OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

Similar documents
Hydro-Mech Bridge Plug

Float Equipment TYPE 925/926

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

Casing Design. Casing Design. By Dr. Khaled El-shreef

DB Bridge Plug. Features. Benefits. Applications

Superior Hydraulic Fishing Jar. Manual D420

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

E NGINEERED C EMENTING S OLUTIONS

PJD Connection. . TenarisHydril Running Manual.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Standard Operating and Maintenance Instructions for Pumping System Model PS-150

Logic Elements Screw-in Cartridge Valves Pressures to 290 bar (4200 psi) Flows to 303 l/min (80 USgpm)

SECTION BUTTERFLY VALVES

OCEAN DRILLING PROGRAM

On-Off Connector Skirt

Model A Sleeve Valve Cement Retainer

Rig Math. Page 1.

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

BUTTERFLY VALVES Series 800

Guide for Evaluating Your Hose Assembly Supplier

Moyno ERT Power Sections. Operational Guidelines

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

Check Valves. Pilot Operated Check Valves. Vickers. 4CG-10, 20 Series 4CS-03, 20 Series 4CT-06/10, 20 Series. Basic Characteristics.

Standard Operating Procedures

Air Operated Hydraulic Pumping Systems to 50,000 psi

VARIABLE SLIPPAGE PUMP

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Installation Operation Maintenance

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Hand pump type CH. Product documentation. 300 bar 8.3 cm 3 /stroke. Operating pressure p max : Displacement volume V max stroke :

Technical Data Sheet TI-F50 Locking Units series KFH

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction

Subsea Safety Systems

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Coiling Tube with Twist-Proof Fitting

HIGH PRESSURE DRILLING FLUID PUMP

WILD WELL CONTROL WARNING SIGNS OF KICKS

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Dean Pump Self-Priming Chemical Process Pumps

HPHT Annular Casing Packer. Obex Annular Casing Packer

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Restoring Fluid Flow in Tubing Strings

WHEATLEY Series 500 Swing Check Valve

TOOLS FOR BREAKDOWN ELIMINATION

COMMON PRECAUTIONS Data Sheet - Be Sure To Read Before Handling Page 1 of 6

IP2, IP2A and IP2D. Spirax-Monnier International Compressed Air Filter/ Regulators

Model GPR Primary Pressure Regulating Valve. Instruction Manual

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

VAM 21 VAM TOP HT VAM FJL VAM HTF DINO VAM VAM HW ST VAM MUST

The industry reference for premium connections

The Hoffman Specialty Series 2000 consists of main

Industrial Filter. FGD series

Fluid Dispensing Systems H O S E R E E L S H O S E S HOSE REELS

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Vickers. Flow Controls. Flow Controls FN, F(C)G, FRG. Released 6/94

09 - Choosing /sizing a cylinder and valve

Installation, Operation and Maintenance Manual for Back Pressure Regulator

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

Right-Angle Tube Roller Model

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

IWCF Equipment Sample Questions (Surface Stack)

WHEATLEY Series 822/820 Swing Check Valve

Retrievable Bridge Plugs

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

Series 10 and 20. Manual A110

Tube Puller CP/CPS series. Pullers designed with cutting edge technology

BP SIT Testing Franks Facility Lafayette

Testing Services Overview

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Section GATE VALVES

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

(1) Type (2) Cylinder dia. (3) Gripper action : Single-acting closing gripper (normally open) (4) Holder type

UTEX INDUSTRIES, INC.

Technical information for O-rings

5k Slickline Lightweight Pressure Control Equipment 4 ID

I. HANDLING TOOLS 1.1Drill Pipe Elevator

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

OWNER S TECHNICAL MANUAL

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

Cautions : 1. Be careful when you release the Stop Fitting with some internal pressure

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Translation of the original Operating Instructions for HKS rubber compensators

Insert Ring. Protection Ring from Tube Deformation. Protect tubes from deformation. Ultra soft tube is connectable to Fitting.

