Ministry of Forests, Lands, and Natural Resource Operations OVERVIEW OF ANGLING MANAGEMENT PLANS FOR THE SKEENA WATERSHED

Similar documents
Ministry of Environment Response to Working Group Recommendations for Skeena Angling Management Plans. Skeena Quality Waters Strategy April 23, 2010

BULKLEY RIVER ANGLING MANAGEMENT PLAN

DRAFT. Angling Management Plan Skeena Quality Waters Strategy

Phase II Consultation Report (October November 2008) Skeena Quality Waters Strategy. Index of Appendices P U

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

Meeting in Support of Species at Risk Act Listing Process for Lower Fraser River and Upper Fraser River White Sturgeon

Steelhead Sport Fishing Regulations Proposals Vancouver Island Region for April 1, 2007

Discussion Paper Men s and Boy s Competition Review 26 May 2017

2010 Kemp Lake Angling and Lake Infrastructure Improvement Proposal

Proposal for Regulation Change: Guidelines for Information Requirements Skeena Fisheries Advisory Committee

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

1998 Thompson River Steelhead Angler Survey

Eleventh Annual Skeena Fisheries Advisory Committee Meeting Skeena Valley Golf and Country Club March 19, 2017

Environmental Appeal Board

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

GULF ANGLER FOCUS GROUP INITIATIVE PROCESS OVERVIEW AND PHASES SUMMARY

Steelhead Stock Status Review British Columbia

PUTTING CANADA s WILD SALMON POLICY INTO ACTION

Proposed 2018 Fisheries Management Measures to Support Recovery of Interior Fraser River Steelhead

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

A SURVEY ON MOOSE MANAGEMENT IN CENTRAL ONTARIO

Angling in Manitoba (2000)

Recreating Sustainable Fisheries in the Skeena Watershed

NOTICE: This publication is available at:

Public Consultation Document

Smithers Golf and Country Club

Loughs Agency Gníomhaireacht na Lochanna Factrie fur Loughs

Peace River Water Use Plan. Monitoring Program Terms of Reference. GMSMON-1 Peace River Creel Survey

Big Game Allocation Policy Sub-Committee Recommendations to AGPAC

The Economic Importance of Recreational River Use to the City of Calgary

Review of the Changes to the Fisheries Act

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Angling in Manitoba Survey of Recreational Angling

Risk Assessments in the Pacific Fisheries for BC & Yukon

Grizzly Bear Management Plan for the Gwich in Settlement Area

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

A PETITION TO THE AUDITOR GENERAL OF CANADA pursuant to s. 22 of the Auditor General Act

Agenda Item G.1.b Supplemental WDFW Report June 2017

Peace Region Wildlife Regulations Proposed Changes for Comment ( )

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues

Review of the Changes to the Fisheries Act Process Overview

Twelfth Annual Skeena Angler Advisory Team Meeting Skeena Valley Golf and Country Club March 18, 2018

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

Thank you for the opportunity to comment on the Draft Freshwater Fisheries Management Plan on behalf of Victoria s recreational fishing sector.

Developing the Best Freshwater Fisheries in North America. Adrian Clarke BCWF AGM and Convention April 23, 2016

Stakeholder Communication and Public Involvement Plan

Unless otherwise noted, images throughout the presentation are by FWC.

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

ZYMOETZ RIVER STEELHEAD TROUT: A PRELIMINARY REPORT OF THE 1978 SPORT FISHERY AND SOME ASPECTS OF THEIR LIFE HISTORY. W.E. Chudyk

Fisheries Management Plan

CPW Marketing FISCAL YEAR OVERVIEW

Tautog PID for Amendment 1. Presented to the Tautog Board August 5, 2015

To pass a Council resolution approving Sunday Gun Hunting in Haldimand County.

