOF TANKS ON STORAGE TANKS IN SERVICE CAT A-2 SOP #33

RIBs policies & procedures

Practice Test FOR GAS POSITIONS APTITUDE BATTERY

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Facility Condition Assessment Report

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Chapter 4 Institutional Review Board (IRB) Roles and Authorities

NZQA registered unit standard version 3 Page 1 of 7. Plan electrical installations for explosive atmospheres

Standard Pneumatic Test Procedure Requirements for Piping Systems

Safe Work Practices for Handling Asbestos DRAFT

Removal of Lead-Based Paint

Hazardous Materials Management Guidelines

PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH. PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

NZQA registered unit standard version 1 Page 1 of 8. Conduct detailed inspection of electrical installations for explosive atmospheres

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

In addition to the responsibility for managing the elements of the respiratory protection program, he/she will be responsible for:

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTRACTOR HEALTH, SAFETY AND ENVIRONMENTAL HANDBOOK

Transcription:

SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Mastery Charter @ Grover Cleveland School ULCS# 4260 Building # B426001-1 3701 North 19 th Street Philadelphia, Pennsylvania 19140 January 2016 Conducted By: Accredited Environmental Technologies, Incorporated Batta Environmental Associates, Incorporated Criterion Laboratories, Incorporated Environmental Testing Consultants, LLC G & C Environmental Services, Incorporated KEM Partners, Incorporated Synertech, Inc. TTI Environmental, Inc. USA Environmental Management, Inc. The Vertex Companies, Inc. Management Plan Prepared By: Criterion Labs, Inc and Synertech Inc. This report must remain in the Main Office as mandated by the US EPA AHERA Regulations.

AHERA THREE-YEAR REINSPECTION VOLUME IX Table of Contents Transmittal Letter Executive Summary I. Summary list of Confirmed Asbestos Containing Building Materials II. Summary list of Assumed Asbestos Contain Building Materials III. Summary list of Non-Asbestos Containing Building Materials IV. Summary list of Non Suspect Asbestos Containing Building Materials V. Summary List of Auditorium DATA for this location VI. Summary list of Attic and/or Crawlspace DATA for this location VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location Section I Report of Re-Inspection A. Introduction B. Three-Year Re-inspection IX Overview C. Post- Management Plan Activities and Changes C.1 - Sampling and Analysis C.2 - New Floor Tile Sampling C.3 - Abatement Activity C.4 - Periodic (Six-Month) Surveillance (Damaged Materials) Section II Re-Inspection Data A. Introduction B. Re-Inspection Key Definitions C. Room by Room Location Log Report Section III Certificates A. Management Planner/Building Inspector Certificates Section IV Cross Reference Table Page 1-8 Asbestos Management Program Page 9-19

SCHOOL DISTRICT OF PHILADELPHIA EDUCATIONAL CENTER 440 NORTH BROAD STREET PHILADELPHIA, PENNSYLVANIA 19130 OFFICE OF ENVIRONMENT AL MANAGEMENT A ND SERVICES PHONE (215)-400-4750 January 2016 TO: All Principals All Building Administrators FROM: Fran Burns Chief Operating Officer Francine Locke, M.S., Director Office of Environmental Management and Services SUBJECT: AHERA Three (3) Year Re-inspection IX report In order to comply with the provisions of the Asbestos Hazard Emergency Response Act (AHERA) the attached report is submitted to you. The law requires that this report be kept in the Main/Principal's office. It cannot be removed from these locations. If the school (program) is relocated to a different building, these environmental documents are to be safely retained for the next school/building occupants. All asbestos reports must be available to the public and Federal EPA upon request. Fran Burns Chief Operation Officer Francine Locke, M.S., Director Office of Environmental Management and Services AHERA-2d Revised 12/14/15

Executive Summary This Asbestos Hazard Emergency Response Act (AHERA) Three-Year Re-inspection Volume # IX Management Plan at this location, has been completed and the report of re-inspection submitted to the School District of Philadelphia. The re-inspections in all School District of Philadelphia buildings of 2015-2016 were conducted and completed between October 5 th, 2015 through March 30 th, 2016 as a joint project by Accredited Environmental Technologies, Inc., Batta Environmental Associates, Inc., Criterion Laboratories, Inc., Environmental Testing Consultants, LLC, G & C Environmental Services, Inc., KEM Partners, Inc., Synertech, Inc., TTI Environmental, Inc., USA Environmental Management, Inc. and The Vertex Companies, Inc. In general, the School District of Philadelphia Office of Environmental Management and Services conducts Environmental Impact Evaluations and provides Asbestos Inspection Reports prior to any renovation, demolition and/or maintenance activities. The AHERA report must be reviewed prior to any renovation, demolition and/or maintenance activities in order to avoid the unknowing disturbance to Asbestos Containing Building Materials identified within this location. In addition, prior to work activities above all drop ceilings this report should be reviewed to avoid potential disturbances to Asbestos Containing Materials. Refer to Section IV of the Cross Reference Table, for additional Asbestos Management Program information. Contact the Office of Environmental Management and Services to have an Environmental Impact Evaluation conducted prior to any renovation, demolition and/or maintenance activities within this facility. The information contained in this report was obtained from the original Asbestos Management Plan for the school, from update reports on changes and activities since the completion of the 1 st Management Plan for each location and from all prior inspections performed and documented in Volume # I through Volume VIII (dated respectively 1992, 1995, 1998, 2001, 2004, 2007, 2010 or 2013) (if applicable) - and by this Three-Year Re-inspection of this school. The re-inspection report/management Plan of 2015-2016 were reviewed and prepared collectively by Management Planner Megan Vala, Mary Anne Lerro of Criterion Laboratories, Inc. and/or Monique Causley, of Synertech Inc. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

The 2015-2016 inspection process included the addition of a comprehensive Room by Room Inventory of all Thermal (T), Surfacing (S) and Miscellaneous (M) Materials specific to each room of this facility. Inspections of each room s thermal, ceilings, walls, floors and miscellaneous items regardless of Asbestos Content are categorized on the Room by Room Location Log Report for this location. Rooms or areas of the facility that were not accessible at the time of the inspection are marked with an X. The Room by Room Location Log Report is found in Section II C of this Management Plan. All Presumed or Suspect Asbestos Containing Building Materials (ACBMs), listed in the following summary charts are categorized as Confirmed, Assumed, Non-Asbestos, and/or Non- Suspect (ACBMs) were identified in the original Management Plan, or in the Volume I through Volume VIII AHERA Three-Year Re-inspection reports, and were re-inspected as part of this project. As mandated by the U S EPA AHERA regulations, periodic Six-Month inspections and Three- Year Re-inspections of this location will be performed and the Inspection Data in this report will be updated accordingly. Please feel free to contact the School District of Philadelphia s Office of Environmental Management and Services (OEMS) regarding any comments, questions, or concerns regarding this report or any Environmental related topic. OEMS staff can be reached at (215) 400 4750, via fax at (215) 400 4751 or via e-mail at flocke@philasd.org and/or gfjunod@philasd.org. Additional information can be found on our website. Here is the link to the OEMS website. http://webgui.phila.k12.pa.us/offices/e/environmental 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

I. Summary list of Confirmed Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have been sampled and Laboratory Analysis has CONFIRMED the presence of Asbestos. Contact OEMS prior to the disturbance of any of the following materials. Confirmed Asbestos Containing Building Materials for this location Boiler Breeching Floor Tile VAT 9" x 9" Tank Insulation * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

II. Summary list of Assumed Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have not been sampled and should not be disturbed until verification of Asbestos Content. Contact OEMS for assessment and sampling prior to the disturbance of these materials. Assumed Asbestos Containing Building Materials for this location Blackboard Glue Dots Pipe Fitting Insulation Sink Undercoat Mastic Floor Tile VAT 12" x 12" Radiator Insulation Spline Ceiling Tile Glue Dots Metal Pan Ceiling Tile Sheetrock Wall Unit Ventilator Insulation * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

III. Summary list of Non-Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have been sampled and Laboratory Analysis has indicated NO Asbestos present or NO ASBESTOS DETECTED (NAD). Non- Asbestos Containing Building Materials for this location Ceiling Tile 1' x 1' Pipe Fitting Insulation Plaster Walls Ceiling Tile 2' x 4' Plaster Ceiling * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

IV. Summary list of Non-Suspect Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials are not typically known to contain Asbestos. Non-Suspect Asbestos Containing Building Materials for this location Brick Wall Concrete Block Wall Partition Room Dividers Carpet Concrete Ceiling Vinyl Vibration Damper Cloth Ceiling Tile 2' x 4' Fiberglass Pipe Fitting Insulation Wood Floor Cement Floor Fiberglass Pipe Insulation * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

V. Summary list of Auditorium DATA for this location These charts are to be used for a quick reference of the Auditorium DATA within this facility. Sampling of the Auditorium Ceilings throughout the District is more difficult because of the various ceiling heights. As sampling occurs this information is updated on a case by case basis for each specific location and facility. This is a list of known sampling information for this locations Auditorium Auditorium Ceiling Tile 2' x 4' Non Suspect ACM Auditorium Concrete Block Wall Non Suspect ACM Auditorium Fiberglass Pipe Insulation Non Suspect ACM Stairwell between Auditorium and Gym Concrete Ceiling Non Suspect ACM Stairwell between Auditorium and Gym Concrete Block Wall Non Suspect ACM Stairwell between Auditorium and Gym Fiberglass Pipe Insulation Non Suspect ACM * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

