Blowdown vessels Meeting the requirements of HSE PM60

Similar documents
AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

SV60 Safety valves. for use with steam, gas and liquids

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

SCA Series Inverted Bucket Steam Traps

BDV60 Blowdown Vessel Installation and Maintenance Instructions

Thermocirc Installation and Maintenance Instructions

TDC46M, TDS46M and UTDS46M Thermodynamic Steam Traps with Maintainable Seat Installation and Maintenance Instructions

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

Fig 1, Fig 12, Fig 13, Fig 14, Fig 16 and Fig 16L Strainers Installation and Maintenance Instructions

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

TSS21 Sealed Thermostatic Steam Tracer Trap

DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps

FV Flash Vessel Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

DCV6 Disc Check Valve

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

DF1 and DF2 Diffusers

DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions

BTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

TD10, TD52M and TD259 Thermodynamic Steam Traps Installation and Maintenance Instructions

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor

SV5 Safety Valve Installation and Maintenance Instructions

Fig 1, Fig 12, Fig 13, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

PC10HP Pipeline Connector (ASME 600)

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats

CP10 Sensor Installation and Maintenance Instructions

MFP14-PPU (Vented) Automatic Packaged Pump Units

Fig 12, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

CA16 and CA16S-14 Air and Gas trap Installation and Maintenance Instructions

CA10S, CA14 and CA14S Air and Gas Traps

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

AVC32 Carbon Steel Air Vent for Steam Systems

S and SF Inverted Bucket Steam Traps

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats Installation and Maintenance Instructions

BCV31 DN20 - Blowdown Control Valve

BDV1 and BDV2 Blowdown / Depressurisation Valves

CA44, CA44S, CA46 and CA46S Air and Gas Traps

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

AVM7 Stainless Steel Thermostatic Air Vent

Fig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers

FT43, FT44, FT46 and FT47 Ball Float Steam Traps Installation and Maintenance Instructions

BTM7, BTS7 and BTS7.1 Stainless Steel Thermostatic Clean Steam Traps

FT53, IFT53, FT54, IFT54, FT57 and IFT57 Ball Float Steam Traps - DIN

BCV31 DN40 - Blowdown Control Valve

CA46S Austenitic Stainless Steel Air and Gas Trap DN40 and DN50

SRV2S Pressure Reducing Valve

AE14 Automatic Air Vents for Liquid Systems Installation and Maintenance Instructions

Fig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions

PV4 and PV6 Piston Valves

BCVi43 Blowdown Control Valve

CA44 and CA44S Carbon Steel Air and Gas Traps Flanged DN15 to DN25

Airodyn, BRair and BRoil Compressed Air Drain Traps

CVS10 Sanitary Check Valves

TP1 and TP2 Temporary Cone Shaped Strainers

TW Temperature Control Valve

Spirax Compact FREME Flash Recovery Energy Management Equipment

Dri-Line Mk3 Monnier Compressed Air Drain Trap

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

776 Cryogenic Safety Valve

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

BPT13 Balanced Pressure Thermostatic Steam Traps

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

BRV71 and BRV73 Pressure Reducing Valves

M33F ISO, M33S ISO and M33V ISO Ball Valves Installation and Maintenance Instructions

M70i ISO and M80i ISO Stainless Steel Ball Valves for Sanitary Systems Installation and Maintenance Instructions

756 Safety Relief Valves

CS10-1 Stainless Steel Clean Steam Separator

Model MTB-ASME Vertical Bladder Tanks

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Model MTB-ASME Vertical Bladder Tanks