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Atlantic States Marine Fisheries Commission

NEWS RELEASE. Harvest allocation ensures certainty for hunting sector

NICOMEN SLOUGH/NORRISH CREEK RECREATIONAL FISHERY ASSESSMENT October 13 th to November 30 th, 2008

April Nisga a Fisheries & Wildlife Department

Transportation Master Plan Advisory Task Force

Gulf of Maine Research Institute Responsibly Harvested Seafood from the Gulf of Maine Region Report on Atlantic Sea Scallops (Inshore Canada)

THE CORPORATION OF THE CITY OF PENTICTON COUNCIL REPORT. DATE: 9 th January 2012 RES:

Traffic Calming Policy

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

LIFE HISTORY DIVERSITY AND RESILIENCE

REPORT TO MAYOR AND COUNCIL

Draft Addendum V For Board Review. Coastal Sharks Management Board August 8, 2018

Monitoring Surfing Quality Below the Jordan River Generating Station (Year 3)

Environment and Public Works Committee Presentation

NATIONAL MARINE FISHERIES SERVICE REPORT ON DEEP-SET BUOY GEAR AMENDMENT SCOPING

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Federal AIS Regulations in Canada: Finally! Kate Wilson Aquatic Invasive Species Specialist Alberta Environment & Parks PNWER July 13, 2015

NASCO Guidelines for the Management of Salmon Fisheries

California Steelhead: Management, Monitoring and Recovery Efforts

Mutton Snapper Public Workshops February Florida Fish and Wildlife Conservation Commission Division of Marine Fisheries Management

Controlled Take (Special Status Game Mammal Chapter)

Environmental Appeal Board

Interim Guidance Fish Presence Absence

Marine Management Strategy Frequently Asked Questions

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement

2018 Sport Fishing Regulations Exhibit B

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

Framework Management in British Columbia

REPORT District of Maple Ridge

Eastern New Brunswick Coastal and Inland Recreational Fisheries Advisory Committee

Big Game Season Structure, Background and Context

Implementing the New Fisheries Protection Provisions under the Fisheries Act

Emergency Action on Regulations

Public Hearing Summary for Coastal Migratory Pelagics Framework Amendment 4

ALBERTA FISH & GAME ASSOCIATION 2015 ANNUAL GENERAL MEETING PASSED RESOLUTIONS FEBRUARY 21, 2015

UBCM Community Excellence Awards 2007 Submission

Salmon Five Point Approach restoring salmon in England

Staff, Organizations Directly Affected (including but not limited to):

Eastern Brook Trout. Roadmap to

ESTABLISHING A TROUT FISHERY IN MILL CREEK

Kispiox River Steelhead: Summary of Current Data and Status Review, James S. Baxter 1

The Alaska Department of Fish and Game administers all programs and activities free from discrimination on the basis of sex, color, race, religion,

The Intended Consequences of Wildlife Allocations in British Columbia

Chagrin River TMDL Appendices. Appendix F

Transcription:

Ministry of Forests, Lands, and Natural Resource Operations OVERVIEW OF ANGLING MANAGEMENT PLANS FOR THE SKEENA WATERSHED November 19, 2013

