STANDARD OPERATING PROCEDURE

Similar documents
Use of Biosafety II cabinets

Antony Ward. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

Markus Hofer (Chair WHS committee) & Dianne Fisher (Safety Officer)

Nick Coleman. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

Nick Coleman. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Biohazard waste. Antony Ward and Trudie Smith

Centrifugation: High Speed Floor Centrifuges

Australian Standard The storage and handling of non-flammable cryogenic and refrigerated liquids SWP055

Handling, storage and use of gas cylinders

School of Molecular Bioscience, University of Sydney Worker induction - Hazard assessment form

School of Molecular Bioscience SMB019. Kamrul Zaman

Sonication. Angela Nikolic. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date:

Angela Nikolic. List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

and Outreach/SOLES List of Legislation, Code of Practice, Australian Standards, Guidance Materials used to determine control measures

HEALTH AND SAFETY SERVICES

Scientific glassware washing

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

The Sample Company Pty Ltd

Revised: June 7, 2017

Nanoelectronics Lab, SR B14 Rules you must agree to follow for access

Operating Procedures for Metal Evaporator I

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

THERMAL EVAPORATION UNIT (for Al evaporation)

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

ASSOCIATED DOCUMENTS:

DEPARTMENT OF CHEMISTY, PHYSICS AND GEOLOGY RADIATION SAFETY PLAN

Accident/Incident Reporting and Investigation Procedures

Auburn University Plasma Sciences Laboratory. Magnet Standard Operating Procedures Version 1.0

Radiation Producing Machines Radiation Safety Training for X-ray Diffraction Units

Usage Policies Notebook for Parylene Coating System

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Warnings: Notes: Revised: January 8,

OPERATING PROCEDURES

ver #. (Indicate version number) (Current Date of Version)

Operating Instructions Part No

UNIVERSITY OF ROCHESTER MEDICAL CENTER

[needs to be discussed with faculty if any new material to be done]

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Lockout/Tagout Program

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Overview of types. T5-R B2/R B2 en v Subject to changes 1 / 4. k vs (Sequence 2)

Use, storage and disposal of flammable liquids

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

University of Aberdeen

Operating Instructions Part No

Warnings: Notes: Revised: October 5, 2015

UNIVERSITY OF EDINBURGH GENERIC RISK ASSESSMENT - RADIATION RP/RA8 - WORK WITH X-RAY FLUORESCENCE ANALYSERS

Standard Operating Manual

H. Control of Hazardous Energy: Lockout/Tag Out

Attachment C. Standard Operating Procedures. AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION PROJECT

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Temperature Controllers

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

Control of Hazardous Energy Lockout / Tagout Program

The Univentor 1250 Anaesthesia Unit

Risk Assessment for: Roaches Pyrotec dyeing machines

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

Laboratory Safety Training. Environmental Health and Safety

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

STANDARD OPERATING PROCEDURE TEMPLATE

MIT Analytical X-Ray Safety Policies and Procedures

THE UNIVERSITY OF NEWCASTLE - DISCIPLINE OF MEDICAL BIOCHEMISTRY

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

Completed by: Anthony Jones (BE Design Laboratory Manager) Staff/Student number: School/Unit: BE Design Laboratory. Current version: V_01

Digital Vacuum Regulator

Customer Responsibilities

University of Arkansas Office of Environmental Health and Safety

SOP GEN-007I Energy Isolation

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Type overview. R B2 en-gb subject to changes 1

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Ultima. X Series Gas Monitor

DPC-30 DPC-100. Reference Manual

Western Sydney University Safety Inspection Checklist - Laboratory Environments

Guide to reporting hazards and incidents (HS713)

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

6800 Maintenance Instruction System Flush Procedure

Customer Responsibilities

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Customer Responsibilities

Standard Operating Procedure

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

1)! DO NOT PROCEED BEYOND THIS MARK

Transcription:

