Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units. GP-B Engineering Procedure P0761 Rev.-

Similar documents
Proto-qual Vibration Test Procedure 2.5 and 6 Vacuum Valves (3179 and 3223) Retest of Flight Spare Valves. GP-B P0735 Rev.-

DESIGN VERIFICATION AND QUALIFICATION OF NEW POPPET AND BUSHING ON GMA FLIGHT SOLENOID VALVES

(PTP) PROBE PRESSURE MEASUREMENT SYSTEM INSTALLATION AND LEAK CHECK PROCEDURE

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

CALIBRATING THE GMA PRESSURE SENSORS AND THE ECU ENGINEERING UNIT

Proton Monitor Thermal Vacuum Test Procedure GP-B P0635

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

BLEED DOWN OF THE HIGH GMA PRESSURE

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

TEST OF GMA SPINUP ASSEMBLY PRESSURE SENSOR CALIBRATION

GSE CAGING BALLAST SYSTEM INSTALLATION

GDS OPERATING PROCEDURE

GMA SLEEP PROCEDURE AT VAFB

(PTP) REMOVE PROBE SPINUP GAS/VAC. LINES (HORIZ.)

CHECK READOUT LOOP CONTINUITY IN PROBE C

PROCEDURE FOR THERMAL CYCLING IN LIQUID NITROGEN

SCRUB LAUNCH RECOVERY PROCEDURE FOR THE GMA

ASSEMBLY OF GAS FLOW HARDWARE INTO SM GMA

GMA PREPARATION FOR E28 TESTING

PROBE-C CAGING VALVE INSTALLATION

GMA VENT EXTENSION SERVICE PROCEDURE

GMA TO SPACE VEHICLE PLUMBING HOOKUP

PROCEDURE TO MEASURE READOUT LOOP RESISTANCE

BLEED DOWN OF THE GMA HIGH PRESSURE AT VAFB

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

CLEANLINESS TEST OF PROBE SPINUP EXHAUST LINES

POROUS PLUG CHARACTERIZATION TEST

SPECIFICATIONS ATTENTION

Section 3- Repair and Calibration Procedures

Pressure Dump Valve Service Kit for Series 3000 Units

Glove Box Installation Manual

Pressure Dump Valve Service Kit for Series 2300 Units

Product Information News

GUARD TANK PRESSURIZATION FOR TRANSPORT

CO2 Tank Conversion Kit P.N , P.N , and P.N

DBML-60/80 Squeeze Tool

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Burst Disk on SMD

LRS(H)4 Pressure-Reducing Regulator User Manual

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Install Fill Line Relief Assembly on SMD

Safety Aspects and Design of the Vent Isolation Chamber. Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow

V5197A. Firing Rate Gas Valve APPLICATION FEATURES PRODUCT HANDBOOK

Tank Blanketing Pressure Regulators RHPS Series

SERVICE BULLETIN. TOPIC: Cylinder NUMBER: SUPERSEDES: NEW DATE: May 15, Indexing Basic Cylinder Height On CFR F-1/F-2 Rating Units

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

E Lightband Compression Tool Operating Procedure

Please refer F 90 of the present manual for the identification of the valves used in the detector.

OPERATING INSTRUCTIONS Sherlock Chamber Testing System

WaterSource Heat Pump Hose Kit Performance Specification-Summary

TWO POST RAM PACKAGE 5 GALLON READ THIS MANUAL CAREFULLY BEFORE INSTALLING, OPERATING OR SERVICING THIS EQUIPMENT.

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

NHR-X-X Encore Feed Hoppers

B. Assemble the Method-25 sample train with a heated probe/filter.

Booster Pump PB4-60 Replacement Kits

Pressurize Well to One Atmosphere with Probe Installed

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

PARTS & SERVICE. regulator (new) for NGW/ GBW applications. Rev. 02/2018 Id.No. DOK50026

T-900 Series. Operation Manual for T-960, T-965, T-970, T-975, T975-CPF

Memorandum. 1. Introduction. 2. Procedure. To: File ALMA Number: FEND A-TDR. Neil Horner Ralph Groves John Effland.