1.0 Intent of this Document This overview provides background information for twelve Angling Management Plans that have been finalized in the Skeena Region. Topics discussed in this document include: the history of angler management pertaining to the Skeena Steelhead fishery the Skeena Quality Waters Strategy process to develop Angling Management Plans stakeholder concerns regarding Classified Waters management and proposed solutions endorsed regulation changes approved by the B.C. Cabinet the approach to monitor river-specific Angling Management Plans It is important to note that this document is not an Angling Management Plan, nor is it meant to replace extensive information prepared during the Skeena Angling Management Plan consultation process (see Dolan, 2008a, 2008b, 2009a, 2009b; MoE, 2010). 1.1 History of Angler Management in the Skeena Watershed In the late 1980s, the popularity of angling for Steelhead in the Skeena watershed was increasing. More and more people were fishing each year, attracted to the region for its wild and large fish, natural setting, and lack of competition from other anglers. As a first step to maintain the existing high-quality angling experience, the provincial government implemented limits to the angling guide industry in 1990. Caps were placed on the number of days each guide could operate and new entrants to the industry were restricted by regulations. An expectation was also created that the growing numbers of non-resident alien anglers would be managed. To summarize these initiatives, the Fish and Wildlife Branch prepared a number of draft Angling Use Plans (AUPs). These AUPs were brief documents which presented a description of each river, its fishery resource and a plan to manage anglers and angling guides. In the 1990s, there were a number of attempts to complete the AUPs. No progress was made, however, due to a combination of public controversy and a lack of government support. In the early 2000s, public pressure increased to find a lasting solution to the continuing conflict among anglers. Ministry staff worked with anglers and angling guides to develop what became known as the Quality Waters Strategy (QWS). The strategy described a detailed approach to develop Angling Management Plans (AMPs; MWLAP, 2005). While this document was not developed as a policy (Dolan, 2012), it did provide guidance that was used throughout the province for a number of years. 1.2 Legislative Requirements for Angling Management Plans According to the Angling and Scientific Collection Regulation under the Wildlife Act, Section 2.02 and 11(1.1), AMPs are a prerequisite to allocate of angler-day quota to angling guides and non-guided, non-resident alien anglers. No provincial standards exist outlining what these plans must contain. 1.3 Skeena Quality Waters Strategy In 2005, the Quality Waters Strategy process was finalized at the provincial level. That same year, the Skeena Fisheries Branch submitted a funding application to the Habitat Conservation Trust Foundation to implement this process regionally. This application was approved and allowed the ministry to move forward with AMP development in the Skeena River watershed. Overview: Angling Management Plans for the Skeena River Watershed Page 2 of 12

Figure 1. Map of Skeena River watershed. Overview: Angling Management Plans for the Skeena River Watershed Page 3 of 12

With assistance from the Regional Quality Waters Committee, twelve Classified Waters were selected to have Angling Management Plans developed. They are outlined in Table 1 below. Table 1. Classified Waters for Angling Management Plan Development Bulkley Babine Morice Kitseguecla Kitwanga Kispiox Suskwa Lakelse Skeena 4 Kitsumkalum Zymoetz I Zymoetz II These waters were perceived to have, or possess in the future, the highest levels of angler conflict. An extensive consultation process was conducted to gather input regarding the problems on these systems, seek solutions and develop recommendations (Figure 2). Comprehensive reports were prepared at each stage in the process (Dolan, 2008a; Dolan, 2008b; Dolan, 2009a; Dolan, 2009b, MOE, 2010) and additional information is presented in Appendix A. Jan 2007 Quality Waters Strategy process initiated in Skeena Region Jan-Mar 2008 Phase I Consultation Process conducted Phase I Consultation Report released March 2008 Apr-Jun 2008 Working Groups formed and Draft Recommendations for Angling Management Plans were developed Oct 2008 Draft Recommendations for Angling Management Plans publicly released Oct-Nov 2008 Phase II Consultation Process conducted Phase II Consultation report released March 2009 Working Group composition revised to include business and tourism interests Apr-Jun 2009 Nov 2009 Working Groups revise draft Recommendations for Angling Management Plans Final Working Group Recommendations publicly released October 2009 Ministry met with Working Groups to explain final recommendations that were endorsed, not endorsed, deferred and why Apr 2010 Ministry Response to Recommendatons for Angling Management Plans publicly released 2011 Assessment of proposed regulation changes conducted Apr 2012 Ministry endorsed proposals for regulation change implemented Endorsed regulation changes form the basis for river-specific Angling Management Plans Figure 2. Timeline for the Skeena Quality Waters Strategy process to develop Angling Management Plans. Overview: Angling Management Plans for the Skeena River Watershed Page 4 of 12

