Big Spring Creek Habitat Enhancement and Fishery Management Plans

Similar documents
Fishery Management Plan for Big Spring Creek (7B) Bureau of Fisheries. Prepared by K.M. Kuhn and C.A. McGarrell November 2012.

Penns Creek, Section 05 Fishery Update and Regulation Review

Current Wild Trout Classification Overview and Listing Process

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project

COLUMBIA LAKE DAM REMOVAL PROJECT

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Environmental Review and Permitting for Wild Trout

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Study Update Tailrace Slough Use by Anadromous Salmonids

Study Update Fish Distribution and Species Composition

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Hydraulic Modeling of Stream Enhancement Methods

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE SPORT FISHERIES MANAGEMENT

PA FISH AND BOAT COMMISSION COMMENTS AND RECOMMENDATIONS November 15, WATER: Big Spring Creek (707B) Cumberland County

Fish population survey report

California Steelhead: Management, Monitoring and Recovery Efforts

Don Pedro Project Relicensing

Distribution. PFBC Northcentral Region Law Enforcement Office, Attention: WCO Kraynak, 1150 Spring Creek Road, Bellefonte, PA 16823

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Notice. Proposed Changes to List of Class A Wild Trout Waters September 2017

Upper/Lower Owl Creek Reservoir

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

California Steelhead: Management, Monitoring and Recovery Efforts

Final Bull Trout Genetics Monitoring Plan for the Wallowa Falls Hydroelectric Project. (FERC No. P-308) June 2017

Robert Weber PA Fish and Boat Commission Fisheries Biologist Fish Management Division

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

An Assessment of the Fish Community in Lake Acworth

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Quemahoning Reservoir

STREAM Girls field notebook

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

REC 6 FISHERIES HABITAT EVALUATION

STEELHEAD SURVEYS IN OMAK CREEK

Fraser River. FISH SURVEY AND MANAGEMENT INFORMATION Jon Ewert - Aquatic Biologist (Hot Sulphur Springs)

Bushkill Creek Trout Redd Survey

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Stevens Creek Corridor

FINAL Caples Lake Fisheries Management Plan. Version 4.0

Management of headwater streams in the White Mountain National Forest

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

STREAM SURVEY File form No..

Notice. Proposed Changes to List of Class A Wild Trout Waters January 2019

Swimming against the tide gates. Paul Franklin

Management Plan for the Obey River Trout Fishery

Resources and Guidance for writing a River Herring Management Plan

Old Stream is a highly productive cold water tributary to the Machias River located in Washington County, Maine. The Machias River contains a portion

Blue River Restoration Project William D. Linfield, P.E.

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

COA-F17-F-1343 YEAR END REPORT

2013 Electrofishing Program Summary. Miramichi Salmon Association In collaboration with the Department of Fisheries and Oceans

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

1.Mill Creek Watershed Summary Description and Land Use

Black Sturgeon Regional Plan

Identifying and Executing Stream Projects Kristin Thomas, Aquatic Ecologist MITU

Outstanding Iowa Waters, Trout Streams & Value to Northeast Iowa

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

Susquehanna University and the PFBC Unassessed Waters Initiative in the Susquehanna Basin Jonathan M. Niles Mike Bilger

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

ARKANSAS RIVER, LAKE FORK

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Importance of Un-named tributaries to Brook Trout populations. Dr. Jonathan M. Niles

Job 1. Title: Estimate abundance of juvenile trout and salmon.

Fish Migration Barrier Severity and Steelhead Habitat Quality in the Malibu Creek Watershed

Mountain Columbia Province

JadEco, LLC PO BOX 445 Shannon, IL 61078

SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER Data Submitted to:

Lake Taneycomo Fisheries Management. Shane Bush : Fisheries Management Biologist

Pennsylvania Fish & Boat Commission Biologist Report. Wilmore Dam. Cambria County. May 2011 Trap Net, Electrofishing and Hoop Net Survey

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

The Effects of Stream Adjacent Logging on Downstream Populations of Coastal Cutthroat Trout

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Unassessed Waters Initiative ( )

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

LAKE TANEYCOMO 2011 ANNUAL LAKE REPORT

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Lower Dolores River Corridor Planning Meeting Jim White Colorado Division of Wildlife

Newaukum Watershed Culvert Assessment

P.O. Box 65 Hancock, Michigan USA fax

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Firth Creek Habitat Enhancement Project 1993