VI. Summary list of Attic and/or Crawlspace DATA for this location These charts are to be used for a quick reference regarding the Attics and/or Crawlspaces inspection DATA within this facility. Contact OEMS prior to entering any attic or crawlspace within this facility and refer to the below chart and legend for Category Rank determination. The Data relative to these spaces is updated as conditions change regarding Abatement or Renovation activity on a case by case basis for each specific location and facility. In general, Crawlspaces are below the basement or 1 st floor and Attics are above the floor space. Category Rank Legend "A" - No Asbestos Containing Materials - Sample Results indicate NO ACM on pipes, fittings, elbows, or equipment located within this functional space, and NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "B" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space, HOWEVER, NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "C" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space, and LOCALIZED VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "D" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space and DISTRIBUTED VISIBLE DEBRIS or SIGNIFICANT DAMAGE observed at time of this inspection. "E" - No Bulk Sample Results Available SUSPECT ACM OBSERVED. Contact OEMS immediately for additional instructions. Attic/Crawl Space Access Area Floor Surface Category Rank Comments Attic Attic near Stairwell Wire Lathe/Wood Planks "A" Attic 3rd Fl. Stairwell in Element 1 Wire Lathe/Wood Planks "C" Crawl Space Localized Debris/Compressed Paper/VDC Needs to be assessed 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Floor Element VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location These charts are to be used for a quick reference regarding the information known about the Pipe Chases and/or Pipe Shafts inspection DATA within this facility. Contact OEMS prior to performing renovation activities any Pipe Chase and/or Pipe Shaft within this facility and refer to the below chart and legend for Asbestos Content of various materials identified within each space. The Data relative to these spaces is updated as conditions change regarding Inspection, Abatement and/or Renovation activity on a case by case basis for each specific location and facility. In general, Pipe Chases are horizontal spaces and Pipe Shafts are vertical spaces. On Site Room Name Pipe Chase Pipe Shaft Material Confirmed Assumed NAD Non Suspect Amount of Material Amount of Damage Color Comments None None 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I Report of Re-inspection A. Introduction B. Three-Year Re-inspection IX Overview C. Post-Management Plan Activities and Changes 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I - A Introduction Report of Re-inspection The Three-Year Re-inspection IX was performed to fulfill the requirements of 40 CFR Part 763 - the Asbestos Hazard Emergency Response Act (AHERA). As required by AHERA, each Local Education Agency (LEA) must re-inspect all known confirmed or assumed Asbestos Containing Building Material (ACBM) located in the LEA's facilities. This re-inspection is intended to update the original Asbestos Management Plan for the LEA's facilities. Multiple Building Inspectors of several firms performed the 2015/2016 re-inspection. The reinspection report/management Plan of 2015-2016 were reviewed and prepared collectively by Management Planner Megan Vala, Mary Anne Lerro of Criterion Laboratories, Inc. and Monique Causley, of Synertech Inc. All of the certificates can be found in Section III. During the re-inspection of each School District of Philadelphia facility, all of the Management Plans for that facility were reviewed. Information from the conclusions section of that report is included in this report. Additionally, information on activities such as abatements, cleanings, sampling and inspections, which have taken place since the completion of the original Management Plan, were reviewed during the re-inspection. Information on those activities is included in this report. As mandated by the U S EPA AHERA regulations, all future periodic Six-Month inspections and Three-Year Re-inspections of this location will be performed and the Inspection Data in this report will be updated accordingly. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I - B Three-Year Re-inspection IX Overview Each homogeneous area of Asbestos Containing Building Material (ACBM) listed in the original Management Plan or in the 1992, 1995, 1998, 2001, etc., Three-Year Reinspection reports were inspected for the AHERA Three-Year Re-inspection Volume IX, and the information for that material verified. Any changes to a homogeneous area listed in the updates to the Management Plans were verified. Any area of suspected ACBM found in the course of the re-inspection, and not listed in the Management Plan or updates, were either assumed to contain asbestos or sampled and analyzed to determine their asbestos content. Any such new areas either assumed to contain asbestos or determined through analysis to contain asbestos were included in the report of the Three- Year Re-inspection. The results of the AHERA Three-Year Re-inspection IX are tabulated in the Room by Room log reports located in Section II-C of this report. As previously noted, all future periodic Six-Month inspections and Three-Year Reinspections of this location will be performed and the Inspection Data in this report will be updated accordingly. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I C.1 Post Management Plan Activities/Changes Information on activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: Sampling and Analysis, New Tile Installation, Abatement Activity and Periodic Six-Month Surveillance Data. Sampling and Analysis As Sampling occurs, data will be listed here. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I C.2 Information on the installation of new floor tiles/renovation activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: New Floor Tile Sampling In the event that new tile is installed, the material must be tested prior to installation. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I C.3 Information on the Asbestos Abatement and renovation activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: Abatement Activity As Abatement occurs, data will be listed here. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section I C.4 Information on the AHERA inspection that noted damage to various Building Materials at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Work orders are created for Corrective Action responses and tracked for completion. Updates to the Management Plan include the following: Periodic (Six-Month) Surveillance (Damaged Materials) Amount Date Element Floor On Site Room Name Material Amount of Material of Damage 1/29/2016 1 3 Staff Restroom Floor Tile VAT 9" x 9" 224 SF 10 SF 1/29/2016 2 GD Gymnasium Floor Tile VAT 9" x 9" 4028 SF 8 SF 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section II Re-inspection Data A. Introduction B. Re-inspection Key Definitions C. Room by Room Asbestos Location Log 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section II - A Introduction Re-inspection Data The following information documents the Three-Year Re-inspection IX of the subject school/facility. The Homogeneous Area Reports were produced using the building inspector's field data on the facility. The key to the Homogeneous Area Report is outlined in the following pages of this report. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section II - B (page 1 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE YEAR RE-INSPECTION IX ITEM DEFINITION ULCS# HOMOGENEOUS AREA ID# Individual identification number assigned to each school within the School District of Philadelphia. Identification number assigned to each homogeneous area in a school/facility. Each section of the homogeneous area ID is significant. 1010/01/01/01 A B C D A. Is the ULCS# for the school. B. Designates the specific building/building area within the school. C. Designates the floor or level within the building/building area. D. Designates the homogeneous material within that floor or level. Note: Item D may be a number or a letter. SYSTEM AFFECTED ITEM AFFECTED Corresponds to the AHERA system for classifying materials. T : Thermal System S : Surfacing System M : Miscellaneous Is a description of the homogeneous material. ORIGINAL This section contains the information found in the original INSPECTION Management Plan (1988-1989). DATA AMOUNT OF MATERIAL/ UNIT Quantity of material, and measuring unit. Units include: Square Feet (SF) Each (EA) Linear Feet (LF) Cubic Feet (CF). 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

(page 2 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY ITEM DEFINITION CND Condition DP Damage Potential ASMD Assumed Asbestos Corresponds to AHERA condition rating for materials. 0 : No Damage 1 : Damage 2 : Significant Damage Corresponds to the AHERA material assessment system. 1 : Potential for Damage 2 : Potential for Significant Damage This means that a material was not sampled for asbestos content during the original Management Plan inspection. RA This corresponds to the AHERA system of response action rating for materials. Response Action 1 : Establish O&M Program 2 : Repair and Establish O&M Program 3 : Enclose 4 : Encapsulate 5 : Remove 6 : Partial Removal and Establish O&M Program CHANGES This section describes changes to the homogeneous material in the twenty-four years since the original AHERA inspection. The abbreviations are defined below. RMVD : Removed ENCL : Enclosed ENCP : Encapsulated DMGD : Damaged SMPLD : Sampled MTRL : Material RPRD : Repaired N/L : None Located RPLCD : Replaced 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

(page 3 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE-YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY ITEM DEFINITION THREE YEAR RE-INSPECTION DMGD AMT Amount Damaged NF Newly Friable RA Response Action This section contains the information obtained from the Three-Year Re-inspection IX. With three exceptions, the information categories are identical in format and meaning to those found in the original inspection data section. The three exceptions are defined below. This section gives the quantity of damaged material in a homogeneous area. The quantity is shown in the same format as the amount of material/unit section. This section identifies materials in the original Management Plan which have since become friable. This rating is based on the AHERA regulations, and is comparable to the RA rating found in the "Original Inspection Data" section. The following table details the response actions. 1. Establish O&M Program 2. Repair and Establish O&M Program 3. Enclose 4. Encapsulate 5. Remove 6. Partial Removal and Establish O&M Program a. High Priority Response The homogeneous material has been scheduled for abatement or other response action. b. Medium Priority Response The homogeneous material will be scheduled for abatement or other response action as soon as the high priority responses have been addressed. c. Low Priority Response The homogeneous material will be scheduled for abatement or other response action as soon as the medium priority responses have been addressed. d. On-Going Response/Operations and Maintenance The homogeneous material does not require abatement or other response action at present, and should be included in the facility's on-going operations and maintenance program. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

(page 4 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE-YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY The information presented in the changes section has been compiled from a variety of sources, including the Re-inspection and the following: * Quality Control/Quality Assurance Reports of asbestos abatement projects, prepared by consultants to the School District. * Permit and Notification Forms for asbestos abatement projects. * Periodic Surveillance Forms * Operations and Maintenance activities performed by School District personnel. * Verbal information from School District personnel. * Reports of sampling and analysis of suspected materials by both School District personnel and outside consultants. ROOM BY ROOM LOCATION LOG REPORT This section gives information, including damage amount and location, for a specific homogeneous material on a room-by-room basis and follows the Re-inspection form. NOTE: The disparate nature of the above sources of information prohibits the verification of much information within the scope of the AHERA Three-Year Re-inspection. Discrepancies and omissions may exist in this information, and therefore is included on an "as is" basis. The inspectors for the Three-Year Re-inspection IX evaluated homogeneous areas based on the materials current condition and location, as evidenced during the inspector's site visit.. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Mastery Charter @ Grover Cleveland School

Section II - C Room by Room Location Log Report These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. NOTE: Contact OEMS prior to the disturbance of any of the materials that are listed as Confirmed and/or Assumed. The quantities listed for (NAD) non-asbestos containing materials and/or Non-Suspect Materials are only estimated and were not measured for the purpose of this report. Field verification of quantities for renovation purposes would be necessary.