PXRF- Tracer Helium Flow Control System

WHEATLEY Series 500 Swing Check Valve

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

RM052S-XXX-XX TWO POST LIFT / RAM

Model PSI Compressor with 3-Gallon Air Tank 12VDC

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR DISCONNECT MAIN TANK VENT LINE FROM GAS MODULE MAIN TANK SUBATMOSPHERIC

Torque Specifications

600 o F High Temperature Aging Cell Instruction Manual

SEMASPEC Test Method for Determination of Cycle Life of Automatic Valves for Gas Distribution System Components

Encore PE 50-lb Feed Hopper

Installing a Christie One Mount/Christie One Mount Plus

Installation, Operation and Maintenance Manual for Back Pressure Regulator

PREPARE FOR CRYO OPS FOLLOWING TRANSPORT TO B1610 To be performed at Vandenberg Air Force Base building 1610

Installation Instructions, Pressure Regulator Series

NHR Powder Feed Hopper

Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

GETZ EQUIPMENT INNOVATORS PART NO.: 9G59554 MODEL: MS 36 SC-R HYDROSTATIC TEST PUMP

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373

INDUSTRIAL EXCESS ESS FLOW VALVES

PANACEA P125 USER MANUAL

VK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010

SERVICE KITS SPECIFICATIONS GENERAL DESCRIPTION. RM052S-XXX-XX Two Post Lift / Ram

TECHNICAL DATA. Q = C v P S

Halsey Taylor Owners Manual STOP!

PANACEA P100 LOW PRESSURE USER MANUAL

Canadian Light Source Inc. Vacuum Component Leak Test Technical Procedure

G92 Series BASOTROL Automatic Pilot Gas Valve

ENGINEERING TECHNICAL REPORT

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

Spectrum AquaLight (SAL ) Color Underwater Light Owner s Manual

Instructions for Installing and Operating Clark Reliance EA101 Series Levalarm

CB 350. Spare parts list. Hydraulic concrete buster. CB 350 s/n DEQ Construction Tools GmbH No

TECHNICAL DATA. Q = C v P S

CRP Ltd INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SYRINGE SAMPLING SYSTEMS

Transcription:

Ops Order No. W. W. Hansen Experimental Physics Laboratory STANFORD UNIVERSITY STANFORD, CALIFORNIA 94305-4085 Gravity Probe B Relativity Mission Vibration/leak Test 2.5 and 6 Vatterfly Valves (3179 and 3223) spare units GP-B Engineering Procedure P0761 Rev.- Prepared by: C. Warren,Test Director Date Approved : L. Sokolsky LMMS Engineer Date Approved : R. Singley,Vatterfly REE Date Approved : D.Ross., Quality Assurance Date Approved : B. Muhlfelder, Program Technical Manager Date

Table of Contents 1 GENERAL DESCRIPTION... 2 2 APPLICABLE DOCUMENTS... 2 3 GENERAL INSTRUCTIONS... 4 4 PARTS... 4 5 RANDOM VIBRATION TEST OF VATTERFLY VALVES (2.5" 3179 & 6.0" 3223)..6 6 PROCEDURE COMPLETION... 14 7 DATA BASE ENTRY... 14-1 -