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

SRV66 Sanitary Pressure Reducing Valve

Eaton Filtration, LLC

Manual Actuated Boiler Blowdown Valves

FTC62 and FTS62 Ball Float Steam Traps Installation and Maintenance Instructions

BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

ML3M Monnier Miniature Compressed Air Lubricator

AE30 Automatic Air Eliminators / Air and Gas Vents for Liquid Systems

VAD Variable Area Desuperheaters

Model MTB-ASME Horizontal Bladder Tanks

PC3000, PC3001 and PC4000, PC4001 Pipeline Connectors

Pilot Operated Pressure Reducing Valve

TECHNICAL DATA. Table 1 - Specifications

VERTICAL BLADDER TANK

Horizontal Bladder Tanks

Vertical Bladder Tanks

Transcription:

Blowdown vessels Meeting the requirements of HSE PM60

BDV60 blowdown vessels A complete range of equipment for the safe disposal of boiler blowdown Boiler blowdown Steam boilers must be blown down to remove contaminants, as too high a level will cause foaming, and scaling of the boiler tubes. A build-up of solids at the bottom of the boiler could also have serious consequences. Most modern boilers are fitted with TDS controls to remove dissolved solids, and a blowdown valve that is opened at regular intervals to remove precipitated solids. Because the bottom blowdown valve is opened once per day for just a few seconds, it is not economical to recover the heat, yet water cannot be discharged to drain unless it is cool. Nowadays, blowdown vessels have replaced blowdown pits as the recommended way of cooling this water. Blowdown from TDS controls should ideally be connected to a heat recovery system, but where this is not practical, TDS blowdown may also be piped to a blowdown vessel. Regulations The key UK regulations are those issued by the Health and Safety Executive and British Standards. The Health and Safety Executive Guidance Note PM60 states that blowdown vessels should normally be provided for all new installations instead of blowdown pits. The blowdown vessels should be constructed to PD 5500 and should be regularly inspected by a competent person such as an insurance inspector. Lifting lugs for safe positioning of vessel on site. Internal stainless steel wear plate. Level control chamber and gauge glass blowdown. Discharge from automatic TDS control system. The implications of PD 5500 construction include design approval, material certification, independent approval of the welders and welding processes. On completion, a data dossier is prepared and issued to the customer. Spirax Sarco blowdown vessels fully comply with all these requirements plus the requirements of the European Pressure Equipment Directive 97/ 23/ EC. Blowdown from the bottom of the boiler. User benefits l Three inlets as standard with dedicated bottom blowdown connection. l Fully complies with the requirements of the European Pressure Equipment Directive 97/ 23/ EC. Line drain valves for emptying a boiler that has been shut down. l Full compliance with PM60 and PD 5500. l Documentation in compliance with PD 5500, Modules B and F. l Complete systems normally readily available from stock. l Quick and easy to install and maintain. l Safer and cheaper than a blowdown pit. l Spirax Sarco's guarantee of worldwide knowledge, service and technical support. 2

The BDV60 blowdown vessel has been designed with three inlets as standard. Dry vented flash steam One inlet is dedicated to bottom blowdown, whilst the other two inlets are interchangeable between TDS blowdown and level gauge glass blowdown. A typical two-boiler application is shown below. Separated water to drain Inlet from blowdown vessel Vent head with internal separator removes moisture from the steam. Pressure gauge for monitoring operation. Outlet to drain maintains internal standing water level to cool incoming blowdown. Oval inspection opening with non-asbestos gasket. Cooling water system for application where frequent blowdown is necessary. Fully complies with the requirements of the European Pressure Equipment Directive 97/23/EC. Drain valve for removing sludge from the blowdown vessel. The blowdown vessel is designed and constructed to PD 5500 complete with full documentation. 3