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 BS Stairwell next to Building Engineer's Office N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 BS Stairwell next to Building Engineer's Office N/A Plaster Walls NAD 1066 SF 0 SF N/A N/A N/A 1 BS Stairwell next to Building Engineer's Office N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 BS Building Engineer's Office N/A Concrete Ceiling Non Suspect ACM 124 SF 0 SF N/A N/A N/A 1 BS Building Engineer's Office N/A Brick Wall Non Suspect ACM 884 SF 0 SF N/A N/A N/A 1 BS Building Engineer's Office N/A Cement Floor Non Suspect ACM 168 SF 0 SF N/A N/A N/A 1 BS Building Engineer's Office N/A Ceiling Tile 2' x 4' NAD 44 SF 0 SF N/A N/A N/A 1 BS Building Engineer's Office N/A Pipe Fitting Insulation NAD 21 EA 0 EA N/A N/A N/A 1 BS Building Engineer's Office N/A Fiberglass Pipe Insulation Non Suspect ACM 135 LF 2 LF N/A N/A N/A 1 BS Art Room N/A Ceiling Tile 2' x 4' NAD 713 SF 0 SF N/A N/A N/A 1 BS Art Room N/A Concrete Block Wall Non Suspect ACM 935 SF 0 SF N/A N/A N/A 1 BS Art Room M Sheetrock Wall 4260/01/0B/BATTA/KM/2100 Assumed 253 SF 0 SF 1 No 1/D 1 BS Art Room M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 713 SF 0 SF Grey 1 No 1/D 1 BS Art Room M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 70 SF 0 SF Blue 1 No 1/D 1 BS Art Room T Unit Ventilator Insulation 4260/01/0B/BATTA/KM/1680 Assumed 36 SF 0 SF 1 No 1/D 1 BS Special Education Classroom N/A Ceiling Tile 2' x 4' NAD 621 SF 0 SF N/A N/A N/A 1 BS Special Education Classroom N/A Concrete Block Wall Non Suspect ACM 847 SF 0 SF N/A N/A N/A 1 BS Special Education Classroom M Sheetrock Wall 4260/01/0B/BATTA/KM/2100 Assumed 253 SF 0 SF 1 No 1/D 1 BS Special Education Classroom M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 621 SF 0 SF Grey 1 No 1/D 1 BS Special Education Classroom M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 60 SF 0 SF Blue 1 No 1/D 1 BS Special Education Classroom T Unit Ventilator Insulation 4260/01/0B/BATTA/KM/1680 Assumed 36 SF 0 SF 1 No 1/D 1 BS Special Education Classroom Restroom N/A Concrete Ceiling Non Suspect ACM 72 SF 0 SF N/A N/A N/A 1 BS Special Education Classroom Restroom N/A Concrete Block Wall Non Suspect ACM 442 SF 0 SF N/A N/A N/A 1 BS Special Education Classroom Restroom N/A Cement Floor Non Suspect ACM 72 SF 0 SF N/A N/A N/A 1 BS Special Education Classroom Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 6 LF 0 LF N/A N/A N/A 1 BS Girl's Restroom N/A Concrete Ceiling Non Suspect ACM 216 SF 0 SF N/A N/A N/A 1 BS Girl's Restroom N/A Concrete Block Wall Non Suspect ACM 792 SF 0 SF N/A N/A N/A 1 BS Girl's Restroom N/A Cement Floor Non Suspect ACM 216 SF 0 SF N/A N/A N/A 1 BS Boy's Restroom N/A Concrete Ceiling Non Suspect ACM 240 SF 0 SF N/A N/A N/A 1 BS Boy's Restroom N/A Concrete Block Wall Non Suspect ACM 816 SF 0 SF N/A N/A N/A 1 BS Boy's Restroom N/A Cement Floor Non Suspect ACM 240 SF 0 SF N/A N/A N/A 1 BS Boy's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 72 LF 0 LF N/A N/A N/A 1 BS Boy's Restroom N/A Pipe Fitting Insulation NAD 9 EA 0 EA N/A N/A N/A 1 BS Main Cafeteria N/A Ceiling Tile 2' x 4' NAD 1748 SF 0 SF N/A N/A N/A 1 BS Main Cafeteria N/A Plaster Walls NAD 2178 SF 0 SF N/A N/A N/A 1 BS Main Cafeteria M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 1748 SF 0 SF White 1 No 1/D 1 BS Main Cafeteria T Unit Ventilator Insulation 4260/01/0B/BATTA/KM/1680 Assumed 72 SF 0 SF 1 No 1/D 1 BS Kitchen Office N/A Concrete Ceiling Non Suspect ACM 72 SF 0 SF N/A N/A N/A 1 BS Kitchen Office N/A Concrete Block Wall Non Suspect ACM 408 SF 0 SF N/A N/A N/A 1 BS Kitchen Office M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 72 SF 0 SF Green 1 No 1/D 1 BS Kitchen N/A Ceiling Tile 2' x 4' NAD SF 0 SF Need amount of material N/A N/A N/A 1 BS Kitchen N/A Concrete Block Wall Non Suspect ACM SF 0 SF Need amount of material N/A N/A N/A 1 BS Kitchen M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed SF 0 SF Blue Need amount of material 1 No 1/D 1 BS Power Room N/A Concrete Ceiling Non Suspect ACM 312 SF 0 SF N/A N/A N/A 1 BS Power Room N/A Brick Wall Non Suspect ACM 806 SF 0 SF N/A N/A N/A 1 BS Power Room N/A Concrete Block Wall Non Suspect ACM 312 SF 0 SF N/A N/A N/A 1 BS Power Room N/A Plaster Walls NAD 390 SF 0 SF N/A N/A N/A 1 BS Power Room N/A Cement Floor Non Suspect ACM 168 SF 0 SF N/A N/A N/A 1 BS Power Room M Floor Tile VAT 12" x 12" 4260/01/0B/MM Assumed 144 SF 0 SF White 1 No 1/D 1 BS Power Room N/A Fiberglass Pipe Insulation Non Suspect ACM 75 LF 0 LF N/A N/A N/A 1 BS Power Room N/A Pipe Fitting Insulation NAD 10 EA 0 EA N/A N/A N/A 1 BS Stairwell between Cafeterias N/A Concrete Ceiling Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 BS Stairwell between Cafeterias N/A Plaster Walls NAD 1886 SF 0 SF N/A N/A N/A 1 BS Stairwell between Cafeterias N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 BS Stairwell between Cafeterias N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 LF N/A N/A N/A 1 BS Stairwell between Cafeterias N/A Pipe Fitting Insulation NAD 9 EA 0 EA N/A N/A N/A 1 BS Stairwell between Cafeterias T Unit Ventilator Insulation 4260/01/0B/BATTA/KM/1680 Assumed 8 SF 0 SF 1 No 1/D 1 BS Small Cafeteria N/A Ceiling Tile 2' x 4' NAD SF 0 SF Need amount of material N/A N/A N/A 1 BS Small Cafeteria N/A Brick Wall Non Suspect ACM SF 0 SF Need amount of material N/A N/A N/A 1 BS Small Cafeteria M Floor Tile VAT 9" x 9" 4260/01/0B/06 Confirmed SF 0 SF Red Need amount of material 1 No 1/D 1 BS Small Cafeteria T Unit Ventilator Insulation 4260/01/0B/BATTA/KM/1680 Assumed 36 SF 0 SF 1 No 1/D 1 BS Small Cafeteria N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 LF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 1

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 BS Small Cafeteria N/A Pipe Fitting Insulation NAD 1 EA 0 EA N/A N/A N/A 1 BS Women's Restroom N/A Concrete Ceiling Non Suspect ACM 45 SF 0 SF N/A N/A N/A 1 BS Women's Restroom N/A Brick Wall Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 BS Women's Restroom N/A Cement Floor Non Suspect ACM 45 SF 0 SF N/A N/A N/A 1 BS Women's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 36 LF 0 LF N/A N/A N/A 1 BS Women's Restroom N/A Pipe Fitting Insulation NAD 4 EA 0 EA N/A N/A N/A 1 BS Men's Restroom N/A Concrete Ceiling Non Suspect ACM 32 SF 0 SF N/A N/A N/A 1 BS Men's Restroom N/A Concrete Block Wall Non Suspect ACM 312 SF 0 SF N/A N/A N/A 1 BS Men's Restroom N/A Cement Floor Non Suspect ACM 32 SF 0 SF N/A N/A N/A 1 BS Men's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 13 LF 0 LF N/A N/A N/A 1 BS Men's Restroom N/A Pipe Fitting Insulation NAD 3 EA 0 EA N/A N/A N/A 1 BS Storage 2 N/A Concrete Ceiling Non Suspect ACM 810 SF 0 SF N/A N/A N/A 1 BS Storage 2 N/A Brick Wall Non Suspect ACM 1824 SF 0 SF N/A N/A N/A 1 BS Storage 2 N/A Cement Floor Non Suspect ACM 810 SF 0 SF N/A N/A N/A 1 BS Storage 2 T Tank Insulation 4260/01/0B/BATTA/KM/0800 Confirmed 400 SF 0 SF 1 No 1/D 1 BS Storage 2 N/A Fiberglass Pipe Insulation Non Suspect ACM 150 LF 0 LF N/A N/A N/A 1 BS Storage 2 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 13 EA 0 EA N/A N/A N/A 1 BS Storage 2 N/A Pipe Fitting Insulation NAD 13 EA 0 EA N/A N/A N/A 1 BS Boiler Room N/A Concrete Ceiling Non Suspect ACM 768 SF 0 SF N/A N/A N/A 1 BS Boiler Room N/A Brick Wall Non Suspect ACM 1792 SF 0 SF N/A N/A N/A 1 BS Boiler Room N/A Cement Floor Non Suspect ACM 768 SF 0 SF N/A N/A N/A 1 BS Boiler Room N/A Fiberglass Pipe Insulation Non Suspect ACM 400 LF 0 LF N/A N/A N/A 1 BS Boiler Room N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 12 EA 0 EA N/A N/A N/A 1 BS Boiler Room N/A Pipe Fitting Insulation NAD 17 EA 0 EA N/A N/A N/A 1 BS Boiler Room T Boiler Breeching 4260/01/0B/BATTA/KM/0600 Confirmed 640 SF 0 SF 1 No 1/D 1 BS Generator Room N/A Concrete Ceiling Non Suspect ACM 168 SF 0 SF N/A N/A N/A 1 BS Generator Room N/A Brick Wall Non Suspect ACM 832 SF 0 SF N/A N/A N/A 1 BS Generator Room N/A Cement Floor Non Suspect ACM 168 SF 0 SF N/A N/A N/A 1 BS Generator Room N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF N/A N/A N/A 1 BS Generator Room N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 1 EA 0 EA N/A N/A N/A 1 BS Custodial Work Room N/A Concrete Ceiling Non Suspect ACM 276 SF 0 SF N/A N/A N/A 1 BS Custodial Work Room N/A Brick Wall Non Suspect ACM 910 SF 0 SF N/A N/A N/A 1 BS Custodial Work Room N/A Cement Floor Non Suspect ACM 276 SF 0 SF N/A N/A N/A 1 BS Custodial Work Room T Boiler Breeching 4260/01/0B/BATTA/KM/0600 Confirmed 96 SF 0 SF 1 No 1/D 1 BS Custodial Work Room N/A Fiberglass Pipe Insulation Non Suspect ACM 70 LF 0 LF N/A N/A N/A 1 BS Custodial Work Room N/A Pipe Fitting Insulation NAD 3 EA 0 EA N/A N/A N/A 1 BS Storage 3 N/A Concrete Ceiling Non Suspect ACM 1064 SF 0 SF N/A N/A N/A 1 BS Storage 3 N/A Brick Wall Non Suspect ACM 2112 SF 0 SF N/A N/A N/A 1 BS Storage 3 N/A Cement Floor Non Suspect ACM 1064 SF 0 SF N/A N/A N/A 1 BS Storage 3 N/A Fiberglass Pipe Insulation Non Suspect ACM 124 LF 0 LF N/A N/A N/A 1 BS Storage 3 N/A Pipe Fitting Insulation NAD 11 EA 0 EA N/A N/A N/A 1 BS Hallway from Cafeterias to Storage 3 N/A Ceiling Tile 2' x 4' NAD 1443 SF 0 SF N/A N/A N/A 1 BS Hallway from Cafeterias to Storage 3 N/A Brick Wall Non Suspect ACM 2976 SF 0 SF N/A N/A N/A 1 BS Hallway from Cafeterias to Storage 3 N/A Cement Floor Non Suspect ACM 1443 SF 0 SF N/A N/A N/A 1 BS Hallway from Cafeterias to Storage 3 N/A Fiberglass Pipe Insulation Non Suspect ACM 14 LF 0 LF N/A N/A N/A 1 1 Stairwell next to Classroom L108 N/A Plaster Ceiling NAD 910 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L108 N/A Plaster Walls NAD 1830 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L108 N/A Cement Floor Non Suspect ACM 455 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L108 M Floor Tile VAT 9" x 9" 4260/01/01/10 Confirmed 455 SF 0 SF White 1 No 1/D 1 1 Classroom L108 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L108 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L108 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L108 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Boy's Restroom N/A Plaster Ceiling NAD 110 SF 0 SF N/A N/A N/A 1 1 Boy's Restroom N/A Plaster Walls NAD 546 SF 0 SF N/A N/A N/A 1 1 Boy's Restroom N/A Cement Floor Non Suspect ACM 110 SF 0 SF N/A N/A N/A 1 1 Classroom L101 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L101 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L101 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L101 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L101 M Floor Tile VAT 12" x 12" 4260/01/01/JJ Assumed 24 SF 0 SF Tan 1 No 1/D 1 1 Classroom L101 Coat Closet N/A Ceiling Tile 2' x 4' NAD 144 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 2