EXTENT OF OBSERVATION

Transcription:

Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and Boat Commission Division of Habitat Management

Topics Discussed in this Presentation Overview of 2010 Habitat Enhancement Project Results of Physical Habitat, Fish Cover, and Electrofishing Surveys 2010 Project Model and Treatment Reaches Proposed Phase 2 Project (Willow Tree) Reach Overview of How PFBC Intends to Move Forward with the Phase 2 Project Summary of How PFBC Proposes to Manage the Big Spring Trout Fishery

Overall Goal of Big Spring Creek Habitat Enhancement Efforts and the 2010 Project: Goal and objectives developed jointly by CVTU, BSWA, and PFBC in December 2006 To improve the instream habitat conditions of Big Spring Creek so that the creek supports a thriving, healthy, wild trout fishery throughout its entire length, targeting brook trout if feasible.

2010 Project Objectives To improve instream habitat and riparian vegetative conditions for a variety of aquatic and terrestrial wildlife species To remove the remains of the Piper Mill and Thomas Hatchery Dams, and implement habitat enhancement activities that will result in a more natural-looking stream channel with appropriate dimensions (width and depth) To increase habitat diversity and provide adequate habitat for all lifestages of trout, ultimately resulting in a sustainable, wild trout destination fishery To monitor pre- and post-implementation physical habitat and biological conditions, and use this monitoring information to guide additional habitat enhancement activities on Big Spring Creek and other limestone spring creeks

2010 Project Habitat Enhancement Approach Use a productive segment of Big Spring Creek as a model for enhancing unproductive segments Model reach criteria: Un-impounded Relatively high abundance of brook trout Relatively low abundance of rainbow and brown trout Physical habitat conditions similar to those described in the literature as optimal for brook trout Initial project area from the boards at the Ditch to ~150 ft downstream of the remains of the Thomas Hatchery Dam Divided the project area into eight distinct Assessment Reaches

2010 Project Habitat Enhancement Approach Conducted field surveys of physical habitat, fish cover, and trout fishery conditions (Summer 2007) Identified potential model and treatment reaches based on: Existing fishery and habitat conditions, and Published brook trout habitat suitability information

80 Brook and Rainbow Trout CPUE Biomass September 2007 (Kg/Ha) Model Habitat Enhancement Target Areas 70 66.8 65.3 60 50 59.2 Piper Mill Pool Thomas Hatchery Pool 54.0 40 30 24.1 20 10 0 7.1 5.0 3.2 1.9 2.2 0.0 0.0 1.1 1.6 0.0 0.0 UpS Iron Br DnS Iron Br UpS of Riffle Riffle Piper Pool DnS of Barrier TH Pool DnS TH Dam Brook Trout Rainbow Trout

Model Reach

Treatment Reach Piper Mill Dam Thomas Hatchery Dam

Piper Mill Pool Treatment Reach

2010 Project Timeframe Design and permitting work completed by Rivers Unlimited in August 2010 Project was constructed by Gleim Environmental in September 2010

Before and After Monitoring Results of 2010 Project and Existing Conditions in the Proposed Phase 2 (Willow Tree) Reach Before 2010 Project Immediately After 2010 Project Private Bridge Private Bridge

Before and After Monitoring Results of 2010 Project and Existing Conditions in the Proposed Phase 2 (Willow Tree) Reach Before 2010 Project October 31, 2012 Private Bridge Private Bridge

Narrowing and Deepening of the Channel Constructed ~0.7 Acres of Riparian Shelves Planted Over 5,000 Native Wetland Herbaceous Plugs (28 Species) Planted 100 Native Wetland Shrubs (8 Species) Photo: B. Ferris

Narrowing and Deepening of the Channel Constructed six log water staging devices, each consisting of 5 to 8 Logs Work in conjunction with riparian shelves to increase water depth Control water surface elevation & velocity Influence soil moisture conditions of riparian shelves Designed and constructed to allow for passage of fish

