Pre-Construction Meeting

Similar documents
83 AVENUE PRE-CONSTRUCTION MEETING

Major Bike Routes 102 Avenue Workshop April 21, 2015

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

122 Avenue: 107 Street to Fort Road

Tonight is for you. Learn everything you can. Share all your ideas.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods QUEEN ALEXANDRA

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CLOSED. Highlights of the Final Concept Design:

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods LANSDOWNE

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Why invest in the 1 Street S.W. Corridor?

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Building Great Neighbourhoods STRATHEARN

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Fulton Market Streetscape

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Living Streets Policy

Governance and Priorities Committee Report For the July 2, 2015 Meeting

42nd Ave N Reconstruction

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Chapter 4: Funding and Implementation

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

STONY PLAIN ROAD STREETSCAPE

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Henderson Ave. Complete Streets Project

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Complete Streets. Designing Streets for Everyone. Sarnia

Construction Newsletter No. 32 October 14, 2016 On-Going

New Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016

KEARNY MESA COMMUNITY PLAN UPDATE

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Downey Road. Transportation Improvement Study

Pavement Rehabilitation & Buffered Bike Lane

Item No. 14 Town of Atherton

Pennsylvania Avenue (CR 484) Design Alternatives Study

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Public Information Centre

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

North Avenue Corridor Study

complete streets design and construction standards public primer City of Edmonton

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Safe Routes to School Action Plan Aberdeen, Idaho

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Glebe Neighbourhood Cycling Plan

Fields of St. Croix HOA Meeting. October 27, 2016

Hospital Link Project Project Update September 2017

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

6.4 RECOMMENDED IMPROVEMENTS

Transportation Assessment

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Terwillegar Drive Expressway Draft Concept Plan

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

City of Seattle Edward B. Murray, Mayor

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

WELCOME Public Information Centre

Dowling/Beaty Cycling Route

Non-Motorized Transportation 7-1

DISTRICT BICYCLE PROGRAM

This page intentionally left blank.

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Monroe Street Reconstruction

Executive Summary Route 30 Corridor Master Plan

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Option W: N. Washington Street Project

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

ECONOMY PEOPLE ENVIRONMENT

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Thank you for attending

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

TRANSPORTATION NEEDS ASSESSMENT

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Derby Street. Project Updates. Salem, Massachusetts

Shore Drive Safety Task Force. Report to the SDAC

PEDESTRIAN ACTION PLAN

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Transcription:

Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes

Objectives & Project Scope To share information on the scope of the upcoming 2018 construction of the Southside Bike Route (83 Avenue from 106 Street to 111 Street, 106 Street from 84 Avenue to Saskatchewan Drive). To provide background on the project construction process. Road and Sidewalk Construction SASKATCHEWAN DRIVE Landscaping 110 ST 109 ST 108 ST 106 ST 106 ST 106 ST 83 AVE 83 AVE 83 AVE 83 AVE 83 AVE 83 AVE 83 AVE 106 ST 107 ST 105 ST 104 ST 103 ST 102 ST 101 ST 100 ST 99 ST 98 ST 97 ST 82 (WHYTE) AVE 82 (WHYTE) AVE 82 (WHYTE) AVE 82 (WHYTE) AVE 1/11

Council Direction (June 2014) Transportation Master Plan and Bicycle Transportation Plan Council approved in 2009. Council Direction in 2014: Major Bike Grid Plan for higher quality infrastructure. Focus on existing routes with greater existing ridership. More opportunities for public input, earlier in the project (route options and evaluation criteria). THE WAY WE MOVE TRANSPORTATION MASTER PLAN SEPTEMBER 2009 2009 Transportation Master Plan 2/11

Council Direction (June 2014 to Present) Feedback On Single Concept Plan April 2015 Review Route Location May/June 2014 Share Final Plan Information June 2015 2014 We Are Here 2018 Aesthetics June 2015 Construction 2016 To 2018 (Final Staging To Be Completed From May to October 2018) Test Two Concept Options November 2014 3/11

Consultation Process 290 Online Dialogue (Route Location) 163 Public Workshops (Route Location) 35 Stakeholder Hubs (Aesthetics) 1560 Total Participants 146 Open House (Aesthetics) 10 Stakeholder Hubs 86 One-On-One Stakeholder Interviews 183 Public Workshops (Single Concept) 40 Stakeholder Conversations (Route Location) 170 Pop-up at Farmer s Market Online Dialogue (Two Concepts) 101 183 19 Public Workshops (Two Concepts) 134 Online Dialogue (Single Concept) Stakeholder Conversations (Single Concept) 4/11