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 1 Classroom L101 Coat Closet N/A Plaster Walls NAD 720 SF 0 SF N/A N/A N/A 1 1 Classroom L101 Coat Closet N/A Wood Floor Non Suspect ACM 144 SF 0 SF N/A N/A N/A 1 1 Classroom L101 Restroom N/A Ceiling Tile 2' x 4' NAD 35 SF 0 SF N/A N/A N/A 1 1 Classroom L101 Restroom N/A Plaster Walls NAD 96 SF 0 SF N/A N/A N/A 1 1 Classroom L101 Restroom M Sheetrock Wall 4260/01/01/BATTA/KM/2100 Assumed 96 SF 0 SF 1 No 1/D 1 1 Classroom L101 Restroom M Floor Tile VAT 12" x 12" 4260/01/01/JJ Assumed 35 SF 0 SF Tan 1 No 1/D 1 1 Girl's Restroom N/A Plaster Ceiling NAD 156 SF 0 SF N/A N/A N/A 1 1 Girl's Restroom N/A Plaster Walls NAD 650 SF 0 SF N/A N/A N/A 1 1 Girl's Restroom N/A Cement Floor Non Suspect ACM 156 SF 0 SF N/A N/A N/A 1 1 Classroom L102 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L102 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L102 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L102 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L102 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 1 Classroom L102 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 1 Classroom L102 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 1 Fire Tower 1 N/A Concrete Ceiling Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 1 Fire Tower 1 N/A Brick Wall Non Suspect ACM 1760 SF 0 SF N/A N/A N/A 1 1 Fire Tower 1 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 1 Fire Tower 2 N/A Concrete Ceiling Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 1 Fire Tower 2 N/A Brick Wall Non Suspect ACM 1200 SF 0 SF N/A N/A N/A 1 1 Fire Tower 2 N/A Cement Floor Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 1 Classroom L103 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L103 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L103 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L103 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L103 Coat Closet N/A Ceiling Tile 2' x 4' NAD 95 SF 0 SF N/A N/A N/A 1 1 Classroom L103 Coat Closet N/A Plaster Walls NAD 576 SF 0 SF N/A N/A N/A 1 1 Classroom L103 Coat Closet N/A Wood Floor Non Suspect ACM 95 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office N/A Ceiling Tile 2' x 4' NAD 230 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office N/A Plaster Walls NAD 792 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office N/A Wood Floor Non Suspect ACM 115 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office M Floor Tile VAT 9" x 9" 4260/01/01/10 Confirmed 115 SF 0 SF Green 1 No 1/D 1 1 Dean of Students Office M Floor Tile VAT 12" x 12" 4260/01/01/JJ Assumed 23 SF 0 SF Blue 1 No 1/D 1 1 Dean of Students Office N/A Fiberglass Pipe Insulation Non Suspect ACM 24 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office Closet N/A Plaster Ceiling NAD 10 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office Closet N/A Plaster Walls NAD 112 SF 0 SF N/A N/A N/A 1 1 Dean of Students Office Closet N/A Wood Floor Non Suspect ACM 10 SF 0 SF N/A N/A N/A 1 1 Classroom L104 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L104 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L104 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L104 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L104 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 1 Classroom L104 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 1 Classroom L104 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 1 Classroom L105 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L105 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L105 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L105 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L105 Coat Closet N/A Ceiling Tile 2' x 4' NAD 120 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Coat Closet N/A Plaster Walls NAD 624 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Coat Closet N/A Wood Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Large Closet N/A Plaster Ceiling NAD 160 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Large Closet N/A Plaster Walls NAD 888 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Large Closet N/A Wood Floor Non Suspect ACM 160 SF 0 SF N/A N/A N/A 1 1 Classroom L105 Large Closet N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 1 Classroom L106 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L106 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L106 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L106 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L106 Coat Closet N/A Ceiling Tile 2' x 4' NAD 126 SF 0 SF N/A N/A N/A 1 1 Classroom L106 Coat Closet N/A Plaster Walls NAD 648 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 3

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 1 Classroom L106 Coat Closet N/A Wood Floor Non Suspect ACM 126 SF 0 SF N/A N/A N/A 1 1 Classroom L106 Coat Closet N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 1 Classroom L106 Coat Closet T Pipe Fitting Insulation 4260/01/01/11 Assumed 4 EA 0 EA 1 No 1/D 1 1 Classroom L107 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L107 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 1 Classroom L107 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 1 Classroom L107 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 1 Classroom L107 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 1 Hallway from Classroom L101 to L106 N/A Ceiling Tile 2' x 4' NAD 1443 SF 0 SF N/A N/A N/A 1 1 Hallway from Classroom L101 to L106 N/A Plaster Walls NAD 2664 SF 0 SF N/A N/A N/A 1 1 Hallway from Classroom L101 to L106 N/A Cement Floor Non Suspect ACM 1443 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L105 N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L105 N/A Plaster Walls NAD 1066 SF 0 SF N/A N/A N/A 1 1 Stairwell next to Classroom L105 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 1 Vestibule off Stair next to Classroom L105 N/A Plaster Ceiling NAD 78 SF 0 SF N/A N/A N/A 1 1 Vestibule off Stair next to Classroom L105 N/A Plaster Walls NAD 494 SF 0 SF N/A N/A N/A 1 1 Vestibule off Stair next to Classroom L105 N/A Cement Floor Non Suspect ACM 78 SF 0 SF N/A N/A N/A 1 1 Vestibule off Stair next to Classroom L105 T Unit Ventilator Insulation 4260/01/01/BATTA/KM/1680 Assumed 12 SF 0 SF 1 No 1/D 1 2 Stairwell between Classroom L201 and Counseling Center N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 2 Stairwell between Classroom L201 and Counseling Center N/A Plaster Walls NAD 1886 SF 0 SF N/A N/A N/A 1 2 Stairwell between Classroom L201 and Counseling Center N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 2 Counseling Center Back Office 211B N/A Ceiling Tile 2' x 4' NAD 384 SF 0 SF N/A N/A N/A 1 2 Counseling Center Back Office 211B N/A Plaster Walls NAD 672 SF 0 SF N/A N/A N/A 1 2 Counseling Center Back Office 211B M Sheetrock Wall 4260/01/02/BATTA/KM/2100 Assumed 384 SF 0 SF 1 No 1/D 1 2 Counseling Center Back Office 211B N/A Wood Floor Non Suspect ACM 384 SF 0 SF N/A N/A N/A 1 2 Counseling Center Back Office 211B T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Hall to Counseling Center Back Room 211B / Supplies N/A Ceiling Tile 2' x 4' NAD 192 SF 0 SF N/A N/A N/A 1 2 Hall to Counseling Center Back Room 211B / Supplies N/A Plaster Walls NAD 912 SF 0 SF N/A N/A N/A 1 2 Hall to Counseling Center Back Room 211B / Supplies N/A Wood Floor Non Suspect ACM 192 SF 0 SF N/A N/A N/A 1 2 Hall to Counseling Center Back Room 211B / Supplies N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 2 Counseling Center Entrance / Copy Room N/A Ceiling Tile 2' x 4' NAD 144 SF 0 SF N/A N/A N/A 1 2 Counseling Center Entrance / Copy Room N/A Plaster Walls NAD 288 SF 0 SF N/A N/A N/A 1 2 Counseling Center Entrance / Copy Room M Sheetrock Wall 4260/01/02/BATTA/KM/2100 Assumed 288 SF 0 SF 1 No 1/D 1 2 Counseling Center Entrance / Copy Room N/A Wood Floor Non Suspect ACM 144 SF 0 SF N/A N/A N/A 1 2 Counseling Center Front Room 211A N/A Ceiling Tile 2' x 4' NAD 400 SF 0 SF N/A N/A N/A 1 2 Counseling Center Front Room 211A N/A Plaster Walls NAD 480 SF 0 SF N/A N/A N/A 1 2 Counseling Center Front Room 211A M Sheetrock Wall 4260/01/02/BATTA/KM/2100 Assumed 480 SF 0 SF 1 No 1/D 1 2 Counseling Center Front Room 211A N/A Wood Floor Non Suspect ACM 400 SF 0 SF N/A N/A N/A 1 2 Boy's Restroom N/A Plaster Ceiling NAD 110 SF 0 SF N/A N/A N/A 1 2 Boy's Restroom N/A Plaster Walls NAD 546 SF 0 SF N/A N/A N/A 1 2 Boy's Restroom N/A Cement Floor Non Suspect ACM 110 SF 0 SF N/A N/A N/A 1 2 Girl's Restroom N/A Plaster Ceiling NAD 156 SF 0 SF N/A N/A N/A 1 2 Girl's Restroom N/A Plaster Walls NAD 650 SF 0 SF N/A N/A N/A 1 2 Girl's Restroom N/A Cement Floor Non Suspect ACM 156 SF 0 SF N/A N/A N/A 1 2 Fire Tower 1 N/A Concrete Ceiling Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 2 Fire Tower 1 N/A Brick Wall Non Suspect ACM 1760 SF 0 SF N/A N/A N/A 1 2 Fire Tower 1 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 2 Fire Tower 2 N/A Concrete Ceiling Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 2 Fire Tower 2 N/A Brick Wall Non Suspect ACM 1200 SF 0 SF N/A N/A N/A 1 2 Fire Tower 2 N/A Cement Floor Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office N/A Ceiling Tile 2' x 4' NAD 230 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office N/A Plaster Walls NAD 792 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office N/A Carpet Non Suspect ACM 230 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 2 Assistant Principals' Office Closet N/A Plaster Ceiling NAD 10 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office Closet N/A Plaster Walls NAD 112 SF 0 SF N/A N/A N/A 1 2 Assistant Principals' Office Closet N/A Wood Floor Non Suspect ACM 10 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 4