Width & Depth Parameter Life Stage (Optimal) Model Before Model After Treatment Before Treatment After Willow Tree 2011 Mean Width (ft) 48.3 48.6 57.1 45.8 77.7 Mean Thalweg Depth (ft) 1.76 1.77 1.22 2.01 1.55 Brook Trout Condition Rainbow Trout Condition Adult (1.38 Min.) Adult (1.48 Min.) Optimal Optimal Sub-Optimal Optimal Optimal Optimal Optimal Sub-Optimal Optimal Optimal Mean Depth (ft) 1.13 1.10 0.74 1.27 0.89 Brook Trout Condition Rainbow Trout Condition Adult (0.89-2.63) Adult (2.20 Min.) Optimal Optimal Sub-Optimal Optimal Optimal Sub- Optimal Sub- Optimal Sub-Optimal Sub-Optimal Sub-Optimal

Velocity & Substrate Parameter Life Stage (Optimal) Model Before Model After Treatment Before Treatment After Willow Tree 2011 Mean Velocity (ft/sec) 0.67 0.82 0.86 0.75 0.46 Brook Trout Condition Rainbow Trout Condition Spawning (0.12 1.11) Spawning (0.60 2.30) Optimal Optimal Optimal Optimal Optimal Optimal Optimal Optimal Optimal Sub-Optimal % Fine + Coarse Gravel (2 64 mm) % Coarse Gravel (16 64 mm) Spawning (Brook Trout) Spawning (Rainbow Trout) 47 49 44 41 41 21 22 26 23 10 % Cobble or Larger (>64 mm) Brook Trout Condition Rainbow Trout Condition Juvenile Cover (10% Min.) Juvenile Cover (12% Min.) 14 16 10 16 14 Optimal Optimal Optimal Optimal Optimal Optimal Optimal Sub-Optimal Optimal Optimal

Increased Fish Cover Constructed Ten 20 -Long Modified Mud Sills Added 19 Habitat Logs Placed 101 Habitat Boulders Constructed 6 Rock Clusters

Fish Cover Parameter % Adult Fish Cover (fish > or = 8 inches in length) Brook and Rainbow Trout Condition % Adult Fish Cover Provided by Aquatic Plants % Adult Fish Cover Other than Aquatic Plants Life Stage (Optimal) Adult (12% Min.) Model Before Model After Treatment Before Treatment After Willow Tree 2011 14 9 3 20 14 Optimal Sub- Optimal Sub-Optimal Optimal Optimal Adult 10 4 2 12 12 Adult 4 5 1 8 2 Mean Distance to Closest Adult Fish Cover (ft) Adult 5 8 18 6 13 % Total Fish Cover 29 32 30 34 53 Brook and Rainbow Trout Condition Juvenile (14% Min.) Optimal Optimal Optimal Optimal Optimal

Water Temperature (Summer 2011) 19.0 18.0 17.0 Temperature from Afternoon 6/30/11 to Morning 7/1/11 Rainbow Trout Upper Limit of Optimal 16.9 16.9 16.0 Brook Trout Upper Limit of Optimal 15.6 Temperature (C) 15.0 14.0 13.0 13.3 12.0 11.0 10.0 11.0 10.9 10.8 10.8 11.0 9.0 Control Thomas Hatchery Willow Tree Lot Nealy Road Lot Stone Arch Bridge Lot Afternoon 6/30/11 (Sunny) Morning 7/1/2011 (Clear)

Dissolved Oxygen (Summer 2011) 12 Dissolved Oxygen Concentration from Afternoon 7/28/11 to Morning 7/29/11 11 Dissolved Oxygen (mg/l) 10 9 8 8.8 8.5 9.6 8.7 10.0 8.1 10.2 10.5 Minimum for Optimal Protection of Salmonids 7.6 7 7.0 6 Control Thomas Hatchery Willow Tree Lot Nealy Road Lot Stone Arch Bridge Lot Afternoon 7/28/11 (Light Rain) Morning 7/29/2011 (Heavy Fog)

Response of Fishery Photo Taken on September 19, 2010 Photo: N. McGarrell

Response of Fishery Trout Fry Photo Taken on January 24, 2011

3000 Control Reach (RM 4.77) Trout Abundance (2008-2012) Before 2010 Project After 2010 Project 2669 2500 2351 2000 Number/Km 1500 1642 1000 769 654 959 500 588 171 0 2008 2009 2011 2012 Brook Trout Rainbow Trout

3000 Piper Mill Pool Reach (RM 4.47) Trout Abundance (2008-2012) Before 2010 Project 2909 After 2010 Project 2500 2000 1963 Number / Km 1500 1287 1000 824 500 0 373 244 231 325 2008 2009 2011 2012 Rainbow Trout Brook Trout