Sizing and selection The selection of a blowdown vessel depends on the flowrate and the proportion of flash steam released. The following factors affect the selection:- n The boiler pressure. n The number of boilers. n The duration of blowdown. n The blowdown line size. n The length of the blowdown line between the boiler and the blowdown vessel. n The blowdown regime. For example, the sizing below assumes the blowdown line has an 'equivalent straight length' of at least 7 m. When estimating 'equivalent straight length' the lengths shown in Table 1 should be added to the length of straight pipe to allow for valves and fittings. From Table 1 it will be seen that in most practical applications it would be unusual for the equivalent straight length to be less than 7 m. If the length is less than 7 m multiply the actual boiler pressure by 1.15 before using the sizing table, Table 2. The blowdown regime: n Typical normal bottom blowdown of, perhaps, 5 seconds duration. n Weekly low level alarm testing where practice is in accordance with PM5 - steam down from normal level to first low water level and blow down from first to second low water level. n Blowdown discharges from sequencing valves on external chambers, gauge glasses etc. n Automatic TDS control discharges. The selection table (Table 2) only applies if the blowdown duration is no longer than 20 seconds in total, starting with a cold vessel (water at a temperature of 15 C to 20 C). If this time is exceeded, carryover of water with the flash steam may occur through the vent. The water may also be too hot to discharge safely and legally into a public drainage system. Always incorporate a cooling water system for multi-boiler applications or in instances where the frequency or duration of blowdown is considerably in excess of PM60 or PM5 requirements. If there is any doubt about correct vessel selection, please contact Spirax Sarco outlining the specific conditions and blowdown regime. How to select the blowdown vessel: Step 1 Step 2 Step 3 Step 4 With the aid of Table 1, determine the equivalent straight length of the blowdown line. Use Table 2 to initially establish the correct size of the vessel. Note: if the result of Step 1 is less than 7 m, multiply the boiler pressure by 1.15. If the vessel is only used in the conditions set out above, then continue to Step 4. Using Table 4, page 5, containing the vessel data, establish the volume of standing water in the selected blowdown vessel. This volume should be at least twice that of the maximum volume of blowdown. The maximum volume of blowdown is usually the volume discharged when blowing down from 1st low level to 2nd low level alarm. If this volume is unknown, it can be calculated with the aid of Graph 1, where details on its use are given. If it is determined that the volume of standing water is insufficient, then a larger blowdown vessel must be selected in order to satisfy this requirement. With the aid of Table 3, the correct vent head can now be selected to suit the vessel. The selection is now complete. Selection example: For a 10 bar g boiler with 40 mm blowdown line at least 7 m long select, from Table 2, a BDV60/5. From Table 3 select a VH6 vent head. Blowdown flowrate (I/s) 10 9 8 7 6 5 4 3 2 Table 1 - Equivalent straight lengths Blowdown line 25 mm 32 mm 40 mm 50 mm size (1") (1¼") (1½") (2") Pipe fitting or valve Equivalent length in metres Long radius bend 0.5 0.7 0.8 0.9 Manifold inlet 1.1 1.5 1.7 2.2 Globe valve 9.6 12.2 13.9 17.8 Check valve 3.6 4.3 5.0 6.3 Blowdown valve 0.3 0.4 0.4 0.5 Table 2 - Blowdown vessel selection Blowdown line 25 mm 32 mm 40 mm 50 mm size (1") (1¼") (1½") (2") Boiler pressure Blowdown vessel bar g psi g BDV60/_ 5.5 80 3 3 3 4 7.6 110 3 3 4 5 8.3 120 3 4 4 6 10.3 150 3 4 5 6 12.1 175 4 4 5 8 17.2 250 4 5 6 8 20.7 300 5 6 8 10 24.1 350 5 6 8 10 27.6 400 6 8 8 12 Note: For intermediate pressures go to the next higher pressure. Graph 1 - Blowdown flowrates This graph will give the flowrate of blowdown in litres per second. When this value has been read, multiply it by the duration of blowdown (seconds), and the answer will be the maximum volume discharged. Blowdown line size 50 mm 20 40 mm 1 4 5 6 7 8 910 20 30 40 Boiler pressure (bar g) Table 3 - Vent head selection 32 mm 25 mm 20 mm Note: The vent head required depends on the vessel selected For a BDV60/3 select a VH4 vent head For a BDV60/4 select a VH4 vent head For a BDV60/5 select a VH6 vent head For a BDV60/6 select a VH6 vent head For a BDV60/8 select a VH8 vent head For a BDV60/10 select a VH8 vent head For a BDV60/12 select a VH10 vent head 4