2.0 Public and Stakeholder Concerns During the first phase of public consultation for AMP development (Dolan, 2008a), stakeholders indicated there were issues with how anglers participated in the recreational Steelhead fishery. Common concerns included: Not enough quality (uncrowded) fishing opportunities for B.C. residents Too many non-resident aliens and guided anglers Angler etiquette issues (not sharing fishing pools with others, fly versus gear conflicts; interpersonal conflicts; unacceptable jet boating practices and extended camping at popular fishing locations) Illegal guiding Absence of women, children and families in the recreational fishery Access issues including lack of boat launches and poor public access for walk-in anglers Too many boats, particularly jet boats and personal floatcraft (i.e. pontoon boats) It is important to note that under the Wildlife Act and delegated authority under the Fisheries Act, the ministry has control over fishing regulations and some aspects of angler use. It does not have the ability to manage all issues concerning stakeholders. Examples of this include access and boat management which are under the direction of land agencies and federal transportation agencies. Other concerns such as angler etiquette are up to anglers themselves. Concerns pertaining to fish conservation issues that are managed by the ministry are not summarized above, as they are discussed through existing regional advisory processes. 3.0 Objectives The primary objective of Angling Management Plans is to establish a water-specific regulatory regime using the least restrictive measures possible to regulate angler use to levels that maintain the quality of the angling experience. While the intent of this approach is to achieve a balance amongst users, it is recognized that it will not satisfy everyone. Interests associated with the Skeena recreational steelhead fishery are diverse, and competing. To assess whether these plans strike a balance and address angler management issues, monitoring will be conducted (see Section 5.0 for more information). It is important to note that the scope of AMPs includes angling and the management of anglers (as the title implies). As such, fish conservation issues are not discussed. 4.0 Final Outcomes Working Groups composed of resident anglers, angling guides and business ad tourism interests were tasked with developing recommendations for AMPs. This was a challenging job which involved consideration of public input (Dolan, 2008a; Dolan 2009a), weighing competing interests and incorporating direction from the ministry. In the end, proposals were put forward in three categories including: 1. regulatory measures intended to apply to all priority waters; 2. river-specific changes; and 3. non-regulatory measures Overview: Angling Management Plans for the Skeena River Watershed Page 5 of 12

As the ministry has no direct control over the non-regulatory measures, they are not discussed in this document (see Dolan, 2009b). For more information on the process to develop recommendations and outcomes that were endorsed, see Appendix A and B. 4.1 Skeena Watershed Recommendations Three system-wide proposals were put forward by Working Groups for all priority waters. They include a limited day licence, a Skeena Steelhead Stamp and a rod-day booking system (for longterm consideration). The intent of the limited day licence was to limit non-guided, non-resident anglers to a maximum period of (up to) eight days per person per river during the Classified Waters period. This measure was perceived as a solution to crowding issues by requiring non-resident anglers to move on after fishing a specific river for eight days. This approach would manage anglers by distributing their effort throughout the region, rather than having individuals focus on one system (a noted problem). It was also felt such a regulation would limit long-term camping and increase barriers for illegal guide operations. Working Group members agreed that the ministry should track angler use over time and the maximum number of days should be adjusted according to management needs. The Skeena Steelhead stamp was proposed to generate revenue for regional Steelhead management and better reflect the value of the Skeena Steelhead resource. Working Groups developed this recommendation as they believed the Steelhead resource was undervalued relative to comparable international fisheries. This stamp was intended to be a licence requirement in addition to the existing Steelhead Conservation Surcharge, offered on a one, eight of annual basis between August 15 and October 31. The funds generated from the sale of this licence were proposed to be directed to regional fisheries management budgets rather than general revenue. The cost of the stamp was proposed between $100-200 for non-residents and $10 for residents per season. A rod day booking system was proposed on a long term basis given the current lack of public support for such a measure. This recommendation was intended to provide a means of spatially and temporally managing anglers. Similar to a reservation system, anglers would be required to identify the river and period of time they desired in advance. Caps based on carrying capacity would restrict total effort on a river and time specific basis 1. It was recognized that this approach provided the most comprehensive solution to addressing crowding issues, in addition to creating significant barriers to illegal guiding. Working Groups felt this system should restrict nonguided, non-resident alien anglers initially and if warranted be applied to other user groups (residents included) to maintain a high quality of experience for all anglers. The ministry was not able to endorse these three proposals in the short term due to a lack of current capacity or perceived need (MOE, 2010). It is important to note, however, that these recommendations were identified as having merit for future consideration. 1 Discussed further in Dolan, 2009, pages 8-9 Overview: Angling Management Plans for the Skeena River Watershed Page 6 of 12