1 GENERAL DESCRIPTION This Vibration/leak test will be done to prove no leak during lift off. The test will be done in Z axis for the 2.5 valve and the X axis for the 6.0 valve as shown in figure 2, the 2.5 valve showed some rattling during Previous vibration test. The test will be done with the valve covers on for maintaining cleanliness, keeping the probe side under vacuum and connected to a helium leak detector. The GSE side is back filled with 1 atmosphere of helium gas. 2 APPLICABLE DOCUMENTS Document number Rev Title 3179 G Drawing, Valve, Vacuum, 2.5 3223 G Drawing, Valve, Vacuum, 6.0 210127-01 - Drawing, Random Vibration Fixture 2.5 210126-01 - Drawing, Random Vibration Fixture 6.0 210121-01 B Drawing, 2.5 Valve Cover, Upper 210122-01 C Drawing, 2.5 Valve Cover, Lower 210123-01 B Drawing, 6.0 Valve Cover, Upper 210124-01 C Drawing, 6.0 Valve Cover, Lower 3 GENERAL INSTRUCTIONS 3.1.1 The Test Director (TD) shall be Chuck Warren or an alternate that he shall designate. The TD has overall responsibility for the implementation of this procedure and shall sign off the completed procedure and relevant sections within it. The Vatterfly Valve REE shall also sign off the completed As-Built procedure. 3.1.2 Test Engineers and other personnel. All engineers and technicians participating in this procedure shall work under the direction of the TD who shall determine personnel that are qualified to participate in this procedure. Participants in this procedure are to be C. Warren and /or R. Stephenson and L. Sokolsky. - 2 -

3.1.3 The test shall be conducted on a formal basis to approved and released procedures. The QA program office shall be notified of the start of this procedure. A Quality Assurance Representative, designated by D. Ross shall be present during the procedure (if deemed necessary) and shall review any discrepancies noted and approve their disposition. Upon completion of this procedure, the QA Manager, D. Ross or her designate, shall certify their concurrence that the effort was performed and accomplished in accordance with the prescribed instructions by signing and dating in the designated place(s) in this document. Discrepancies will be recorded in a D-log or as a DR per Quality Plan P0108. If a retest of any or all of the hardware is necessary, the TD will determine the appropriate changes in the procedure, with the QA Manager s approval. Do not break test configuration if a failure occurs. Notify QA. ONR representative, and QA to be notified 24 hours prior to beginning this procedure SU QA time & date ONR time & date - 3 -

3.2 Red-line Authority 3.2.1 Authority to red-line (make minor changes during execution) this procedure is given solely to the TD, his designate or the Vatterfly Valve REE, and shall be approved by QA. Additionally, approval by the Program Technical Manager shall be required, if in the judgment of the TD or QA Representative, experiment functionality may be affected. 4 PARTS 4.1 Take Delivery of Parts from Bonded Stores 4.1.1 Accept the following parts from Stores: Description Part Number Serial Number 2.5 Vatterfly valve 3179 0001 (back up engineering unit) 6.0 Vatterfly valve (back up engineering unit) 3223 0002 4.2 Test Equipment Item # Qty. Equipment Model and Sn, or Part Number Cal due date 1. 1 Ea. Alcatel leak detector ASM 180T, NA 2. 1 Ea. Varian helium calibrated leak F8473302, EBBC6015 1/25/02 3. 1 Ea. Vatterfly Valve Test Manifold NA NA - 4 -

4.3 Hardware Item # Qty. Description P/N / Size 1. 2 Ea. Viton O-ring, 2.5 2-234 2. 2 Ea. Viton O-ring, 6.0 2-259 3. 12Ea. Stainless steel washers #10 4. 12 Ea. Stainless steel socket head 10-32x1 lg screws 5. 4 Ea. Stainless steel hex head bolts ¼-20x3.5 lg 6. 12 Ea. Stainless steel washers ¼ 7. 8 Ea. Stainless steel socket head bolts ¼-28x5/8 lg 8. 8 Ea. Special stainless socket head ¼-20x 6 lg bolts with 5/16 allen head 9. 8 Ea. Brass washers 1/2 10. 6 Ea. Stainless steel socket head bolts 10mm x 30mm lg 11. 6 Ea. Stainless steel washers 3/8 12. 2 Ea. ¼ stainless bellows 24 lg 13. 2 Ea. 1/2 stainless bellows 24 lg 14. AR ¼ VCR gaskets SS-4-VCR-2-GR 15. AR 1/2 VCR gaskets SS-8-VCR-2-GR 16. 1 Ea. 1/2 VCR male union SS-8-VCR-6-DM 17. 1 Ea. Adapter ½ male VCR to KF25 K100-VCR50 18. 1 Ea. KF-25 centering ring K100-CR 19. 1 Ea. KF-25 clamp K100-C 20. 16 Ea. Stainless steel socket head bolts 3/8-16x1.5 lg. 21. 16 Ea. Stainless steel washers 3/8 22. 16 Ea. Stainless steel lock washers 3/8 4.4 Tools Description Size Combination wrench ¾ Combination wrench 5/8 Combination wrench 7/16 Allen wrench 3/16 Allen wench 5/16 Adjustable wrench 6 Torque wrench 0 to 150 inch lbs., 3/8 drive Socket 7/16, 3/8 drive - 5 -

