Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Similar documents
Douglas Land Use and Transportation Study

2. Context. Existing framework. The context. The challenge. Transport Strategy

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Launceston's Transport Futures. Greater travel options for the people of Launceston

DRAFT for a State Policy for Healthy Spaces and Places

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Transportation Master Plan Advisory Task Force

GD 0043/18 ACTIVE TRAVEL STRATEGY

Living Streets response to the Draft London Plan

London Cycle Network Annual Report 2000

HISTON ROAD Have your say on better public transport, cycling and walking journeys

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

ABERDEEN: CITY OF THE FUTURE

Final Plan 20 December 2016

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

9. Parking Supporting Statement

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

TRANSPORT AND MOVEMENT

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Nottingham Cycle City Frequently Asked Questions

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Active Transportation Infrastructure Investment A Business Case

Strategy for Walking & Cycling Action Plan

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Executive Summary Route 30 Corridor Master Plan

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Active Travel Strategy Dumfries and Galloway

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

MILTON ROAD LLF PROJECT UPDATE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

CHAPTER 7. Movement and Transport. Naas Town Development Plan

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Section 2 Strategic Alignment. Contents

Your views are important. Please fill in a form before you leave. Or alternatively

North Coast Corridor:

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

CONNECTING PEOPLE TO PLACES

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

City of Waterloo Complete Streets Policy

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Bristol City Council has produced a draft Bristol Transport Strategy document.

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

ENFIELD TOWN THE REVISED DESIGN

Hennepin County Bicycle and Pedestrian Planning

Chelmsford City Growth Package

4.1 Introduction. 4.2 Aspects of walkable communities

City of Novi Non-Motorized Master Plan 2011 Executive Summary

BYRES ROAD: PUBLIC REALM Public Consultation

Delivering the. Strategy 7.0

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

PIMMS CAPITAL Import Visit 2012 Ostrava Czech Republic 17 th January 2012

Appendix N(b): Portishead Station Outline Travel Plan

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Cork to Limerick Route Pre-Feasibility Study Update

North West Non-Technical Summary of the Transport Assessment September 2011

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

EXECUTIVE SUMMARY. Vision

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Minutes and matters arising This is not applicable as this was the first SPC meeting of the new Council.

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Regional Cycle Programme Update

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Extracting Maximum Benefit from Parking Policy - 10 Years Experience in Perth, Australia. By Emmerson Richardson Sinclair Knight Merz

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

ACTIVE TRANSPORTATION

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Welcome! Public Open House on UBC s Transportation Plan

Transportation Master Plan April 2017 i

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Determining bicycle infrastructure preferences A case study of Dublin

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

CUERDEN TRANSPORT PROPOSALS

Draft Greater Sydney Region Plan

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Cascade Bicycle Club Strategic Plan

Oxford Street West. 21 December

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Nottingham, the great cycle city

Living Streets Policy

Cambridge Access and Capacity Study

FAQ s Walsh Road / Ferguson Road Pilot Scheme

OPEN HOUSE WELCOME Bronte Village Growth Area Review

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Transcription:

Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013

Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along a major ring road (N40), which has grown from an old textile milling village. Recently, the town centre is showing signs of increased vacancy levels and there is a major problem of traffic congestion in peak periods. The Douglas Land Use and Transportation Strategy (DLUTS) was first identified in the Carrigaline Electoral Area Local Area Plan in 2011, where it was recognised that in order to ensure balanced land use growth in the future, it was necessary to retrofit a modern transportation network, in particular focusing on a major shift towards other transport modes in line with the national priority of Smarter Travel. The overall aim of the Douglas Land Use and Transportation Strategy is to ensure that there is an integrated approach to land use planning, urban design and transportation engineering for the future development of the town. Specifically, the goals of this strategy were: to provide a framework for future planning decisions optimise the traffic and transport network provide a guide to the investment in transport infrastructure identify the capacity of the town centre for additional retail and other development inform the future use of two areas zoned Special Policy Areas (Douglas Town Centre X-03a and the lands described as Douglas Golf Course X-03b) in the Carrigaline Electoral Area Local Area Plan (2011). DLUTS Context Map The project was undertaken by the staff of Forward Planning and Strategic Development in Cork County Council in conjunction with MVA Consultancy, who were retained to provide traffic and transportation inputs. It began in April 2012 and was completed by July 2013. DLUTS Study Area