4.2 River-specific Recommendations In addition to the regional proposals, Working Groups recommended a number of river-specific changes. These included water re-classification (change from Class II to Class I), extension of the Classified Water season and time period when a Steelhead Stamp is required, increased management and restriction of angling guides and resident-only times and zones (see Appendix B and river-specific Angling Management Plans). In general, the ministry accepted all river-specific recommendations. In some cases, however, changes were made to ensure regulations were consistent among rivers. For example, Working Groups proposed a number of different options for resident-only times and zones. In some cases, these measures were proposed on different week and weekend days for adjacent rivers. The ministry recognized that unless these restrictions were consistent, angler crowding could result through transfer of effort from one river to another. For this reason, resident-only weekends (i.e. Saturday and Sunday) were generally accepted for all rivers 2. Another change made by the ministry was to broaden the definition of resident-only. Working Groups desired resident-only time and zone restrictions to permit B.C. resident anglers to fish and restrict anglers from other provinces (non-resident Canadians) and countries (non-resident aliens). In response to feedback from the Department of Fisheries and Oceans, the ministry expanded the definition of resident-only to include B.C. resident anglers and Canadian anglers from other provinces. This is discussed further in Section 5.1 of MoE (2010). 5.0 Monitoring Angling Management Plans When AMPs were implemented in the Skeena Region, the ministry committed to reviewing them after three years. To inform this review, monitoring will be conducted to assess how the plans are impacting angler management issues. Baseline information regarding angler effort will be gathered from the e-licencing system and feedback from anglers will be taken into consideration. Additional information on angler use and satisfaction may also be collected through surveys or river guardian projects. Carrying out these projects will depend on available ministry resources (staff time, financial support) and annual priorities. 2 Exceptions include the Zymoetz, Telkwa and Lakelse rivers where Canadian resident-only times and zones extend beyond weekend days. Overview: Angling Management Plans for the Skeena River Watershed Page 7 of 12

6.0 References Dolan, A. 2008a. Consultation Report Phase I (January March 2008). Skeena Quality Waters Strategy. Report prepared by Alan Dolan and Associates for the Ministry of Environment, Smithers, B.C. Dolan, A. 2008b. Draft Angling Management Plan, Skeena Quality Waters Strategy. Report prepared by Alan Dolan and Associates for the Ministry of Environment, Smithers, B.C. Dolan, A. 2009a. Consultation Report Phase II (October November 2008). Skeena Quality Waters Strategy. Report prepared by Alan Dolan and Associates for the Ministry of Environment, Smithers, B.C. Dolan, A. 2009b. Recommendations of the Working Groups, Skeena Quality Waters Strategy Angling Management Plans. Report prepared by Alan Dolan and Associates for the Ministry of Environment, Smithers, B.C. Dolan, A. 2012. Review and Evaluation of the Quality Waters Strategy. Report prepared by Alan Dolan and Associates for the Ministry of Forests, Lands and Natural Resource Operations, Victoria, B.C. Ministry of Environment. 2010. Ministry of Environment Response to Working Group Recommendations for Skeena Angling Management Plans. Victoria, B.C. Ministry of Water, Land and Air Protection. 2005. Quality Waters Strategy Resource Document. Victoria, B.C. Overview: Angling Management Plans for the Skeena River Watershed Page 8 of 12

