SECTION P4 SEPARATION SYSTEMS

Start up XXX from normal shutdown Introduction

OPERATING PROCEDURES

Safe Work Practices and Permit-to-Work System

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

HUMAN FACTORS CHECKLIST

SECTION P4 SEPARATION SYSTEMS

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

Lab Assessments Workshop

GeQuip Joule Thomson Plant. Process Description (see Figure 1) Standard Control Instrumentation

JORDAIR/BAUER Service Manual

NORMAL OPERATING PROCEDURES Operating Parameter Information

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

Control of Hazardous Energy Program (Lockout/Tagout)

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

GAS COMPRESSION SYSTEM

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

Elements of a Lockout/Tagout Program OSHA

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

SECTION P4 SEPARATION SYSTEMS

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

CONTROL OF HAZARDOUS ENERGY

Lockout/Tagout Training Overview. Safety Fest 2013

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

GAS DEHYDRATION SYSTEM

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

Lockout/Energy Control

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Official Journal of the European Union L 92/3

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

RMP/PSM WEBINAR SERIES

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

M-06 Nitrogen Generator (Nitrogen Making Machine)

ONSHORE GAS GATHERING FAQS

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Hydraulic Reliability & Preventive Maintenance Report

Dow s New Practice for Locating Temporary Portable Buildings. P. Partridge 9/29/05 UNRESTRICTED - May be shared with anyone Slide 1

Hazardous Energy Program Lockout/Tagout

White Paper. Electrical control valve actuators on oil and gas production separators

CROT-6 CROT-10 CRO-4. for Compressor Overload Protection

EXECUTIVE SHIP MANAGEMENT PTE LTD M 24 Q 4 SINGAPORE QI 19 Page 1 of 5 (9/05 Rev 2) Decision. Implement

Operating Instructions

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS

Control & Maintenance. INT69 Diagnose INT69 TM Diagnose. Protect the heart of your system

EVT * -Pro Electronic Valve Tester

F All types of inert gas systems are to comply with the following:

Lock Tag Try Procedure

Cycle Isolation Monitoring

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

PRESSURIZED EQUIPMENT AND SYSTEMS

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

Lockout Tagout Program

29 CFR CONFINED SPACE ENTRY

HYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

MSC Guidelines for Compressed Air Systems

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

Recovery from a Process Saturation Condition. Benefits of Using DeltaV PIDPlus

LOCKOUT / TAGOUT PROGRAM

THE UNIVERSITY OF NORTH CAROLINA

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Safe Work Permits A Safety Advantage

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

TITAN FLOW CONTROL, INC.

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

IIAR 8. Decommissioning of Closed-Circuit Ammonia Refrigeration Systems

Confined Space Entry

SAMSON SOLUTIONS Energy and Power (Critical Applications)

Refrigeration Scroll For Parallel Applications

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

OLGA. The Dynamic Three Phase Flow Simulator. Input. Output. Mass transfer Momentum transfer Energy transfer. 9 Conservation equations

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

LOCKOUT-TAGOUT PROGRAM

MAKING MODERN LIVING POSSIBLE. Pilot operated internal safety valves type POV REFRIGERATION AND AIR CONDITIONING DIVISION.

Control of Hazardous Energy Program (LOTO)

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

Sequence of Operations

AUGMENTED OFFGAS SYSTEM. Ariadna G. Clark System Manager Oyster Creek Generating Station

CNG FILLING STATIONS

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

Gettysburg College. Energy Control Program

Installation Manual. Model # SF-3W 9/16/03 REV 1. Arch Chemicals, Inc Lower River Road. P.O. Box 800 Charleston, TN PULSAR

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

LO/TO LOCKOUT/TAGOUT PROGRAM

NGP-250/500 Nitrogen Generator Quick Start Guide

RPLA. Heat Pumps. Parts List 19-July-2011

Risk-based Decision Making & USA Compliance Requirements & Methods

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Transcription:

Standard Operating Procedures Ken Hufford Risk Management Professionals 949/282-0123 www.rmpcorp.com RMP Risk Management Professionals RMP Risk Management Professionals

Disclaimer Regarding this Presentation Risk Management Professionals, Inc. regards the work that it has done as being advisory in nature. The specific requirements for Operating Procedures may vary from facility to facility.