5 RANDOM VIBRATION TEST OF VATTERFLY VALVES, 2.5 3179 AND 6.0 3223 5.1 Testing will be done either at Bell Technologies or at LMMS bldg. 181. Accelerations in the shake axis will be recorded at the fixture. See Figure 2 for sketch of test set-up. 5.2 Initial set-up and leak check of 2.5 and 6.0 valves for vibe/leak test. (See figure 1) 5.2.1 Installation of 2.5 valve into upper and lower covers. 5.2.1.1 Install o-ring into groove in lower cover. 5.2.1.2 Place Vatterfly valve seal side down onto lower cover with motor housing opposite shutoff valve (V-2) 5.2.1.3 Secure Vatterfly valve to lower cover using 8 ea. ¼-28 x5/8 long stainless socket head bolts. 5.2.1.4 Install o-ring into groove in upper cover. 5.2.1.5 Place Vatterfly valve and lower cover assembly into upper cover with motor housing in cutout opposite shutoff valve (V-1). 5.2.1.6 Secure whole assembly with 6 ea. 10-32x1 long stainless socket head screws and washers. 5.2.2 Installation of 6.0 valve into upper and lower covers. 5.2.2.1 Install o-ring into groove in upper cover. 5.2.2.2 Place Vatterfly valve into upper cover with motor housing in cutout opposite shutoff valve(v-1). 5.2.2.3 Secure Vatterfly valve to upper cover using 6 ea. 8mm x 30mm long stainless bolts with washers. 5.2.2.4 Install o-ring into groove in lower cover. 5.2.2.5 Place Vatterfly valve and upper cover assembly onto lower cover with motor housing opposite shutoff valve (V-2). 5.2.2.6 Secure whole assembly with 6 ea. 10-32x1 long stainless socket head screws and washers. - 6 -

5.2.3 Leak check and helium backfill of 2.5. (See figure 1) 5.2.3.1 Start-up leak detector and calibrate as per manufacturer s instructions. After cal. record leak rate in table below. Date/Time Calibrated leak SN / leak rate (mbar l/sec) of helium / EBBC6015/4.52E -8 1-25-02 Calibrated leak cal. due date Leak rate after cal. (mbar l/sec) of helium 5.2.3.2 Vent leak detector by pressing cycle switch and attach Vatterfly valve test manifold to leak detector using KF-25 centering ring and clamp. 5.2.3.3 Connect V-1and V-2 from Vatterfly valve to Vatterfly valve test manifold using 2 ea.¼ x24 lg. Bellows and 4 ea. ¼ VCR gaskets. 5.2.3.4 Attach helium gas supply to MV-3 on Vatterfly valve test manifold using ¼ polyflow tubing as required.. 5.2.3.5 Close verify closed all valves. 5.2.3.6 Open valves MV-1, MV-2, V-1 and V-2 and start leak detector pumping by pressing the cycle button on leak detector. 5.2.3.7 When leak detector crosses over into fine leak test and leak rate is< 1E -7 mbar l/sec leak test all connections using helium spray method. When all connections are leak tight to <1E-7 mbar.l/sec close V-2, MV-3 and MV-2. 5.2.3.8 Open MV-3 and vent GSE side of Vatterfly valve to ~1/2 psi of helium gas and close MV-3. 5.2.3.9 Open MV-1 and MV-2 vent up to air by pushing cycle button on leak detector. 5.2.3.10 Disconnect Vatterfly valve test manifold from leak detector and Vatterfly valve - 7 -

