PEPSE Modeling of Triple Trains of Turbines Sending Extraction Steam to Triple Trains of Feedwater Heaters

Similar documents
S-CO 2 Brayton Recompression Loop Design and Control

VALVE CRITICALITY MODELING

OIL AND GAS INDUSTRY

Transient Analyses In Relief Systems

Cycle Isolation Monitoring

POWER Quantifying Correction Curve Uncertainty Through Empirical Methods

Basic Autoclave #1 Ideal Gas Law, Inert Gas

Chapter 14 Coal Boiler Flue Gas Scrubber II

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Optimizing Compressed Air Storage for Energy Efficiency

Gerald D. Anderson. Education Technical Specialist

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners

sorting solutions osx separator series

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis

Quantitative Risk Analysis (QRA)

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Free Surface Flow Simulation with ACUSIM in the Water Industry

Plan B Dam Breach Assessment

FUNDAMENTAL PRINCIPLES OF SELF-OPERATED PRESSURE REDUCING REGULATORS. John R. Anderson Emerson Process Management Fluid Controls Institute

NE 405/505 Exam 2 Spring 2015

Installation, Operation, and Maintenance Manual

Dynamic Analysis of a Multi-Stage Compressor Train. Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun

Process Simulator Evaluates Blower and Valve Control Strategies for WWTP Aeration

COMPRESSORS WITH SIDE STREAM

These variables can be accessed by holding the UP button for 5 seconds.

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

Fail Operational Controls for an Independent Metering Valve

Basic Hydraulics. Module 4: Flow Control Valves & Pressure Relief Valves. Academic Services PREPARED BY. January 2012

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE

GAS SUPPLY APPLICATION GUIDE

Courseware Sample F0

How to use the PBM Flow Calculator Spreadsheet (V2.04)

Control Strategies for operation of pitch regulated turbines above cut-out wind speeds

A SEMI-PRESSURE-DRIVEN APPROACH TO RELIABILITY ASSESSMENT OF WATER DISTRIBUTION NETWORKS

Exercise 8. Closed-Loop Pressure Control, Proportional-Plus-Integral Mode EXERCISE OBJECTIVE

Safe hydraulics for hydroforming presses. more finished product to be created from less raw material.

Implementing Mid Ranging in a DCS Environment

( ) ( ) *( A ) APPLICATION DATA. Procidia Control Solutions Coarse/Fine Control. Split-Range Control. AD Rev 2 April 2012

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

Control of Nuclear Gloveboxes and Enclosures Using the No- Moving-Part Vortex Amplifier (VXA)

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

*MAT GAS MIXTURE, a new gas mixture model for airbag applications

ACV-10 Automatic Control Valve

Recovery from a Process Saturation Condition. Benefits of Using DeltaV PIDPlus

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

GAS SUPPLY DESIGN GUIDE

ERTC PETROCHEMICAL Conference 20 st -22 nd February 2002, Amsterdam, The Netherlands

UNIVERSITY OF WATERLOO

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

A Chiller Control Algorithm for Multiple Variablespeed Centrifugal Compressors

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Pressure on Demand. Air Pressure Amplifiers

MODELLING AND SIMULATION OF FIRETUBE BOILERS WITH ECOSIMPRO: ANALYSIS OF CONTINUOUS AND STAND-BY OPERATION

Control System Nur Istianah-THP-FTP-UB-2014

Modelling of the Separated Geothermal Water Flow between Te Mihi flash plants

The Future of Hydraulic Control in Water-Systems

MIKE NET AND RELNET: WHICH APPROACH TO RELIABILITY ANALYSIS IS BETTER?

SINGLE VALVE WITH LOW-FLOW BYPASS

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

SINGER MODEL 106/206-RPS-L&H

TP Validating a dynamic grid model with tracer gas injection and analysis

Spirax Compact FREME Flash Recovery Energy Management Equipment

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

UNIQUE ADVANTAGES OF PIPENET

SHUTDOWN SYSTEMS: SDS1 AND SDS2

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it.