Project preparation The project preparation involved an evaluation of the existing situation on the ground and a number of surveys were conducted of land use, traffic and public realm. In order to provide solutions to the issues identified in the surveys, different scenarios were developed for two 10 year periods up to 2032. The preferred scenario identified a number of transportation proposals and public realm solutions that laid the foundation for an improved land use development framework. One of the first tasks undertaken was the development of a vision statement for the project which would clearly express the purpose and aims of the project. The following is the statement that was developed: DLUTS Vision Statement To secure a successful vibrant urban centre with a more efficient transport network for Douglas, that provides an improved public realm, reduces congestion, encourages greater levels of walking & cycling, and improves the quality of life for the community, thereby enabling sustainable future growth. Consultation with public and key stakeholders The three public consultation events in April 2012, July 2012 and January 2013, were well attended by the residents, landowners, civic groups, business associations and general public. Comments were received, analysed and incorporated into the final text of the report. Individual meetings were also held with every significant landowner and key community groups during the project. All these reports were discussed at the Project Management Group (PMG) comprising key Council officials (Roads, Planning, Architects, Engineering and Management). A further level of consultation took place with the Public Agencies Consultative Group (PACG) comprising key stakeholders of NRA, NTA, Cork City Council, Bus Eireann, Health Services Executive, Department of Education, and An Garda Siochana. Finally, the findings of each stage of the project planning process was debated and agreed with the members of the Area Committee of County Council, which were called the Policy Group.

Main issues facing Douglas Following a comprehensive number of surveys (land use, retail, traffic and public realm), the following set of issues emerged from the analysis: Transportation Severe traffic congestion in peak periods Car dominance throughout the area Douglas is a pinch point for through traffic movements Many junctions require improvement Douglas not an employment destination with bombshell effect by commuting traffic East West movements difficult and slow with resultant adverse effects on the village centre and knock on effects on National Road Network Severance by National Roads Schools travel is a major problem which adds significantly to traffic congestion in peak periods Poor walking and cycling facilities in the area Difficult to provide a high quality public transport service for the area Public Realm Visually weak landscape and architectural urban edge Fragmented desire lines No sense of place in the village Barriers to pedestrian circulation Unattractive junctions Poor quality urban space and streetscape Car has high priority Community Park undervalued Land Use Housing areas disconnected from village centre High population growth Uncoordinated piecemeal development Lack of daytime population Higher than average levels of convenience shopping in a total of 23000sqm of retail floor space High Vacancy Rate 20% Lower footfall and loss of vitality Barriers to connectivity between land uses Difficulties with connectivity between Douglas and the Cork City Centre Future Development Scenarios In order to prepare a set of land use, transportation and public realm proposals, it was necessary to look at the development of alternative scenarios based on two 10 year time horizons; namely, the short to medium term (2012-2022) and the medium to long term (2022-2032). The preferred scenario, after evaluation, looked at an option to develop the transport proposals in their entirety during the first tranche so that it may create conditions for longer term growth in land use development. Obviously, the problem of vacancy is a short term issue and needs to be filled before any new development should take place. The public realm proposals should also take place at the same time as both the transport and land use proposals are implemented in order to provide a better quality townscape.

Traffic and Transportation Proposals In summary, the traffic and transportation proposals involve a number of investments in: 1. 23 key junctions to be upgraded to provide improved bus priority, pedestrian, cycle and traffic movements 2. 30 kph speed limit in village centre to improve safety and encourage a village atmosphere 3. East West Link Bridge linking Donnybrook Hill to the Carrigaline road to remove through traffic from village centre 4. 36 km of walking and cycling routes including Mangala/Ballybrack Stream, Tramore Valley Park and City connectivity 5. Public Transport priority on East Douglas St with the elimination of through traffic 6. One-way east bound on Church Road so as to improve road safety in the area 7. Key junctions incorporated into Cork City Council s SCOOT system to improve traffic efficiency 8. Schools Travel Planning with support from Green Flag for Schools programme Some transport proposals of the future of Douglas