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 2 Classroom L207 N/A Ceiling Tile 2' x 4' NAD 768 SF 0 SF N/A N/A N/A 1 2 Classroom L207 N/A Plaster Walls NAD 1344 SF 0 SF N/A N/A N/A 1 2 Classroom L207 N/A Wood Floor Non Suspect ACM 768 SF 0 SF N/A N/A N/A 1 2 Classroom L207 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 2 Classroom L207 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L206 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L206 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L206 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L206 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L206 Coat Closet N/A Ceiling Tile 2' x 4' NAD 126 SF 0 SF N/A N/A N/A 1 2 Classroom L206 Coat Closet N/A Plaster Walls NAD 648 SF 0 SF N/A N/A N/A 1 2 Classroom L206 Coat Closet N/A Wood Floor Non Suspect ACM 126 SF 0 SF N/A N/A N/A 1 2 Classroom L206 Coat Closet N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A 1 2 Stairwell between Classrooms L206 and L205 N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 2 Stairwell between Classrooms L206 and L205 N/A Plaster Walls NAD 1066 SF 0 SF N/A N/A N/A 1 2 Stairwell between Classrooms L206 and L205 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 2 Classroom L205 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L205 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L205 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L205 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L205 Coat Closet N/A Ceiling Tile 2' x 4' NAD 120 SF 0 SF Efflorescence on exterior wall ~20 sf N/A N/A N/A 1 2 Classroom L205 Coat Closet N/A Plaster Walls NAD 624 SF 0 SF N/A N/A N/A 1 2 Classroom L205 Coat Closet N/A Wood Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A 1 2 Classroom L205 Office N/A Ceiling Tile 2' x 4' NAD 160 SF 0 SF N/A N/A N/A 1 2 Classroom L205 Office N/A Plaster Walls NAD 888 SF 0 SF N/A N/A N/A 1 2 Classroom L205 Office N/A Cement Floor Non Suspect ACM 160 SF 0 SF N/A N/A N/A 1 2 Classroom L205 Office N/A Fiberglass Pipe Insulation Non Suspect ACM 60 LF 0 LF N/A N/A N/A 1 2 Classroom L204 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L204 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L204 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L204 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L204 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 2 Classroom L204 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 2 Classroom L204 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 2 Classroom L203 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L203 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L203 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L203 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L203 Coat Closet N/A Ceiling Tile 2' x 4' NAD 95 SF 0 SF N/A N/A N/A 1 2 Classroom L203 Coat Closet N/A Plaster Walls NAD 576 SF 0 SF N/A N/A N/A 1 2 Classroom L203 Coat Closet N/A Wood Floor Non Suspect ACM 95 SF 0 SF N/A N/A N/A 1 2 Classroom L202 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L202 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L202 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L202 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L202 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 2 Classroom L202 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 2 Classroom L202 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 2 Classroom L201 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L201 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 2 Classroom L201 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 2 Classroom L201 T Unit Ventilator Insulation 4260/01/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 2 Classroom L201 Coat Closet N/A Ceiling Tile 2' x 4' NAD 120 SF 0 SF moldy ceiling tile N/A N/A N/A 1 2 Classroom L201 Coat Closet N/A Plaster Walls NAD 624 SF 0 SF N/A N/A N/A 1 2 Classroom L201 Coat Closet N/A Wood Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A 1 2 Classroom L201 Office N/A Ceiling Tile 2' x 4' NAD 160 SF 0 SF N/A N/A N/A 1 2 Classroom L201 Office N/A Plaster Walls NAD 888 SF 0 SF N/A N/A N/A 1 2 Classroom L201 Office M Floor Tile VAT 12" x 12" 4260/01/02/KK Assumed 160 SF 0 SF Tan 1 No 1/D 1 2 Classroom L201 Office N/A Fiberglass Pipe Insulation Non Suspect ACM 36 LF 0 LF N/A N/A N/A 1 2 Hallway between Classrooms L201 and L206 N/A Ceiling Tile 2' x 4' NAD 1443 SF 0 SF N/A N/A N/A 1 2 Hallway between Classrooms L201 and L206 N/A Plaster Walls NAD 2664 SF 0 SF N/A N/A N/A 1 2 Hallway between Classrooms L201 and L206 N/A Cement Floor Non Suspect ACM 1443 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 5

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 3 Stairwell between Classrooms L301 and L308 N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 3 Stairwell between Classrooms L301 and L308 N/A Plaster Walls NAD 1886 SF 0 SF N/A N/A N/A 1 3 Stairwell between Classrooms L301 and L308 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 3 Assistant Principal of School Culture's Office N/A Plaster Ceiling NAD 224 SF 0 SF N/A N/A N/A 1 3 Assistant Principal of School Culture's Office N/A Plaster Walls NAD 1092 SF 0 SF N/A N/A N/A 1 3 Assistant Principal of School Culture's Office N/A Carpet Non Suspect ACM 224 SF 0 SF N/A N/A N/A 1 3 Classroom L301 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L301 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L301 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L301 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L301 Coat Closet N/A Ceiling Tile 2' x 4' NAD 120 SF 0 SF N/A N/A N/A 1 3 Classroom L301 Coat Closet N/A Plaster Walls NAD 624 SF 0 SF N/A N/A N/A 1 3 Classroom L301 Coat Closet N/A Wood Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A 1 3 Classroom L302 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L302 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L302 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L302 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L302 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 3 Classroom L302 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 3 Classroom L302 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 3 Classroom L303 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L303 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L303 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L303 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L303 Coat Closet N/A Ceiling Tile 2' x 4' NAD 95 SF 0 SF N/A N/A N/A 1 3 Classroom L303 Coat Closet N/A Plaster Walls NAD 576 SF 0 SF N/A N/A N/A 1 3 Classroom L303 Coat Closet N/A Wood Floor Non Suspect ACM 95 SF 0 SF N/A N/A N/A 1 3 Classroom L304 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L304 N/A Plaster Walls NAD 1584 SF 0 SF efflorescence on wall N/A N/A N/A 1 3 Classroom L304 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L304 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L304 Coat Closet N/A Ceiling Tile 2' x 4' NAD 85 SF 0 SF N/A N/A N/A 1 3 Classroom L304 Coat Closet N/A Plaster Walls NAD 440 SF 0 SF N/A N/A N/A 1 3 Classroom L304 Coat Closet N/A Wood Floor Non Suspect ACM 85 SF 0 SF N/A N/A N/A 1 3 Classroom L305 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L305 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L305 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L305 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L305 Coat Closet N/A Ceiling Tile 2' x 4' NAD 120 SF 0 SF N/A N/A N/A 1 3 Classroom L305 Coat Closet N/A Plaster Walls NAD 624 SF 0 SF N/A N/A N/A 1 3 Classroom L305 Coat Closet N/A Wood Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A 1 3 Stairwell between Classrooms L305 and L306 N/A Plaster Ceiling NAD 364 SF 0 SF N/A N/A N/A 1 3 Stairwell between Classrooms L305 and L306 N/A Plaster Walls NAD 1066 SF 0 SF N/A N/A N/A 1 3 Stairwell between Classrooms L305 and L306 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 3 Staff Restroom N/A Plaster Ceiling NAD 224 SF 0 SF N/A N/A N/A 1 3 Staff Restroom N/A Plaster Walls NAD 1092 SF 0 SF N/A N/A N/A 1 3 Staff Restroom M Floor Tile VAT 9" x 9" 4260/01/03/19 Confirmed 224 SF 10 SF Brown painted white 1 No 2/C 1 3 Classroom L306 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L306 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L306 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L306 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L306 Coat Closet N/A Ceiling Tile 2' x 4' NAD 126 SF 0 SF N/A N/A N/A 1 3 Classroom L306 Coat Closet N/A Plaster Walls NAD 648 SF 0 SF N/A N/A N/A 1 3 Classroom L306 Coat Closet N/A Wood Floor Non Suspect ACM 126 SF 0 SF N/A N/A N/A 1 3 Classroom L307 N/A Ceiling Tile 2' x 4' NAD 768 SF 0 SF N/A N/A N/A 1 3 Classroom L307 N/A Plaster Walls NAD 1344 SF 0 SF N/A N/A N/A 1 3 Classroom L307 N/A Wood Floor Non Suspect ACM 768 SF 0 SF N/A N/A N/A 1 3 Classroom L307 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Principal's Office N/A Ceiling Tile 2' x 4' NAD 230 SF 0 SF N/A N/A N/A 1 3 Principal's Office N/A Plaster Walls NAD 792 SF 0 SF N/A N/A N/A 1 3 Principal's Office N/A Wood Floor Non Suspect ACM 230 SF 0 SF N/A N/A N/A 1 3 Principal's Office Closet N/A Plaster Ceiling NAD 10 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 6