5.2.4 Leak check and helium backfill of 6.0. (See figure 1) 5.2.4.1 Start-up leak detector and calibrate as per manufacturer s instructions. After cal. record leak rate in table below. Date/Time Calibrated leak SN / leak rate (mbar l/sec) of helium / EBBC6015/4.52E -8 1-25-02 Calibrated leak cal. due date Leak rate after cal. mbar l/sec of helium 5.2.4.2 Vent leak detector by pressing cycle button and attach Vatterfly valve test manifold to leak detector using KF-25 centering and clamp. 5.2.4.3 Connect V-1and V-2 from Vatterfly valve to Vatterfly valve test manifold using 2 ea.¼ x24 lg. Bellows and 4 ea. ¼ VCR gaskets. 5.2.4.4 Close verify closed all valves. 5.2.4.5 Open valves MV-1, MV-2, V-1 and V-2 and start leak detector pumping by pressing the cycle button on leak detector. 5.2.4.5.1 When leak detector crosses over into fine leak test and leak rate is< 1E -7 mbar l/sec leak test all connections using helium spray method. When all connections are leak tight to <1E-7 mbar.l/sec close V-2, MV-2 and MV-1. 5.2.4.6 Open MV-3 and vent GSE side of Vatterfly valve to ~1/2 psi of helium gas and close MV-3. 5.2.4.7 Open MV-1 and MV-2 vent up to air by pushing cycle button on leak detector. 5.2.4.8 Disconnect Vatterfly valve test manifold and Vatterfly valve leak from leak detector. - 8 -

QA (D. Ross or appointee) to attend testing 5.3 Z Axis Shake of 2.5 Vatterfly valve (See figure 2) 5.3.1 Bolt 2.5 Vatterfly valve to fixture 210127-01 using 4 Ea. ¼-20 x 3.5 lg. Stainless steel hex head bolts and Torque to 90 in-lbs. Date Torque value in lbs. 5.3.2 Bolt 2.5 Vatterfly valve and fixture 210127-01 to shake table using 8 Ea. 3/8-16-1.5 lg. Stainless steel socket head bolts, and Torque to 25 ft-lbs. Date Torque value ft lbs. 5.3.3 Bond Z axis and redundant accelerometers to fixture. 5.3.4 Start-up leak detector and calibrate as per manufacturer s instructions. After cal. record leak rate in table below. Date/Time Calibrated leak SN / leak rate mbar l/sec of helium / EBBC6015 / 3.38E -8 1-25-02 5.3.5 Vent leak detector by pushing cycle button Calibrated leak cal. due date 5.3.6 Connect leak detector to V-2 with ½ x24 lg bellows and 2 ea. 1/2 VCR gaskets as shown in figure 2. 5.3.7 Open V-2 and start leak detector pumping by pushing cycle button on leak detector. When leak detector goes into fine leak test mode and stabilizes record leak rate mbar l/sec of helium. 5.3.8 Check leak rate at the probe side and record mbar l/sec of helium. 5.3.9 Vibrate valve in Z direction to the required levels as shown in table below. Z axis Random Vibration Spectrum Frequency (Hz) Shake level (g 2 /hz) 20 0.008 50 0.05 800 0.05 2000 0.008 Composite (grms) 7.9 Duration: 60 seconds Spec: ±3 db, 20 hz to 2000 hz RMS: ± 10% Leak rate after cal. (mbar l/sec) of helium - 9 -