Land use proposals 1. In the short term, the land use priority is to fill the existing retail vacancy of 10,000m2 and there is an opportunity to build new development on sites that have existing planning permissions. 2. In the longer term, when transport proposals have been implemented, it is proposed to consolidate the town centre into 5 connected precincts, namely: TC 1 St Patrick s Woollen Mills TC 2 Douglas Village Shopping Centre TC 3 Barry s Field TC 4 Cinema Site TC 5 Douglas Court Shopping Centre 3. In these precincts, it is policy to encourage mixed use development (retail, offices and residential) with the main aim to improve vibrancy and vitality through increased daytime population. Community Facilities, Recreation and Amenities 1. Existing schools and Douglas Golf Course to remain in present locations 2. Urgent need for a multi-purpose leisure facility for sports and community clubs 3. Urgent need for additional playing fields in Douglas 4. Provide walkways/cycleways to connect Donnybrook along Mangla/Ballybrack Stream 5. Provide improvement to community park amenity area and provide pedestrian/cycle linkage to City Tramore Valley Park 4. Introduce a Town Centre Management Partnership to co-ordinate activities and promote the village centre. Proposed Consolidation of the town centre into 5 precincts Public Realm proposals There is a need to increase permeability in Douglas Village by improving the pedestrian and cycling environment. Within the town centre, public realm improvements will include widening and improving footpaths thereby improving connectivity and safety between land uses. Four town centre gateways have been identified in Douglas which will be improved, including the two bridging points under the N40, the Fingerpost Roundabout and Daly s Corner. The beneficial desire lines between points of interest (shopping centres) have been identified and shall be improved/enhanced. Overall the public realm improvements will seek to bring order to Douglas and enhance the streetscape.

Some land use proposals for the future of Douglas Benefits Integrated approach to Public Realm Land Use and Transport Strategy will deliver: Additional 7km on-street & off-street Cycle Priority Measures 30kph Zone in Village Centre increased safety for cyclists Advanced stop lines for cyclists at all key junctions Shared Surface, pedestrian friendly area linking Douglas Village Centre and East Village 30kph Zone in Village Centre increased safety for pedestrians Improved pedestrian crossing facilities 18km of off-street pedestrian routes improved journey time and reliability for 80% of bus routes serving Douglas Village More Bus Priority More efficient public transport operating environment Reduced traffic in Village Centre Better use of Strategic Routes key junctions improvements will ensure more efficient traffic movement Improved Public Realm in the Village Centre Increased footfall, improved vitality and vibrancy Reduce Vacancy

Some public realm proposals for Douglas in the future Implementation Tranche 1: Medium Term 2013 to 2022: Emphasis on investment in transport infrastructure, reducing vacancy and limited development in view of continued economic weakness Walking and Cycling Network Schools Travel Planning 30 kph zone All junctions enhanced Expand SCOOT system to incorporate key junctions East West Link Road. Traffic Circulation Plan. Reduction in vacancy. All committed development built on. Improved and enhanced public realm Tranche 2: Long Term 2022 to 2032: Emphasis on performance monitoring of transport infrastructure with limited investment, elimination of vacancy and support for development of suitable land used in town centre precincts Continuous monitoring of transport network to ensure an efficient and safe movement environment for all users within Douglas while area develops Douglas to develop in accordance with the DLUTS strategy, in 5 town centre precincts. Continuous delivery of public realm improvements in tandem with additional development. Summary The DLUTS strategy will, for a modest investment in infrastructure, facilitate the sustainable transformation of Douglas into a more vibrant and economically sound business centre, providing jobs and improved public realm. Douglas will be a more pleasant place to visit, do business in and a healthier place to live in. The DLUTS strategy plots out the road map that shows how all of this can be achieved without major investment and in a relatively short timeframe. The challenge to residents of Douglas is to embrace the strategy and change the way they make their day to day decisions on travel options to work, school, leisure and shopping. After final approval, this strategy s recommendations will be incorporated into the statutory plan (Carrigaline Electoral Area Local Area Plan) by way of an amendment and the project will continue to be implemented by the local authority. Full report available online at www.corkcoco.ie.