Appendix 2-B: Paint Testing Summary Table

Similar documents
17374 US ROUTE 694 OTTAWA, OHIO 45875

Each year, the United States produces many tons of nuclear

The Five Various Steel Fire Tower Models Utilized in New York State

TERMITE PROTECTION Material Description Qty Units Cost M/up Labor Total. Termite Control (Slab) 188 m Subtotal

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

Survey Style - Borders

Thesis Proposal. Table of Contents. Executive Summary...2. Analysis 1 Joint Ventures...3. Analysis 2 LEED Improvement (Breath Topic)...

Operation of the Perkin Elmer TGA-GC/MS

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING

BILL OF QUANTITIES 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS 2 MOBILIZATION AND SITE PREPARATION :

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

BJC HEAVY INDUSTRIES PCL. GALVANIZING GRATING BUILT-UP BEAM

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

Building Materials Forecasting Service. Executive Summary: Q2 2010

APPENDIX P U.S. EPA WARM MODEL OUTPUT

Drinking-Water Systems Regulation O. Reg. 170/03

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

Swimming Pool IAQUALINK WEB CONNECT

Two Rivers Activity Center (TRAC) McGough Construction 2737 Fairview Avenue North St. Paul, MN Phone: (651)

CompacSas BA. Comfort and design for high-security access

WITTICH HALL RENOVATION

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone

Fortified For Safer Living

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

IECEx Certificate of Conformity Annexe

Basic & Controlled Atmosphere Glove Boxes

Swivel, harness, PVC, bearing, tow strap, bungee (0.6lbs)

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study

Leica TCS SP5 Confocal Live Cell Imaging Set Up User Guide

Experiment C-6 Gas Solubility

Scottish Parliament Building Trail

CP10 Sensor Installation and Maintenance Instructions

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

3/4 SafeClaw Anchorage Connectors

Standard Operating Procedure

GTX. 1 of 9. The GTX scrubber s 2 recover drain and hose are larger than those on many other machines, making the GTX scrubber less likely to clog.

RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

TECHNICAL DATA OBSOLETE

FILE - RE CAULKING WINDOWS AND DOORS EBOOK

Industrial Hygiene Sampling. Husqvarna Construction Products

LPCorp.com

Precision Calibration Gas

Buoyancy and the Density of Liquids (approx. 2 h) (11/24/15)

PGA (Processed Glass Aggregate)

General Safety and Health Provisions for Construction Self Inspection Checklist

A Post ETHAN ALLEN Capsizing Assessment January 1, 2017

WAT305 Math Part 1 ABC Math

FLOOR WALL DECORATIVE KEYSTONES COLORBODY PORCELAIN MOSAICS

Baseball Bash Game Elements. Table of Contents

Building Planning PART. Chapter 3. Chapter 3. Building Planning. Climatic and Geographic Design Criteria C

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Determination of Zn using Atomic Absorption with Multiple Standard Additions

DFT in excess of 8.0 mils per coat is not recommended.

Process for Identifying Confined Spaces

TABLE OF CONTENTS House-To-Gos

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

WP2 Fire test for toxicity of fire effluents

Confined Space Entry Written Program

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

FINAL Designated Substances Survey Report Women s Residence 674 Dundas Street West, Toronto, Ontario

The Classroom Environment

For every inch of rain that falls on a catchment area of 1,000 square feet, you can expect to collect about 600 gallons of water.

CONTINENTAL NH3 PRODUCTS PRODUCT CATALOG

The men s shot put has been a test of

KC Series Gas Components and Supply Design Guide

Instruction Manual VCG-6

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

DIVER INSPECTION REPORT Canyon South, Raw Water Tank

System Overview. TCD Detector temperature setpoint Regulator

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Hand s on Build Workshop with contemporary Bali Artisans

SnowBreaker.com Snow Breaker : Break Up Snow And Ice

BoatWasher Swede, , MS Float

Bladder Tank Installation & System Design Information

Sept 23, 2014 LAB MANUAL

Non-required Fences Update

Test Report. No.: EM CE003 Date:Sep.22,2016 Page 1 of 9. : Sep.21,2016 ~ Sep.22,2016

REPORT NUMBER REPORT DATE SEND TO ISSUE DATE Jan 14, Jan 14, 2019 RECEIVED DATE Jan 07, 2019

Wausau Innovative Designs

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Existing Rule Language Compared to Proposed Rule Language

EXPLORE FLIP AND NEST COLLABORATIVE TABLE

1. Study the performance of a binary distillation column operated in batch mode.

POOL BACKWASH SYSTEM. Installation manual. Proudly manufactured by

EXPLOSIVE STORAGE CAPACITY CALCULATING TOOL USER MANUAL

Walkability Study Prepared by

2. The reference depth is an important measurement for basic flotation testing?

REPORT NUMBER REPORT DATE SEND TO ISSUE DATE Mar 13, Mar 13, 2018 RECEIVED DATE Mar 06, 2018

MSC Guidelines for Pressure Vessels

Step 1: Step 2: psi psi

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Baseball Stadium Renovations at US Cellular Field

Two Rivers Activity Center (TRAC) McGough Construction 2737 Fairview Avenue North St. Paul, MN Phone: (651)

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Above Ground Pool In-Stock Pool Sale

Transcription:

Final Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 2-B: Paint Testing Summary Table Earth Resources

PAINT TESTING SUMMARY TABLE RASCO RECYCLING FACILITY 2241 ROUTE 22 DOVER PLAINS, NEW YORK PSI PROJECT NO. 08211060 February 6, 2012 Paints at the site were analyzed by RCRA 8 Metals in accordance with NYS DEC s direction. The paint testing analytical results are provided in milligrams per kilogram (mg/kg) which is equivalent to parts per million (ppm). Metals concentrations exceeding the respective Toxicity Characteristic Leaching Procedure (TCLP) Trigger concentration are indicated in bold with Trigger concentration in parentheses. Building Sample Number/Location Paint Color Substrate Metal Analytical Result (in 1 Main Building PB-04 / East Façade-6 th Window from South White Wood Window 1 Main Building PB-05 / Bay A19 Extension Beige Ceramic Wall Tile 1 Main Building PB-06 / Bay F7 Structural Steel 3.24 499 15 277 (100) 115,000 (100) 3.55 31 (4) 11.4 1.57 4.2 2,190 (100) 1.47 32.6 (4) 358 (100) 5.87 126 (100) 1,530 (100) 0.262 Page 1 of 7

Building 2 PB-15 / Building 2 East façade 2 nd window bay from South White Wood Building 2 PB-16 / Building 2 East side South bay from structural steel Structural Steel Building 3 PB-19 / Building 3 South End West Window Frame Green Wood Building 3 PB-20 / Building 3 South West End from Concrete Block Wall Green Concrete Block Building 4 PB-12 / North Wall Center Green Concrete Block 77.8 2,570 (2000) 90.5 (20) 475 (100) 117,000 (100) 1.96 2.84 56.9 (4) 10.2 2,700 (2000) 212 (20) 438 (100) 88,200 (100) 4.06 0.498 17.4 356 30.2 (20) 18.1 39,100 (100) 0.0857 26.8 9.70 262 (100) 0.186 94.7 7.05 105 (100) 0.154 Page 2 of 7

Building 4 PB-13 / North Row of Columns Second Column from East Page 3 of 7 Red Structural Steel Building 4 PB-14 / Bay F7 Gray Structural Steel Building 4 PB-21 / North Façade Window Gray Exterior Wood Building 5 NO SAMPLES COLLECTED TO SAFETY DUE Building 6 PB-31 / South End South Window Frames Gray Steel Window Frame Building 6 PB-32 / North Factory Building West Side Center Orange Structural Steel 42.5 30.1 154 (100) 85.2 0.039 63.6 86.7 108 (100) 0.194 23.1 1,020 224 (20) 782 (100) 86,700 (100) 1.35 0.878 12.3 1260 56.8 (20) 250 (100) 82,000 (100) 0.246 21.7 176 (100) 94,300 (100)

Boiler House PB-22 / Boiler House building North Façade West Window Gray Wood Concrete Foundation NO SAMPLES COLLECTED NO PAINTS Fire Pumphouse PB-24 / Blue Tank- North Side Blue Metal Tank Fire Pumphouse PB-26 / Generator Building-North Façade-Window Gray Wood Window Lab PB-03 / East Façade-South End White Wood Window Office Building PB-09 / East Façade Window Green Concrete Block 109 (100) 1,970 247 (20) 275 (100) 78,000 (100) 4.57 0.219 94.9 962 (100) 970 (100) 0.0452 8.17 2,150 (2000) 27.7 (20) 273 (100) 387,000 (100) 7.92 0.251 8.58 36.7 7.05 44.3 9,580 (100) 3.47 131 12.3 169 (100) 1.08 Page 4 of 7

Office Building PB-10 / Southeast Corner Gray Concrete Block 9.64 49.3 7.81 17.6 Red Tank PB-23 / North Side of Steel Tank Red Steel Shell Building PB-25 / Southeast Structural Steel Debris Pile Blue Structural Steel South Silos PB-11 / South Silos-First Floor-South End Structural Steel Water Well/ Chlorination Building PB-34 / Waste Treatment Building East Façade Center Gray Wood 5.87 263 (100) 2,880 (100) 934 77.2 0.0372 23.0 216 (100) 54.9 0.0323 221 (100) 2,650 (2000) 307 (20) 240 (100) 108,000 (100) 2.15 3.46 39.5 (4) Page 5 of 7

Water Treatment & Water PB-27/East Façade-South Windows White Wood Tower Water Treatment & Water Tower Water Treatment & Water Tower Water Treatment & Water Tower PB-28/West Façade-North Windows Gray Steel Window Frame PB-29/East Side- from Steel Tank Gray Steel Tank PB-30/North End from Water Tower Gray Structural Steel Weigh Station PB-07 / West Façade Center from Wooden Base Gray Wood Siding 24.3 1.49 14.3 48.1 0.946 1270 259 (20) 472 (100) 89,900 (100) 0.604 51.2 1110 25.8 (20) 3,250 (100) 184,000 (100) 2.86 0.184 24.8 1240 28.0 (20) 1,240 (100) 83,900 (100) 0.109 40.9 10.2 27.2 0.0486 Page 6 of 7

Weigh Station PB-08 / West Façade from North Window Green Wood Window Trim = None Detected (#) = Respective TCLP Trigger Concentration 214 3.77 12.1 Page 7 of 7