BDV60 technical data Table 4 - Sizes, pipe connections, dimensions, weights and capacities (approximate) in mm, kg and L Blowdown vessel type BDV60/3 BDV60/4 BDV60/5 BDV60/6 BDV60/8 BDV60/10 BDV60/12 A Flanged PN16* 100 100 150 150 200 200 250 B Flanged PN16* 80 80 100 100 150 150 150 C Oval Height 100 100 100 100 100 100 320 Width 150 150 150 150 150 150 420 D 460 610 765 915 1 205 1 500 1 800 Sizes, pipe E 400 400 400 400 400 400 400 connections F 500 540 580 630 705 770 840 and G 310 350 390 440 525 590 660 dimensions H 1 830 1 910 1 995 2 095 2 240 2 370 2 515 J 1 080 1 125 1 165 1 215 1 290 1 355 1 430 K 330 405 485 560 705 850 1 000 X 1080 1120 1163 1568 1612 1676 1427 Y - - - 864 962 1026 - Number of legs 3 3 3 3 3 3 4 Weights Empty 185 220 275 392 480 892 1 275 Full (e.g. for hydraulic test) 370 570 825 1 267 2 090 3 567 4 925 Capacities - standing water 92 175 275 437 805 1 337 1 825 * Note: Flanged BS 1560 ANSI Class 150 or ANSI Class 300 connections are available at extra cost. For further details contact Spirax Sarco. K K Pressure/temperature limits D A vent Please note: For the application of boiler blowdown and to comply with the HSE Guidance Note PM60 the vessel internal pressure should not G exceed 0.35 bar g. F Body design conditions PN16 PMA Max allowable pressure 7 bar g @ 171 C 2" BSP pressure TMA Maximum allowable temperature 171 C @ 7 bar g gauge Minimum allowable temperature 0 C PMO Maximum operating pressure re. PM60 0.35 bar g H 2" BSP drain Inlet 3 DN25 PN16 (Level control chamber and gauge Inlet 2 glass blowdown or TDS blowdown) DN25 PN16 (TDS control system or level control chamber/gauge glass blowdown) Inlet 1 DN50 PN16 (Main bottom blowdown) The BDV60 is constructed from carbon steel to meet all the requirements of PD 5500. The paint finish is silver. E Name-plate * B outlet Y ¾" BSP cooling water inlet 1" BSP temperature sensor J X * TMO Maximum operating temperature re. PM60 109 C Minimum operating temperature 0 C Designed for a maximum cold hydraulic test pressure of 12 bar g PTMX Maximum test pressure 17 bar g Safety information, installation and maintenance For full details see the Installation and Maintenance Instructions supplied with the product. Note: There is a second inspection opening on the BDV60/6, BDV60/8 and BDV60/10 which is fitted 180 to the top opening. Other sizes have a single central opening, similar to the one shown on page 3. Maintenance note: The vessel must be drained every six months to remove concentrated blowdown water/sludge. Before reusing, the vessel must be refilled with fresh water. Blowdown vessels should be thoroughly examined by a 'competent person' every 14 months or at every major boiler inspection. Spare parts: New gaskets for the inspection openings are available as spares from Spirax Sarco. How to order Example: 1 off Spirax Sarco BDV60/5 blowdown vessel and a VH6 vent head to suit a 10 bar g boiler having a 40 mm blowdown line. 5