Appendix A - Consultation Summary for Skeena Quality Waters Strategy Process Phase I Consultation Process January to March 2008 The Phase I consultation process was held in the Skeena River watershed to identify public concerns regarding the quality of experience associated with the recreational steelhead fishery. Participants were invited to identify problems on local rivers and suggest potential solutions. The results of that process included: Skeena Quality Waters Strategy website created Twenty-five stakeholder meetings held in the communities of Houston, Smithers, Hazelton, Terrace, Kitimat and Prince Rupert, 113 people attended Six public meetings held in the above communities, 255 people attended 248 online Response Forms completed regarding the draft Angling Management Plans More than 60 people provided direct email comments to the facilitator Phase I Consultation Report published (see Dolan, 2008a) Draft Recommendations for Angling Management Plans October 2008 From April to June 2008, three stakeholder-based Working Groups developed draft recommendations for Angling Management Plans. With the guidance of facilitators, they used the Phase I Consultation Report, angling use data, and their local knowledge and experience on the rivers, to develop the draft recommendations. The results of their volunteer efforts were published in Dolan (2008b). Phase II Consultation Process October to November 2008 The goal of the Phase II consultation process was to gather feedback on draft Angling Management Plans for the Working Groups to consider. The results of this process included: Twenty-eight stakeholder meetings held in the communities of Houston, Smithers, Hazelton, Terrace, Kitimat and Prince Rupert, 228 people attended Six public open houses held in the above communities with 145 people attending An online response form was developed with 428 respondents participating About 350 emails sent directly to the facilitator Phase II consultation report published (see Dolan, 2009a) Revising Draft Angling Management Plans April to June 2009 Following the Phase II Consultation Process, the Working Groups met to revise the draft recommendations for Angling Management Plans. This revision was based on input received from the public during the Phase II Consultation Process (see Dolan, 2009a). Final Working Group recommendations posted October 2009 The final Working Group recommendations for Angling Management Plans were publicly released on October 16, 2009 (Dolan, 2009b). This information was forwarded to the ministry for consideration. In November 2009, ministry staff met with the Working Groups to discuss which recommendations were endorsed, not endorsed, deferred and the rationale for these decisions. Overview: Angling Management Plans for the Skeena River Watershed Page 9 of 12

Ministry Response to Working Group Recommendations April 2010 In April 2010, the ministry publicly released a response to the Working Group recommendations (MOE, 2010). This document presented the Working Groups recommendations and the response from the ministry. This review considered factors including fairness and equity, cost, regulatory complexity and enforceability. Tourism and Economic Assessment of Proposed Changes - 2011 In the fall of 2010, the provincial government announced the endorsed recommendations would not be implemented on April 1, 2011. Instead, a tourism and economic assessment would be conducted to determine impacts before any regulation changes were implemented. This assessment included a review of 2010 licence sales which indicated: In the fall of 2010, 18,992 classified waters days were purchased in the Skeena region by non-resident Canadians and non-resident aliens. 2,391 days (13%) were purchased on weekends by non-guided anglers from the USA or Overseas. These anglers would be impacted by the proposed Canadian resident-only times and zones. There was an equal distribution of classified waters license purchases throughout the week. If the distribution was skewed toward weekend days, more non-canadians would be impacted from Canadian resident-only times and zones. Ministry Endorsed Regulation Changes Implemented April 2012 In the fall of 2011, the provincial government announced that the ministry endorsed regulation changes (see Appendix B) would be implemented on April 1, 2012. These regulations were approved by Cabinet via Order in Council 499-2011 and 500-2011. Overview: Angling Management Plans for the Skeena River Watershed Page 10 of 12