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS

Expansion Tank Design (Chilled Water)

ENVIRONMENTAL CONTROL SYSTEM (ECS)

SIDRA INTERSECTION 6.1 UPDATE HISTORY

Queue analysis for the toll station of the Öresund fixed link. Pontus Matstoms *

Verification and validation of computer codes Exercise

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

Retention Time Locking: Concepts and Applications. Application

Special Print. Innovative Control Technology. Control Valves with Extremely Fast and Precise Positioning Capabilities

Modification of the CNS Helium Injection Logic

The API states the following about tube rupture for a shell-and-tube heat exchangers:

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

D-Case Modeling Guide for Target System

COMPRESSED AIR TEXTILES ENERGY EFFICIENCY

Rate of Flow Valve Series 120

Section 1: Multiple Choice Explained EXAMPLE

Improving Smelt Dissolving Tank TTA Control at Zellstoff-Celgar. Coyle, Irene; Russell, Shawn; Zellstoff Celgar LLP

HumiSys HF High Flow RH Generator

EVT * -Pro Electronic Valve Tester

Valve Communication Solutions. Safety instrumented systems

1. Study the performance of a binary distillation column operated in batch mode.

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Calculation of Trail Usage from Counter Data

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL

Transcription:

PEPSE Modeling of Triple Trains of Turbines Sending Extraction Steam to Triple Trains of Feedwater Heaters Gene L. Minner, PhD SCIENTECH, Inc 440 West Broadway Idaho Falls, ID 83402

ABSTRACT This paper reports a robust method for modeling turbine cycle arrangements where extractions from three parallel turbine trains cross-tie to supply shell steam to three parallel trains of feedwater heaters. This technique successfully analyzes arrangements where the three feedwater heaters are the same or where they differ from one to the other. In addition one or more of the heaters out of service can be analyzed with the method. These arrangements are encountered in steam turbine cycles that receive main steam from nuclear heat sources. INTRODUCTION This paper was inspired by questions that have been asked by customers using the PEPSE technical support service. In some analysis tasks for nuclear power plants, modelers choose to simulate flow arrangements where three turbine extraction lines combine at a header, with the outflow then splitting to three feedwater heaters. Combinations involving extraction from a single turbine or two turbines are routinely addressed by PEPSE, but modeling extractions from three turbines to three heaters is not routine. In order to model three, creativity in modeling is required. The objective of modeling the triple combination is to calculate the correct amount of extraction steam that flows to each of the three feedwater heaters. Possible simulations include the three feedwater heaters all being the same or different, or possibly out of service. In the simulation method that is presented, all three could be represented in performance mode, where TTD and DCA are explicitly specified, or one or more could be represented in design mode. The descriptions of inputs for PEPSE models are given in Ref 1. EXAMPLE MODEL An example model is used as a vehicle for discussion of this method. The figure below shows a submodel, called UGM02A.MDL, that includes three parallel turbines and three parallel feedwater heaters with the extraction lines cross-tied. Typically this type of arrangement would be repeated several times in a full system model, and the same modeling approach could be used for all such occurrences. For simplicity s sake, this paper deals with the combination shown. 10-1

In the schematic above, the cross-tie is represented by the triple-mixer, component 53. The splits to the three heaters are modeled by components 61 and 62. The turbines in this model are LP s represented as Type 8 components, having been excerpted from a full system model. The feedwater heaters are all modeled in the full design mode. Each feedwater heater has a unique need for incoming shell steam flow in order to attain an energy balance. In the simpler, routine application, this need is communicated using the demand reference for the feedwater heater. The analysis task in this complex arrangement is to communicate to the three turbines the needed steam flows for the feedwater heaters. Some assumptions are needed for this model. Assumptions: In order to make this method work, several assumptions were made. 1. Because of the cross-tie, based on pressure drop considerations, it is assumed that the flow rate supplied from the three turbines are all equal, but alternative assumptions could be made and implemented. This is rationalized based on the further assumption that the supply lines from each of the three turbines are similar and that the condition at the turbine s extraction point is the same from one turbine to the other. One alternative method could calculate the flow proportions based upon detailed hydraulic analysis for the extraction lines. 2. The proportion of feedwater flow to each of the feedwater heaters must be measured or assumed. In the example of this paper, it is assumed that the feedwater flows to the three 10-2