Procedure: School/Department: SOP prepared by: Version: STANDARD OPERATING PROCEDURE Using small-angle scattering X-ray generator (SAXSess Lab) School of Molecular Bioscience Jill Trewhella, Nick Coleman SMB027.3 Section 1 - Personal Protective Equipment 1. Lab coat or lab gown 2. Proper enclosed footwear 3. Hair tied back if long Section 2 Potential Hazards + Safety precautions 1. The X-ray equipment is hazardous. Do not use it unless you have been personally instructed by the equipment custodian, and you have been added to the qualified users list. This list can only be amended by Professor Jill Trewhella. Just reading this SOP is not sufficient to allow safe use. 2. X-rays can cause burns and DNA damage leading to cancer. Read the risk assessment for X-ray equipment and ensure you understand the risks and how to control them during this procedure 3. No safety circuits (Figure D) may be disabled or bypassed except during maintenance procedures under the supervision of qualified maintenance personnel designated by Professor Jill Trewhella 4. The X-ray equipment contains very high voltages, and thus possibility of electric shock if equipment is faulty or misused. Inspect equipment before use to ensure everything is in good working order, and take precautions to avoid the possibility of water spills in the room. 5. Workers with pre-existing medical conditions (e.g. allergy, immunocompromised state, chemical sensitivity) and workers who are pregnant or expecting pregnancy must consult with their supervisor AND medical specialist AND the university's WHS services before performing this procedure. If there are any serious concerns expressed by any of these individuals, this task must not be performed. Section 3 Equipment and Procedure 1. Equipment: Panalytical PW3830 X-ray generator located in Room 282 (SAXSess Lab) connected to an Anton Paar SAXSess small-angle X-ray scattering instrument Figure A (next page). The SAXSess system, generator and X-ray source (cathode tube) are a completely sealed system. The chiller is located in room 285 Powering up: 2. Press POWER ON and wait for two minutes for the unit to self-check. 3. Turn the HT ON Key (clockwise) and wait for two minutes. The system should indicate a setting of 20kV/10mA (Standby mode). All LED indicators (Figure B) should be off except the Shutter safety circuit (X-rays on lam should be illuminated (Figure D.) 4. Slowly increase voltage from 20 kv to 25 kv by pressing the left side + button (once every three seconds Figure B). Wait for 1 minute. Repeat process with 30 kv, 35 kv until 40 kv is reached. 5. Slowly increase to current from 10 ma to 20 ma by pressing the right side + button (once every three seconds (Figure B)). Wait for 1 min. Repeat process with 30 ma, 40 ma until 50 ma is reached. 6. Ensure both of the black vacuum valves are closed (vertical position) See Fig A and C. Check the vacuum controller; if nothing displays on the screen, turn on the switch from the backside of the controller and wait 30 seconds for vacuum to calibrate. Once complete, press the Start/Stop button to start the pump. 7. Fill out the generator log book (Figure C) User and hours. Using the X-rays. 8. Release vacuum on the camera of choice. 9. Load sample cell. Next review due: 2/3/2017 Page 1 of 5

10. Close sample cell. 11. Evacuate camera it is impossible to open the shutter unless the camera(s) are under vacuum. 12. Dual button shutter control is required to open either Shutter 1 or Shutter 4. Press Shutter open enable button in combination with Open (Shutter 1 or 4.) (Fig B). 13. To close shutter: Press Close (Shutter 1 or 4). Figure B. 14. Experiments are run through CCD QUANT software. After sample loading, there is no need to touch the unit other than to open or close the shutter. Powering Down: 15. Ensure that that BOTH cameras are under vacuum. Close both the vacuum valves (Figure A). Press the vacuum controller Start/Stop button to stop the pumping and turn off the vacuum controller from the backside. 16. Slowly decrease the current by pressing the right side button (once every three seconds) until the current is 10 ma (Figure B). 17. Slowly decrease the voltage by pressing the right side button (once every three seconds (Figure B)) until the voltage reads 20 kv. The system will be in standby mode (20 kv/10 ma). Fill out generator log-book (user and Hours) 18. The system is usually kept in standby mode. If there is a requirement to shut the system down: 19. When in standby mode turn the HT key anticlockwise to the OFF position. 20. Press the OFF button to shut the system down. 21. Fill out the log book. Section 4 Disposal / Spills / Incidents 1. Any incidents that involve injuries to personnel need to be reported immediately to your supervisor and via the online reporting system. Near misses (situations that appear hazardous) should also be reported in the same way. Section 5 Repairs / Certification / Validation 1. Repairs and annual maintenance of the SAXess is performed by Anton Paar, Section 6 Relevant safety data sheets Not applicable. Section 7 References 1. Risk assessments for X-ray equipment 2. Instruction manuals for SAXSess equipment Next review due: 2/3/2017 Page 2 of 5

Figure A SAXSess & PW3830 X-ray generator setup located in room 282. Figure B PW3830 X-ray generator located in room 282. Figure C PW3830 X-ray generator X-ray generator instructions and log book. The log book must document every user who has powered up/powered down the X-ray generator, the time and instrument hours. Located in room 282 Next review due: 2/3/2017 Page 3 of 5

Figure D Safety circuits to be changed by AUTHORISED personnel only Figure E SOP and documentation Posted in SAXSess lab. Primary Qualified Training Personnel Prof. Jill Trewhella Don M. Parkin Trained Personnel Paul Fitzgerald. (Chemistry) Naveed Nadvi Ann Kwan (power up and down only) Next review due: 2/3/2017 Page 4 of 5

SOP Consultation, Training and Approval Print names and enter signatures and dates to certify that the persons named in this section have been consulted/trained in relation to the development and implementation of this Standard Operating Procedure. WHS Representative (WHS Committee) certifies that consultation has taken place. Position Name Signature Date Supervisor Name Authorising (Printed): DIANNE FISHER... Signature:... Date: 2/3/15... WHS Committee Representative Name (Printed): MARKUS HOFER... Signature:... Date: 2/3/15... Next review due: 2/3/2017 Page 5 of 5