3000 Thomas Hatchery (RM 4.29) Trout Abundance (2008-2010) Before 2010 Project After 2010 Project 2769 2500 2309 2000 Number/Km 1500 1000 702 798 500 0 143 106 10 27 2008 2009 2011 2012 Brook Trout Rainbow Trout

3000 Thomas Hatchery (RM 4.29) and Willow Tree (RM 3.88) Trout Abundance Before 2010 Project After 2010 Project 2769 2500 2309 2000 Number/Km 1500 1000 702 798 1034 500 0 10 27 427 143 106 79 49 2008 2009 2011 2012 Willow Tree TH Brook Trout TH Rainbow Trout WT Brook Trout WT Rainbow Trout

Current Status of Fishery Short-term response of fishery to 2010 Project Long-term response minimum of seven years total (September 2017) Piper Mill Pool (RM 4.47) Trout Abundance (2008-2012) Piper Mill Pool (RM 4.47) Trout Biomass (2008-2012) 3500 3000 Before 2010 Project After 2010 Project 210 180 Before 2010 Project After 2010 Project Number / Km 2500 2000 1500 1000 Biomass (Kg/Ha) 150 120 90 60 500 30 Class A Brook Trout 30 Kg/Ha 0 2008 2009 2011 2012 0 2008 2009 2011 2012 Rainbow Trout Brook Trout Brook Trout Rainbow Trout

Fishery Management Strategy for Big Spring Creek Goal : To optimize brook trout Trout Species Composition Objective for Sections 01 and 02: Minimum of 70% brook trout abundance Maximum of 30% other trout species combined By September 2017 Total Trout Biomass Objective for Sections 01 and 02: 90 Kg/Ha (all trout species combined) By September 2017

Phase 2 Project Approach Water Quality Improve the water temperature and dissolved oxygen conditions Narrow the channel to reduce: Water temperature Aquatic plant photosynthesis levels Variability in D.O. and water temperature Increase air-water interface turbulence Photo: N. McGarrell

Phase 2 Project Approach Spawning Substrate Limit coarse gravel Incorporate fine gravel

Phase 2 Project Approach Depth & Velocity Log water staging devices: optimal spawning habitat for brook, but not rainbow Increase mean depth to conditions of the model reach, but not greater than Reduce thalweg depth conditions to just below the optimal range of rainbow Maintain existing mean velocity conditions

Phase 2 Project Approach Fish Cover Increase adult fish cover other than aquatic plants to model reach conditions Reduce mean distance to closest adult fish cover to the model reach conditions

Fish Migration Barrier Consideration Consideration was given to constructing a fish migration barrier on Big Spring Creek and relocating rainbow and brown trout downstream of barrier Barriers considered: Log barrier Gabion barrier with log spillway Rolling weir barrier Electronic fish screen (Hydrolox) Concrete barrier Log Fish Migration Barrier Gabion barrier with Log Spillway

Fish Migration Barrier Consideration Barrier construction is not practical at this time Permitting issues Cost Maintenance and liability issues Relocating fish to downstream of Laughlin Mill Dam not an acceptable alternative due to inadequate angler access (posted property) Concrete Fish Barrier Rolling Weir Barrier

Fishing Regulation Proposal Fishery management goal and objectives may not be obtained by habitat enhancement alone Competition with other trout species may prevent attainment of the goal and 70% brook trout objective Removal of rainbow and brown trout may be required in order to attain the goal and 70% brook trout objective

Fishing Regulation Proposal Current (2012) Trout Species Composition Section 01 (Boards at the Ditch to the former Piper Mill Dam) Brown Trout 0.1% Section 02 (Former Piper Mill Dam to Nealy Road) Brown Trout 0.7% Brook Trout 4.5% Rainbow Trout 39.2% Brook Trout 60.7% Rainbow Trout 94.8%

Fishery Management Strategy for Big Spring Creek Recommend regulation change for Sections 01 and 02 beginning in 2014: Fly-fishing tackle only Catch-and-release of brook trout Harvest of a total of five rainbow and brown trout per day greater than or equal to seven inches in length If species composition objective is not attained in both Sections 01 and 02 by September 2017, rainbow and brown trout removal by electrofishing will be considered

Fishing Regulation Proposal If rainbow and brown trout are removed they will be stocked in local, limestone spring-influenced, Approved Trout Waters, with no or low densities of wild trout

Questions Photo: N. McGarrell