VACUUM REGULATORS CONTENTS

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

PVC Quick Drain Valve

TYPE 3710 CARTRIDGE SPLIT SEAL Technical Specification

Installation Instructions, Pressure Regulator Series

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000

Installation, operation & maintenance manual - original version

Transcription:

Page 1 of 8 OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Size Series 6.50" 478 Reviewed And Approved By: Signature: Initials: Date:

Page 2 of 8 Section OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE CONTENTS Page CONTENTS...2 1. Description...3 2. Operation...4 2.1. General...4 2.2. Placement...5 2.3. Field Inspection...5 2.4. Maximum Rotating Hours...6 3. Maintenance and Storage...7 4. Specifications...8 CONTENTS

Page 3 of 8 1. DESCRIPTION A drilling jar intensifier installed in the drill string will aid jarring operations under difficult drilling conditions. To jar up under normal drilling conditions, tension is applied to the jar causing the drill pipe to stretch. When the jar releases, the drill pipe contracts, accelerating the drill collars and/or heavy weight drill pipe above the jar upward. At the end of its free stoke, the jar stops suddenly, converting the kinetic energy of the rapidly moving mass into an intense impact force. To jar down, the drill string is lowered, applying a compressive force on the jar. When the jar releases, the drill string accelerates downward, creating an intense jarring force when it stops suddenly at the end of the jar s free stroke. In directional or crooked holes, wall drag can retard the acceleration of the drill collars or heavyweight drillpipe above the jar. In shallow holes, drillpipe stretch may not be sufficient to effectively accelerate the drill collars / heavyweight drill pipe. Under these conditions, the resulting impact would be reduced. The Griffith Double Acting Hydraulic Drilling Jar Intensifier compensates for the negative effects of wall drag, or insufficient drillpipe stretch, by using compressible fluid to store the energy applied in tension or compression. When the jar releases, this stored energy will accelerate the drill collars above the jar, intensifying the impact force at the stuck point. The Intensifier allows full circulation to be maintained during jarring operations and is not affected by hydrostatic wellbore pressures. Wellbore temperature DOES affect the spring force and stroke available and the tool must be correctly prepared at a service center if high temperatures are expected down hole. The standard configuration is for temperatures up to 300 F (150 C). Higher temperatures will damage the seals. With the special high temperature seal kit installed, the intensifier is suited to temperatures up to 500 F (260 C). At lower temperatures the spring force is reduced substantially and the high temperature configuration should be avoided in lower temperature holes. All components are manufactured on computer controlled machine tools and from high strength/low alloy steels to enhance accuracy and durability. 1 DESCRIPTION

Page 4 of 8 2. OPERATION 2.1. GENERAL The Nationl Oilwell Double Acting Hydraulic Drilling Jar Intensifier should be installed in the drill string with the mandrel end up. Prior to make up, a suitable thread compound meeting A.P.I. Spec. 7, 40 th Ed. Appendix "G" should be applied to the end connections. Protect the mandrel sealing surface from possible damage during handling or storage. Never apply tongs, slips, chains or slings to this area. Rig tongs should be applied immediately adjacent to the top and bottom connections to avoid applying torque to the jar body connections. All body connections are torqued to specification at the service center. Avoid breaking these connections at the rig. There are no special operating procedures required when utilizing an intensifier. Jarring operations should be conducted in accordance with the recommended operating procedures for the drilling jar. The Hydraulic Intensifier may have substantial freeplay at room temperature. This is normal and results from the fact that the compressible oil in the hydraulic chamber expands with temperature downhole. As the oil expands it fills the chamber and makes full spring force available when downhole. While installing the tool in the bottom hole assembly care should be taken weight is applied. 2 OPERATION

Page 5 of 8 2.2. PLACEMENT The following guidelines should be used to determine the location of the intensifier in the drill string: The intensifier must be located above the jar. To avoid becoming stuck above the intensifier and jar, the drill string above should not exceed the intensifier and jar diameter. Avoid locating the intensifier directly above BHA components of larger diameters. A minimum of three drill collars or the equivalent weight in heavy weight drill pipe should be placed between the jar and the intensifier to provide sufficient mass for jarring. The buoyed weight placed between the jar and the intensifier should not exceed 40% of the load to fully extend the intensifier at operating temperature. 2.3. FIELD INSPECTION On each round trip the Intensifier should be visually inspected for any indication of damage, excessive wear, or leakage. When the jar is first removed from the hole, a small quantity of fluid may be noticed draining from the balancing ports. This condition is normal and does not indicate a problem. 2 OPERATION

