Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Similar documents
Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

Rennick Yard Roller-Compacted Concrete Pavement

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

Managing Density For Asphalt Pavement

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Compaction Theory and Best Practices

MNDOT PAVEMENT DESIGN MANUAL

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

HIR on Oklahoma Turnpikes

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

50 Year Roads: Don't Accept Anything Less

9 QUALITY ASSURANCE PROCEDURES

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack

T-24. A Practical Approach to Managing Density

Asphalt Mixture Quality Acceptance

Hot Mix Asphalt (HMA) Quality Assurance

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

Best Practices for Smoothness & Density

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Appendix B Existing ADOT Data Parameters

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

Kentucky Transportation Center

Hot Mix Asphalt (HMA) Quality Assurance

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

Asphalt Mixture Quality Assurance

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Stop Chasing & Start Managing Density

ASPHALT PAVING LEVEL 1

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

PROPOSAL. PROPOSAL OF, a corporation a

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Driveway Design Criteria

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

DRAFT WSDOT PAVEMENT POLICY

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

Implementing Strategies from Missouri s Blueprint for Safer Roadways Using System-wide Safety Solutions to Save Lives

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

PENNDOT HPMS DATA COLLECTION GUIDE

Pavement Management Report. City Council Meeting of May 21, 2013

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

High Performance Racetracks

2018 ROAD MAINTENANCE PROGRAM

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

Standard Test Procedures Manual

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

Tabulation of Bids. Counties: Project(s):

Restoration Requirements

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

GDOT Cross Section Elements. Course ID: GDOT PDH Credits

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Agenda. NTTA Network of Roadways. Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

PRESENTATION OUTLINE

The first lift, mainline, shall be placed using a spray paver.

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Driving Indiana s Economic Growth

General Notes. Project No /15/2018 Page 1 of 1

Bases, Ballasts, and Paving

OHD L-47. Guidelines for Resolving Differences in Test Results

SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

New Mexico Transportation Funding Challenges

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

Road Usage Permit Application Form

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. January 15, 2016

Transcription:

Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic: 140,000 to 170,000 AADT Truck Traffic: 20%

Design Loading Analysis Table 1 RCC Thickness Required Allowable Interior Load Repetitions Over Lifetime of RCC Pavement Design Life in Years 20 yr 10 yr Allowable Daily Repetitions 5 yr 5.5 25977 4 7 14 6 121504 17 33 67 6.5 432506 59 118 237 7 1000000 500 1000 2000

Existing Asphalt Shoulder Removed

Design and Acceptance RCC: Required 28-day Mix Design Strength of 4,000 psi Cement: 500 lbs/cy Acceptance based on density- 98% AASHTO T-180 or 28-day core strength of 3500 psi Core strength : 3980 psi avg Cylinder strength : 3964 psi avg

Concrete Plant

Completed Shoulder

Rumble Strips

Finished Product

March 2010

RECONSTRUCTION OF SR 6 RCC SHOULDER RCC MEDIAN

RCC 500 lbs/cy cement 5500 psi compressive strength

I-985 Gainesville, GA 6000 Cubic Yards of 7 RCC Pavement. 10 Inside Shoulders used for temporary lane. 2.5 Asphalt Overlay for Rideability.

I-985 Gainesville, GA

I-985 Gainesville, GA

After Removal of Asphalt Layer 2009

I-85 Kia Interchange LaGrange, GA 6600 Cubic Yards of 12 RCC Pavement. 10 Outside Shoulders. First use of Dual Lift RCC Shoulders in US.