parallel heaters are equal to each other. Alternative assumptions are possible if sufficient supporting information is available. 3. The drain cascade from higher pressure heaters is represented by source component 20. In this example application, it is assumed that the cascaded flow rates are identical among heaters A, B, and C. In a full system model, no such assumption would be required. Other heaters in the model would have determined the amounts of cascaded flows, and they would not necessarily have been equal. This assumption made here does not diminish the utility of the modeling technique under discussion. IMPLEMENTATION OF DETAILS IN UGM02A.MDL Motivated by ease-of-use, this method relies to the greatest extent possible on standard, existing, frequently used modeling techniques in PEPSE. It has been stated that the extractions from the three turbine components are cross-tied at mixer component 53. Therefore, the thermal condition received by the three heaters is the same. This equalization happens automatically in the model at mixer 53. The flow rates to the individual heaters are furnished by eligible demand suppliers that are referenced as such by the heaters. For the B and C heaters, the demand suppliers are demand splitter components 61 and 62, respectively. There is no obvious eligible demand splitter to supply the A heater. This heater receives steam from the U port of splitter 61. Consequently, the A heater must take the steam that is left over after the B and C heaters have satisfied their demands. The only possible remaining eligible demand supplier is the extraction port of one of the turbines in the model. But which turbine is appropriate for this demand? We could choose any one of the three, but we will choose the A turbine, component 210. Thus, in the input for A heater, component 222, we indicate 210 as the ID of the demand supplier. See Appendix A for the complete input data file. It has been assumed that the three turbines supply equal amounts of extraction flow. This equality is obtained using operations, numbers 101 and 102. Variable WEXTP is used as it sets the extraction flow from the turbine component. Table A-1 of Appendix A contains the model s data file (UGM02A.JOB). This file shows the operations that accomplish the equalization. Because the extraction update algorithm thinks that turbine 210 will make the total flow adjustment needed by heater 222, there is a problem in this setup. The equalization of extraction flows by the operations would cause three times as much flow update as is actually needed. To prevent this excess adjustment, we specify a relaxation factor equal to 1/3 (0.333333) for the heater 222 demand calculations. Thereby the amount of the demand update is divided among the three turbines. The first variable used in the operations for the equalization is WEXTHL taken from Appendix E of the Volume I PEPSE Manual. This variable has been calculated for turbine 210 in the normal course of computations by the demand updating specified for heater 222. See Tables 1 and 2 for the graphics input forms showing the relaxation factor and an example setup of an operation. 10-3

Table 1 Input form to show heater A s relaxation factor 10-4

Table 2 Input form to show example equalization operation The input file in Table A-1 gives a comprehensive presentation of the data for several cases. These cases include all three heaters in operation and various combinations of heaters out of service. The analyses for heaters out of service are accomplished by closing the shell steam inlet streams to the respective heaters. The figures of Appendix A also show schematics including computed results for these various combinations of heaters out of service. The heater A out of service case is not included in the figures shown in Appendix A. As modeled in UGM02A.MDL, if heater A is out of service, there is no mechanism to communicate a flow update to the turbine components. This shortcoming could be overcome by modifying the setup of the demands for this case, but this is messy. It would be better to have a model that would handle the heater A out of service combination automatically. Some alternative modeling approach is needed to address this situation. 10-5

A MORE VERSATILE MODEL The second example model, UGM02B.MDL, below, overcomes the shortcoming of UGM02A.MDL relative to analyzing heater A out of service. The difference here from the previous model, UGM02A.MDL, is that an additional demand splitter is included now to supply steam to heater A. The B port of splitter 150 supplies shell steam to heater A, component 222. With this arrangement, the input data for the three heaters, then, reference the demand splitters, 61, 62, and 150, as their suppliers of shell steam. This schematic arrangement appears to be unconventional. The U port of splitter 150 feeds a stream to sink component 160. This part does not actually exist in the real system. Because it does not truly exist, our simulation must provide an answer that has zero flow to this sink, and we need to be sure to check for this result in the output. Addition of this connection is a trick that allows heater component 222 to have its own demand splitter. It becomes necessary to communicate the flow update requirement upstream to the turbines, beyond the demand splitters. As with the first example, this is accomplished by using operations. Table B-1 of Appendix B shows the input file (UGM02B.MDL) that includes the operations that provide this result. These are operations 201, 202, 211, 212, 221, 231, 232, and 233. Note that the previous example, UGM02A.MDL, was able to use variable WEXTHL as the "first" variable in the equalization operations because one of the feedwater heaters was 10-6

