Project
General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2
General Information: Project Limits: Euclid Heights Blvd. and Bayreuth Road Project Administration: ODOT District 12 ODOT Project Engineer: Al Yost ODOT Area Engineer: Patrick McCafferty 3
Work Schedule Scheduled Start Date: April 2012 Scheduled Completion Date: September 30, 2012 4
Work Schedule Work will generally be from 7 a.m. - 3:30 p.m. No night work Weekend work only if needed to keep the project on schedule 5
Work Description Repair the concrete base and resurface with asphalt from Euclid Heights Blvd to Bayreuth Road All of the existing asphalt will be removed Extensive concrete slab repair and replacement from Euclid Heights Blvd to Mayfield Road 6
Work Description Additional concrete base repairs as needed from Mayfield Road to Bayreuth Road Resurface with approximately 5 ½ inches of asphalt 7
Work Description Eastern most lane (the lane nearest to the shopping center) from Euclid Heights Blvd to Mayfield Road will be removed Road will be 5 lanes wide in this area when work is complete New curbs and drainage inlets will be installed 8
Work Description Replace damaged portions of curb throughout the project Approximately 40 driveway aprons will be replaced (at locations marked for curb replacement) Upgrade curb ramps to ADA requirements 9
Work Description Traffic signals at Severance Center Access and Hollister Road will be removed permanently 10
Phase 1 Shift all traffic to the East half of the road and make repairs to the West half Maintain both Northbound and Southbound traffic 11
Phase 1 On Taylor Road between Euclid Heights Blvd and Mayfield Road 1 Southbound lane 2 Northbound lanes 12
Phase 1 On Taylor Road between Mayfield Road and Monticello Blvd 1 Southbound lane 1 Northbound lane 1 Center turn lane 13
Phase 1 On Taylor Road between Monticello Blvd and Bayreuth Road 1 Southbound lane 1 Northbound lane 14
Phase 1 - Intersections Euclid Heights Blvd / Taylor Road Left turn lane for Northbound traffic Left turn lane for Southbound traffic 15
Phase 1 - Intersections Mayfield Road / Taylor Road Right turn lane for Northbound traffic Left turn lane for Southbound traffic Lanes on Mayfield Road not changed 16
Phase 1 - Intersections Monticello Blvd. / Taylor Road Left turn lane for Northbound traffic 17
Phase 2 Shift all traffic to the West half of the road and make repairs to the East half Maintain both Northbound and Southbound traffic 18
Phase 2 On Taylor Road between Euclid Heights Blvd and Mayfield Road 1 Northbound lane 1 Southbound lane 1 Center turn lane 19
Phase 2 On Taylor Road between Mayfield Road and Bayreuth Road 1 Northbound lane 1 Southbound lane 20
Phase 2 - Intersections Euclid Heights Blvd / Taylor Road Right turn lane for Northbound traffic Left turn lane for Southbound traffic 21
Phase 2 - Intersections Mayfield Road / Taylor Road Left turn lane for Northbound traffic Lanes on Mayfield Road not changed 22
Project Notes Please watch for construction personnel and equipment while travelling through the work zones. ODOT and City staff will work with you to mitigate any concerns which will arise during the reconstruction. 23
Contact Us City of Cleveland Heights: (216) 691-7311 ODOT Public Information Office: (216) 584-2005 ODOT Construction Office: (216) 584-2152 Al Yost & Pat McCafferty 24
Thank You 25