Project Overview 83 Avenue Bike Route Connects the neighbourhoods of Strathcona and Garneau to the University area. Has high ridership for cyclists. The bike infrastructure includes installation of a two-way protected bike lane adjacent to the north curb of 83 Avenue between 106 Street and 111 Street with the addition of a physical median between the protected bike lanes and motor vehicle lanes. 106 Street Bike Route Has high ridership for cyclists. The bike infrastructure includes installation of an elevated oneway cycle path provided on either side of 106 Street between 84 Avenue and Saskatchewan Drive adjacent to the sidewalk. Construction Details The Roadway Renewal portion includes: reconstruction and resurfacing of roadways, reconstruction of sidewalks, curbs and gutters, and streetlight renewal. All sidewalk reconstruction will be project cost, therefore no cost for adjacent homeowners. Work will also include a portion of private sidewalk connectors and landscape restoration. Aesthetic enhancements will be made on City-owned property. 5/11

83 Avenue Bike Route 83 Avenue (106 Street to 111 Street) 83 Avenue will remain one-way local eastbound roadway for vehicles. Protected bike lanes (east and westbound). Parking maintained on the south side of the roadway from 111 to 109 Street. Parking/drop-off bays will be provided from 109 to 106 Street. All other parking will be removed. Raised median through 109 Street. Curb extensions at 111 Street, 110 Street and 108 Street. Aesthetic improvements will be implemented. 110 Street 109 Street 107 Street 6/11

106 Street Bike Route 106 Street (84 Avenue to Saskatchewan Drive) 106 Street is a two lane collector roadway. The roadway will remain as a two-way road for cars. The bike infrastructure includes installation of an elevated one-way cycle path provided on either side of 106 Street adjacent to the sidewalk. There will continue to be no parking along 106 Street between 84 Avenue and Saskatchewan Drive. Pedestrian amber flashers will be installed at the 106 Street/Saskatchewan Drive intersection. Road Construction Raised Bike Path Concrete Construction 7/11

Construction Staging Construction takes place over three years (2016 to 2018): 83 Avenue (106 Street to 111 Street) and 106 Street (84 Avenue to Saskatchewan Drive) To be completed in 2018 (May to October). During roadway reconstruction access to the front of properties will intermittently be unavailable. While this work is underway, residents are encouraged to use the back lane for access. 83 Avenue (95A Street to 106 Street), 106 Street (82 Avenue to 84 Avenue), and 95A Street (82 Avenue to 83 Avenue) This portion of the bike route has already been constructed (2016 and 2017). Some aesthetics/landscaping works will be completed in 2018. This portion of the 106 Street bike route was coordinated with 83 Avenue bike route construction in 2018. 8/11

Cross Sections 111 to 109 Street 109 to 108 Street 108 to 106 Street Existing Existing Existing Future Future Future 9/11

Vehicle Drop-Off Zones Every effort has been made to protect boulevard trees along the corridor. Vehicle drop-off zones will be added to the three blocks on 83 Avenue where parking is being removed due to narrow roadway widths. There is one vehicle drop-off zone on 106 Street north of 82 Avenue. The project team has worked with Forestry to identify locations where trees are less well-established or in poorer health. Drop-off zones will be provided where trees will be relocated or removed. Existing The asset value of each tree will be invested in new tree plantings within the community. Overall, seven trees will be relocated or removed in order to accommodate vehicle drop-off zones between 109 and 106 Street. Future 10/11

Aesthetic Improvements Prickly Wild Rose Stamped Asphalt Crosswalk 700 Series Backless Bench Q Bike Rack Fixit Bike Repair Station Scarlet Pavement Rose American Elm Prince of Wales Juniper Snowmound Spirea Red Osier Dogwood Trembling Aspen Litter Receptacle 11/11

Drop-in from 5 9pm Third floor conference room #305 6:30 8:30pm Pre-registration is required due to limted space Third floor conference room #305 Please take the elevator or stairs!

Drop-in from 5 9pm Third floor conference room #305 6:30 8:30pm Pre-registration is required due to limted space Third floor conference room #305 Please take the elevator or stairs!