"updating" the extraction flow for turbine 210. This is not the case here; all of the heaters are "updating" demand splitters. Therefore, a slightly different tactic is applied. Operations form the sum of "flow updates" for the three heaters. Next the operations form the sum of the existing extraction flows. The new total extraction flow for the three heaters combined is taken by adding the total existing extraction flow and the total flow update. Once this new combined extraction flow is known, it is divided equally among the three turbine components again using input variable WEXTP for the turbine components. Table B-1 also gives a comprehensive view of the data for 8 cases that include all possible combinations of heaters out of service. The figures of Appendix B show the computed results for all of these cases. Clearly, this form of the model deals successfully with the heater A out of service analysis task, as well as with other combinations. Comparison of the flow results to the feedwater heaters in Appendix A and Appendix B reveal identical matches for comparable cases. ALTERNATIVE METHOD OF MODELING The method of analysis that has been discussed depends mainly on energy-balance considerations. An alternative way to analyze three-on-three arrangements would be to base the flow calculations on precise modeling of hydraulics, with pressure matching at cross-ties. This means that the pressure-drop characteristics of the lines from the turbines to the cross-ties, and the lines from there to the feedwater heaters would be carefully characterized. Alternatively, the relative flows could be calculated as an extension of some measured/known flow condition, based on use of Darcy s formula for the flow-pressure relationship. Greg Boerschig presented the hydraulic balancing method in a paper at the 1987 User s Group Meeting in Charleston, South Carolina, Ref 2. CONCLUSION A method for modeling triple trains of steam turbines that send extraction steam through crossties to triple trains of feedwater heaters has been described, and two example applications have been shown. This method handles symmetric heater arrangements and non-symmetric arrangements. Included in the scenarios that can be addressed is the heater-out-of-service case, as well as combinations of performance mode and design mode heater descriptions. REFERENCES 1. Minner, Gene, et al, PEPSE Manual Volume 1, SCIENTECH, Inc, 2001 2. Boerschig, Greg, Modeling Technique for Atypical Turbine Extraction/Feedwater Heater Demand Mismatch, Performance Software User s Group Meeting Proceedings, June 17-19,1987, Charleston, South Carolina. 10-7

APPENDIX A Table A-1 Input data file, UGM02A.JOB for first example model 010001 80 PRINT 010101 0.0 DATE: Friday, April 26, 2002 TIME: 3:03 PM MODEL: UGMO2A.MDL JOB FILE: C:\chkv67\UGM02A.job =C:\CHKV67\UGM02A(SET 1)-BASE, 3 FWH ON 3 LP TURB, X-TIES STREAMS 500790 53 U 62 I 500830 62 U 61 I 501810 180 B 52 I 501820 180 C 56 I 501800 180 U 54 I 500520 52 U 210 I 500540 54 U 310 I 500560 56 U 410 I 502320 61 U 222 S 503320 61 B 322 S 504320 62 B 422 S 502150 210 E 53 IB 503150 310 E 53 IA 504150 410 E 53 IC 500100 10 U 180 I 502100 210 U 60 I 503100 310 U 70 I 504100 410 U 80 I 500510 50 B 222 T 500500 50 U 322 T 500530 50 C 422 T 503240 322 D 130 I 502240 222 D 120 I 504240 422 D 140 I 502220 222 T 90 I 503220 322 T 100 I 504220 422 T 110 I A-1

500200 20 U 30 I 500310 30 B 222 D 500300 30 U 322 D 500320 30 C 422 D 500400 40 U 50 I Intercept Valves to LP Bowl 600520 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 600540 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 600560 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 A EXTRACTION LINE PRESSURE DROP 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 B EXTRACTION LINE PRESSURE DROP 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 C EXTRACTION LINE PRESSURE DROP 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 COMPONENTS LP 'A' - 1st Stage 702100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 702101 0.8955-1.633 702109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 LP 'B' - 1st Stage 703100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 703101 0.8955-1.633 703109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 LP 'C' - 1st Stage 704100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 704101 0.8955-1.633 704109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 FWH 4A - MOD FLOW UPDATE TOOLS - reduced relaxation 702220 16 1 210-1 0.0 0.68 0.75 525.2 1052. 9.8 702221 0.0 0.0 1. 0.000118384 0.9375 0.9375 0.0 0.0 0.0 0.0 702222 0.0 0.0-0.785181 2 2 20. 0.0 20. 0.0 14. 702223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 A-2