I-85 Kia Interchange LaGrange, GA

GDOT MAINTENANCE FACILITY

Current Project I-75 Widening and Reconstruction in Cook and Tift Counties

NH-75-1(206) Cook CSNHS-0006-00(073) Tift Reconstruct 10 miles of I-75 in northern Cook and southern Tift Counties Let to Contract 2-16-07 Successful low bidder was Archer Western Contractors Ltd. Bid Amount: $ 128,485,844.70 Contract completion date of 3-31-2010

NH-75-1(206) Cook CSNHS-0006-00(073) Tift

NH-75-1(206) Cook CSNHS-0006-00(073) Tift Project in a nutshell Remove existing 4 lanes plain PCC pavement Install 12 Graded Aggregate Base Place 3 12.5 mm asphalt superpave Install 6 lanes of 12 Continuous Reinforced Concrete Pavement (413,661 SY) Install Concrete median barrier (51,785 LF) Install inside and outside paved shoulders

NH-75-1(206) Cook CSNHS-0006-00(073) Tift Stage construction was required 51,000 vpd 24% trucks Contractor chose to use Roller Compacted Concrete alternate on outside shoulder Staging called for SB outside shoulder to carry mainline traffic

NH-75-1(206) Cook CSNHS-0006-00(073) Tift

NH-75-1(206) Cook CSNHS-0006-00(073) Tift RCC Shoulder SBL Subcontractor: Site Prep Inc. of North Carolina RCC Paving SBL began: 5-18-09 and 8-24- 09 RCC Paving SBL concluded: 6-13-09 and 9-4-09 Plant was located on the project SBL Shoulder opened to Stage Construction traffic on: 8-13-09 and 11-3-09

NH-75-1(206) Cook CSNHS-0006-00(073) Tift

NH-75-1(206) Cook CSNHS-0006-00(073) Tift Shortly after opening to traffic RCC began to show problems on the surface Surface looked like asphalt stripping Surface has continued to ravel and spall Contractor has repaired areas with epoxy based patches

GDOT Specification Density Requirements: In-place field density will be not less than 98% of the average maximum laboratory density obtained according to AASHTO T 180, Method D, based on a moving average of five consecutive tests, with no test below 95%. RCC properly placed and compacted, but not meeting these requirements will be cored and tested at no additional cost.

GDOT Specification RCC pavement not meeting density requirements outlined in Subsection 442.3.05.D.8, Density Requirements will be accepted based on compressive strength development at 28 days. The compressive strength value shall be at least 3,500 psi (25 MPa).

GDOT Specification No Direct Requirement for a test section Rolling: Determine the sequence and number of passes by vibratory and non-vibratory rollers to obtain the specified density and surface finish. Only operate rollers in the vibratory mode while in motion. Rubber-tire rollers may be used for final compaction.

GDOT Specification No Direct Requirement for a test section Paver Requirements: Adjust the paver and regulate the speed to prevent segregation and provide a surface course that is smooth and continuous without tears and pulling.

GDOT SPECIFICATION Place RCC with an asphalt paver meeting the following requirements: 1. Equip the paver with compacting devices capable of producing a RCC pavement with a minimum of 90% of the maximum density in accordance with AASHTO T 180, Method D. 2. Spread and finish the RCC material without segregation, to the required thickness, smoothness, surface texture, cross-section and grade using a paver of suitable weight and stability.

GDOT SPECIFICATION Immediately begin compaction behind the placement of RCC material and complete within 60 minutes of the start of mixing at the plant. This time may be increased or decreased depending on the use of set retarding admixtures or ambient weather conditions of temperature, wind and humidity.

GDOT SPECIFICATION Multiple Lift Placement: For multi-layer construction, a horizontal joint is considered a fresh joint when an subsequent RCC lift is placed within 60 minutes of placing the previous lift, with time adjusted depending on use of retarders or ambient weather conditions.

GDOT SPECIFICATIONS If segregation occurs in the RCC during paving operations, CEASE the spreading until the cause is determined and corrected to the satisfaction of the Engineer. If the Engineer determines the segregation to be severe, remove and replace the segregated area at no additional cost.

Upcoming Project I-16 Replacement of Outside Lane 9 inch RCC for Inside and outside shoulders 330,000 sy Bid Price $18.39 sy

QUESTIONS OR COMMENTS