Key Topics Operating Procedure Requirements Annual Certification What to Look for During Annual Certification Operating Procedure Improvements Conclusion Questions

Operating Procedure Requirements According to 40 CFR 68.69, 8 CCR 5189 (f), and 19 CCR 2760.3, Operating Procedures must cover: Initial Startup Normal Operations Temporary Operations Emergency Shutdown Emergency Operations Normal Shutdown Startup Following a Turnaround or Emergency

Operating Procedure Requirements The procedures must include: Steps for Each Operating Phase Consequences of Deviations Steps to Correct Deviations Safety and Health Considerations Safety Systems and Functions Operating procedures must be readily accessible Updates precipitating from major changes and annual certification Development & implementation of safe work practices

Annual Certification Owner or operator shall certify annually that these operating procedures are current and accurate Ensure that the procedures are read through and verified Verified by operator Changes in personnel Keep records of the review Act as a self-auditor DATE REVIEWED NAME TITLE SIGNATURE 5/5/2006 Henry Jacobs Operator 5/5/2007 Henry Jacobs Operator 5/5/2008 Henry Jacobs Operator 5/5/2009 Fred Williams Operator 5/5/2010 Fred Williams Operator

What to Look for During Annual Certification Operating procedures should be easily accessible to operators Maintain a printed copy near the process area OR Keep a copy on a nearby computer for reference If multiple copies exist, ensure all are updated if changes occur

What to Look for During Annual Certification Temporary Operations Must be addressed in Operating Procedures Operations that occur infrequently or do not fit into the other categories listed. For example: Transfer/charging operations Oil draining operations Pump-down operations Bypass operations Hot gas defrost

What to Look for During Annual Certification Address Safety and Health Considerations List appropriate PPE, especially for particularly dangerous procedures Note the location of the MSDS and safety shower/eyewash stations

What to Look for During Annual Certification Examples of safe work practices Lockout/tagout procedures Confined space entry Opening process equipment or piping Control over entrance into a stationary source

What to Look for During Annual Certification Consequences of Deviation Compressor High Discharge Temperature Condition Compressor high discharge temperature shutdown Consequences Compressor shutdown Loss of feed gas to Plant Low back pressure for downstream process Eventual process upset condition Correction Reason Bad discharge valves Bad suction valves High discharge pressure Correct compressor knockdown condition and restart compressor Call compressor mechanic to change bad valves Check residue gas flow rate Consequences of Deviation Corrections for mis-operation Reference Process Hazard Analysis or Hazard Review for additional information

Operating Procedure Improvements Additional Detail to Capture Best Operations Practices INITIAL STARTUP PROCEDURES 1 2 3 4 Check oil separator level. Check the levels in the vessels. Turn on the Evaporative Condensers. Check to make sure all operational valves are open. 1 2 3 4 INITIAL STARTUP PROCEDURES Check oil separator level on MyCom Compressors. Check the levels in the High Pressure Receiver (should be around 25-35%) and the Low Pressure Receiver (should be around 40-50%). Turn on the Evaporative Condensers water pumps and then the Evaporative Condenser fans. Ensure the condensers are set to auto. Check to make sure all operational valves are open (suction/discharge valves on the MyCom Compressors, valves on the inlet/outlet of the High Pressure Receiver, valves on the inlet/outlet of the Evaporative Condenser).

Operating Procedure Improvements Incorporation of P&ID information Reference specific valves/equipment Incorporation of photos/drawings Emergency Shutdown Procedures Step Key Points 1 If there is a release/fire at the Unit, close the valve at the inlet Field Gas line and the outlet from the System. If there is a release/fire at a downstream unit, follow normal shutdown procedures for the Unit.

Questions? Ken Hufford Ken.Hufford@RMPCorp.com 949-282-0123 Ext. 228 RMP Risk Management Professionals