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 1 3 Principal's Office Closet N/A Plaster Walls NAD 112 SF 0 SF N/A N/A N/A 1 3 Principal's Office Closet N/A Wood Floor Non Suspect ACM 10 SF 0 SF N/A N/A N/A 1 3 Fire Tower 2 N/A Concrete Ceiling Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 3 Fire Tower 2 N/A Brick Wall Non Suspect ACM 1200 SF 0 SF N/A N/A N/A 1 3 Fire Tower 2 N/A Cement Floor Non Suspect ACM 104 SF 0 SF N/A N/A N/A 1 3 Fire Tower 1 N/A Concrete Ceiling Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 3 Fire Tower 1 N/A Brick Wall Non Suspect ACM 1760 SF 0 SF N/A N/A N/A 1 3 Fire Tower 1 N/A Cement Floor Non Suspect ACM 364 SF 0 SF N/A N/A N/A 1 3 Girl's Restroom N/A Plaster Ceiling NAD 156 SF 0 SF N/A N/A N/A 1 3 Girl's Restroom N/A Plaster Walls NAD 650 SF 0 SF N/A N/A N/A 1 3 Girl's Restroom N/A Cement Floor Non Suspect ACM 156 SF 0 SF N/A N/A N/A 1 3 Boy's Restroom N/A Plaster Ceiling NAD 110 SF 0 SF N/A N/A N/A 1 3 Boy's Restroom N/A Plaster Walls NAD 546 SF 0 SF N/A N/A N/A 1 3 Boy's Restroom N/A Cement Floor Non Suspect ACM 110 SF 0 SF N/A N/A N/A 1 3 Classroom L308 N/A Ceiling Tile 2' x 4' NAD 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L308 N/A Plaster Walls NAD 1584 SF 0 SF N/A N/A N/A 1 3 Classroom L308 N/A Wood Floor Non Suspect ACM 1089 SF 0 SF N/A N/A N/A 1 3 Classroom L308 T Unit Ventilator Insulation 4260/01/03/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 1 3 Classroom L308 Coat Closet N/A Ceiling Tile 2' x 4' NAD 96 SF 0 SF N/A N/A N/A 1 3 Classroom L308 Coat Closet N/A Plaster Walls NAD 456 SF 0 SF N/A N/A N/A 1 3 Classroom L308 Coat Closet M Sheetrock Wall 4260/01/03/BATTA/KM/2100 Assumed 72 SF 0 SF 1 No 1/D 1 3 Classroom L308 Coat Closet N/A Wood Floor Non Suspect ACM 96 SF 0 SF N/A N/A N/A 1 3 Classroom L308 Server Closet N/A Ceiling Tile 2' x 4' NAD 96 SF 0 SF N/A N/A N/A 1 3 Classroom L308 Server Closet N/A Plaster Walls NAD 456 SF 0 SF N/A N/A N/A 1 3 Classroom L308 Server Closet M Sheetrock Wall 4260/01/03/BATTA/KM/2100 Assumed 72 SF 0 SF 1 No 1/D 1 3 Classroom L308 Server Closet N/A Wood Floor Non Suspect ACM 96 SF 0 SF N/A N/A N/A 2 GD Main Entrance Vestibule N/A Ceiling Tile 1' x 1' NAD 182 SF 0 SF N/A N/A N/A 2 GD Main Entrance Vestibule M Spline Ceiling Tile Glue Dots 4260/02/0G/BATTA/KM/2603 Assumed 182 SF 0 SF 1 No 1/D 2 GD Main Entrance Vestibule N/A Concrete Block Wall Non Suspect ACM 540 SF 0 SF N/A N/A N/A 2 GD Main Entrance Vestibule M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 91 SF 0 SF Tan 1 No 1/D 2 GD Main Entrance Vestibule M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 91 SF 0 SF White 1 No 1/D 2 GD Main Entrance Vestibule T Radiator Insulation 4260/02/0G/BATTA/KM/1600 Assumed 12 SF 0 SF 1 No 1/D 2 GD Hallway from Main Office to Gym N/A Ceiling Tile 1' x 1' NAD 741 SF 0 SF N/A N/A N/A 2 GD Hallway from Main Office to Gym M Spline Ceiling Tile Glue Dots 4260/02/0G/BATTA/KM/2603 Assumed 741 SF 0 SF 1 No 1/D 2 GD Hallway from Main Office to Gym N/A Concrete Block Wall Non Suspect ACM 1270 SF 0 SF N/A N/A N/A 2 GD Hallway from Main Office to Gym M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 370 SF 0 SF White 1 No 1/D 2 GD Hallway from Main Office to Gym M Floor Tile VAT 12" x 12" 4260/02/0G/00 Assumed 370 SF 0 SF Tan 1 No 1/D 2 GD Main Office N/A Ceiling Tile 1' x 1' NAD 640 SF 0 SF N/A N/A N/A 2 GD Main Office M Spline Ceiling Tile Glue Dots 4260/02/0G/BATTA/KM/2603 Assumed 640 SF 0 SF 1 No 1/D 2 GD Main Office N/A Concrete Block Wall Non Suspect ACM 1040 SF 0 SF N/A N/A N/A 2 GD Main Office M Floor Tile VAT 12" x 12" 4260/02/0G/00 Assumed 640 SF 0 SF Multi 1 No 1/D 2 GD Main Office T Unit Ventilator Insulation 4260/02/0G/BATTA/KM/1680 Assumed 18 SF 0 SF 1 No 1/D 2 GD Nurse's Office N/A Ceiling Tile 1' x 1' NAD 240 SF 0 SF N/A N/A N/A 2 GD Nurse's Office M Spline Ceiling Tile Glue Dots 4260/02/0G/BATTA/KM/2603 Assumed 240 SF 0 SF 1 No 1/D 2 GD Nurse's Office N/A Concrete Block Wall Non Suspect ACM 640 SF 0 SF N/A N/A N/A 2 GD Nurse's Office M Floor Tile VAT 12" x 12" 4260/02/0G/00 Assumed 240 SF 0 SF Blue 1 No 1/D 2 GD Nurse's Office Restroom N/A Concrete Ceiling Non Suspect ACM 35 SF 0 SF N/A N/A N/A 2 GD Nurse's Office Restroom N/A Concrete Block Wall Non Suspect ACM 240 SF 0 SF N/A N/A N/A 2 GD Nurse's Office Restroom N/A Cement Floor Non Suspect ACM 35 SF 0 SF N/A N/A N/A 2 GD Main Office Conference Room N/A Concrete Ceiling Non Suspect ACM 169 SF 0 SF N/A N/A N/A 2 GD Main Office Conference Room N/A Concrete Block Wall Non Suspect ACM 520 SF 0 SF N/A N/A N/A 2 GD Main Office Conference Room M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 169 SF 0 SF Pink 1 No 1/D 2 GD Attendance Office N/A Ceiling Tile 1' x 1' NAD 169 SF 0 SF N/A N/A N/A 2 GD Attendance Office M Spline Ceiling Tile Glue Dots 4260/02/0G/BATTA/KM/2603 Assumed 169 SF 0 SF 1 No 1/D 2 GD Attendance Office N/A Concrete Block Wall Non Suspect ACM 520 SF 0 SF N/A N/A N/A 2 GD Attendance Office M Floor Tile VAT 12" x 12" 4260/02/0G/00 Assumed 169 SF 0 SF Tan 1 No 1/D 2 GD Main Office Supply Room N/A Concrete Ceiling Non Suspect ACM 168 SF 0 SF N/A N/A N/A 2 GD Main Office Supply Room N/A Concrete Block Wall Non Suspect ACM 520 SF 0 SF N/A N/A N/A 2 GD Main Office Supply Room M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 168 SF 0 SF Pink 1 No 1/D 2 GD Auditorium N/A Ceiling Tile 2' x 4' Non Suspect ACM 4350 SF 0 SF N/A N/A N/A 2 GD Auditorium N/A Concrete Block Wall Non Suspect ACM 5320 SF 0 SF N/A N/A N/A 2 GD Auditorium M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 1450 SF 0 SF Tan 1 No 1/D Color reqired for VAT Damage Potential (DP) Response Action (RA) 7

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 2 GD Auditorium M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 2900 SF 0 SF Green 1 No 1/D 2 GD Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 125 LF 0 LF N/A N/A N/A 2 GD Auditorium N/A Pipe Fitting Insulation NAD 4 EA 0 EA N/A N/A N/A 2 GD Stairwell between Auditorium and Gym N/A Concrete Ceiling Non Suspect ACM 64 SF 0 SF N/A N/A N/A 2 GD Stairwell between Auditorium and Gym N/A Concrete Block Wall Non Suspect ACM 416 SF 0 SF N/A N/A N/A 2 GD Stairwell between Auditorium and Gym M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 64 SF 0 SF White 1 No 1/D 2 GD Stairwell between Auditorium and Gym N/A Fiberglass Pipe Insulation Non Suspect ACM 32 LF 0 LF N/A N/A N/A 2 GD Stairwell between Auditorium and Gym N/A Pipe Fitting Insulation NAD 5 EA 0 EA N/A N/A N/A 2 GD Stairwell between Auditorium and Gym T Radiator Insulation 4260/02/0G/BATTA/KM/1600 Assumed 12 SF 0 SF 1 No 1/D 2 GD Gym M Metal Pan Ceiling Tile 4260/02/0G/BATTA/KM/1720 Assumed 4028 SF 0 SF 1 No 1/D 2 GD Gym N/A Concrete Block Wall Non Suspect ACM 5160 SF 0 SF N/A N/A N/A 2 GD Gym M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 4028 SF 8 SF Green 1 No 2/C 2 GD Gym N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF N/A N/A N/A 2 GD Gym N/A Pipe Fitting Insulation NAD 10 EA 0 EA N/A N/A N/A 2 GD Gym Equipment Room N/A Concrete Ceiling Non Suspect ACM 128 SF 0 SF N/A N/A N/A 2 GD Gym Equipment Room N/A Concrete Block Wall Non Suspect ACM 480 SF 0 SF N/A N/A N/A 2 GD Gym Equipment Room M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 128 SF 0 SF Tan 1 No 1/D 2 GD Gym Equipment Room N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 0 LF N/A N/A N/A 2 GD Gym Equipment Room N/A Pipe Fitting Insulation NAD 1 EA 0 EA N/A N/A N/A 2 GD Gym Girl's Restroom N/A Concrete Ceiling Non Suspect ACM 35 SF 0 SF N/A N/A N/A 2 GD Gym Girl's Restroom N/A Concrete Block Wall Non Suspect ACM 240 SF 0 SF N/A N/A N/A 2 GD Gym Girl's Restroom N/A Cement Floor Non Suspect ACM 35 SF 0 SF N/A N/A N/A 2 GD Gym Boy's Restroom N/A Concrete Ceiling Non Suspect ACM 77 SF 0 SF N/A N/A N/A 2 GD Gym Boy's Restroom N/A Concrete Block Wall Non Suspect ACM 360 SF 0 SF N/A N/A N/A 2 GD Gym Boy's Restroom N/A Cement Floor Non Suspect ACM 77 SF 0 SF N/A N/A N/A 2 GD Gym Boy's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 11 LF 0 LF N/A N/A N/A 2 GD Education Works Office N/A Concrete Ceiling Non Suspect ACM 360 SF 0 SF N/A N/A N/A 2 GD Education Works Office N/A Concrete Block Wall Non Suspect ACM 760 SF 0 SF N/A N/A N/A 2 GD Education Works Office N/A Cement Floor Non Suspect ACM 360 SF 0 SF N/A N/A N/A 2 GD Gym Office N/A Concrete Ceiling Non Suspect ACM 56 SF 0 SF N/A N/A N/A 2 GD Gym Office N/A Concrete Block Wall Non Suspect ACM 300 SF 0 SF N/A N/A N/A 2 GD Gym Office M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 56 SF 0 SF Tan 1 No 1/D 2 GD Gym Office Restroom N/A Concrete Ceiling Non Suspect ACM 28 SF 0 SF N/A N/A N/A 2 GD Gym Office Restroom N/A Concrete Block Wall Non Suspect ACM 220 SF 0 SF N/A N/A N/A 2 GD Gym Office Restroom N/A Cement Floor Non Suspect ACM 28 SF 0 SF N/A N/A N/A 2 GD Gym Office Closet N/A Concrete Ceiling Non Suspect ACM 6 SF 0 SF N/A N/A N/A 2 GD Gym Office Closet N/A Concrete Block Wall Non Suspect ACM 100 SF 0 SF N/A N/A N/A 2 GD Gym Office Closet M Floor Tile VAT 9" x 9" 4260/02/0G/32 Confirmed 6 SF 0 SF Tan 1 No 1/D 2 1 Classroom 109 N/A Ceiling Tile 1' x 1' NAD 828 SF 0 SF N/A N/A N/A 2 1 Classroom 109 M Spline Ceiling Tile Glue Dots 4260/02/01/BATTA/KM/2603 Assumed 828 SF 0 SF 1 No 1/D 2 1 Classroom 109 N/A Concrete Block Wall Non Suspect ACM 1180 SF 0 SF N/A N/A N/A 2 1 Classroom 109 M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 828 SF 0 SF Multi 1 No 1/D 2 1 Classroom 109 T Unit Ventilator Insulation 4260/02/01/BATTA/KM/1680 Assumed 18 SF 0 SF 1 No 1/D 2 1 Classroom 109 M Blackboard Glue Dots 4260/01/01/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 1 Classroom 110 N/A Ceiling Tile 1' x 1' NAD 828 SF 0 SF N/A N/A N/A 2 1 Classroom 110 M Spline Ceiling Tile Glue Dots 4260/02/01/BATTA/KM/2603 Assumed 828 SF 0 SF 1 No 1/D 2 1 Classroom 110 N/A Concrete Block Wall Non Suspect ACM 1180 SF 0 SF N/A N/A N/A 2 1 Classroom 110 M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 828 SF 0 SF Blue 1 No 1/D 2 1 Classroom 110 T Unit Ventilator Insulation 4260/02/01/BATTA/KM/1680 Assumed 18 SF 0 SF 1 No 1/D 2 1 Classroom 110 M Blackboard Glue Dots 4260/01/01/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 1 Girl's Restroom N/A Concrete Ceiling Non Suspect ACM 143 SF 0 SF N/A N/A N/A 2 1 Girl's Restroom N/A Concrete Block Wall Non Suspect ACM 480 SF 0 SF N/A N/A N/A 2 1 Girl's Restroom N/A Cement Floor Non Suspect ACM 143 SF 0 SF N/A N/A N/A 2 1 Boy's Restroom N/A Concrete Ceiling Non Suspect ACM 143 SF 0 SF N/A N/A N/A 2 1 Boy's Restroom N/A Concrete Block Wall Non Suspect ACM 480 SF 0 SF N/A N/A N/A 2 1 Boy's Restroom N/A Cement Floor Non Suspect ACM 143 SF 0 SF N/A N/A N/A 2 1 Men's Restroom N/A Concrete Ceiling Non Suspect ACM 88 SF 0 SF N/A N/A N/A 2 1 Men's Restroom N/A Concrete Block Wall Non Suspect ACM 380 SF 0 SF N/A N/A N/A 2 1 Men's Restroom N/A Cement Floor Non Suspect ACM 88 SF 0 SF N/A N/A N/A 2 1 Custodial Closet next to Men's Restroom N/A Concrete Ceiling Non Suspect ACM 16 SF 0 SF N/A N/A N/A 2 1 Custodial Closet next to Men's Restroom N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A 2 1 Custodial Closet next to Men's Restroom N/A Cement Floor Non Suspect ACM 16 SF 0 SF N/A N/A N/A Color reqired for VAT Damage Potential (DP) Response Action (RA) 8