The BDV60 system VH vent head Stainless steel vent head which fits on top of the flash steam vent pipe. The vent head incorporates an internal separator to remove water spray from the steam and discharge it separately through the drain connection. Dimensions (approximate) in mm Vent head type VH4 VH6 VH8 VH10 Inlet size 100 150 200 250 Drain size 1" BSP 1" BSP 1½" BSP 1½" BSP H 320 390 430 495 W 240 340 425 525 For full details see separate literature. H Drain connection W Inlet connection with plated carbon steel lap joint flange to suit PN16 MF manifold For blowdown vessel inlets on multi-boiler installations. Available with manifold size DN50 flanged PN16 or DN25 flanged PN16 and with 2 (MF2) to 6 (MF6) branches sizes 15, 20, 25, 40 or 50 mm. Note: 40 and 50 mm are only available in DN50 size. Carbon steel welded construction with swept bends. Hydraulically tested to 24 bar g. Paint finish is grey. 90 275 150 155 DCV2 check valve Disc check valve which fits between flanges. Stainless steel construction. For further details see separate literature. G3 stop valve and line drain valve Cast steel stop valve with stainless steel valve seat and disc. Flanged PN40 but suitable for use with PN16 flanges. Dimensions (approximate) in mm Valve size DN15 DN20 DN25 DN32 DN40 DN50 A 130 150 160 180 200 230 B 191 191 209 206 282 276 A B 6

Pressure gauge A C B Useful to ensure that the vessel is not pressurised during blowdown. Improves safety since any pressure would give early indication of pipework blockage. The pressure gauge set consists of:- A 4" dial pressure gauge 0-1.6 bar (0-23 psi) B 2" BSP 'U' syphon C 2" BSP gauge cock Steel Brass Cooling water system Designed to cool the standing water in the blowdown vessel prior to the next blowdown discharge into the vessel. The system is thermostatically controlled and injects cooling water into the blowdown vessel when standing water exceeds a set temperature (typically 40 C). This equipment is particularly useful when several boilers have to be blown down in succession into the blowdown vessel. The interval between blowdowns needs to be several minutes in order for the cooling system to perform its function effectively. A B C D A E F The system consists of:- A¾" BSP non-venting ball valve B¾" BSP LCV1 check valve C¾" BSP SBRA control valve D¾" BSP Fig 12 Y-type strainer E Sensor pocket F Temperature controller For full details see separate literature. Nickel plated brass Bronze Bronze Brass Brass 128 range 20 C to 110 C Caution: Where the cooling water is likely to give rise to scale formation, the advice of a water treatment specialist should be sought. Vessel drain valve 2" BSP nickel plated brass non-venting ball valve on the bottom connection of the blowdown vessel. Regular opening ensures that the vessel is kept clear of sludge. 7

How to specify A typical specification for the blowdown vessel shown on pages 2 and 3 for a two boiler installation complete with all the ancillaries recommended in PM60 might be as follows:- Blowdown vessel 1 - Spirax Sarco blowdown vessel type BDV60/5 designed, constructed and tested to PD 5500 1 - Stainless steel vent head type VH6 For main blowdown from bottom of boiler: 1 - Inlet manifold: type MF2 (DN50), branch sizes DN40 PN16 2 - Check valves type DCV2, DN40 2 - Stop valves type G3, DN40 PN16/40 2 - Line drain valve type G3, DN40 PN16/40 For auto TDS control discharges: 1 - Inlet manifold: type MF2 (DN25), branch sizes DN25 PN16 2 - Check valves type DCV2, DN25 2 - Stop valves type G3, DN25 PN16/40 For level controls blowdown: 1 - Inlet manifold: type MF2 (DN25), branch sizes DN15 PN16 2 - Check valves type DCV2, DN15 2 - Stop valves type G3, DN15 PN16/40 Other fittings recommended in PM60: 1 - Blowdown vessel drain valve, 2" BSP 1 - Blowdown vessel pressure gauge set 1 - Cooling water system Some of the products may not be available in certain markets. Spirax-Sarco Limited, Charlton House, Cheltenham, Gloucestershire, GL53 8ER UK. Tel: +44 (0)1242 521361 Fax: +44 (0)1242 573342 E-mail: Enquiries@SpiraxSarco.com Internet: www.spiraxsarco.com Copyright 2005 Spirax Sarco is a registered trademark of Spirax-Sarco Limited 8 SB-P405-01 AB Issue 7