702228 0.0 0.783681 0.0 0.0 702224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 702225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 702229 0 0 0.3333333 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 FWH 4B - MOD FLOW UPDATE TOOLS 703220 16 1 61-1 0.0 0.68 0.75 525.2 1052. 9.8 703221 0.0 0.0 1. 0.000118318 0.9375 0.9375 0.0 0.0 0.0 0.0 703222 0.0 0.0-0.7851061 2 2 20. 0.0 20. 0.0 14. 703223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 703228 0.0 0.783606 0.0 0.0 703224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 703225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 703229 0 0 0.75 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 FWH 4C - MOD FLOW UPDATE TOOLS 704220 16 1 62-1 0.0 0.68 0.75 525.2 1052. 9.8 704221 0.0 0.0 1. 0.000116235 0.9375 0.9375 0.0 0.0 0.0 0.0 704222 0.0 0.0-0.780527 2 2 20. 0.0 20. 0.0 14. 704223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 704228 0.0 0.792689 0.0 0.0 704224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 704225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 704229 0 0 0.75 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 700600 30 700602 0 700700 30 700702 0 700800 30 700802 0 700900 30 700902 0 701000 30 701002 0 701100 30 701102 0 701200 30 701202 0 A-3

701300 30 701302 0 701400 30 701402 0 Steam to LP turbine 700100 31 0.9796 224.07 12200000. 0.0 0.0 0 700102 0 0 0 Drain Flow to #4 FWH 700200 31 367.6 219.5 2500000. 0.0 0.0 0 700202 0 0 0 Feedwater to #4 FWH 700400 31 300.5 531.91 14700000. 0.0 0.0 0 700402 0 0 0 LP 'A' Intercept Valve 700520 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700521 0.0 0.0 0.0 LP 'B' Intercept Valve 700540 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700541 0.0 0.0 0.0 LP 'C' Intercept Valve 700560 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700561 0.0 0.0 0.0 FWH 4 Extraction Flow Mixer 700530 54 1 0.0 Demand supply to 4B fwh 700610 60 0.0 500000. 0.0 0 0.0 700611 0 Demand supply to 4C fwh 700620 60 0.0 500000. 0.0 0 0.0 700621 0 LP Turbine Main Steam Splitter 701800 63 0.0 0.33333333 701801 1 0.0 0.33333333 Drain inlet flow split for FWH #4 A-4

700300 63 0.0 0.33333333 700301 1 0.0 0.33333333 FW flow split to FWH #4 700500 63 0.0 0.33333333 700501 1 0.0 0.33333333 SPECIAL FEATURES EQUALIZE B EXTR FLOW TO A EXTR FLOW 881010 WEXTHL 222 EQL WEXTP 310 EQUALIZE C EXTR FLOW TO A EXTR FLOW 881020 WEXTHL 222 EQL WEXTP 410 890010 "MIXER OUTLET FLOW" 890011 WW 79 0.0 U GENERATOR # 1 FLAGS AND DATA 011010 1 1 5 0 3600 250000. 0.9 0.0 0.0 0.0 011011 0.0 0.0 0.0 CYCLE FLAGS 010200 2 0 1 5 0 0 0.0 0.0 END OF BASE DECK / =C..UGM02A(SET 2)-SHUT OFF HEATER B STREAMS SHUT OFF HEATER B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE / =C..UGM02A(SET 3)-SHUT OFF HEATER C A-5

REACTIVATE HEATER B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 OPEN SHUT OFF HEATER C 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 604326 CLOSE / =C..UGM02A(SET 4)-SHUT OFF HEATER B AND C SHUT OFF HEATER B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE. Figure A-1 Results for UGM02A.MDL, all heaters in service A-6

Figure A-2 Results for UGM02A.MDL, heater B out of service Figure A-3 Results for UGM02A.MDL, heater C out of service A-7

Figure A-4 Results for UGM02A.MDL, heaters B and C out of service A-8

APPENDIX B Table B-1 Input data file, UGM02B.JOB for first example model 010001 80 PRINT 010101 0.0 DATE: Friday, April 26, 2002 TIME: 3:02 PM MODEL: UGMO2B.MDL JOB FILE: C:\chkv67\UGM02B.job =C:\CHKV67\UGM02B(SET 1)-BASE 3 FWH, 3 LP TURB, X-TIES STREAMS 500790 53 U 62 I 500830 62 U 61 I 501810 180 B 52 I 501820 180 C 56 I 501800 180 U 54 I 500520 52 U 210 I 500540 54 U 310 I 500560 56 U 410 I 503320 61 B 322 S 504320 62 B 422 S 502150 210 E 53 IB 503150 310 E 53 IA 504150 410 E 53 IC 500100 10 U 180 I 502100 210 U 60 I 503100 310 U 70 I 504100 410 U 80 I 500510 50 B 222 T 500500 50 U 322 T 500530 50 C 422 T 503240 322 D 130 I 502240 222 D 120 I 504240 422 D 140 I 502220 222 T 90 I 503220 322 T 100 I 504220 422 T 110 I 500200 20 U 30 I B-1