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 2 1 Women's Restroom N/A Concrete Ceiling Non Suspect ACM 66 SF 0 SF N/A N/A N/A 2 1 Women's Restroom N/A Concrete Block Wall Non Suspect ACM 340 SF 0 SF N/A N/A N/A 2 1 Women's Restroom N/A Cement Floor Non Suspect ACM 66 SF 0 SF N/A N/A N/A 2 1 Server / Book Room N/A Ceiling Tile 1' x 1' NAD 144 SF 0 SF N/A N/A N/A 2 1 Server / Book Room M Spline Ceiling Tile Glue Dots 4260/02/01/BATTA/KM/2603 Assumed 144 SF 0 SF 1 No 1/D 2 1 Server / Book Room N/A Concrete Block Wall Non Suspect ACM 500 SF 0 SF N/A N/A N/A 2 1 Server / Book Room M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 144 SF 0 SF Green 1 No 1/D 2 1 Small Special Education Classroom N/A Ceiling Tile 2' x 4' Non Suspect ACM 392 SF 0 SF N/A N/A N/A 2 1 Small Special Education Classroom N/A Concrete Block Wall Non Suspect ACM 476 SF 0 SF N/A N/A N/A 2 1 Small Special Education Classroom M Sheetrock Wall 4260/02/01/BATTA/KM/2100 Assumed 280 SF 0 SF 1 No 1/D 2 1 Small Special Education Classroom M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 392 SF 0 SF Green 1 No 1/D 2 1 Small Special Education Classroom T Unit Ventilator Insulation 4260/02/01/BATTA/KM/1680 Assumed 18 SF 0 SF 1 No 1/D 2 1 Large Special Education Classroom N/A Ceiling Tile 2' x 4' Non Suspect ACM 868 SF 0 SF N/A N/A N/A 2 1 Large Special Education Classroom N/A Concrete Block Wall Non Suspect ACM 810 SF 0 SF N/A N/A N/A 2 1 Large Special Education Classroom M Sheetrock Wall 4260/02/01/BATTA/KM/2100 Assumed 280 SF 0 SF 1 No 1/D 2 1 Large Special Education Classroom M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 868 SF 0 SF Green 1 No 1/D 2 1 Large Special Education Classroom T Unit Ventilator Insulation 4260/02/01/BATTA/KM/1680 Assumed 18 SF 0 SF 1 No 1/D 2 1 Faculty Lounge N/A Ceiling Tile 1' x 1' NAD 450 SF 0 SF N/A N/A N/A 2 1 Faculty Lounge M Spline Ceiling Tile Glue Dots 4260/02/01/BATTA/KM/2603 Assumed 450 SF 0 SF 1 No 1/D 2 1 Faculty Lounge N/A Concrete Block Wall Non Suspect ACM 860 SF 0 SF N/A N/A N/A 2 1 Faculty Lounge M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 450 SF 0 SF Green 1 No 1/D 2 1 Faculty Lounge M Sink Undercoat Mastic 4260/02/01/BATTA/KM/2602 Assumed 6 SF 0 SF 1 No 1/D 2 1 Faculty Lounge T Unit Ventilator Insulation 4260/02/01/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 1 Hallway from Classroom 109 to Special Education Classrooms N/A Ceiling Tile 1' x 1' NAD 624 SF 0 SF N/A N/A N/A 2 1 Hallway from Classroom 109 to Special Education Classrooms M Spline Ceiling Tile Glue Dots 4260/02/01/BATTA/KM/2603 Assumed 624 SF 0 SF 1 No 1/D 2 1 Hallway from Classroom 109 to Special Education Classrooms N/A Concrete Block Wall Non Suspect ACM 1040 SF 0 SF N/A N/A N/A 2 1 Hallway from Classroom 109 to Special Education Classrooms M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 624 SF 0 SF White 1 No 1/D 2 1 Stairwell next to Faculty Lounge N/A Concrete Ceiling Non Suspect ACM 209 SF 0 SF N/A N/A N/A 2 1 Stairwell next to Faculty Lounge N/A Concrete Block Wall Non Suspect ACM 600 SF 0 SF N/A N/A N/A 2 1 Stairwell next to Faculty Lounge M Floor Tile VAT 9" x 9" 4260/02/01/27 Confirmed 209 SF 0 SF White 1 No 1/D 2 2 Stairwell next to Office 301 N/A Concrete Ceiling Non Suspect ACM 209 SF 0 SF N/A N/A N/A 2 2 Stairwell next to Office 301 N/A Concrete Block Wall Non Suspect ACM 600 SF 0 SF N/A N/A N/A 2 2 Stairwell next to Office 301 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 209 SF 0 SF White 1 No 1/D 2 2 Stairwell next to Office 301 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 LF N/A N/A N/A 2 2 Boy's Restroom N/A Concrete Ceiling Non Suspect ACM 286 SF 0 SF N/A N/A N/A 2 2 Boy's Restroom N/A Concrete Block Wall Non Suspect ACM 740 SF 0 SF N/A N/A N/A 2 2 Boy's Restroom N/A Cement Floor Non Suspect ACM 286 SF 0 SF N/A N/A N/A 2 2 Boy's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 11 LF 0 LF N/A N/A N/A 2 2 Counselor's Office N/A Concrete Ceiling Non Suspect ACM 176 SF 0 SF N/A N/A N/A 2 2 Counselor's Office N/A Concrete Block Wall Non Suspect ACM 540 SF 0 SF N/A N/A N/A 2 2 Counselor's Office M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 176 SF 0 SF Green 1 No 1/D 2 2 Principal's Office 312 N/A Ceiling Tile 1' x 1' NAD 225 SF 0 SF N/A N/A N/A 2 2 Principal's Office 312 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 225 SF 0 SF 1 No 1/D 2 2 Principal's Office 312 N/A Concrete Block Wall Non Suspect ACM 680 SF 0 SF N/A N/A N/A 2 2 Principal's Office 312 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 225 SF 0 SF Green 1 No 1/D 2 2 Classroom 311 N/A Ceiling Tile 1' x 1' NAD 899 SF 0 SF N/A N/A N/A 2 2 Classroom 311 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 899 SF 0 SF 1 No 1/D 2 2 Classroom 311 N/A Concrete Block Wall Non Suspect ACM 1200 SF 0 SF N/A N/A N/A 2 2 Classroom 311 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 899 SF 0 SF Green 1 No 1/D 2 2 Classroom 311 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 311 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Classroom 310 N/A Ceiling Tile 1' x 1' NAD 841 SF 0 SF N/A N/A N/A 2 2 Classroom 310 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 841 SF 0 SF 1 No 1/D 2 2 Classroom 310 N/A Concrete Block Wall Non Suspect ACM 1160 SF 0 SF N/A N/A N/A 2 2 Classroom 310 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 841 SF 0 SF Green 1 No 1/D 2 2 Classroom 310 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 310 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF Green 1 No 1/D 2 2 Classroom 309 N/A Ceiling Tile 1' x 1' NAD 841 SF 0 SF N/A N/A N/A 2 2 Classroom 309 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 841 SF 0 SF 1 No 1/D Color reqired for VAT Damage Potential (DP) Response Action (RA) 9