Appendix B Ministry Endorsed River-Specific Recommendations Bulkley River Canadian resident-only on Saturday and Sunday from September 1 to October 31; guiding not permitted Telkwa River Canadian resident-only all week from September 1 to October 31; guiding not permitted Regional Manager to resolve 53 Permit Days upstream of CN railway bridge Morice River Canadian resident-only on Saturday and Sunday from September 1 to October 31; guiding permitted Babine River Canadian resident-only Saturday and Sunday from September 1 to October 31 in a zone from the outlet of Nilkitkwa Lake (smolt fence) downstream to the Nilkitkwa River confluence; guiding not permitted Reduction of guided angler-day quota (long term) Regional Manager to resolve 80 angler-day discrepancy Kitwanga and Kitseguecla Rivers Resident-only on Saturday and Sunday from April 1 to March 31; guiding not permitted Suskwa River Change from Class 2 to Class 1 designation from April 1 to March 31 Canadian resident-only on Saturday and Sunday from April 1 to March 31; guiding not permitted Kispiox River Canadian resident-only Saturday and Sunday from September 1 to October 31; guiding permitted Lakelse River Change from Class 2 to Class 1 designation Extension of mandatory Steelhead Stamp from September 1 to May 31 Canadian resident-only zone April 1 to March 31 from outlet of Lakelse Lake downstream to powerline crossing located 3.5 km upstream of the Lakelse River confluence with the Skeena River. Zymoetz River Class 1 Section Extension of Classified Waters period from July 24 to December 31 Extension of mandatory Steelhead Stamp from July 24 to December 31 Guide restrictions: maximum 3 anglers/group and 1 group/guide/day Increase allocation of guided angler-days from 58 to 100 Overview: Angling Management Plans for the Skeena River Watershed Page 11 of 12

Decrease guided angler-day allocation from 250 to 100 in Schedule A of B.C. Regulation 125/90 Canadian resident-only on Friday, Saturday and Sunday from July 24 to December 31; guiding permitted Zymoetz River Class 2 Section Extension of mandatory Steelhead Stamp from July 24 to May 31 Extension of Classified Waters period from July 24 to May 31 Canadian Resident-only on Friday, Saturday and Sunday from July 24 to May 31 o Guiding allowed on Friday and in a zone on Saturday from Mattson Creek confluence downstream to the Skeena River confluence Guide restrictions: maximum 3 anglers/group and 1 group/guide/day Modify guided angler-day allocation to accommodate Classified Waters period extension o Maintain allocation of 117 days from September 1 to October 31 o Allocate 100 days from July 24 to August 31 o Allocate 50 days from November 1 to May 31 Kitsumkalum River Extension of mandatory Steelhead Stamp from August 7 to May 31 Guide restrictions: maximum 3 anglers/group; 1 group/guide/day in upper river and 1 group/guide/day in lower river Reduce total number of angling guides from 13 to 11 Ministry decision to alter no guiding period to November 1 to April 1 Canadian resident-only from April 1 to March 31 on: o Saturday in zone from Kitsumkalum Lake outlet downstream to Glacier Creek confluence; guiding not permitted o Sunday on the entire river; guiding not permitted Skeena River Section IV Extension of Classified Waters period from July 1 to December 31 Extension of mandatory Steelhead Stamp from July 1 to December 31 Increase guided angler-day allocation by 586 days amongst 12 new guide licenses in a zone from Flint Creek confluence to the Chimdemash Creek confluence o Concern was expressed that allocation may be too high. Accordingly, these days will be offered on a limited term opportunity, such as 20 years or less. Canadian resident-only on Saturday and Sunday from July 1 to December 31 in the following areas: a) Shegunia River confluence downstream to Sedan Creek confluence; guiding permitted b) Chimdemash Creek confluence downstream to 1.5 km upstream from Zymoetz River confluence; guiding not permitted Overview: Angling Management Plans for the Skeena River Watershed Page 12 of 12