500310 30 B 222 D 500300 30 U 322 D 500320 30 C 422 D 500400 40 U 50 I 500610 61 U 150 I 501500 150 U 160 I 502320 150 B 222 S Intercept Valves to LP Bowl 600520 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 600540 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 600560 2 0.033 0.0 0.0 0.0 0.0 0.0 0.0 0.0 B EXTRACTION LINE PRESSURE DROP 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 C EXTRACTION LINE PRESSURE DRIP 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 A EXTRACTION LINE PRESSURE DROP 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 COMPONENTS LP 'A' - 1st Stage 702100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 702101 0.8955-1.633 702109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 LP 'B' - 1st Stage 703100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 703101 0.8955-1.633 703109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 LP 'C' - 1st Stage 704100 8 1 2 1 5 0 2 1 0.03 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 704101 0.8955-1.633 704109 1. 1. 1. 0.0 0.0 0.0 0.0 0.0 0.0 FWH 4A 702220 16 1 150-1 0.0 0.68 0.75 525.2 1052. 9.8 702221 0.0 0.0 1. 0.000118384 0.9375 0.9375 0.0 0.0 0.0 0.0 B-2

702222 0.0 0.0-0.785181 2 2 20. 0.0 20. 0.0 14. 702223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 702228 0.0 0.783681 0.0 0.0 702224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 702225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 702229 0 0 0.75 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 FWH 4B 703220 16 1 61-1 0.0 0.68 0.75 525.2 1052. 9.8 703221 0.0 0.0 1. 0.000118318 0.9375 0.9375 0.0 0.0 0.0 0.0 703222 0.0 0.0-0.7851061 2 2 20. 0.0 20. 0.0 14. 703223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 703228 0.0 0.783606 0.0 0.0 703224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 703225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 703229 0 0 0.75 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 FWH 4C 704220 16 1 62-1 0.0 0.68 0.75 525.2 1052. 9.8 704221 0.0 0.0 1. 0.000116235 0.9375 0.9375 0.0 0.0 0.0 0.0 704222 0.0 0.0-0.780527 2 2 20. 0.0 20. 0.0 14. 704223 0.0 12. 0.0 0.0 0.0 0.0 0.0 1 0 1 704228 0.0 0.792689 0.0 0.0 704224 0.68 0.75 167.5 1052. 9.8 0.0 0.0 1. 1.00000000E-005 0.9375 704225 0.9375 500. 6. 0.0 0.0 0.0 0.0 0.0 2 2 704229 0 0 0.75 0.0 0.0 0.2 0.0 0.0 8. 10. 0 0 0 0.0 700600 30 700602 0 700700 30 700702 0 700800 30 700802 0 700900 30 700902 0 701000 30 701002 0 701100 30 701102 0 701200 30 B-3

701202 0 701300 30 701302 0 701400 30 701402 0 RECEIVER OF EXCESS EXTRACTION STEAM 701600 30 701602 0 Steam to LP turbine 700100 31 0.9796 224.07 12200000. 0.0 0.0 0 700102 0 0 0 Drain Flow to #4 FWH 700200 31 367.6 219.5 2500000. 0.0 0.0 0 700202 0 0 0 Feedwater to #4 FWH 700400 31 300.5 531.91 14700000. 0.0 0.0 0 700402 0 0 0 LP 'A' Intercept Valve 700520 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700521 0.0 0.0 0.0 LP 'B' Intercept Valve 700540 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700541 0.0 0.0 0.0 LP 'C' Intercept Valve 700560 34 0.0 0.0 0.0 0.0 0.0 0.0 0.0 700561 0.0 0.0 0.0 FWH 4 Extraction Flow Mixer 700530 54 1 0.0 Demand supply to 4B fwh 700610 60 0.0 500000. 0.0 0 0.0 700611 0 Demand supply to 4C fwh 700620 60 0.0 500000. 0.0 0 0.0 700621 0 B-4