Page 6 of 8 2.4. MAXIMUM ROTATING HOURS The chart shown below indicates the maximum recommended rotating hours between shop servicings. This chart takes into consideration the rotating speed and static bottom hole temperature, assuming that the intensifier has only been used for short periods of light jarring totaling less than two hours. The intensifier should be serviced as soon as possible, following any continuous heavy jarring. Chart 2-1 Maximum Rotating Hours o o 100 F (38 C) o o 200 F (95 C) o o 300 F (150 C) o o 400 F (200 C) STATIC BOTTOM HOLE TEMP. 500 400 300 200 100 MAXIMUM ROTATING HOURS 50 75 100 125 150 0 Example R.P.M. Example: 95 R.P.M. at 200 F = 380 HOURS 2 OPERATION

Page 7 of 8 3. MAINTENANCE AND STORAGE New tools are shipped painted. The threaded ends are chemplated with iron-phosphate and coated with rust preventative coating. Thread protectors are installed to eliminate mechanical damage. The rust preventative coating must be removed using petroleum base solvent and a stiff bristle brush before the jar is installed into the drill string. When the jar is to be laid down the following should be done: 1. Flush all drilling fluid from the bore and from the balancing chamber with fresh water 2. Wash external surfaces of the tool 3. Apply thread compound and protectors to the end connections. Tools stored horizontally should be rotated to a new position occasionally to prevent seals from setting and resultant fluid leakage. 3 MAINTENANCE AND STORAGE

Page 8 of 8 4. SPECIFICATIONS DOUBLE ACTING DRILLING JAR INTENSIFIERS TOOL O.D. inches 6.50 (+API Drill Collar Tolerance) (mm) (165) SERIES 478 MAX. RECOMMENDED HOLE DIA. inches 12 ¼ (Hole Openers Not Recommended) (mm) (311) TOOL I.D. inches 2.75 (mm) (70) LENGTH ft 27 (m) (8.2) WEIGHT lbs 2000 (kg) (900) STROKE UP inches 12 (mm) (305) STROKE DOWN inches 12 (mm) (305) AXIAL LOAD TO FULLY EXTEND lbs 180,000 (At Maximum Temperature) (kn) (800) AXIL LOAD TO FULLY COMPRESS lbs 100,000 (At Maximum Temperature) (kn) (440) MAXIMUM TENSILE LOAD lbs 865,000 (kn) (3 850) PUMP OPEN AREA Inches 2 11.04 (71) (cm 2 ) MAXIMUM TORSIONAL LOAD lb-ft 41,000 (TO YIELD BODY CONNECTIONS) (N-m) (56 000) Specifications subject to change without notice. Up to 300 F (150 C) or, With High Temperature seal kit: Up to 500 F (260 C) in a very well circulated hole. 4 SPECIFICATIONS

4507R01A DOUBLE ACTING HYDRAULIC DRILLING JAR INTENSIFIER TECHNICAL DATA TOOL O.D. inches 8.00 (+API DRILL COLLAR TOLERANCE) (mm) (203) SERIES 4507 MAX. RECOMMENDED HOLE DIA. inches 17 ½ Hole openers not recommended (mm) (445) TOOL I.D. inches 3.06 (mm) (78) LENGTH (NEUTRAL POSITION) ft 28.0 (m) (8.5) WEIGHT lbs 3270 (kg) (1 480) STROKE UP inches 12 (mm) (305) STROKE DOWN inches 12 (mm) (305) AXIAL LOAD TO FULLY EXTEND lbs 300,000 (AT 300 F) (dan) (133 400) AXIL LOAD TO FULLY COMPRESS lbs 125,000 (dan) (55 600) MAXIMUM TENSILE LOAD lbs 1,250,000 (dan) (556 000) MAXIMUM TORSIONAL LOAD lb-ft 82,000 (TO YIELD BODY CONNECTIONS) (N-m) (111 000) PUMP OPEN AREA Inches sq. 15.9 (cm sq) (103) Specifications subject to change without notice.