5.3.10 Record leak rate every 20 sec in table below. Time in seconds Leak Rate (mbar l/sec) of He 5.3.11 The test failed only if there was a major leak that saturated the leak detector (> 1E -2 mbar l/sec of He). Spikes of leaks are O.K. 5.3.12 Remove valve from fixture. 5.3.13 Attach all plots and pictures of test set-up to back of procedure. 5.4 X Axis Shake of 6.0 Vatterfly valve (See figure 2) 5.4.1 Bolt shake fixture 210126-01 to shake table using 16 Ea. 3/8-16-1.5 lg. Stainless steel hex head bolts, and Torque to 25 ft-lbs. Date Torque value ft lbs. 5.4.2 Bolt 6.0 Vatterfly valve to shake fixture 210127-01 using 4 Ea. ¼-20 x 3.5 lg. Stainless steel hex head bolts, and Torque to 90 in-lbs. Date Torque value in lbs. 5.4.3 Bond Z axis and redundant accelerometers to fixture. 5.4.4 Start-up leak detector and calibrate as per manufacturer s instructions. After cal. record leak rate in table below. Date/Time Calibrated leak SN / leak rate (mbar l/sec) of helium / EBBC6015 / 3.38E -8 1-25-02 5.4.5 Vent leak detector by pushing cycle button Calibrated leak cal. due date 5.4.6 Connect leak detector to V-2 with ½ x24 lg bellows and 2 ea. 1/2 VCR gaskets as shown in figure 2. 5.4.7 Open V-2 and start leak detector pumping by pushing cycle button on leak detector. When leak detector goes into fine leak test mode and stabilizes record leak rate mbar l/sec of helium. 5.4.8 Check leak rate at the probe side and record mbar l/sec of helium. Leak rate after cal. (mbar l/sec) of helium - 10 -

5.4.9 Vibrate Vatterfly valve in X-axis to the required levels as shown in table below. X axis Random Vibration Spectrum Frequency (Hz) Shake level (g 2 /Hz) 20 0.008 50 0.05 800 0.05 2000 0.008 Composite (grms) 7.9 Duration: 60 seconds Spec: ±3 db, 20 Hz to 2000 Hz RMS: ± 10% 5.4.10 Record leak rate every 20 sec in table below. Time in seconds Leak Rate (mbar l/sec) He 5.4.11 The test failed only if there was a major leak that saturated the leak detector (>1E -2 mbar l/sec of He) Spikes of leaks are O.K. 5.4.12 Remove valve from fixture 5.4.13 Attach all plots and pictures of test set-up to back of procedure. - 11 -

Figure 1 Vatterfly vibe/leak test setup 6.0 or 2.5 Valve HELIUM GAS IN V-1 MV-3 MG-1 GSE Side Atmosphere Helium Upper Cover 2.5 Part # 210121-01 6.0 Part # 210123-01 Seal Side Valve Body VALVE DRIVE MV-2 V-2 PROBE SIDE VACUUM Lower Cover 2.5 Part # 210122-01 6.0 Part # 210124-01 MV-1 Vatterfly valve Test Manifold LEAK DETECTOR - 12 -

Figure 2 2.5 \ 6.0 Valve Shake test setup Z Axis Shake X Axis Shake 2.5 Valve 6.0 Valve V-1 V-2 Redundant Accel Shake Fixture 1 Axis Accel Shaker Head LEAK DETECTOR - 13 -

6 PROCEDURE COMPLETION The results obtained in the performance of this procedure are acceptable: Operation completed. Date: Completed by Discrepancies if any: Date: Q.A representative Time: Approved: Date: R. Singley Vatterfly REE Approved: Date: D. Ross, QA Manager 7 DATA BASE ENTRY The following data shall be entered into the GP-B Data base: Name, number and revision of this procedure Date of successful completion of procedure. Part numbers and serial numbers of Vatterfly valve and their components - 14 -