Demand supply to 4A fwh 701500 60 0.0 170000. 0.0 0 0.0 701501 0 LP Turbine Main Steam Splitter 701800 63 0.0 0.33333333 701801 1 0.0 0.33333333 Drain inlet flow split for FWH #4 700300 63 0.0 0.33333333 700301 1 0.0 0.33333333 FW flow split to FWH #4 700500 63 0.0 0.33333333 700501 1 0.0 0.33333333 SPECIAL FEATURES ADD FWH#4 FLOW UPDATES 882010 WWDUSE 222 ADD WWDUSE 322 OPVB 201 CONT'D 882020 OPVB 201 ADD WWDUSE 422 OPVB 201 ADD FWH#4 OLD VALUES OF FLOWS 882110 WW 232 ADD WW 332 OPVB 211 CONT'D 882120 OPVB 211 ADD WW 432 OPVB 211 CALC NEW TOTAL EXTR FLOW 882210 OPVB 201 ADD OPVB 211 OPVB 221 EQUALIZE EXTR FLOWS FOR A, B, C TURBINES 882310 OPVB 221 EQL WEXTP 210 882311 0.0 0.0 0.33333333 CONT'D 882320 OPVB 221 EQL WEXTP 310 882321 0.0 0.0 0.33333333 CONT'D 882330 OPVB 221 EQL WEXTP 410 882331 0.0 0.0 0.33333333 B-5

GENERATOR # 1 FLAGS AND DATA 011010 1 1 5 0 3600 250000. 0.9 0.0 0.0 0.0 011011 0.0 0.0 0.0 CYCLE FLAGS 010200 2 0 1 5 0 0 0.0 0.0 END OF BASE DECK / =C..UGM02B(SET 2)-SHUT OFF FWH#4A STREAMS A EXTRACTION LINE CLOSURE - SHUT OFF FWH 4A 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 602326 CLOSE / =C..UGM02B(SET 3)-SHUT OFF FWH#4B STREAMS B EXTRACTION LINE CLOSURE - SHUT OFF FWH 4B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE A EXTRACTION LINE REOPEN - FWH#4A REACTIVATION 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 602326 OPEN / =C..UGM02B(SET 4)-SHUT OFF FWH#4C STREAMS B-6

B EXTRACTION LINE REOPEN - FWH#4B REACTIVATION 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 OPEN C EXTRACTION LINE CLOSURE - SHUT OFF FWH#4C 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 604326 CLOSE / =C..UGM02B(SET 5)-SHUT OFF FWH#4A AND 4B STREAMS B EXTRACTION LINE CLOSURE - SHUT OFF FWH 4B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE C EXTRACTION LINE - REACTIVATE FWH#4C 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 604326 OPEN A EXTRACTION LINE CLOSURE - SHUT OFF FWH 4A 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 602326 CLOSE / =C..UGM02B(SET 6)-SHUT OFF FWH$4A AND 4C STREAMS B EXTRACTION LINE - REACTIVATE FWH 4B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 OPEN C EXTRACTION LINE CLOSURE - FWH#4C 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 604326 CLOSE B-7

/ =C..UGM02B(SET 7)-SHUT OFF FWH#4B AND C STREAMS B EXTRACTION LINE CLOSURE - SHUT OFF FWH 4B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE A EXTRACTION LINE REOPEN - FWH#4A REACTIVATION 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 602326 OPEN / =C..UGM02B(SET 8)-SHUT OFF FWH#4A, B, AND C STREAMS SHUT OFF EXTRACTIONS 601506 CLOSE B EXTRACTION LINE CLOSURE - SHUT OFF FWH 4B 603320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 603326 CLOSE C EXTRACTION LINE CLOSURE - SHUT OFF FWH#4C 604320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 604326 CLOSE A EXTRACTION LINE CLOSURE - SHUT OFF FWH 4A 602320 2 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 602326 CLOSE. B-8

Figure B-1 Results for UGM02B.MDL, all heaters in service Figure B-2 Results for UGM02B.MDL, heater A out of service B-9

Figure B-3 Results for UGM02B.MDL, heater B out of service Figure B-4 Results for UGM02B.MDL, heater C out of service B-10

Figure B-5 Results for UGM02B.MDL, heaters A and B out of service Figure B-6 Results for UGM02B.MDL, heaters A and C out of service B-11

Figure B-7 Results for UGM02B.MDL, heaters B and C out of service Figure B-8 Results for UGM02B.MDL, heaters A, B, and C out of service B-12