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 2 2 Classroom 309 N/A Concrete Block Wall Non Suspect ACM 1160 SF 0 SF N/A N/A N/A 2 2 Classroom 309 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 841 SF 0 SF Green 1 No 1/D 2 2 Classroom 309 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 309 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Classroom 308 N/A Ceiling Tile 1' x 1' NAD 841 SF 0 SF N/A N/A N/A 2 2 Classroom 308 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 841 SF 0 SF 1 No 1/D 2 2 Classroom 308 N/A Concrete Block Wall Non Suspect ACM 1160 SF 0 SF N/A N/A N/A 2 2 Classroom 308 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 841 SF 0 SF Green 1 No 1/D 2 2 Classroom 308 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 308 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Classroom 308 M Sink Undercoat Mastic 4260/02/02/BATTA/KM/2602 Assumed 6 SF 0 SF 1 No 1/D 2 2 Men's Restroom N/A Concrete Ceiling Non Suspect ACM 99 SF 0 SF N/A N/A N/A 2 2 Men's Restroom N/A Concrete Block Wall Non Suspect ACM 400 SF 0 SF N/A N/A N/A 2 2 Men's Restroom N/A Cement Floor Non Suspect ACM 99 SF 0 SF N/A N/A N/A 2 2 Women's Restroom N/A Concrete Ceiling Non Suspect ACM 90 SF 0 SF N/A N/A N/A 2 2 Women's Restroom N/A Concrete Block Wall Non Suspect ACM 380 SF 0 SF N/A N/A N/A 2 2 Women's Restroom N/A Cement Floor Non Suspect ACM 90 SF 0 SF N/A N/A N/A 2 2 Classroom 307 N/A Ceiling Tile 1' x 1' NAD 696 SF 0 SF N/A N/A N/A 2 2 Classroom 307 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 696 SF 0 SF 1 No 1/D 2 2 Classroom 307 N/A Concrete Block Wall Non Suspect ACM 1060 SF 0 SF N/A N/A N/A 2 2 Classroom 307 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 696 SF 0 SF Tan 1 No 1/D 2 2 Classroom 307 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 307 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Stairwell next to Classroom 307 N/A Concrete Ceiling Non Suspect ACM 184 SF 0 SF N/A N/A N/A 2 2 Stairwell next to Classroom 307 N/A Concrete Block Wall Non Suspect ACM 620 SF 0 SF N/A N/A N/A 2 2 Stairwell next to Classroom 307 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 184 SF 0 SF White 1 No 1/D 2 2 Classroom 306 N/A Ceiling Tile 1' x 1' NAD 728 SF 0 SF N/A N/A N/A 2 2 Classroom 306 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 728 SF 0 SF 1 No 1/D 2 2 Classroom 306 N/A Concrete Block Wall Non Suspect ACM 1080 SF 0 SF N/A N/A N/A 2 2 Classroom 306 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 728 SF 0 SF Tan 1 No 1/D 2 2 Classroom 306 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 306 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Classroom 306 N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 0 LF N/A N/A N/A 2 2 Classroom 306 N/A Pipe Fitting Insulation NAD 2 EA 1 EA N/A N/A N/A 2 2 Classroom 305 N/A Ceiling Tile 1' x 1' NAD 812 SF 0 SF N/A N/A N/A 2 2 Classroom 305 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 812 SF 0 SF 1 No 1/D 2 2 Classroom 305 N/A Concrete Block Wall Non Suspect ACM 860 SF 0 SF N/A N/A N/A 2 2 Classroom 305 N/A Partition Room Dividers Non Suspect ACM 280 SF 0 SF N/A N/A N/A 2 2 Classroom 305 M Floor Tile VAT 12" x 12" 4260/02/02/AA Assumed 406 SF 0 SF Grey 1 No 1/D 2 2 Classroom 305 M Floor Tile VAT 12" x 12" 4260/02/02/AA Assumed 406 SF 0 SF White 1 No 1/D 2 2 Classroom 305 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 305 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 80 SF 0 SF 1 No 1/D 2 2 Classroom 305 M Sink Undercoat Mastic 4260/02/02/BATTA/KM/2602 Assumed 6 SF 0 SF 1 No 1/D 2 2 Fan Room N/A Concrete Ceiling Non Suspect ACM 612 SF 0 SF N/A N/A N/A 2 2 Fan Room N/A Concrete Block Wall Non Suspect ACM 1060 SF 0 SF N/A N/A N/A 2 2 Fan Room N/A Cement Floor Non Suspect ACM 612 SF 0 SF N/A N/A N/A 2 2 Fan Room N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF N/A N/A N/A 2 2 Fan Room N/A Pipe Fitting Insulation NAD 28 EA 0 EA N/A N/A N/A 2 2 Fan Room N/A Vinyl Vibration Damper Cloth Non Suspect ACM 105 SF 0 SF N/A N/A N/A 2 2 Classroom 304 N/A Ceiling Tile 1' x 1' NAD 812 SF 0 SF N/A N/A N/A 2 2 Classroom 304 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 812 SF 0 SF 1 No 1/D 2 2 Classroom 304 N/A Concrete Block Wall Non Suspect ACM 860 SF 0 SF N/A N/A N/A 2 2 Classroom 304 M Sheetrock Wall 4260/02/02/BATTA/KM/2100 Assumed 280 SF 0 SF 1 No 1/D 2 2 Classroom 304 M Floor Tile VAT 12" x 12" 4260/02/02/AA Assumed 406 SF 0 SF Grey 1 No 1/D 2 2 Classroom 304 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 203 SF 0 SF Blue 1 No 1/D 2 2 Classroom 304 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 203 SF 0 SF White 1 No 1/D 2 2 Classroom 304 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 304 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 80 SF 0 SF 1 No 1/D 2 2 Classroom 303 N/A Ceiling Tile 1' x 1' NAD 840 SF 0 SF N/A N/A N/A 2 2 Classroom 303 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 840 SF 0 SF 1 No 1/D 2 2 Classroom 303 N/A Concrete Block Wall Non Suspect ACM 1160 SF 0 SF N/A N/A N/A 2 2 Classroom 303 M Floor Tile VAT 12" x 12" 4260/02/02/AA Assumed 420 SF 0 SF Grey 1 No 1/D Color reqired for VAT Damage Potential (DP) Response Action (RA) 10

4260 Mastery Charter @ Grover Cleveland - 2015 2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 1/22-1/29/2016 Mastery Charter at Grover Cleveland Room by Room Location Log Report Building Inspector: Kelly Mayberry 3701 N. 19th Street Number: 045814 Philadelphia, PA 19140 Management Planner: Mary Anne Lerro ULCS# 4260 Number: 742327 E l e m en F l o o r On Site Room Name System Affected Material Description HID# Confirmed, Assumed, NAD, Amount of Amount of (SF/LF/E Attic/Crawlspac Newly t Non Suspect ACM Material (SF/LF/EA) Damage A) Comments/Description/Notes e Ranking Friable (NF) 2 2 Classroom 303 M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 420 SF 0 SF Blue 1 No 1/D 2 2 Classroom 303 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 303 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Classroom 302 N/A Ceiling Tile 1' x 1' NAD 924 SF 0 SF N/A N/A N/A 2 2 Classroom 302 M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 924 SF 0 SF 1 No 1/D 2 2 Classroom 302 N/A Concrete Block Wall Non Suspect ACM 1220 SF 0 SF N/A N/A N/A 2 2 Classroom 302 M Floor Tile VAT 12" x 12" 4260/02/02/AA Assumed 924 SF 0 SF Grey 1 No 1/D 2 2 Classroom 302 T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Classroom 302 M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Dean of Student's Office N/A Ceiling Tile 1' x 1' NAD 648 SF 0 SF N/A N/A N/A 2 2 Dean of Student's Office M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 648 SF 0 SF 1 No 1/D 2 2 Dean of Student's Office N/A Concrete Block Wall Non Suspect ACM 1020 SF 0 SF N/A N/A N/A 2 2 Dean of Student's Office M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 648 SF 0 SF Green 1 No 1/D 2 2 Dean of Student's Office T Unit Ventilator Insulation 4260/02/02/BATTA/KM/1680 Assumed 24 SF 0 SF 1 No 1/D 2 2 Dean of Student's Office M Blackboard Glue Dots 4260/01/02/BATTA/KM/2600 Assumed 160 SF 0 SF 1 No 1/D 2 2 Dean of Student's Office N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 LF N/A N/A N/A 2 2 Dean of Student's Office N/A Pipe Fitting Insulation NAD 1 EA 0 EA N/A N/A N/A 2 2 Girl's Restroom N/A Concrete Ceiling Non Suspect ACM 250 SF 0 SF N/A N/A N/A 2 2 Girl's Restroom N/A Concrete Block Wall Non Suspect ACM 700 SF 0 SF N/A N/A N/A 2 2 Girl's Restroom N/A Cement Floor Non Suspect ACM 250 SF 0 SF N/A N/A N/A 2 2 Girl's Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF N/A N/A N/A 2 2 Custodial Closet next to Girl's Restroom N/A Concrete Ceiling Non Suspect ACM 24 SF 0 SF N/A N/A N/A 2 2 Custodial Closet next to Girl's Restroom N/A Concrete Block Wall Non Suspect ACM 200 SF 0 SF N/A N/A N/A 2 2 Custodial Closet next to Girl's Restroom N/A Cement Floor Non Suspect ACM 24 SF 0 SF N/A N/A N/A 2 2 Hallway from Counselor's Office to Dean of Student's Office N/A Ceiling Tile 1' x 1' NAD 2880 SF 0 SF N/A N/A N/A 2 2 Hallway from Counselor's Office to Dean of Student's Office M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 2880 SF 0 SF 1 No 1/D 2 2 Hallway from Counselor's Office to Dean of Student's Office N/A Concrete Block Wall Non Suspect ACM 4320 SF 0 SF N/A N/A N/A 2 2 Hallway from Counselor's Office to Dean of Student's Office M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 2880 SF 0 SF Multi 1 No 1/D 2 2 Hallway from Counselor's Office to Dean of Student's Office N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF N/A N/A N/A 2 2 Hallway from Counselor's Office to Dean of Student's Office N/A Pipe Fitting Insulation NAD 3 EA 0 EA N/A N/A N/A 2 2 Hallway from Counselor's Office to Bridge N/A Ceiling Tile 1' x 1' NAD 297 SF 0 SF N/A N/A N/A 2 2 Hallway from Counselor's Office to Bridge M Spline Ceiling Tile Glue Dots 4260/02/02/BATTA/KM/2603 Assumed 297 SF 0 SF 1 No 1/D 2 2 Hallway from Counselor's Office to Bridge N/A Concrete Block Wall Non Suspect ACM 540 SF 0 SF N/A N/A N/A 2 2 Hallway from Counselor's Office to Bridge M Floor Tile VAT 9" x 9" 4260/02/02/29 Confirmed 297 SF 0 SF Multi 1 No 1/D 2 2 Hallway from Counselor's Office to Bridge N/A Fiberglass Pipe Insulation Non Suspect ACM 11 LF 0 LF N/A N/A N/A 1 A Attic near Stairwell X X X X X X X X X "A" X X X 1 A 3rd Fl. Stairwell in Element 1 X X X X X X X X X Localized Debris/Compressed Paper/VDC "C" X X X Color reqired for VAT Damage Potential (DP) Response Action (RA) 11